RFQ-4-25-05_Addendum_1.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ-4-25-05
- Issued by
- Florida
About this file
This document is an Addendum 1 for a Request for Qualifications (RFQ-4-25-05) issued by Brevard County Purchasing Services for Veteran's Memorial Park Amphitheater Management Services, dated July 3, 2025. The addendum provides a critical correction to the original RFQ, specifically changing the stage peak height from 8'3" to 28'3" for the 2,100-square-foot open-air stage. The qualification opening date remains scheduled for Friday, July 25, 2025, at 10:00 AM, and the addendum includes additional construction design images to illustrate the final project configuration.
The attached images reveal a detailed rendering of the Veteran's Memorial Park Amphitheater, showing an architectural design with a curved black roof, brick-colored walls, and a circular stage area. An American flag is positioned near the structure, and the surrounding landscape includes trees and green spaces. The design appears to be a modern, open-air performance venue with architectural elements that suggest a memorial or commemorative purpose, consistent with its name and intended use for community events and performances.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services 2725 Judge Fran Jamieson Way
Building C, Room 303 Viera, Florida 32940
VETERAN’S MEMORIAL PARK AMPHITHEATER MANAGEMENT SERVICES
RFQ-4-25-05
JULY 3, 2025
ADDENDUM 1
TO ALL PROSPECTIVE PROPOSERS
This is an Addendum to and shall be considered as part of the original RFQ package for the above-mentioned bid. Proposers are requested to acknowledge receipt of this Addendum with their submittal.
CORRECTION:
Section 2.3 BACKGROUND states “the Amphitheater design features a 2,100-square-foot open-air stage with a peak height of 8’3”…” This should be corrected to reflect a peak height of 28’3”.
ADDITIONL INFORMATION:
Attached are images illustrating the final construction design.
Please note that the qualification opening date and time remains Friday, July 25, 2025 @ 10:00 AM.
All other terms and conditions remain unchanged.
Sincerely, Mary Bowers Purchasing Manager
PLEASE REVIEW IMAGES ON FOLLOWING PAGES
File details come from the government source that posted it. Updated .