This is Addendum No. 1, issued on November 17, 2025, to RFQ-484-120325 for Roadway Design Review Services administered by the Georgia Department of Transportation (GDOT) Office of Procurement Engineering and Design Services. The addendum clarifies requirements and answers questions submitted during the RFQ phase and must be acknowledged with a signed copy attached to Phase I submissions. Key clarifications include confirmation that Professional Development Program (PDP) certification is not a mandatory requirement; however, proposers must indicate whether the Project Manager, Key Technical Leaders, and Key Technical Manager hold current GDOT PDP certifications. Additionally, the addendum permits the inclusion of non-IDIQ contracts with similar scope involving roadway plan reviews in addition to IDIQ/On-Call contract experience for demonstrating similar project experience under section IV.E.1.
The addendum does not contain information regarding pricing terms, set-asides, contract duration, funding sources, or award dates. Proposers are advised that failure to adhere to the changes outlined in this addendum may result in disqualification, and in the event of any conflicts between previously released information and this addendum, the information contained herein shall control.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_484_120325 (Shortlist) .pdf | ||
| RFQ_484_120325 Notice of Award.pdf | ||
| LAP Evaluation Form.xlsx | XLSX spreadsheet | |
| RFQ_484_120325 _Selection of Firm for Negotia.pdf | ||
| RFQ_484_120325 Roadway Design Review Services.pdf | ||
| Legacy Evaluation Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
ISSUE DATE: 11/17/2025
This Addendum shall become and form a part of the RFQ for:
RFQ-484-120325 – Roadway Design Review Services
NOTE: PLEASE REVIEW CAREFULLY! THERE MAY BE CHANGES TO THE INFORMATION TO BE PROVIDED.
FAILURE TO ADHERE TO ANY CHANGES ADDRESSED IN THIS ADDENDUM MAY RESULT IN
DISQUALIFICATION.
In the event of a conflict between previously released information and the information contained herein, the latter shall control.
NOTE: A signed acknowledgment of this addendum (this page) MUST be attached to your SUBMITTAL for Phase I.
Firm Name
Signature Date
Typed Name and Title
Georgia Department of Transportation (GDOT)
Office of Procurement Engineering and Design Services
One Georgia Center 600 West Peachtree Street, NW
19th Floor Atlanta, Georgia 30308
This Addendum, including all questions and answers, shall become and form a part of the original RFQ package and shall be taken into account when preparing your proposal.
The purpose of this addendum is to provide the answer to the written question received during the question and answer period of the RFQ Phase as follows:
I. Written Question and Answer:
Q1: IV.C.1.d, IV.C.2.d, and IV.C.3.d each indicate that PDP certification is required, with certificates attached, but the bottom of page 7 below IV.C.3 states PDP certification is not required. Please clarify.
A1: A PDP Certification is not required. However, we are asking to indicate whether the PM, KTLs, and KTM has a current GDOT PDP Certifications.
Q2: IV.E.1 requests similar project experience with only IDIQ/On-Call contracts. Can non-IDIQ contracts with similar scope, reviewing roadway plans, be included?
A2: Yes