This is a Request for Quotations (RFQ) issued by the U.S. Embassy Nepal for the fabrication and installation of two shade structures (sheds) at the Sally Port Common Access Control (CAC) gates at the Phora Compound in Kathmandu, Nepal. The RFQ number is 19NP4026Q0039, with quotations due by September 8, 2026, at 1200 hours Kathmandu local time. The Government intends to award a firm fixed-price contract to the lowest-priced, technically acceptable offeror. A mandatory site visit is scheduled for August 17, 2026, at 1000 hours at the Phora Durbar, Kathmandu. Offerors must submit quotations electronically to KTMContracts@state.gov in MS-Word, MS-Excel, or Adobe Acrobat format (maximum 20MB file size), along with completed SF-1449 forms, pricing information, representations and certifications, and proof of System for Award Management (SAM) registration.

The scope of work encompasses comprehensive design-build services for metallic shade cover structures at two Sally Port CAC gate locations, with all design, fabrication, materials, labor, equipment, tools, transportation, field supervision, and incidentals to be provided by the contractor at no additional cost to the Government. The project follows strict milestone timelines: Milestone 1 requires completion of fabrication activities within one month of receiving written design approval from the Contracting Officer's Representative (COR), and Milestone 2 requires all on-site installation, structural work, painting, and final handover within 15 days. The contractor must comply with extensive safety requirements including OSHA standards (29 CFR 1926), U.S. Army Corps of Engineers safety manual (EM 385-1-1), hot work permits, fall protection protocols, and activity hazard analyses. Additional requirements include obtaining formal security clearance for site access 48 hours in advance, maintaining a one-year comprehensive warranty covering all structural materials and craftsmanship, and ensuring performance standards limiting customer complaints to no more than one per month. Offerors must demonstrate established business operations in Nepal, provide three years of relevant past performance references, submit required licenses and permits, include Defense Base Act insurance costs in pricing, and maintain SAM registration with active UEI numbers at time of quotation submission and award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19NP4026Q0039, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19NP4026Q0039, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement,

• Attachment 2 to Government Furnished Property

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions including Instructions to Offerors

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not

Prescribed in Part 12

CONTINUATION TO SF-1449

RFQ NUMBER S- [19NP4026Q0039]

PRICES, BLOCK 23

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR16177940

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

19NP4026Q0039

6. SOLICITATION ISSUE DATE

08/06/2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Bidhya Gyawali

b. TELEPHONE NUMBER(No collect calls)

014234000

8. OFFER DUE DATE/

09/08/2026 , 1200 hrs LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

American Embassy Kathmandu Bramha Cottage, Narayan Gopal Sadak, Maharajgunj, Kathmandu

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB

DESTINAT-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

American Embassy Kathmandu Attn: General Services Officer Maharajgunj, Kathmandu ktmcontracts@state.gov

General Services Officer

Bramha Cottage, Narayan Gopal Sadak, Maharajgunj, Kathmandu

17a. CONTRACTOR/

OFFERER

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY

Financial Management Officer

Bramha Cottage, Narayan Gopal Sadak, CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Fabrication and installation of two sheds for Sally CAC at Phora compound. Execution of the plan shall be as per the drawings and specifications, in line with the SOW, including materials and labor charges.

2 Job

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

ADDENDA

ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED

____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS

TO ITEMS:

mailto:ktmcontracts@state.gov

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

Albina Collingham

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.02/2012)

PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

ACCEPTED AND CONFORMS TO THE

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER

NUMBER

35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIA

L

FINA

L

COMPLETE

38. S/R ACCOUNT NO.

39. S/R VOUCHER

NO.

40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR

42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING

OFFICER

41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Note:

1. Please strictly follow instructions below to submit your offer/quote:

• Submit your offer/quote ONLY to email id: KTMContracts@state.gov. Do not copy your offer to any other email address. If you copy your offer to any other email, your offer will not be considered as valid offer for evaluation.

• You must mention solicitation/RFQ number 19NP4026Q0039 and description in your email subject.

Send questions/queries related to solicitation to gyawalib@state.gov and copy to KTMContracts@state.gov. Do not copy your offer/quote to the email gyawalib@state.gov or anyone other than KTMContracts@state.gov.

mailto:gyawalib@state.gov

CONTINUATION TO SF-1449,

RFQ NUMBER 19NP4026Q0039

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price purchase order is to for FAC- Fabrication and

Installation of Shed at Phora Compound in accordance with Attachment A.

B. The contract will be for a one-year period from the date of the contract award, with no one-year options.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs Performance Threshold

Services.

Fabrication and installation of two sheds for Sally CAC at Phora compound. Execution of the plan shall be as per the drawings and specifications, in line with the SOW, including materials and labor charges.

WORK

STATEMENT

All required services are performed and no more than one (1) customer complaint is received per month.

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF 2010 NOTICE:

UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS SUBSEQUENT TO THIS

PROCUREMENT ARE SUBJECT TO AN EXCISE TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.

1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

2. STANDARD. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial Services (NOV 2023), if any of the services exceed the standard.

3. PROCEDURES.

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

https://www.acquisition.gov/far/52.212-4

II. PRICING

Services Description Unit of Meas urem ent

Rate per Unit in Local Currency

Quantity Total Amount

Fabrication and installation of two sheds for Sally CAC at Phora compound. Execution of the plan shall be as per the drawings and specifications, in line with the SOW, including materials and labor charges.

Lot NPR 1

VAT

Grand

Total

1.1 VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:

CONTINUATION TO SF-1449,

RFQ NUMBER 19NP4026Q0039

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK (SOW)

Project Title: Design, Fabrication, and Installation of Sally Port Shade Structures Location: Phora Compound – Sally Port Common Access Control (CAC) Gates (2 Sites), Kathmandu, Nepal Prepared For: Regional Security Office (RSO), Kathmandu, Nepal Date: July 31, 2026

1. PROJECT OVERVIEW

The U.S. Embassy General Services Office (GSO), on behalf of the Local Guard Force (LGF), requires a qualified contractor to provide turnkey design and build services for metallic shade cover structures at two (2) Sally Port CAC gate locations within the Phora Compound. The objective from a Facility Management perspective is to introduce assets that are highly durable, weather-resistant, and low-maintenance, improving working conditions for security personnel without introducing operational vulnerabilities or compromising structural safety.

2. CONTRACTOR RESPONSIBILITY & COST COVERAGE

This is a comprehensive design-build project. The contractor is solely responsible for ensuring that all costs related to the design and build phases—including all labor, materials, equipment, tools, transportation, field supervision, and incidentals—shall be fully covered and borne by the contractor.

3. PROJECT TIMELINE & STRICT TRACKING MILESTONES

To ensure seamless asset integration and site coordination, the project schedule is tightly controlled through consecutive milestone tracking deadlines.

3.1 Milestone 1: Fabrication Track (1 Month)

• Execution Window: 1 Months

• Requirements: Upon receiving written design approval from the COR, the contractor shall procure all primary structural steel or aluminum framing, roofing materials, and industrial components. Off-site steel preparation, component shaping, and primary raw material processing must be fully completed within this one-month window to minimize heavy material staging inside the compound.

3.2 Milestone 2: Installation & Finishing Track (15 Days)

• Execution Window: 15 days

• Requirements: All processed materials must be mobilized to the Phora Compound. The contractor has a strict 15-day window to complete all on-site foundations, structural welding, anchoring, assembly, multi-coat painting, site cleanup, and final handover. Final COR walkthrough, asset acceptance, and project sign-off must occur on or before Day 53.

4. DETAILED SAFETY & WORK PERMIT REQUIREMENTS

The contractor shall maintain a safe worksite at all times. From a Facility Management perspective, safety compliance is strict; any non-compliance or unpermitted hazardous operation will result in an immediate work stoppage to protect compound personnel and facility assets.

4.1 Framework and Safety Compliance

• The contractor must execute all construction, risk management, and hazard mitigation protocols in absolute accordance with the American Engineer Corps standards and OSHA standards. All design choices and structural execution methodologies must respect the ethical and physical safety benchmarks dictated by the American engineer code of conducts.

• Hot Work Permit Requirement: The contractor is strictly required to obtain a formally approved Hot Work Permit 24 hours prior to the start of any spark- or flame-producing activities, including structural welding, torch cutting, or grinding. No hot work will be permitted on-site without an active, validated permit verified by Facility Management.

4.2 OSHA Construction Safety Standards (29 CFR 1926)

The contractor must fully comply with the following OSHA standards:

• 29 CFR 1926.20: General Safety & Health Provisions.

• 29 CFR 1926.28: Personal Protective Equipment (PPE).

• 29 CFR 1926.100: Head Protection – Hard hats are required at all times.

• 29 CFR 1926.102: Eye and Face Protection.

• 29 CFR 1926.416: Electrical Safety.

• 29 CFR 1926.451: Scaffolding safety measures (if applicable).

• 29 CFR 1926.502 & 503: Fall Protection Systems and Fall Protection Training.

• 29 CFR 1926.651: Excavation & Trenching Safety.

• 29 CFR 1926.64: Hazardous Materials – Paint & Chemical Handling.

4.3 U.S. Army Corps of Engineers (USACE) – EM 385-1-1

Compliance with the USACE Safety and Health Requirements Manual is required, specifically including:

• Specific Safety and Work Plan: Must be submitted and approved by the Post Occupational

Safety and Health Officer (POSHO) prior to mobilization. Submit Safety and Work Plan after contract is awarded but before site mobilization. Work can only start after POSHO/POSHO- Assistant approves this Plan. This Plan must include work methodology/plan/procedure, list of tools, equipment and PPE, safety plan, work schedule, drawings, emergency contact numbers and Activity Hazard Analysis (AHA)

• Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA):: Must be submitted for each major phase of work, elevated or high-risk work, hot work, prior to commencement. Daily Safety Briefings: Must be conducted for all on-site personnel each workday.

• Site Safety Officer (SSO): A designated SSO must be present on-site during all active work phases. SSO can be the contractor’s site supervisor.

4.4 Personal Protective Equipment (PPE) & General Safety

• The Contractor shall be responsible for conducting the work in a manner that ensures the safety of its employees and USG employees/personnel at the project site during the entire project.

• The Contractor shall be responsible for any mishaps, injuries or accidents which occur during the project. Any mishaps and near misses involving the contractor’s employees must be reported to the COR, the POSHO and APOSHO at the earliest on the same day.

• Based on hazard assessments, the Contractor must provide or afford each affected employee Personal Protective Equipment (PPE) that will protect the employee from hazards. At a minimum PPE should consist of safety glasses and/or goggles for eye protection, hard hats for head protection, appropriate gloves, and closed-toe shoes. Closed shoes with steel toe are mandatory for employees using power actuated tools (e.g., a jack hammer, pick for excavation, axe for cutting trees, and for work that requires lifting heavy materials, etc.).

Sandals or athletic shoes are not acceptable. PPE such as gloves, dust masks, earplugs, hard hats, safety shoes, high-visibility safety vest, and coveralls and face shields are recommended for contracted personnel. These items must be provided at the Contractor’s expense. All contractor personnel shall wear PPEs as identified in the Safety Plan, and/or deemed necessary by the COR, FM/POSHO or A-POSHO.

• Workers may use discretion if they feel unsafe in using the equipment.

• The Contractor must not create an unsafe or hostile work environment for its personnel.

• Work Area Demarcation: Areas must be clearly demarcated with safety barriers, cones, and signage to prevent unauthorized access.

• Working at Heights: Any worker at an elevated and unprotected location above 1.8 meters (6 feet), with the exception of a portable ladder or balcony with railings, must be provided and utilize a safety harness with lanyard. These items must be in good condition and free from cuts and damages.

• Scaffoldings should be provided by Contractors for working at heights where ladder use is unsafe. Full body fall harness with lanyard should also be used by the Contractor. Bamboo scaffolding is not allowed to be used at USG properties and leased residences. The

Contractor will use only COR and/or POSHO/APOSHO approved metal scaffoldings with platforms and bracing.

• Welders must have proper PPE: welding goggles/mask, leather gloves, apron or welding jacket that is fire rated. Fire Watch with dedicated fire extinguisher should be on the vicinity of work site. Fire curtain should be used not to expose welding sparks to others. Contractor must obtain Embassy’s Hot Work Permit (see attachment) daily before commencing any hot work (cutting, grinding, welding). Hot work equipment must be in good condition. Fire safe materials will be placed under any welding or hot work to protect the surface under the work and prevent ignition of surfaces.

• Safe Electrical Work Practices: The Contractor must follow safe electrical work practices to prevent electric shock, arc flash, or other injuries resulting from either direct or indirect contact with electrical circuits or equipment which are or may be energized.

• Work de-energized. Use Lock-Out/Tag-Out (LO/TO) while working on energized equipment/circuit. Inform all other affected personnel.

• All electrical equipment such as drilling machines, welding machines, portable grinders, power strips, and electrical extension cords must be in good working condition, properly grounded, and be free from any cuts/defects on/in the insulation cover. Three pin plugs shall be used instead of live wires when plugging into any power outlets.

• Correctly connect electrical wires with the wire caps (also known as wire nuts) and do not use only electrical tape to make electrical bonds.

• Use 10mA Ground Fault Circuit Breakers (GFCIs) on power outlets/extension cable drums while working outdoors or in wet areas.

• Use wooden or fiber ladders instead of metal ladders while working on electrical circuits.

• Respiratory Protection: Approved respirator mask (half face/full face) shall be used while performing work that produces toxic organic vapors. For example: epoxy or spray-painting work, using adhesives, using coil cleaners, using Hydrochloric acid (HCl) for cleaning, etc.

The Contractor must provide respirator(s) with the correct type of cartridge to every employee (respirator should not be shared between employees); and masks/ respirators must pass the fit test for workers using them. The room/area where vaporous work is being conducted shall be well ventilated to prevent excess and prolonged exposure to vapors. Dust masks are not an acceptable replacement for respirators.

• Chemicals and paint: The Contract shall submit Safety Data Sheets (SDSs) of any/all chemicals and paints to be used in this project. Proper PPE should be selected and used as required by the SDS.

• Housekeeping: The Contractor shall keep the site clean and organized on a daily basis to prevent slip, trip, and fall hazards.

• Emergency Equipment: A fully stocked first aid kit and a fire extinguisher must be maintained on-site at all times.

• Work may be stopped at any time by any US Embassy employee for unsafe work practices.

• The COR, GTM, SME, POSHO or APOSHO can stop work at any time if unsafe working conditions are observed or encountered. The Embassy Monitor (Escort) can also temporarily stop work for any unsafe action while one of the above responds to the worksite to examine the situation and make a final determination as to the safety of contracted personnel.

• The Contractor’s and its employees shall attend mandatory safety briefings and training provided by the US Embassy Safety team before the start of, or any phase thereof, the project.

• The Contactor must have a competent person on-site for inspection of equipment, training workers in the safe use of equipment and the recognition of hazards related to their use, supervision, and identifying and correcting unsafe work practices for high hazard work.

5. SITE CONSTRAINTS & SECURITY PROTOCOLS

The Phora Compound Sally Port gates are active, high-security common access control points.

The contractor must strictly adhere to all Regional Security Office (RSO) and Facility Management security parameters:

• Access Requests: Full access clearance requests for all working professionals, field laborers, and project vehicles must be submitted and granted 48 hours prior to the scheduled start of any on-site work.

• Identification Requirements: All personnel must physically bring and present a hard copy of their valid, government-issued identification (e.g., National ID, Passport, or Citizenship Certificate) at the gate to gain entry to the compound. Digital copies or photocopies will not be accepted.

• Unobstructed Operations: Structural fabrication and installation methodologies must be carefully engineered so they never block, restrict, or compromise the flow of personnel or vehicles through the gates. Total operational coordination with the COR and the LGF Team Lead is required daily.

6. WARRANTY & ACCEPTANCE

• Facility Inspection: Work will be deemed acceptable once the structures are physically verified as sound, paint finishes are smooth and defect-free, and as-built drawings are delivered.

• Warranty: The contractor shall provide a comprehensive one (1) year warranty covering all structural materials, fabrication craftsmanship, and paint finishes from the date of final signature acceptance. Any failures during this period must be fixed at no extra cost to the Government.

Gate A Option 2A

Gate A Option 2 B

Gate A Option 2 C

Gate B Option A

Gate B Option B

PLAN

X

X

AA

Y

Y

MAIN ROAD

MAIN ROAD

ROOF PLAN

X

X

AA

Y

Y

EXISTING POST

EXISTING RAILINGS

ISB 122 X 61 X 4.5 MM RECT. METAL SECTION FINISHED WITH

MATT BLACK ENAMEL PAINT

EXISTING PEDESTRIAN

GATE

EXISTING GATE EXISTING GATE

EXISTING VERTICAL POSTS

EXISTING COLUMN

'-10" 1

1"

'-11" 5

'-10" 6

'-3" 6

' 5

'-1" 5

'-1" 5

'-11" 6

'-8" 5

'-11" 5

'-4"

'-6"

'-6"

'-6"

'-6"

'-4"

4'-10"

4'

4'

-9

5'

1'-8" 2"

8'-4" 2"

8'-4" 2"

8'-4" 2"

8'-4" 2"

8'-4" 2"

8'-2" 2"

1'-4"

8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-4"

54'

'-4

'-5

'-5

'-5

'-5

'-5

'-5

'-1 1"

'-5

'-6

'-6

'-6

'-6

'-6

'-6

8'

-4

TRUSS STRUCTURE AS PER STRUCTURE DRAWING

FINISHED WITH MATT BLACK ENAMEL PAINT

SOUTH ELEVATION

NORTH ELEVATION

WEST ELEVATION EAST ELEVATION

TO DRAIN

SECTION AT Y-Y

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-4" )

SECTION AT X-X

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-4" )

A

5MM COLOURLESS ACRYLIC SHEETS

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-4" )

SECTION AT A-A

5MM COLOURLESS ACRYLIC SHEET

5MM COLOURLESS ACRYLIC SHEET

5"

'-8

2 mm MS PLATE FASCIA

8"

'-1

1"

5"

'-4

GUTTER

DETAIL AT A

BOTTOM MEMBER OF RAFTER

EXTENDED TO SUPPORT GUTTER

1"X 2" PURLIN

S CALE 1"=1'-0"

Gate A (Option 2)

TITLE:

DWG.NR.DATE: 12 July 2026FAC DESIGN SERVICES-PROPOSED SHED, PHORA COMPOUND

K ANTIPATH, KATHMANDU, NEPAL

PROJECT:

AMERICAN MISSION ASSOCIATION

SMT CONSTRUCTION (P.) LTD.

BANESHWOR HEIGHT-10, KATHMANDU, NEPAL

TEL.:+01-4599344

E-mail:info@smtconstruction.com

M AIN ROAD

R4'-8" 4 "

7 '-8"

4 "

5 " 1 '-10"

6 '-1" 4 "

8 '-4"

4 "

1 '-10"

9 "

8 ' 8 '-8" 8 '-8"

6 '

7 " 1 '-

9" 8 "

1 2

8 "

1 '- 9"

7 " 6 '

1 5 '-1

3 0

X

X

M AIN ROAD

X

X

PLAN

ROOF PLAN

5 '-2" 2 "

7 '-10" 2 "

8 '-6" 2 "

8 '-6"

2 " 1 '-1"

2 "1 ' -5

2 "

2 ' -1

0"

2 "

2 '-

2 "

2 '-

2 "

2 '-

2 "

2 '-

2 "

1 '- 2"

3 ' 3 '

3 ' 3 '

3 ' 1 '

-7

1 8

8 ' 8 '-8" 8 '-8"

3 1'-8"

TRUSS STRUCTURE AS PER STRUCTURE DRAWING

FINISHED WITH MATT BLACK ENAMEL PAINT

AA

4 '-4" 9 "

1 '-1"

3 3'-1"

AA

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-7" )

ROAD LEVEL

- 1'-3"

SECTION AT A-A

5MM COLOURLESS ACRYLIC SHEETS

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-4" )

SECTION AT X-X

A

TOP RAILING LEVEL

+9'-7"

GROUND LEVEL

±0'-0"

EAVES LEVEL

+15'-0"

RIDGE LEVEL ( +17'-4" )

SECTION AT X-X

A

5 MM COLOURLESS ACRYLIC SHEETS 5MM COLOURLESS ACRYLIC SHEETS

4 "

1' -3

1'

-3

BOTTOM MEMBER OF RAFTER

EXTENDED TO SUPPORT GUTTER

5"

1"X 2" PURLIN

GUTTER

2 mm MS PLATE FASCIA

DETAIL AT A

SCALE 1"=1'-0"

SOUTH ELEVATION NORTH ELEVATION

WEST ELEVATION EAST ELEVATION

TO DRAIN

11.1 SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

11.2 STANDARD. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Terms and Conditions—Commercial Products and Commercial Services), if any of the services exceed the standard.

11.3 PROCEDURES

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant.

The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

A

SECTION 2 - CONTRACT CLAUSES

52.212-4 TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (DEVIATION) (JAN 2026) IS INCORPORATED

BY REFERENCE. (SEE SF-1449, BLOCK 27A)

ADDENDUM TO CONTRACT CLAUSES

FAR AND DOSAR CLAUSES NOT PRESCRIBED IN PART 12

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at:

Acquisition.gov or Revolutionary FAR Overhaul. Note that this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Microsoft Bing or Yahoo) to obtain the latest location of the most current FAR.

THE FOLLOWING FEDERAL ACQUISITION REGULATIONS (FAR) CLAUSES ARE

INCORPORATED BY REFERENCE:

CLAUSE TITLE AND DATE

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL

(JAN 2011)

52.204-13 SYSTEM FOR AWARD MANAGEMENT—

MAINTENANCE (DEVIATION) (JAN 2026)

52.204-91 CONTRACTOR IDENTIFICATION (DEVIATION) (JAN 2026)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS MAINTENANCE (DEVIATION) (JAN 2026)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

https://acquisition.gov/browse/index/far https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl

PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED

(DEVIATION) (JAN 2026)

52.217-2 CANCELLATION UNDER MULTIYEAR CONTRACTS (OCT 1997)

52.224-3 PRIVACY TRAINING (JAN 2017) – ALTERNATE I (JAN 2017)

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION

OF CONTRACT (FEB 2000)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING (MAY 2024)

52.228-3 WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT) (JUL

2014)

52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.232-30 INSTALLMENT PAYMENTS FOR COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2021)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER-OTHER THAN

SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

52.232-36 PAYMENT BY THIRD PARTY (DEVIATION) (FEB 2026)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (MAR 2023)

52.232-90 FAST PAYMENT PROCEDURE (DEVIATION) (FEB 2026)

52.233-3 PROTEST AFTER AWARD (DEVIATION) (JAN 2026)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (DEVIATION)

(JAN 2026)

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION (APR 1984)

52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (DEVIATION) (JAN

2026)

52.240-93 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (DEVIATION) (JAN 2026)

52.245-1 GOVERNMENT PROPERTY (SEP 2021)

52-244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (DEVIATION) (JAN 2026)

52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES

(APR 2012)

52.245-9 USE AND CHARGES (APR 2012)

52.253-1 COMPUTER GENERATED FORMS (DEVIATION) (FEB 2026)

THE FOLLOWING FAR CLAUSE(S) IS/ARE PROVIDED IN FULL TEXT:

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the performance period of the contract.

(End of clause)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within the performance period of the contract or within 30 days after funds for the option year become available, whichever is later.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(a) The total duration of this contract, including the exercise of any options under this clause, shall not exceed two years.

52.222-50 COMBATING TRAFFICKING IN PERSONS (DEVIATION) (FEB 2026)

(a) Definitions. As used in this clause- Agent means any individual, including a director, an officer, an employee, or an independent contractor, authorized to act on behalf of the organization.

Coercion means-

(1) Threats of serious harm to or physical restraint against any person;

(2) Any scheme, plan, or pattern intended to cause a person to believe that failure to perform an act would result in serious harm to or physical restraint against any person; or

(3) The abuse or threatened abuse of the legal process.

Commercial sex act means any sex act on account of which anything of value is given to or received by any person.

Commercially available off-the-shelf (COTS) item —

(1) Means any item of supply (including construction material) that is—

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101;

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Debt bondage means the status or condition of a debtor arising from a pledge by the debtor of his or her personal services or of those of a person under his or her control as a security for debt, if the value of those services as reasonably assessed is not applied toward the liquidation of the debt or the length and nature of those services are not respectively limited and defined.

Employee means an employee of the Contractor directly engaged in the performance of work under the contract who has other than a minimal impact or involvement in contract performance.

Forced Labor means knowingly providing or obtaining the labor or services of a person-

(1) By threats of serious harm to, or physical restraint against, that person or another person;

(2) By means of any scheme, plan, or pattern intended to cause the person to believe that, if the person did not perform such labor or services, that person or another person would suffer serious harm or physical restraint; or

(3) By means of the abuse or threatened abuse of law or the legal process.

Involuntary servitude includes a condition of servitude induced by means of-

(1) Any scheme, plan, or pattern intended to cause a person to believe that, if the person did not enter into or continue in such conditions, that person or another person would suffer serious harm or physical restraint; or

(2) The abuse or threatened abuse of the legal process.

Recruitment fees means fees of any type, including charges, costs, assessments, or other financial obligations, that are associated with the recruiting process, regardless of the time, manner, or location of imposition or collection of the fee.

(1) Recruitment fees include, but are not limited to, the following fees (when they are associated with the recruiting process) for-

(i) Soliciting, identifying, considering, interviewing, referring, retaining, transferring, selecting, training, providing orientation to, skills testing, recommending, or placing employees or potential employees;

(ii) Advertising;

(iii) Obtaining permanent or temporary labor certification, including any associated fees;

(iv) Processing applications and petitions;

(v) Acquiring visas, including any associated fees;

(vi) Acquiring photographs and identity or immigration documents, such as passports, including any associated fees;

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim

(vii) Accessing the job opportunity, including required medical examinations and immunizations; background, reference, and security clearance checks and examinations; and additional certifications;

(viii) An employer's recruiters, agents or attorneys, or other notary or legal fees;

(ix) Language interpretation or translation, arranging for or accompanying on travel, or providing other advice to employees or potential employees;

(x) Government-mandated fees, such as border crossing fees, levies, or worker welfare funds;

(xi) Transportation and subsistence costs-

(A) While in transit, including, but not limited to, airfare or costs of other modes of transportation, terminal fees, and travel taxes associated with travel from the country of origin to the country of performance and the return journey upon the end of employment; and

(B) From the airport or disembarkation point to the worksite;

(xii) Security deposits, bonds, and insurance; and

(xiii) Equipment charges.

(2) A recruitment fee, as described in the introductory text of this definition, is a recruitment fee, regardless of whether the payment is-

(i) Paid in property or money;

(ii) Deducted from wages;

(iii) Paid back in wage or benefit concessions;

(iv) Paid back as a kickback, bribe, in-kind payment, free labor, tip, or tribute; or

(v) Collected by an employer or a third party, whether licensed or unlicensed, including, but not limited to-

(A) Agents;

(B) Labor brokers;

(C) Recruiters;

(D) Staffing firms (including private employment and placement firms);

(E) Subsidiaries/affiliates of the employer;

(F) Any agent or employee of such entities; and

(G) Subcontractors at all tiers.

Severe forms of trafficking in persons means-

(1) Sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or

(2) The recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

Sex trafficking means the recruitment, harboring, transportation, provision, or obtaining of a person for the purpose of a commercial sex act.

Subcontract means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.

Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Policy. The United States Government has adopted a policy prohibiting trafficking in persons including the trafficking-related activities of this clause. Contractors, contractor employees, and their agents must not—

(1) Engage in severe forms of trafficking in persons during the period of performance of the contract;

(2) Procure commercial sex acts during the period of performance of the contract;

(3) Use forced labor in the performance of the contract;

(4) Destroy, conceal, confiscate, or otherwise deny access by an employee to the employee’s identity or immigration documents, such as passports or drivers' licenses, regardless of issuing authority;

(5)

(i) Use misleading or fraudulent practices during the recruitment of employees or offering of employment, such as failing to disclose, in a format and language understood by the employee or potential employee, basic information or making material misrepresentations during the recruitment of employees regarding the key terms and conditions of employment, including wages and fringe benefits, the location of work, the living conditions, housing and associated costs (if employer or agent provided or arranged), any significant costs to be charged to the employee or potential employee, and, if applicable, the hazardous nature of the work;

(ii) Use recruiters that do not comply with local labor laws of the country in which the recruiting takes place;

(6) Charge employees or potential employees recruitment fees;

(7)

(i) Fail to provide return transportation or pay for the cost of return transportation upon the end of employment-

(A) For an employee who is not a national of the country in which the work is taking place and who was brought into that country for the purpose of working on a U.S. Government contract or subcontract (for portions of contracts performed outside the United States); or

(B) For an employee who is not a United States national and who was brought into the United States for the purpose of working on a U.S. Government contract or subcontract, if the payment of such costs is required under existing temporary worker programs or pursuant to a written agreement with the employee (for portions of contracts performed inside the United States);

except that—

(ii) The requirements of paragraphs (b)(7)(i) of this clause must not apply to an employee who is—

(A) Legally permitted to remain in the country of employment and who chooses to do so; or

(B) Exempted by an authorized official of the contracting agency from the requirement to provide return transportation or pay for the cost of return transportation;

(iii) The requirements of paragraph (b)(7)(i) of this clause are modified for a victim of trafficking in persons who is seeking victim services or legal redress in the country of employment, or for a witness in an enforcement action related to trafficking in persons. The contractor must provide the return transportation or pay the cost of return transportation in a way that does not obstruct the victim services, legal redress, or witness activity. For example, the contractor must not only offer return transportation to a witness at a time when the witness is still needed to testify. This paragraph does not apply when the exemptions at paragraph (b)(7)(ii) of this clause apply.

(8) Provide or arrange housing that fails to meet the host country housing and safety standards;

or

(9) If required by law or contract, fail to provide an employment contract, recruitment agreement, or other required work document in writing. Such written work document must be in a language the employee understands. If the employee must relocate to perform the work, the work document must be provided to the employee at least five days prior to the employee relocating. The employee's work document must include, but is not limited to, details about work description, wages, prohibition on charging recruitment fees, work location(s), living accommodations and associated costs, time off, roundtrip transportation arrangements, grievance process, and the content of applicable laws and regulations that prohibit trafficking in persons.

(c) Contractor requirements. The Contractor must-

(1) Notify its employees and agents of-

(i) The United States Government's policy prohibiting trafficking in persons, described in paragraph (b) of this clause; and

(ii) The actions that will be taken against employees or agents for violations of this policy. Such actions for employees may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment; and

(2) Take appropriate action, up to and including termination, against employees, agents, or subcontractors that violate the policy in paragraph (b) of this clause.

(d) Notification.

(1) The Contractor must inform the Contracting Officer and the agency Inspector General immediately of—

(i) Any credible information it receives from any source (including host country law enforcement) that alleges a Contractor employee, subcontractor, subcontractor employee, or their agent has engaged in conduct that violates the policy in paragraph (b) of this clause (see also 18 U.S.C. 1351, Fraud in Foreign Labor Contracting, and 52.203-13(b)(3)(i)(A), if that clause is included in the solicitation or contract, which requires disclosure to the agency Office of the Inspector General when the Contractor has credible evidence of fraud); and

(ii) Any actions taken against a Contractor employee, subcontractor, subcontractor employee, or their agent pursuant to this clause.

(2) If the allegation may be associated with more than one contract, the Contractor must inform the contracting officer for the contract with the highest dollar value.

(e) Remedies. In addition to other remedies available to the Government, the Contractor's failure to comply with the requirements of paragraphs (c), (d), (g), (h), or (i) of this clause may result in—

(1) Requiring the Contractor to remove a Contractor employee or employees from the performance of the contract;

(2) Requiring the Contractor to terminate a subcontract;

(3) Suspension of contract payments until the Contractor has taken appropriate remedial action;

(4) Loss of award fee, consistent with the award fee plan, for the performance period in which the Government determined Contractor non-compliance;

(5) Declining to exercise available options under the contract;

(6) Termination of the contract for default or cause, in accordance with the termination clause of this contract; or

(7) Suspension or debarment.

(f) Mitigating and aggravating factors. When determining remedies, the Contracting Officer may consider the following:

(1) Mitigating factors. The Contractor had a Trafficking in Persons compliance plan or an awareness program at the time of the violation, was in compliance with the plan, and has taken appropriate remedial actions for the violation, that may include reparation to victims for such violations.

(2) Aggravating factors. The Contractor failed to abate an alleged violation or enforce the requirements of a compliance plan, when directed by the Contracting Officer to do so.

(g) Full cooperation.

(1) The Contractor must, at a minimum—

(i) Disclose to the agency Inspector General information sufficient to identify the nature and extent of an offense and the individuals responsible for the conduct;

(ii) Provide timely and complete responses to Government auditors' and investigators' requests for documents;

(iii) Cooperate fully in providing reasonable access to its facilities and staff (both inside and outside the U.S.) to allow contracting agencies and other responsible Federal agencies to conduct audits, investigations, or other actions to ascertain compliance with the Trafficking Victims Protection Act of 2000 (22 U.S.C. chapter 78), E.O. 13627, or any other applicable law or regulation establishing restrictions on trafficking in persons, the procurement of commercial sex acts, or the use of forced labor; and

(iv) Protect all employees suspected of being victims of or witnesses to prohibited activities, prior to returning to the country from which the employee was recruited, and must not prevent or hinder the ability of these employees from cooperating fully with Government authorities.

(2) The requirement for full cooperation does not foreclose any Contractor rights arising in law, the FAR, or the terms of the contract. It does not-

(i) Require the Contractor to waive its attorney-client privilege or the protections afforded by the attorney work product doctrine;

(ii) Require any officer, director, owner, employee, or agent of the Contractor, including a sole proprietor, to waive his or her attorney client privilege or Fifth Amendment rights; or

(iii) Restrict the Contractor from—

(A) Conducting an internal investigation; or

(B) Defending a proceeding or dispute arising under the contract or related to a potential or disclosed violation.

(h) Compliance plan.

(1) This paragraph (h) applies to any portion of the contract that—

(i) Is for supplies, other than commercially available off-the-shelf items, acquired outside the United States, or services to be performed outside the United States; and

(ii) Has an estimated value that exceeds $700,000.

(2) The Contractor must maintain a compliance plan during the performance of the contract that is appropriate—

(i) To the size and complexity of the contract; and

(ii) To the nature and scope of the activities to be performed for the Government, including the number of non-United States citizens expected to be employed and the risk that the contract or subcontract will involve services or supplies susceptible to trafficking in persons.

(3) Minimum requirements. The compliance plan must include, at a minimum, the following:

(i) An awareness program to inform contractor employees about the Government’s policy prohibiting trafficking-related activities described in paragraph (b) of this clause, the activities prohibited, and the actions that will be taken against the employee for violations. Additional information about Trafficking in Persons and examples of awareness programs can be found at the Web site for the Department of State’s Office to Monitor and Combat Trafficking in Persons at http://www.state.gov/j/tip/.

(ii) A process for employees to report, without fear of retaliation, activity inconsistent with the policy prohibiting trafficking in persons, including a means to make available to all employees the hotline phone number of the Global Human Trafficking Hotline at 1-844-888-FREE and its email address at help@befree.org.

(iii) A recruitment and wage plan that only permits the use of recruitment companies with trained employees, prohibits charging recruitment fees to the employee or potential employee, and ensures that wages meet applicable host-country legal requirements or explains any variance.

(iv) A housing plan, if the Contractor or subcontractor intends to provide or arrange housing, that ensures that the housing meets host-country housing and safety standards.

(v) Procedures to prevent agents and subcontractors at any tier and at any dollar value from engaging in trafficking in persons (including activities in paragraph (b) of this clause) and to monitor, detect, and terminate any agents, subcontracts, or subcontractor employees that have engaged in such activities.

(4) Posting.

http://www.state.gov/j/tip/ mailto:help@befree.org

(i) The Contractor must post the relevant contents of the compliance plan, no later than the initiation of contract performance, at the workplace (unless the work is to be performed in the field or not in a fixed location) and on the Contractor's Web site (if one is maintained). If posting at the workplace or on the Web site is impracticable, the Contractor must provide the relevant contents of the compliance plan to each worker in writing.

(ii) The Contractor must provide the…