RFQ_26-005_Maps.pdf

PDF 997 KB Posted

Attached to
Route 238 Landscape Maintenance
Solicitation number
26-005
Issued by
Alameda County, Hayward City, California

About this file

The document contains a series of project maps detailing a multi-phase transportation infrastructure improvement project along Route 238/Mission Boulevard and Route 92/Jackson Street in Hayward, California. The project is divided into five distinct phases covering approximately 8.5 total miles: Phase 1 (5 miles from Apple Ave to Industrial Parkway), Phase 2 (1.5 miles from Industrial Parkway to Union City limits), Phase 3 (0.5 miles from A Street to Rose Court), a Linear Park segment called "The 52" (0.5 miles from Fairway Street to Blanche Street), and a Route 92/Jackson Corridor (1.5 miles from Mission Boulevard to Santa Clara Street).

Each phase is color-coded on detailed maps showing the precise routes through various Hayward neighborhoods, passing near landmarks such as local businesses, schools, parks, and community facilities. The maps demonstrate the project's comprehensive approach to improving transportation infrastructure across different segments of the city, with each phase targeting specific street sections along Mission Boulevard and Jackson Street. The project appears to involve roadway improvements, potentially including street upgrades, lane modifications, or other transportation infrastructure enhancements, though specific technical details are not provided in these mapping documents.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTE 238/Mission Blvd – PHASE 1 (in red – Apple Ave to Industrial Pkwy along Foothill/Mission Blvd.), PHASE 2 (in blue – Industrial Pkwy to Union City Border, around Westchester St, along Mission Blvd.), PHASE 3 (in yellow – Rose St to A St along Mission Blvd.), LINEAR PARK (in green – Fairway St to Blanche St.), and RT 92/JACKSON (in orange – Jackson/Mission to Santa Clara St. along Jackson St.)

RTE 238/MISSION BLVD – PHASE 1 (Approx 5 miles: Apple Ave to Industrial Pkwy along Foothill/Mission Blvd)

RTE 238/MISSION BLVD – PHASE 2 (Approx 1.5 miles: Industrial Pkwy to Union City limits along Mission Blvd)

RTE 238/MISSION BLVD – PHASE 3 (Approx 0.5 miles: A St. to Rose Ct. along Mission Blvd)

LINEAR PARK/ “The 52” (Approx 0.5 miles: Fairway St. to Blanche St. along Mission Blvd.)

RTE 92/JACKSON CORRIDOR (Approx. 1.5 miles: Mission Blvd to Santa Clara St along Jackson St)

File details come from the government source that posted it. Updated .