RFQ 19PK4027Q5001 - QA Responses.pdf
PDF 182 KB Posted
- Attached to
- 19PK4027Q5001 Gravel Pulverization Services
- Solicitation number
- 19PK4027Q5001
- Issued by
-
Department of State
About this file
This is a Questions and Answers document clarifying requirements for a federal contract opportunity involving site preparation and stone crushing work.
The contract covers a 45-calendar-day performance period commencing after Notice to Proceed and contract award, with firm fixed-price compensation paid upon completion and acceptance. The scope involves scraping and crushing operations across approximately 131,000 square feet, with a target of 20 cubic meters of stone pulverized daily. Scraping shall be performed manually by hand shovel and wheelbarrow in areas near buildings and utilities where gravel depth does not exceed three inches; however, tractors may be used in areas with large acreage of gravel. The contractor must provide an electric three-phase crusher capable of processing at least 20 cubic meters per day, with motor capacity up to 25 horsepower. The Government will provide three-phase electrical power supply at various crusher locations to support the 25HP motor requirement. Fines and stone dust produced during crushing need not be screened out and may remain mixed in the finished layer. If crushing yields insufficient usable material to achieve the required three-inch layer depth over the full project area, the Government will process a separate purchase order for supplementary stone supply under the optional services rates listed in the RFQ pricing schedule rather than requiring the contractor to supply additional material as part of the base job price. Site supervision by one qualified site supervisor with adequate HSE management qualifications is sufficient; a separate dedicated health, safety, and environment representative is not required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Performance period: Page 6 states that the contract will be for one year, while the pricing schedule on page 7 states 45 calendar days after the Notice to Proceed. Please confirm the applicable performance period. This is not a multi-year contract. Desired period of performance will be 45 days after
Contract award and NTP
2. Scraping method: Section 4.3 states that scraping may be performed by tractor or manual labor under the approved work plan, but the note immediately below requires manual scraping by hand shovel and wheelbarrow. Please confirm whether a tractor may be used for scraping outside the approximately 4,440-square-foot weed-barrier area, or whether all scraping must be manual.
Since the depth of gravel is not more than three inches manual scrapping is the desired method. The areas near the buildings and utilities must be excavated manually. However, in some areas where there is large acreage of gravel, tractor can also be used.
3. Payment basis: Page 6 refers to a fixed price per visit, while the pricing schedule lists each principal service as one job. Please confirm whether this is one firm-fixed-price project paid upon completion and acceptance, or whether pricing/payment should be based on separate visits or milestones.
The Government shall pay the Contractor as full compensation for all work required, performed, and accepted under this contract the firm fixed-price stated in this contract (ref 652.232-7 page 30) as per
PRICING TABLE page 7
4. Crusher capacity: Attachment 1 requires an electric three-phase crusher meeting or exceeding the reference machine’s capacity, but no numerical capacity is stated. Please provide the minimum required throughput in metric tons per hour.
Our target is to have 20 cubic meters stone pulverized per day in order to achieve the job in 45 days.
5. Electrical supply: Please confirm the available three-phase supply at the crusher location, including voltage, frequency, available amperage or kVA, and connection arrangement.
As discussed during the walkaround, post will provide electric connection to the crusher machine at various locations identified during the visit. As a baseline, post can arrange three phase power supply for the machine for upto 25HP motor.
1. Reference crusher: The site team indicated that an image of the reference crusher had been shared, but Al Saeed did not receive it. Please provide the image and any available capacity, motor-rating, feed-size, and output specifications. The RFQ refers to Attachment 1, but the machine details are not available to the vendor.
Feed rate should meet or exceed 20 cubic meters per day. Electric motor to be upto 25 HP, three phase.
2. Fines/stone dust: Al Saeed inspected and sampled the rounded, water-worn aggregate and estimates that crushing it to ½ inch or smaller may produce approximately 40% fines/stone dust.
Must the fines be screened out? No
If so, should they be removed off-site, stockpiled on-site, or used as a base layer?
Alternatively, may fines remain mixed in the finished layer? Yes
3. Material shortfall: If the crushing process leaves insufficient usable material to restore an approximately 3-inch layer over the full 131,000-square-foot area, should the contractor supply additional crushed stone to achieve the required thickness, or spread the available crushed material at a reduced thickness? No, additional stone supply is not part of this contract.
If supplemental stone is required, should it be included in the base job price or handled under the optional per-ton rate with prior approval? (The vendor estimates that approximately 570 cubic meters of usable crushed material may remain from the stated 950 cubic meters)
If the material fell short after crushing, post will process separate purchase order for the supply of additional stone as per “Optional services rates” mentioned on Page 8 of the RFQ
During the site visit, we identified the following questions and would appreciate the Government’s clarification:
1. Electrical Connections: If we use electrically powered equipment to perform the work, will the Consulate provide access to suitable electrical connections and power supply at the site?
Yes, post will be able to supply three phase power to the machine upto
25hp capacity.
2. Site Supervision and HSE Management: Is one Site Engineer/Supervisor sufficient to oversee the overall work, including Health, Safety, and
Environment (HSE) management, or does the Government require a separate dedicated HSE representative?
One site supervisor is sufficient. Site supervisor should have adequate qualification to oversee the site safety as well.