RFQ - 19KV4225Q0003 - Construction Inspection Services for the Chief of Mission Residence.pdf

PDF 411 KB Posted

Attached to
Construction Inspection Services for the Chief of Mission Residence
Solicitation number
19KV4225Q0003
Issued by

About this file

This is a Request for Quotations (RFQ #19KV4225Q0003) issued by the U.S. Embassy in Pristina, Kosovo for Construction Inspection Services for the Chief of Mission Residence. The contract includes an 18-month base period with a possible 6-month extension option.

The scope of work requires construction inspection support services including review of contractor submittals, answering Requests for Information (RFIs), conducting site visits, performing quality assurance inspections, reviewing contractor progress reports and pay applications, ensuring code compliance, conducting safety inspections, and providing daily weather reports. The contract will be awarded as a Time-and-Materials contract with some Firm-Fixed Price elements, with 3,900 hours estimated for onsite Project Engineer support and 1,500 hours for local code compliance review. Reimbursable expenses are capped at EUR 5,000. Quotes are due by January 10, 2025 at 12:00 local time and must be submitted electronically to PristinaProcurement@state.gov. Contractors must be registered in SAM prior to submission. The government intends to award to the lowest-priced, technically acceptable offer based on initial proposals without discussions.

View the file

Other files

File Type Posted
Cover Page 19KV4225Q0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER)

THIS RFQ [ ] IS [x] IS NOT A SMALL BUSINESS-

SMALL PURCHASE SET-ASIDE (52.219-4)

PAGE

OF

PAGES

1. REQUEST NO.

19KV4225Q0003

2. DATE ISSUED

12/10/2024

3. REQUISITION/PURCHASE REQUEST

NO.

4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5A. ISSUED BY U.S. Embassy in Pristina, GSO

4 Korriku # 25 , Pristina, Kosovo

6. DELIVER BY (Date)

5B. FOR INFORMATION CALL: (Name and telephone no.) (No collect calls 7. DELIVERY

FOB DESTINATION X OTHER (See Schedule)

NAME

Burim Buza – Procurement Supervisor

TELEPHONE NUMBER

AREA CODE

381-38

NUMBER

59593000

8. TO: 9. DESTINATION

a. NAME

b. COMPANY

a. NAME OF CONSIGNEE

U.S. EMBASSY PRISTINA

c. STREET ADDRESS

b. STREET ADDRESS

4 Korriku # 25

d. CITY

e. STATE f. ZIP CODE c. CITY

PRISTINA, KOSOVO

d.

STATE

e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS (Date)

01/10/2025 before 12:00LT

IMPORTANT: This is a request for information, and quotations furnished are not offers.

If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Construction Inspection Services for the Chief of Mission Residence

Months

12 DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR

DAYS

b. 20 CALENDAR DAYS

c. 30 CALENDAR DAYS

d. CALENDAR DAYS

NUMBER %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13 NAME AND ADDRESS OF QUOTER 14 SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15 DATE OF QUOTATION

a. NAME OF QUOTER

b. STREET ADDRESS

16. SIGNER

c. COUNTY a. NAME (Type or print)

b. TELEPHONE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) AREA CODE

NUMBER

TABLE OF CONTENTS

SF-18 COVER SHEET

A. PRICING

B. STATEMENT OF WORK

C. PACKAGING AND MARKING

D. INSPECTION AND ACCEPTANCE

E. DELIVERIES AND PERFORMANCE

F. CONTRACT ADMINISTRATION DATA

G. SPECIAL TERMS AND CONDITIONS

H. CLAUSES

I. LIST OF ATTACHMENTS

J. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION

K. EVALUATION CRITERIA

L. REPRESENTATIONS CERTIFICATIONS AND OTHER

SECTION A – PRICING

A.1.0 GENERAL

The Contractor shall perform construction inspection services for a U.S. Government construction project at the American Embassy in Pristina. This is (1) a Firm, Fixed-Price contract type for submittals reviews, identified in Exhibit A and (2) a Time-and-Materials contract with fixed, fully loaded hourly rates for all other effort, using the labor categories set forth below. The hourly rates stated in the contract shall include all direct and indirect costs, insurance, overhead, general and administrative expense, and profit.

A.2.0 PRICING

A.2.1 VALUE ADDED TAX

VALUE ADDED TAX (VAT). The Government will not reimburse the Contractor for VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the U.S. Embassy has a tax exemption certificate with the host government.

A.2.2 LABOR-HOUR RATES

All work performed under this contract, with the exception of Submittals reviews, shall be invoiced and paid on a Time-and-Materials basis. The following labor hour rates, set forth in local currency EUR shall apply.

The hourly rates are fully loaded rates, including:

all direct and indirect labor costs (including, but not limited to any premiums relating to overtime and holidays), except for separately priced Review of Submittals;

all direct and indirect material costs (except for separately priced Review of Submittals);

insurance-DBA;

all overhead and indirect costs, including general and administrative expenses (G&A); and profit.

Labor Hour Rates for All Services other than Review of Submittals

TOTAL NOT TO EXCEED AMOUNT: ____5400HR________

The Contractor shall notify the Contracting Officer in writing 60 days before the Contractor expects the total costs incurred to exceed 75% of any ceiling price/not to exceed amount listed above.

A.2.3 REIMBURSABLE EXPENSES

The clause at G.4 identifies the types of expenses that will be reimbursable, if otherwise allowable, allocable and reasonable. The Government will only pay the price as documented on the receipt. No overhead or profit will be added to these reimbursable costs.

The total reimbursable expenses shall not exceed: ___EUR5,000.00______

A.2.4 FIRM, FIXED-PRICE FOR REVIEW OF SUBMITTALS IDENTIFIED

IN EXHIBIT A

LINE-ITEM NO. DESCRIPTION Hourly Rate Est. Hrs. Total Cost

0001 Project Engineer – Onsite Support (Based on 10 Hours per Day, 5 Days per working week)

3900 Hours

LINE ITEM NO. DESCRIPTION Hourly Rate Est. Hrs. Total Cost

0002 Hourly rates for local code compliance review of contractual documents. Not to Exceed projected amount.

1500 Hours

B.3.4. SUMMARY

- BASE REQUIREMENT

LINE-ITEM NO. DESCRIPTION TOTAL COST

PROJECT ENGINEER

LOCAL CODE COMPLIANCE

REVEW

3900HR X

1500HR X

0003 REIMBURSABLE EXPENSES

(ESTIMATED)

$5,000.00

TOTAL FIRM-FIXED PRICE: _________________EUR

B.4.1 OPTION 1 (6-month extension)

LINE-ITEM NO. DESCRIPTION EST. TOTAL COST

Project Engineer – Onsite Support (Based on 10 Hours per Day, 5 Days per working week)

Hourly rates for local code compliance review of contractual documents. Not to Exceed projected amount.

1300HR X

750HR X

1003 REIMBURSABLE EXPENSES

(ESTIMATED)

EUR300.00

TOTAL FIRM-FIXED PRICE: _________________EUR

B.4.2 SUMMARY COST OF BASE REQUIREMENT OPTION 1

TOTAL FIRM-FIXED PRICE – 18 MONTHS

EST. TOTAL COST OPTION 1 (6 Month EX)

CONTRACTOR SHALL SPECIFY CURRENCY:

SECTION B - STATEMENT OF WORK

A&E CONSTRUCTION INSPECTION SERVICES

B.1.0 GENERAL

B.1.1 DEFINITIONS

‐ A/E of Record means A/E who designed the construction drawings and specifications

‐ Government ( U.S. Government ) ‐ Day means calendar day unless otherwise specifically indicated ‐ FAR means Federal Acquisition Regulation ‐ Contracting Officer Representative (COR) means a person appointed by the

Contracting Officer who is authorized to perform the duties outlined in this contract.

‐ Contractor means the A/E performing this contract ‐ Construction contractor means the general construction contractor performing the construction contract

B.1.2 SCOPE OF WORK

This scope of work covers construction inspection support services on an as-needed basis to U.S. Embassy in Pristina related to the administration of the construction contract for the Construction Inspection Services for the Chief of Mission Residence. The Contracting Officer’s Representative (COR) for this construction inspection services contract will be the:

Mr. John D. Sligh, OBO/COR slighjd@state.gov Cell: +355 69 701 5897 Email: slighjd@state.gov The construction inspection services contractor shall provide support services for the following categories (see succeeding paragraphs for more details for each category listed below):

‐ Review of construction submittals initiated by the Contractor as outlined in Exhibit A.

‐ Answering Requests for Information (RFI’s) initiated by the construction contractor and/or the COR.

‐ Site visits as required to review construction issues, samples and mock-ups or to provide other construction related services.

‐ Inspection Activities

‐ Other Miscellaneous Directly-Related Services, including daily weather reports

B.2.0 SUBMITTALS

B.2.1 SERVICES

SERVICES SHALL INCLUDE:

The scope of work covers the Architecture/Engineer and Construction Inspection Services in support of the New Chief of Mission Residence in Pristina, Kosovo:

Review of contractor’s design for local code/standards compliance Site monitoring / Quality assurance inspections Contractor submittal processing Shop drawing, product data and sample reviews Test and inspection reports Review of Contractor progress reports and Pay Applications Advise OBO Project Director in addressing field-generated Requests for

Information (RFIs).

Preparation of drawings and/or documents necessary to support OBO correspondence to the Contractor.

Routinely conduct comprehensive construction inspections to oversee the project’s quality control program Identify deficient and/or non-compliant work in the field and recommend remedies and corrections Actively participate in construction preparatory meetings prior to the start of new construction activities Ensure coordination is performed across construction disciplines Perform regular safety inspections Generate punch list for project completion Evaluate proposed substitutions to the Contract submitted to OBO and provide recommendations to the OBO Project Director as required.

B.2.2 ORDERING

All submittals will be reviewed by the COR for sufficiency of content only, before forwarding to the Contractor. The COR will then forward the submittals to the Contractor, following the procedures outlined in B.2.3 below.

B.2.3 DELIVERY METHOD

The COR will send the submittals to the Contractor via electronic transmission unless otherwise restricted by size, weight, or time limitation. The COR will include a transmittal letter with each submittal. Unless otherwise directed, the Contractor shall return submittals to the COR by commercial delivery service or hand-delivered.

B.2.4 REVIEW PERIOD

Time is of the essence. Therefore, unless otherwise directed in writing, the Contractor review shall be completed and the submittals returned to the COR within seven

(7) calendar days from the date of receipt by the Contractor. If additional review of a submittal is required because the Contractor did not perform acceptably initially, the Contractor shall complete the second review within the time specified by the COR at the time that submittal is returned by the COR to the Contractor.

B.2.5 PAYMENT

The Government shall make payment in accordance with A.2.3. for each item reviewed at the Contractor facility. All invoices for Technical Support Services shall be submitted in duplicate to the COR at the following address:

Mr. John D. Sligh slighjd@state.gov Cell: +355 69 701 E.mail: slighjd@state.gov

Invoices may be submitted on a monthly basis and shall include:

• For review services for submittals, request for information (RFI’s), provide the complete description of each task completed, the completion date, individual’s time spent, and price based on approved rates.

• For reimbursable expenses, list expenses and provide sufficient documentation (i.e., bills, receipts, etc.) to substantiate costs incurred.

• Invoices will be paid through post Financial Management Officer The A&E will be paid in full for:

• The services performed as authorized, accepted and correctly invoiced.

• Allowable reimbursable expenses substantiated by documentation.

B.3.0 LABOR-HOUR SERVICES

B.3.1 REQUESTS FOR INFORMATION (RFI)

SERVICES SHALL INCLUDE:

‐ Review and processing of Requests For Information (RFI’s). These are not the resolution of errors and omissions associated with the contract drawings and specifications, but may include request for substitutions, clarifications, etc.

RFI’s may include schematics, descriptive literature, performance and test data, and similar material furnished by the construction contractor.

‐ Preparation of sketches and drawings that may be necessary to clarify portions of the work. COR will coordinate the review of these sketches and drawings with the A/E of record.

Review Period: Time is of the essence. Therefore, unless otherwise directed, the

Contractor shall complete the review of RFI’s not later than 4 calendar days after receipt of the item to be reviewed.

B.3.2 SITE VISITS

Services shall include site visits to the construction sites. These on-site visits may include submittal and sample reviews or other construction-related services. The Contractor shall provide a site visit report to the COR by the next regular business day after the conclusion of each visit. Each report shall be delivered to the address listed in E.2.0. See also paragraph below, that includes certain activities which require on-site services relating to inspection.

B.3.3. INSPECTION ACTIVITIES

B.3.3.1 General

Services shall include site visits to the construction sites, though some of the work may be performed off-site, as noted below. Each report/all documentation shall be delivered to the address listed in E.2.0.

B.3.3.2 Contractor Liability

The Contractor shall not interact with the construction contractor or the A/E of record. The Contractor shall limit all interaction regarding services provided under this contract, to interaction with the Contracting Officer, COR, or designee. The Contractor shall ensure that it does not represent itself as an agent of the Government. Furthermore, the Contractor shall take all precautions to ensure that its actions do not result in the construction contractor or the A/E of record taking their own action. Should the construction contractor or A/E of record later claim that they took action based on something the Contractor did or communicated, the Contractor will be liable for any increased costs or delays incurred by the construction contractor or A/E of record.

B.3.3.3 These on-site visits may include the following:

‐ Inspection of construction activities to ascertain that the work is performed according to sound engineering principles and practices and meets all applicable standards. Each day this type of service is provided, the Contractor shall submit a written report to the COR by close of business (COB) the next regular business day. The format to be followed is set forth in Exhibit B.

‐ Documentation and description of differing site conditions, dates of discovery, potential impact on the project schedule and costs. This documentation shall be part of the inspection report, as the situation requires.

‐ Review of surveys, alignments, and elevations during construction to assure conformance with the drawings and specifications.

‐ Review of construction contractor compliance with the quality level expected for the project. Before any review, the Contractor shall develop procedures for analyzing the quality of work performed. The Contractor shall develop these procedures at the Contractor’s facility and submit them within 5 calendar days of contract award.

‐ Review of the adequacy and acceptability of the engineering aspects of the construction work through field inspections, review of construction reports, and meeting with COR.

‐ Verification that testing and inspection of the construction contractor’s work are accomplished consistent with industry quality standards.

‐ Review of safety standards at the site. Perform weekly safety inspections with the Post Safety Officer and COR. The COR has the authority to direct the construction contractor to correct safety violations.

B.3.4 MISCELLANEOUS DIRECTLY-RELATED SERVICES

Services shall include miscellaneous related services most of which are to be provided on an as-needed basis. One service that must be provided throughout the term of this contract are accurate daily weather reports, to be provided weekly.

The Contractor shall provide the following miscellaneous related on an as-needed basis.

‐ Review the construction contractor’s progress payments submittals for accuracy and acceptability. Following receipt of the construction contractor's request for payment from the COR, and on the basis of an inspection of the work, the Contactor shall perform a review of the progress payment and make a written recommendation to the COR as to the amount which is then due. If, the Contractor recommends less that the full amount, the Contractor shall provide the reasons for the lesser payment.

‐ Inspection and verification that all material and equipment delivered on site and used for the project meet the contract requirements.

‐ Provide a statement of work and cost estimate to the COR if modifications or changes are required to the construction contract. Review of the construction contractor’s proposals and provide written comments to the COR as to their accuracy and advisability. The Contractor shall evaluate and recommend the cost of alternative proposals and substitutions.

‐ Provide assistance to the COR in preparation of a punch list and verification of punch list items being corrected, and recommend issuance of the substantial completion and final completion certificates for the construction.

‐ Establish the methods and procedures to minimize the potential for claims and or the impact of claims against the U.S. Government with minimal disruption to the ongoing construction efforts. The Contractor shall immediately inform the COR of any occurrence whereby the U.S. Government may be found liable for the possible claims by the action or inaction of the construction contractor or the

USG.

‐ Provide back up information and assist the COR in a background role, to resolve any potential claim, or dispute by the construction contractor.

B.3.5 ORDERING

The COR will order the services in B.3. in writing. The Government will not pay for work performed by the Contractor if the work was not ordered in writing by the COR.

The order will include the list of documents to be reviewed or other work activities required on that visit and a proposed time period for the visit. The Contractor proposed dates for the visit must be approved by the COR prior to the visit.

The Contractor shall follow the schedule of inspection as defined in B.3.3. above and set forth as Exhibit C. The COR will order any additional visits in writing. The order will detail the services to be provided or other work activities required on that visit and a proposed time period for the visit. The Contractor-proposed dates for the visit must be approved by the COR prior to the visit.

B.3.6. PAYMENT

The Contractor will be paid at the established (fully burdened) hourly rates identified in A.2.1. for all RFI’s, on site inspections and report preparation associated with the contract drawings or specifications.

Invoicing shall be based on the actual time expended by individuals at the hourly rates specified in A.2.1. The Contractor shall submit certified time cards with each invoice. Facsimile and international telephone calls shall be listed as reimbursable expenses as described below in G.4.0.

B.4.0 REPORTS

B.4.1 FORMAT

Except for the reports whose format is set forth in Exhibit B, all other reports shall be prepared in a consistent format agreed upon with the COR.

B.4.2 REQUIRED REPORTS

An accurate daily record of weather conditions Submittal reviews RFIs Construction meetings with COR.

Reports of inspections A log of site correspondence

B.4.3 ADDRESS

All reports shall be delivered to the address and individual listed in E.2.0.

B.5. CONTRACTING OFFICER’S REPRESENTATIVE

The Contractor shall direct all communication regarding this contract, to the COR or the Contracting Officer. Communication from other Government representatives, the construction contractor, subcontractor and supplies is prohibited. Actions taken by the Contractor as a result of direction from other than the COR or the Contracting Officer are at his own risk. The Government will not pay for work performed by the Contractor if the work was not ordered in writing by the COR, or the Contracting Officer. The Contractor shall not directly communicate with the construction contractor’s representative. See also F.1.0.

B.6. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC)

The Contractor shall carefully review and coordinate submittals with drawings and specifications, and other project documents. The Contractor shall have a quality control program in effect, which will require his employees and consultants to thoroughly review and coordinate all project data. The letter of transmittal, outlining Contractor recommendations, shall certify that all documents have been reviewed and coordinated.

The certification shall be signed by a principal of the Contractor’s firm. The Contracting Officer's Representative (COR) will review and approve the Quality Assurance/Quality Control (QA/QC) program proposed by the Contractor. This program shall indicate the method of controlling the quality of all work produced by the Contractor and consultants.

Refer to FAR Clause 52.236-23, "Responsibility of the Architect/Engineer Contractor".

SECTION C - PACKAGING AND MARKING

C.1 PACKAGING AND MARKING

Packaging and marking shall follow commercial practice.

C.2 PREPARATION OF DELIVERABLE ITEMS

Deliverable items other than letter reports shall be three-hole punched and bound with screw-type binders and rubber bands.

C.3 SHIPPING

The Contractor shall ship drawing sets in rolls or electronically as requested by

COR.

SECTION D - INSPECTION AND ACCEPTANCE

D.1. INSPECTION

The Contractor shall maintain a system of quality assurance and quality control to ensure that all documentation of the design meet the requirements of this contract. The Government reserves the right to inspect the Contractor's work as well as its system of Quality Assurances and Quality Control (QA/QC).

The Contractor's key individual responsible for quality of design/review of submittals is . The Contractor's key individual responsible for quality of documentation is . If a key individual (see D.3 below) needs to be replaced during performance of this contract the Contractor shall submit a resume for a replacement to the COR for approval.

D.2. ACCEPTANCE

The COR shall accept deliverable items. Acceptance or use of documents developed under this contract shall not relieve the Contractor of responsibility of his work, including any design work.

SECTION E - DELIVERIES AND PERFORMANCE

E.1. PERIOD OF PERFORMANCE

The Contractor shall provide the construction inspection services outlined in Section B commencing by the date of notice to proceed and concluding at the end of the construction project, currently scheduled for 18 months, with possibility to extend for additional 6 months.

E.2. DELIVERABLES

The Contractor shall submit all deliverables to the COR at the following address:

U.S. Embassy in Pristina or direct to COR of this contract: slighjd@state.gov

SECTION F - CONTRACT ADMINISTRATION DATA

F.1.0. 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR)

(AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.

(b) The COR for this contract is Mr. John D. Sligh

F.1.1. DUTIES

The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract. The COR is designated as the authority to act for the Contracting Officer in matters concerning technical clarification, inspection, and acceptance of the Contractor's performance under this contract. The COR will coordinate all work with the Contractor during the term of this contract. In no instance is the COR authorized to alter the contract's terms or conditions, including the design to budget parameter. Such changes must be authorized by the Contracting Officer in a written modification to the contract.

F.2.0. INVOICING AND PAYING INSTRUCTIONS

F.2.1 INVOICING

(a) The Contractor shall submit invoices in the original and three copies to the designated billing address indicated in this contract. The COR will determine whether the invoice is complete and proper as submitted. The COR also will determine whether billed services have been satisfactorily performed and whether reimbursable expenses billed are correct. If the amount billed is incorrect, the COR will, within seven days, ask the Contractor to submit a revised invoice. Invoices may be submitted on a monthly basis and shall include:

(1) For Submittal Reviews, the line item submittal review provided, list the date completed, and fixed price.

(2) For preparation of responses to Requests for Information (RFI’s), list the completion date, the individual’s time spent and the time card provided to substantiate costs incurred, in accordance with the rates in A.2.1.

(3) For Site Visits, list the name, the dates of the visit, and the established hourly rate specified in A.2.1 for each individual whose time is being invoiced.

(4) For Inspection Activities, list the name of individual(s), the dates and times of the visit, and the established hourly rate specified in A.2.1 for each individual whose time is being invoiced.

(5) For Other Directly Related Services, list the description of each task completed, the completion date, individual’s time spent and time card to substantiate costs, and price based on rates specified in A.2.1 for each individual whose time is being invoiced.

(6) For Reimbursable Expenses, list expenses and provide sufficient documentation (i.e., bills, receipts, etc.) to substantiate costs incurred.

(b) Payment

The Contractor will be paid in full for:

(1) The line item price listed in Appendix A for the submittals reviewed at the Contractor office accepted and invoiced.

(2) For preparation of responses to Requests for Information (RFI’s), accepted and invoiced.

(3) Each site visit at the established hourly rate per person, for each visit completed and invoiced.

(4) For inspection services at the established hourly rate per person, for each visit completed and invoiced.

(5) For performing Additional Services, accepted and invoiced.

(6) Allowable reimbursable expenses substantiated by documentation.

F.2.2. FINAL INVOICE

The Contractor shall specifically identify its last invoice as "Final Invoice." The final invoice shall include the remaining payments due under the basic contract and any and all modifications issued. The final invoice shall also attach a "Contractor's Release Certificate". The Contractor should keep one copy of the certificate for its files and include the others with each copy of the final invoice. If the Contractor has any questions regarding payment status, contact the designated billing office.

F.2.3. MONTHLY PROGRESS PAYMENTS

Monthly progress payments pursuant to the contract clause FAR 52.232-10 titled "Payments Under Fixed Price Architect Engineer Contracts" are not authorized. Payments for deliverable items listed in Exhibit A shall be made in accordance with FAR 52.232-1, "Payments". For reimbursable expenses listed in Section G.2.0, payment shall be made after an acceptable invoice has been submitted by the Contractor.

F.2.4 DESIGNATED BILLING OFFICE

The Contractor shall mail invoices to:

U.S. Embassy # ATT:

FMO

Pristina, Kosovo 4Korriku # 25

Invoices shall reflect the contract number and the name of the COR.

SECTION G - SPECIAL TERMS AND CONDITIONS

G.1.0. SECURITY

The following considerations must be followed by the Contractor and/or must be incorporated into any deliverables submitted under this contract.

G.1.1. All documents received or generated under the contract are the property of the U.S. Government.

G.1.2. All documents are to be controlled and disseminated on a need-to-know basis. Reproduction and distribution is prohibited without express approval of the U.S.

Government. The Contractor shall mark all design and construction documents as follows:

WARNING

This document is the property of the United States Government. Further reproduction and/or distribution is prohibited without the express written approval of:

U.S. EMBASSY IN PRISTINA

G.1.3. Proposed and actual contract documents shall only be disseminated on a strict need-to-know basis, and shall not be further disseminated without prior authorization from the Department of State.

G.1.4. Contractor personnel receiving proposed or actual contract documents, to include blueprints, other technical drawings, sketches, submittals, RFI’s, photographs, exposed negatives, and/or descriptive narratives pertaining to the project, shall be responsible for these materials while in their possession, or that of any of their subcontractors. The Contractor shall return all documents, including all copies, promptly upon demand by the Government.

G.1.5. Photographs of any public areas of any U.S. diplomatic or consular facility overseas must be approved and authorized in advance by the Site Security Manager (SSM) and/or the Senior Security Officer (SSO). The SSO or SSM will establish any controls, limits, and/or other restrictions as deemed necessary. The Contractor shall submit a written request for authorization for such photography citing the reason(s) and use(s) for the photographs and/or negatives.

G.1.6. The Department of State shall be afforded the opportunity to review all photographs and negatives in advance of any public use, and reserves the right to deny such use. No further dissemination, publication, duplication, or other use beyond that which was requested and approved under this contract is authorized without specific advance written approval from the Department of State.

G.1.7. Department reserves the right to demand retention of all copies of photographs and negatives.

G.2. STANDARDS OF CONDUCT

The Contractor shall maintain satisfactory standards of competency, conduct, cleanliness, appearance and integrity. Each Contractor employee is expected to adhere to standards of conduct that reflect credit on themselves and the United States Government.

G.3.0. REIMBURSABLE EXPENSES

Reimbursements for Construction Inspection Services. Reimbursable Expenses shall not include overhead, G&A, or profit and should not exceed $5,000.00 unless this amount is increased in writing by the Contracting Officer

G.4.0. ORGANIZATIONAL CONFLICTS OF INTEREST

Neither the Contractor nor any of its employees, affiliates, or related entities may participate in any way in the construction contract identified in B.1.0. The Contractor, its employees, affiliates, or related entities may not provide consulting or subcontract services related to the construction contract, to any party other than the U.S. Government.

The Contractor shall include this clause in all subcontracts, purchase orders, and consulting agreements for service.

G.5.0. RELEASE OF INFORMATION

All data furnished to the Contractor and data developed in connection with the project shall be considered privileged. The Contractor shall not make public announcements, including news and press releases; these are the prerogative of the Contracting Officer.

G.6.0. NOTIFICATION OF CHANGES

G.6.1. This clause applies to changes other than changes directed by the Government pursuant to the contract clause titled "52.243-1 Changes - Fixed Price (AUG 1987) Alternate III (APR 1984)."

G.6.2. DEFINITIONS. "Contracting Officer," as used in this clause, does not include representatives of the Contracting Officer.

G.6.3. NOTICE. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to be a change to this contract.

Except for changes identified in writing and signed by the Contracting Officer, the Contractor shall notify the Contracting Officer in writing within ten (10) days from the date the Contractor identified any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. Any notification received after 10 days will not be considered. On the basis of the most accurate information available to the Contractor, the notice shall state

(i) The date, nature and circumstances of the conduct regarded as a change;

(ii) The name, function, and activity of each Government individual and

Contractor official or employee involved in or knowledgeable about such conduct;

(iii) The identification of any documents and the substance of any oral communication involved in such conduct;

(iv) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;

(v) The particular elements of contract performance that the Contractor may seek an equitable adjustment under this clause, including –

What contract line items have been or may be affected by the alleged change;

What labor or materials or both have been or may be added, deleted, or wasted by the alleged change;

To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change;

What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and

(vi) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay, or disruption of performance.

G.6.4. CONTINUED PERFORMANCE. Following submission of the notice required above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor. Unless the notice reports a direction of the Contracting Officer or a communication from a representative of the Contracting Officer, the Contractor shall continue performance. However, if the Contractor regards the direction or communication as a change as described above, notice shall be given in the manner provided.

G.6.5. GOVERNMENT RESPONSE. The Contracting Officer shall, within thirty

(30) days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall -

(1) Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;

(2) Countermand any communication regarded as a change;

(3) Deny that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance; or

(4) Advise the Contractor what additional information is required and when, and establish the date by which it should be furnished and the date the Government will respond.

G.6.6. EQUITABLE ADJUSTMENTS

If the Contracting Officer confirms that the Government conduct effected a change as alleged by the Contractor, and the conduct causes an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, the Government will modify the contract to make an equitable adjustment -

(1) In the contract price or delivery schedule or both; and

(2) Any other term of the contract affected.

G.6.7. Failure to agree to any adjustment shall be a dispute under the Disputes clause. Nothing in this section shall relieve the Contractor from proceeding with the work.

G.7.0 PERSONNEL SECURITY

After award of the purchase order, the Contractor has five (5) calendar days to submit to the COR a list of personnel assigned to this project who will require access to the construction site, for the Government to conduct all necessary security checks.

Information necessary to process clearance of personnel: Full name, ID#, Date of Birth, Place of Birth, Nationality and a recent photograph.

Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application. Once the Government has completed the security screening and approved the applicants, they will be given access to the site. Access to the site may be revoked at any time due to falsification of data or misconduct on site.

SECTION H - CLAUSES

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.

THE FOLLOWING FEDERAL ACQUISITION REGULATION (FAR) CLAUSES ARE

INCORPORATED BY REFERENCE:

CLAUSE TITLE AND DATE

52.202-1 DEFINITIONS (JUN 2020)

52.203-3 GRATUITIES (APR 1984)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2018)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE

(OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2016)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATION AND VIDEO SURVEILLANCE SERVICES

OR EQUIPMENT (AUG 2020)

52.204-27 PROHIBITION ON A BYTEDANCE COVERED

APPLICATION (JUN 2023)

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED OR PROPOSED FOR DEBARMENT (JUN 2020)

52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND

REMEDIES (NOV 2023)

52.222-50 COMBATING TRAFFICKING IN PERSONS (OCT 2020)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (JUN 2020)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND

TRANSLATION OF CONTRACT (FEB 2000)

52.227-17 RIGHTS IN DATA – SPECIAL WORKS (DEC 2007)

52.228-4 WORKERS’ COMPENSATION AND WAR HAZARD INSURANCE

OVERSEAS (APR 1984)

52.228-3 WORKER’ S COMPESATION INSURANCE (Defense Base Act)

(JUL 2014)

52.229-6 TAXES – FOREIGN FIXED PRICE CONTRACT(FEB 2013)

52.232-1 PAYMENTS (APR 1984)

52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND MATERIALS

LABOR-HOUR CONTRACTS (AUG 2012)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-1 PAYMENTS ( APR 1984)

52.232-11 EXTRAS (APR 1984)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

52.232-26 PROMPT PAYMENT FOR FIXED-PRICE ARCHITECT-ENGINEER

CONTRACTS (JULY 2013)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR

(APR 1984)

52.236-24 WORK OVERSIGHT IN ARCHITECT-ENGINEER CONTRACTS

(APR 1984)

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT AND

VEGETATION (APR 1984)

52.242-14 SUSPENSION OF WORK (APR 1984)

52.243-1 CHANGES – FIXED-PRICE (AUG 1987) ALTERNATE III (APR 1984)

52.243-3 CHANGES – TIME-AND-MATERIAL OR LABOR-HOUR (SEPT 2000)

52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)

52.246-6 INSPECTION – TIME-AND-MATERIAL AND LABOR-HOUR

(MAY 2001) ALTERNATE I (APR 1984)

52.246-26 REPORTING NONFORMING ITEMS (DEC 2019)

52.249-14 EXCUSABLE DELAYS (APR 1984)

52.249-7 TERMINATION (FIXED-PRICE ARCHITECT-ENGINEER) (APR 1984)

FEDERAL ACQUISITION REGULATION (FAR) CLAUSES INCORPORATED IN

FULL TEXT

52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER

THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES)

(NOV 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV

2021) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub.

L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN

2023) (Section 102 of Division R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

(viii) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(ix) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(x) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C.3553).

(xi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) ( Pub.

L. 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.233-1, Disputes (MAY 2014).

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (NOV 2023).

(viii) 52.253-1, Computer Generated Forms (JAN 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (NOV

2023) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) ( 41 U.S.C.chapter

65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (JUN

2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (JUN

2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(viii) 52.222-41, Service Contract Labor Standards (AUG

2018) ( 41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(ix)

(A) 52.222-50, Combating Trafficking in Persons (NOV

2021) ( 22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.

Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).

(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN

2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).

(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv) 52.223-15, Energy Efficiency in Energy- Consuming Products (MAY 2020) ( 42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP)) will be-

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xvi) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvii) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xviii)

(A) 52.225-1, Buy American-Supplies (OCT 2022) ( 41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition-

(1) Is set aside for small business concerns; or

(2) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).

(B) Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end product in paragraph (a) of 52.225-1: (A) The cost of its components mined, produced, or manufactured in the United States exceeds __65__ percent of the cost of all its components.

(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations., Promoting Excess Food Donation to Nonprofit Organizations (JUN

2020) ( 42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).

(xx) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).

(xxi) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305)(Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)

(ii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).

(iii) 52.211-17, Delivery of Excess Quantities (Sept 1989) (Applies to fixed-price supplies).

(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).

(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

(d) Inspection/Acceptance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .