This is a Request for Quotations (RFQ) issued by the U.S. Consulate General in Karachi, Pakistan for Gravel Pulverization Services on Consulate Grounds. The solicitation number is 19PK4027Q5001, with a quotation due date of November 23, 2026 at 3:00 PM Pakistan Standard Time. A mandatory pre-quotation site visit is scheduled for October 28, 2026 at 11:00 AM at the American Consulate General facility in Karachi. Quotations must be submitted electronically in PDF format (not exceeding 30MB per file) to KRCprocurementcontracting@state.gov, and offerors must be registered in the System for Award Management (SAM) prior to submission. Award will be made to the lowest-priced, acceptable, responsible offeror based on initial quotations without discussions, unless the Government determines discussions are necessary.

The contract is a firm fixed-price agreement with a performance period of 45 calendar days following issuance of the Notice to Proceed. Deliverables include gravel stone scraping services, stone crushing services using an electric-powered pulverization machine (producing ½-inch or smaller crushed stone), and crushed gravel stone layout services covering approximately 131,000 square feet and 950 cubic meters of gravel. The contractor must provide all labor, materials, equipment, insurance (including Defense Base Act coverage), overhead, and profit. Offerors must demonstrate at least three years of experience in similar civil work contracts, provide electric stone crush machinery specifications with qualified operator details, and meet liability insurance requirements. Additional requirements include compliance with U.S. Army Corps of Engineers Safety and Health requirements (EM-385), worker's compensation insurance per FAR 52.228-4, environmental management protocols, and ongoing quality assurance with a performance threshold of no more than one customer complaint per month. Optional services pricing is requested for crushed stone delivery, equipment rental, and manual labor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Consulate General Karachi

Date: October 19, 2026

Dear Prospective Quoter:

Subject: Solicitation No:19PK4027Q5001 Gravel Pulverization Services

Enclosed is a Request for Quotations (RFQ) for Gravel Pulverization Services. If you would like to submit a quotation, follow the instructions in Section 3 & 4 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on Standard Form

1449 that follows this letter. The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

The Consulate intends to conduct a pre-quotation site visit on October 28, 2026, at 11:00am

(Pakistan standard time). Offerors interested in attending must e-mail:

KRCprocurementContracting@state.gov below details on or before October 26, 2026, 15:00Hrs.

Full name/s CNIC/s Vehicle make Vehicle model Vehicle color Vehicle registration # Cell/phone contact#

Only two persons from each firm may participate in the pre-proposal site visit. Following the site visit all relevant questions must be submitted no later than COB 05 November 2026

Quotations are due by November 23, 2026, 15:00Hrs (Pakistan standard time). No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted. Bids must be submitted electronically to Krcprocurementcontracting@state.gov. It is important to make sure the submission is made in Adobe Acrobat (pdf) file format not to exceed

30MB. If the file size should exceed 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

For a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section I, Pricing

3. Section 5 Representations and Certifications

4. Additional information as required in Section 3

5. Proof of SAM Registration

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102.

Failure to be registered at the time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Sincerely, Michael R Ries.

Contracting Officer

United States Government https://www.sam.gov/

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR16331666

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

19PK4027Q5001

6. SOLICITATION ISSUE DATE

October 19, 2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Syed Abdus Samad

b. TELEPHONE NUMBER (No collect calls)

+92-213-527-25211

8. OFFER DUE DATE/ LOCAL

TIME

November 23, 2026

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

Contracting Officer, GSO-Procurement & Contracting Office, American Consulate General, Karachi, New TPX Area, Plot 3-5.

Mai Kolachi, Karachi, Pakistan

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB

DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

U.S. Consulate General, Karachi

Karachi, Pakistan

U.S. Consulate General, Karachi

Karachi, Pakistan (Facility Maintenance)

17a. CONTRACTOR/

OFFERER

TELEPHONE NO.

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY

U.S. Consulate General, Karachi

Karachi, Pakistan – (FMC)

CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

As mentioned on page 7

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

ADDENDA

ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL

ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED

____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

Michael R Ries.

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449

(REV. 02/2012)

PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212

SBU - CONTRACTING AND ACQUISITIONS

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER

NUMBER

35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIA

L

FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NO.

39. S/R VOUCHER

NO.

40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR

PAYMENT

42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING

OFFICER

41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19PK4027Q5001 Prices, Block 23

• Continuation To SF-1449, RFQ Number 19PK4027Q5001, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Machinery Specifications

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER S- 19PK4027Q5001

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price Contract is for required services against Pulverization of Gravel on Consulate Grounds Project in accordance with the attached scope of work.

B. The contract will be for one year firm fixed Price

The Contractor shall perform Pulverization of Gravel on Consulate Grounds, which includes services, for the U.S. Consulate General, Karachi. The price shall include all labor, material, equipment, insurance (see FAR 52.228-4 and 52.228-5), overhead, and profit. The Government will pay the Contractor the fixed price per visit for services that have been satisfactorily performed.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor

Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the

Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Paragraphs

Performance Threshold

Services.

Performs all Pulverization of Gravel services set forth in the scope of work.

Page 9 thru Page 18

All required services are performed and no more than one

(1) customer complaint is received

1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF

2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS

SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE

TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.

2. STANDARD. The performance standard is that the Government receives no more than one

(1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial

Services (NOV 2023), if any of the services exceed the standard.

3. PROCEDURES.

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the

Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the

COR will contact the Contracting Officer for appropriate action under the Inspection clause.

II. PRICING

The rates below include all costs associated with providing Pulverization of Gravel services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, equipment, insurance (see FAR 52.228-4 and 52.228-5), overhead, and profit The Contractor shall provide the services shown below for the period of the contract starting from the dated noted in NTP.

Period of Performance: 45 calendar days after NTP is issued

CLIN Description Quantity Unit Unit price

(PKR)

Total per (PKR)

Gravel stone scraping services as per SoW

1 Job

Gravel stone crushing services as per SoW

1 Job

Crushed Gravel stone layout services as per SoW

1 Job

004 DBA insurance 1 Lot

Total Price https://www.acquisition.gov/far/52.212-4

Optional Services. Services exceeding beyond or which are note covered under the existing Scope of work are NOT included under this agreement (see 7.0) and are to be done outside this contract. However, the Government desires current item rates in the event that there is an issue discovered during the performance of the specified service. Please provide your current Item rates in the optional services fields below. As stated in para 7.0 any necessary repairs or parts will be submitted for approval and then billed against a separate (PO). The Contractor is not approved to do any additional work without approval.

Optional services Rates

1. Supply with delivery of Crushed stone PKR__________/Ton

2. Rental for Stone crushing equipment PKR__________/Day (10 hours)

(with operator)

3. Manual labor/Helper PKR__________/Shift (12 hours)

III. VALUE ADDED TAX

Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or invoices because it is not levied in Pakistan.

For any tax levied, a tax exemption certificate will be issued to your company with collaboration of Ministry of Foreign Affairs, Pakistan For Tax Exemption. Vendor must submit 1x commercial invoice (without GST) and 1x Sales Tax Invoice along with colored copy of NTN, STRN certificate along with ATL Status.

POST only Provide Tax exemption certificate for GST all other additional Taxes (if applicable) should be all inclusive within the price schedule/offers

Special Requirements” Risk Analysis Management (RAM)

Offers that fall within our competitive range require additional processing for companies wishing to do business with U.S. Mission, Pakistan.

This extra risk analysis vetting is performed on key contractor personnel, including host country, third country, U.S. citizens, and Legal Permanent Residents of the United States.

The vetting process applies to all contracts, purchase orders, delivery orders, Blanket Purchase Agreements (BPAs), and BPA calls.

A request for information will be emailed to offerors in the competitive range or selected vendors, and all interested vendors must provide all information requested in the DS Form 4184, Risk Analysis Information. Vendors are required to submit the requested data required for vetting via a secure online portal linking them to the Risk Analysis Management (RAM) office; access to the Portal and instructions for creating an account will be provided to the vendor by email.

Successful passing of vetting is one condition of receiving award. Other factors are price reasonableness and technical acceptability. Each vendor should submit the requested data via the secure online RAM portal within 3-5 days after being contacted. Vendors who do not provide the information will not be considered for contract award.

CONTINUATION TO SF-1449,

RFQ NUMBER 19PK4027Q5001

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1.0 SCOPE OF WORK

The U.S. Consulate General Karachi requires services from qualified Contractor to deliver Pulverization of Gravel on Consulate Grounds. The Contractor shall furnish all necessary managerial, administrative, and direct labor personnel, along with transportation, equipment, tools, implements, supplies, and materials needed to undertake this project in accordance with the USG Service standards. Under this contract, the Contractor shall provide:

• The Deliverables against services for Pulverization of Gravel as outlined in section

4.0 “Work Requirements”;

• Provide Electric powered stone pulverization machine rental with operator (as per specifications “Attachment 1”);

• Provide necessary oversight to USG Post Occupation health and safety measures as outlined in section 6.0 “safety, health, and environmental management”.

2.0 HOURS OF PERFORMANCE

The Contractor shall schedule all work during normal building hours which are defined as

8:00 to 16:00 Monday to Friday, excluding local and bank holidays, unless approved in advance by the Contracting Officer's Representative (COR).

With the approval of CoR contractor may execute service in weekends or after hours depending upon the present circumstances and project requirements

3.0 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

3.1 General. The Contractor shall designate a representative who shall supervise the

Contractor's project field staff and be the Contractor's liaison with the American

Embassy/Consulate. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Contractor employees shall have access to the elevators' hoist ways, lobbies and machine rooms, either with or without security escorts, only with specific permission by either the Contracting Officer or the COR.

3.2 Personnel security. The Government reserves the right to deny access to U.S.- owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this contract prior to their utilization. The Government shall issue identity cards to approved

Contractor personnel, each of whom shall display his/her card(s) on the uniform at all times while on Government property or while on duty at private residences serviced under this contract. These identity cards are the property of the Government.

The Contractor shall return all identify cards when the contract is completed, when a

Contractor’s employee leaves this contract, or at the request of the Government.

3.3 Standards of conduct

3.3.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct.

The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

3.3.2 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. All employees shall wear uniforms approved by the

Contracting Officer's Representative (COR). The Contractor shall provide, to each employee and supervisor, uniforms and personal equipment. The Contractor shall be responsible for the cost of purchasing, Cleaning, pressing, and repair of the uniforms.

3.3.3 Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

3.3.4 The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

3.3.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

3.3.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

3.3.7 Key Control. The Contractor shall receive, secure, issue and account for any keys issued for access to buildings, offices, equipment, gates, or other areas, for the purposes of this contract. Keys shall not be duplicated without the COR's approval. Where the Government determines that the Contractor or its agents have duplicated a key without permission of the

COR, the contractor shall remove the individual(s) responsible from performing work under the contract. If the Contractor has lost any such keys, the Contractor shall immediately notify the

COR. In either event, the Contractor shall reimburse the Government for the cost of rekeying that portion of the system so compromised.

4.0 WORK REQUIREMENTS

4.1 Background.

The Post requires existing gravel to be reduced to ½-inch or smaller. A Contractor is for required services against Pulverization of Gravel on Consulate Grounds Project in accordance with the attached scope of work.

4.2 Project Description

The area covered by gravel on consulate grounds is approximately 131,000 square feet. The volume is estimated to be around 950 cubic meters (1500 Metric ton estimated). All the gravel needs to be pulverized into small sized stones and laid on the grounds.

The contractor has to arrange;

1) Manual labor to load and unload gravel,

2) Stone pulverization machine with operator to crush gravel into small sized stones

3) Ground Scraping tools & equipment

4) Stone/crush Carriage tools & equipment

5) Stone/crush Layout/leveling tools & equipment

4.3 Deliverables

1. Pre-Construction Activities

• Site survey: Within 5 days of award, inspect the site jointly with the Contracting

Officer's Representative (COR). Record existing conditions with photographs and verify all measurements and the 950 m3 area/volume.

• Differing site conditions: Find and report any concealed conditions, such as access hinderance, cracks, delamination, before work starts.

• Work plan: Submit a detailed work plan, schedule, and site-specific safety plan for COR approval.

2. Scraping Services

Scraping of already laid approximately 3" thick layer of Gravel stone from the entire area by means of tractor or manual labor (as per approved work plan), job also includes its transportation to the designated area where gravel crush in US Consulate Compound as per the instructions of the COR.

Note:

• Scraping services need to be performed manually via Hand shovel and wheel borrow.

• Scraped material needs to be transported via contractor’s pickup vehicle

• Approx 4440 Landscaping area Sq ft area contains Weed Barrier/ fabric 2mm thick.

Contractor needs to ensure the fabric stays undamaged during scraping services. In event of any damage, the contractor shall be liable to provide replacement material at no extra cost to the USG

3. Stone Crushing Services

Crushing of Stone at site with Electric Stone Crusher (refer to specifications “Attachment 1”).

For this purpose, 3 Phase Electricity for crusher will be provided by post.

Size of the crushed stone should be ½ inch or lower.

Note: Contractor will be responsible to ensure worksite cleanliness at the end of each job day.

All waste/debris must be properly contained/controlled and disposed of in accordance to the SoP communicated by the CoR

4. Crush Stone Layout Services

Laying of scraped crush stones from crushing site and laid approximately 3" thick layer of crushed stone on the entire area by means of tractor or manual labor (as per approved work plan), job also includes its transportation to the original area from where stone collect for crushing in

US Consulate Compound as per the instructions of the COR.

5. Machinery Rental

Rental charges for Stone Crushing Plant with operator along with transportation costs are to be included in the contract scope.

6. Labor/Equipment

Labor and material to be provided by contractor includes but not limited to,

• wheel barrows (at least six),

• manual shovels,

• manual compactors,

• mule/gator to move materials,

• small 800cc pick-up truck,

• Un-skilled labors and helpers (up to 15).

Note: Refer to section 7.0 “personnel, tools, parts, materials and supplies”

5.0 COR INSPECTION & APPROVAL CHECKLIST

5.1 General

The COR will inspect at these hold points, and the Contractor shall not move to the next stage without COR approval:

1. Installation of pulverization machine at site.

2. Demonstration/Sampling of machine operations and crushing of at least 5 cubic meters of gravel and inspection of pulverized stone size.

3. Weekly progress achievement.

5.2 Checklist Approval

The Contractor shall submit to the COR a schedule and description of the scheduled checklist which the Contractor plans to provide. The Contracting Officer or COR must approve the proposed "Scheduled Service/Task Checklist" prior to contract work commencement.

6.0 SAFETY, HEALTH, AND ENVIRONMENTAL MANAGEMENT

6.1 General.

The contractor is responsible for ensuring the safety of all employees, visitors, and workers at the U.S. Consulate Karachi during the project. The contractor shall comply with the following safety standards:

US Army Corps of Engineers EM-385 Safety and Health Requirements

• Chapter 8 (Accident Prevention Signs, Tags, Labels) and Chapter 13 (Hand and Power Tools) Chapter 14 (Material Handling, Storage, Disposal).

The contractor shall conduct risk assessments and manage health and safety issues associated with the project. Personal protective equipment (PPE) must be provided to all employees, including coveralls, eye protection, gloves, body harnesses, safety ropes, hard hats, and safety shoes. Sandals or athletic shoes are prohibited.

The contractor shall prepare and implement the following prior to work commencement:

• Activity Hazard Analysis (AHA).

• Hot Work Permit (if applicable).

A competent person must be present on-site to inspect equipment, train workers in safe equipment use, recognize hazards, supervise work, and correct unsafe practices. The contractor shall provide necessary signage and announcements to prevent accidents, including signals for restricted areas, electrical risks, flammable materials, construction zones, and general hazards. Signs must be made of acrylic or galvanized sheets with a yellow background and red or black lettering. Means of egress must always remain clear during the project.

Contractor to submit safety data sheets (SDS) in English for all chemicals brought to the site.

Eye and Face Protection:

• Face mask and shields shall be worn any time, work operations can cause foreign objects to get in the eye. For example, during dusting, scrubbing, vacuuming (or when working with harmful chemicals or when exposed to flying particles). There is zero tolerance for failure to adhere to this requirement.

• Safety Glasses shall be impact rated and shall be of the wrap around style or have side shields.

Foot Protection:

• Safety boots of either steel or composite toes shall be always worn while on the grounds of Consulate compound.

• Footwear shall have a minimum rating of 75 pounds impact and 75 pounds of compression.

• Workers shall wear work shoes or boots with slip-resistant and puncture and water-resistant soles.

• At no time shall contractor employees be in sneakers while on the compound. There is a zero tolerance for failure to adhere to this requirement.

Hand Protection:

• Gloves shall fit snugly.

• Workers shall wear the right gloves for the job (examples: rubber gloves while using cleaning chemicals).

Head Protection:

• A Class 1 G Rated hard hat is the minimal hard hat rating acceptable to use on an

Consulate compound.

• Hard hats that have any of the following: dents, cracks, signs of deterioration shall be replaced.

Hearing Protection:

• Ear plugs shall have a minimal rating of 29 dB and be readily available.

• Ear plugs shall be used when the dB level is above 85 and the employee is exposed, i.e., while using vacuum.

• Earmuffs can be used in place of earplugs if desired. Earmuffs must be rated to provide

33dB protection.

Fall Protection:

• Fall protection shall be used for any employee on a walking/working surface 6 feet (1.8

m) or more above lower levels.

• Workers shall be protected from falling by a guardrail system, safety net system, or personal fall arrest system that can hold 400 lbs.

• Any scaffolding that must be erected must have an inspection by COR or Safety representative certifying the scaffold is in good repair and is safe to use.

• Scaffolding erection shall be done by contractor’s designated competent person for scaffolding erection and inspection.

6.2 Materials and equipment:

The Contractor shall provide all necessary services and equipment to meet the Government’s requirements. These shall be subject to the POST POSHO EM-385 protocols (as applicable) below;

Any equipment coming on compound must have valid 3rd Party Inspection Certificate along with inspection checklist from a recognized body.

All document/list copies must be shared with POST POC prior to the job day and original ones must be kept in contractor/auctioneer at job site on the workday.

Please make sure at the time of job execution vendor must bring following items (as applicable):

• Original Inspection Certificate with checklist

• Vehicle documents (Vehicle fitness, running page and route permit)

• Original Operator/Rigger’s Competency Certificate

• Original Valid driving license of Vehicle operator/driver

• Certificate of Inspection for Lifting Wire Ropes/Shackles/Slings (Original)

• All inspected Lifting Wire Ropes/Shackles/Slings must have inspection tags attached

• Always Wear Suitable Personal Protective Equipment (PPE): Ensure workers are wearing the appropriate PPE as per the designated job (goggles, masks, helmet, hives jacket)

• No Loose Clothing: Kurta shalwar is not permitted on compound

• Always Wear Safety Shoes: Slippers, flip flops, and Peshawari chappal are strictly prohibited.

• Adhere to Safety Protocols and Procedures: Understand signages and follow the instructions.

• Inspect Tools and Equipment Prior to Use: Do not use damaged tools on the compound.

• Never Overlook Warning Signs: Pay attention to warning signs around the compound.

• Avoid Engaging in Risky Behaviors: Maintain a safe working environment.

• Vendor is required to bring pans (approx. size 3”x 3”), and to be used in case of any hydraulic oil leakages.

Heads Up Before Job Day:

• Lifting Plan for the Crane Operations

• Valid 3rd Party Certificate of Mobile Crane with Checklist (Original)

• Valid Lifting gear Certificate (Original)

• Valid Crane Operator Certificate (Original)

• Driving License of Crane Operator (Original)

For the Job Day, Please Ensure Provision of:

• Use of outriggers during the operations along with plywood pads.

• Dedicated Banksman/Rigger for lifting job (with Hi-Vis Jacket).

• Tag line to be attached with the lifted load while it is suspended.

• Proper sling ropes with no sign of wear/damage.

• Proper Lifting Wire Ropes/Shackles/Slings without any damages or wear.

• PPEs for deployed staff (Safety Shoes, Hard Hat, Goggles, Gloves).

• Barricading lifting site (with Barricading Tape & Safety Cones).

The most usual point of rejection in visual inspection are:

• Visual wear/tear/damage on crane

• Engine Oil leakage

• Hydraulic Oil leakage

• Tire condition

• Unusual noises

• Damaged crane block

• Kinking/doglegged/bird caging/broken/corrosive wire rope

• Un-operational SLI

• missing reverse alarm

In order to make the U.S. Consulate General Karachi Incident-free, it is crucial to prioritize the safety of Employees, Contractor/auctioneers, and Property. Please adhere to all safety protocols and guidelines to prevent any accidents or damage

7.0 PERSONNEL, TOOLS, PARTS, MATERIALS AND SUPPLIES

The Contractor shall provide trained workforce with the appropriate tools and service equipment for carrying out all deliverables as required by this contract. Workers which are physically unfit to independently handle/carry weight up to 25 Kg will not be accepted. The Contractor shall provide complete list of all the necessary items, materials, equipment and supplies to execute the contract as per manner and Sop’s laid down in this Contract.

This statement of work requires the Contractor to provide site assessment and survey services, project management, logistics and material procurement services, cost estimating and scheduling services, and general support services for this maintenance services contract

Any additional services required (not otherwise included as part of this contract deliverables) shall be executed via separate Purchase order as and when needed as per the rates given under optional services pricing table

8.0 EXCLUSIONS

The Contractor shall not assume responsibility for any work to be performed which is falling outside the stated Scope of work of this contract. Service rendered beyond the Scope of work without fully funded and approved purchase order will result in rejection of payment

Any query in this regard is required to be raised with CoR and notified to Procurement at KRCProcurementcontracting@state.gov in consultation to CoR

9.0 INSURANCE REQUIREMENTS

9.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor's personnel in the performance of this contract

The Contractor's assumption of absolute liability is independent of any insurance Policies

9.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this contract, whatever insurance is legally necessary.

9.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required by the laws of either the country in which the mailto:KRCProcurementcontracting@state.gov employees are working or the employee's native country, whichever offers greater benefits, following FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”.

10.0 PERMITS

The Contractor shall maintain in full force and effect all permits, licenses, and appointments required for the prosecution of work under this contract at no additional cost to the

Government. The Contractor shall obtain these permits, licenses, and appointments in compliance with host country laws.

11.0 LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the contract shall be payable by the Contractor without Government reimbursement.

12.0 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT

The Contractor shall physically inventory all Government furnished property in its possession. Physical inventories consist of sighting, tagging or marking, describing, recording, reporting, and reconciling the property with written records. The Contractor shall conduct these physical inventories annually during the contract and at the completion or termination of the contract, as directed by the COR. Unless approved in advance by the Contracting Officer, personnel other than those who maintain the property records or who have custody of the property shall conduct the inventory.

13.0 CONTRACTING OFFICER’S REPRESENTIVE and U.S. CONSULATE CONTROL

OFFICER

13.1 All technical questions concerning the scope and requirements of the U.S.

Consulate Karachi, Pakistan against this contract shall be directed to the Contracting Officer’s

Representative (COR):

COR

Abdulrab A Iqbal – Maintenance supervisor

IqbalAA@state.gov

ATTACHMENT 1

MACHINERY SPECIFICATIONS

S# Description Reference

Locally manufactured “electric powered” stone pulverization machine

(Requirement to meet crushed stone size ½ inch or lower.)

Link:

Stone crusher plant #machine#construction

#stone #stonecrusherline #stonemachine

#construction - YouTube

Important Note: Reference is provided for local fuel operated stone crusher. However, as per POST’s civil work SOP, only “Electric Powered” machinery with 3-phase power capacity meeting/exceeding the stated reference will be considered qualified and acceptable offer https://www.youtube.com/watch?v=Sz0GgSC1Cb8

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

FAR 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Mar 2026)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or

Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further

Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31

U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and

108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting

Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun

2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American

Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712);

this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun

2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of

Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply

Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec

2023) ( Pub. L. 115–390, title II).

__ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec

2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025)

( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022)

( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

(Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)

(15 U.S.C. 657a).

__ (17) [Reserved]

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and

(3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep

2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-

Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024)

(15 U.S.C. 657f).

https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27

__ (26)

(i) 52.219-28, Postaward Small Business Program Representation (Jan

2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically

Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small

Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022)

(15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar

2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (MAR

2026)( E.O. 13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__ (34)

(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35)

(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496).

_X_ (39)

(i) 52.222-50, Combating Trafficking in Persons (OCT 2025) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items

(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim

__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy…

This is the start of the file's text. The full file is on GovTribe.