RFQ-25-8_Notice_of_Meeting_Change.pdf

PDF 44 KB Posted

Attached to
Professional Coastal Engineering Services for Continuing Contract
Solicitation number
RFQ-25-8
Issued by
Florida

About this file

This is a Notice of Meeting Change issued by the Canaveral Port Authority regarding RFQ-25-8 for Professional Coastal Engineering Services for a Continuing Contract. The Selection Committee meeting originally scheduled for September 8, 2025, at 2:00 PM has been rescheduled to 4:00 PM on the same date and location. According to the related solicitation, proposals for this continuing contract are due September 4, 2025, at 2:00 PM EDT. The selection committee will review submissions on the rescheduled date of September 8, 2025, with potential oral interviews to follow on September 11, 2025, and a final ranking presentation to the CPA Board of Commissioners on September 24, 2025. The contract will provide professional coastal engineering services for Port Canaveral's inlet management and coastal engineering needs, including inlet sediment management, dredging, navigation engineering, jetty analysis, channel embankment design, beach nourishment, shoreline improvements, and environmental resource assessments. The continuing contract is expected to last five to ten years, with services authorized through individual purchase orders on an as-needed basis.

Qualified firms must demonstrate at least ten years of specific port and maritime coastal engineering experience and possess the majority of required disciplines in-house. The evaluation process will award up to 100 points across five criteria: similar experience (35 points), coastal engineering knowledge (15 points), regulatory knowledge (15 points), organizational capabilities (20 points), and references (15 points). The compensation structure is time and materials-based with reimbursement for direct costs and an unspecified total contract value, with hourly rates and cost details to be negotiated. Comprehensive insurance requirements include commercial general liability, professional liability, automobile liability, and workers' compensation with specific minimum coverage limits. Selection does not guarantee work but rather indicates the firm meets minimum qualifications for potential future projects. Potential cost-of-living adjustments may be considered beginning in 2027, subject to CPA approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CANAVERAL PORT AUTHORITY

NOTICE OF MEETING CHANGE

FOR

RFQ-25-8

PROFESSIONAL COASTAL ENGINEERING SERVICES

FOR CONTINUING CONTRACT

The Selection Committee meeting scheduled for September 8, 2025, at 2:00 PM, is changed to 4:00 PM. The meeting date and location remain unchanged.

File details come from the government source that posted it. Updated .