This is a Request for Quotation (RFQ) for the procurement and turnkey installation of a center pivot irrigation system to replace a damaged unit at the Roman L. Hurska U.S. Meat Animal Research Center (USMARC) in Clay County, Nebraska. The solicitation number is 1232SA26Q0390, issued by USDA ARS Acquisition and Property Division on March 31, 2026, with quotes due by April 13, 2026 at 5:00 p.m. ET. This is a Total Small Business Set-Aside under NAICS code 333111 with a 1,250-employee size standard. The acquisition is unrestricted with FOB Destination and requires delivery within 60 days of award. The site visit is scheduled for Friday, April 3, 2026 at 9:00 a.m., and questions must be submitted by April 7, 2026 at 1:00 p.m. ET to the Contracting Officer, Richard Hawthorne, at Richard.hawthorne@usda.gov. All quotes must include company letterhead, SAM.gov UEI Number, technical documentation with meets/does not meet statements for minimum specifications, a Firm-Fixed-Price for the complete turnkey project including equipment, shipping, installation labor, concrete pad, and hookups, estimated lead time/completion date, and validation that the quote is valid for at least 60 days.
The required center pivot system must be a hot-dipped galvanized, seven-tower system with approximately 1,296 feet length, GPS-ready VRI sector programming, and specialized sprinkler packages. Key specifications include 105-inch minimum ground clearance, 150-inch minimum wheelbase, 11.2" x 38" 8-ply tires, 16 programmable sectors with remote control capability, automatic application depth changes by field position, Nelson SR-100 end gun with 2-horsepower pressure booster pump achieving 110-130 feet throw at 800 GPM, and electrical or hydrostatic drive options with full hookup installation. The system must accommodate existing field obstacles including water tanks and permanent fences. Evaluation will be based on price and technical capability, with the Government reserving the right to select a superior technical solution even if not the lowest priced. Award will be made to one contractor representing the best value to the Government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional Questions and Answers.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
ARS-1232SA
BELTSVILLE MD 20705
RM 3-2102
5601 SUNNYSIDE AVENUE
USDA ARS ACQUISITION AND PROPERTY D
ARS-126538 CODE 16. ADMINISTERED BYCODE
X
X
X
333111
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORARS-1232SA
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
04/13/2026 1700 ET
03/31/2026
6626865296RICHARD HAWTHORNE
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
1232SA26Q0390
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 15 1163649OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
CLAY CENTER NE 68933
P.O. BOX 166, STATE SPUR 18D
PA U.S. MEAT ANIMAL RESEARCH CENTER
15. DELIVER TO
BELTSVILLE MD 20705
RM 3-2102
5601 SUNNYSIDE AVENUE
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
1,250
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
USDA ARS ACQUISITION AND PROPERTY D
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 60 Days After Award
0001 Pivot and the installation of pivot
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
FRANK C. PALMER
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
15 2 of
Center Pivot Replacement
1232SA26Q0390
Description -
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1232SA26Q0390 is issued as a Request for Quotation (RFQ) for a Center Pivot Replacement.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 333111 The small business size standard is 1250 employees This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Statement of Requirement
The USDA Agricultural Research Service requires the procurement and turnkey installation of a new center pivot irrigation system to replace a damaged unit at the Roman L. Hurska U.S. Meat Animal Research Center (USMARC) in Clay County, Nebraska. The project calls for a hot-dipped galvanized, seven-tower system featuring GPS-ready VRI sector programming and specialized sprinkler packages, with completion expected within 30 to 45 days of award. For detailed specifications, refer to the provided Statement of Work.
Award Type
The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.
Evaluation and Basis for Award
The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government.
The Government will conduct a comparative evaluation of quotes to select the Contractor that is best suited to fulfill the requirement. The evaluation factors are: Price and Technical Capability.
Technical Capability will be evaluated based on the offeror’s ability to meet the salient characteristics of the pivot system, including the accuracy of the proposed sprinkler package and the system’s ability to navigate existing field obstacles (water tanks/fences). The Government reserves the right to select a quote that represents a superior technical solution, even if it is not the lowest priced.
Submission Requirements:
To be considered, provide a quote on company letterhead including:
• Vendor Details: SAM.gov UEI Number.
• Technical Documentation: Descriptive material and a "meets/does not meet" statement for the minimum specifications.
• Pricing: Provide a Firm-Fixed-Price (FFP) for the turnkey project. This price must be F.O.B.
Destination and include all equipment, shipping, installation labor, the concrete pad (if required), and all necessary hookups.
• Timeline: Estimated lead time/completion date.
• Validity: Quote must be valid for at least 60 days.
Offerors shall identify where the offered item meets or does not meet each of the Government's functional and performance minimum specifications listed herein.
Please ensure all email correspondence includes the solicitation number in the subject line. Emails without the RFQ number in the subject line may not be seen, read, and /or reviewed and therefore disqualified from consideration.
QUESTIONS REGARDING THIS RFQ ARE DUE TO RICHARD HAWTHORNE at Richard.hawthorne@usda.gov, NO LATER THAN 1:00 p. m. ET, April 7th, 2026. Questions will only be accepted via email and WILL NOT be answered if received after this date/time.
QUOTES REGARDING THIS RFQ ARE DUE TO RICHARD HAWTHORNE at Richard.hawthorne@usda.gov , NO LATER THAN 5:00 p. m. ET, April 13th, 2026.
Place of Performance:
USDA – ARS - USMARC
844 Road 313 Clay Center, NE 68933
Site Visit Information
• Date/Time: 9am, Friday 4/3/26
• Meeting Location: 844 Road 313,Clay Center, NE 68933
• POC for Access: Danny Trausch, 402-762-4120, danny.trausch@usda.gov
• Inquiries: The POC is for site visit coordination and physical access only. The POC is not authorized to discuss the RFQ, technical specifications, or contract terms. All formal inquiries and Requests for Information (RFIs) must be submitted in writing to the Contract Specialist at Richard.hawthorne@usda.gov. Any information obtained from unauthorized sources is unofficial and non-binding. Bidders who attempt to bypass formal RFI procedures or seek an unfair competitive advantage through unauthorized technical contact may have their proposals found non-responsive.
mailto:Richard.hawthorne@usda.gov
Statement of Work
29BC IRRIGATION PIVOT SYSTEM
A. BACKGROUND AND PURPOSE:
Scientists at the Roman L. Hurska U.S. Meat Animal Research Center (USMARC) are developing scientific Information and new technologies to solve high priority problems for the U.S. beef, swine, and sheep industries. USMARC can produce a large amount of the feed required to feed such a large animal population. Nearly all the fields used to produce forage, and other feeds are under pivots to keep the crops properly watered and at peak production. Due to extreme weather conditions resulting in damage to one pivot we are in need of a full replacement.
B. CONTRACTOR REQUIREMENTS:
1. GENERAL SPECIFICATIONS
Pivot will be installed in half section of 29-6-7W in Clay County Nebraska. This pivot is currently a 2012-2015 Reinke System with a total wetted radius of approximately 1335 feet and is situated in the middle of the section.
Equipment manufacturer shall have a continuous production record of center pivot irrigation systems for a minimum of 15 years.
The center pivot system(s) provided by the manufacturer should be of their latest and proven design.
All structural members of the center pivot systems including the pipe, shall be hot-dipped galvanized on all surfaces. Certain nominal items/brackets may be painted.
System should be of standard height with a minimum 105” ground clearance at the lowest truss.
Wheelbase shall be minimum 150”.
The center pivot system shall be equipped with 11.2” x 38” 8 ply+ non-directional tires and appropriately sized wheels.
Existing chemigation valve, flow meter and service pipe may be reused on new installation. If existing equipment is not reusable, include replacement prices with pivot bid.
The center pivot systems shall be a minimum of seven towers, overall length of approximately 1296 feet. Typical ¼ section center pivot, site visitation is highly recommended to ensure that pivot is optimally sized to maintain existing irrigated acres and avoids obstacles located under the pivot. This pivot is in an irrigated pasture with water tanks and the pivot must be measured to miss the water tanks and permanent fences established.
One copy of all pertinent instruction and/or operation manuals shall be provided with the center pivot installed.
Materials, equipment, and services not specifically mentioned in these specifications, but are obviously required for the completion of the installation, shall be provided, or installed by the successful offeror as though fully specified and shown.
2. SYSTEM CONTROL FEATURES:
The system shall be designed and installed to meet the following criteria:
• Travel direction and application depths with at least 16 programable sectors controlled at pivot point. GPS Position and remote control ready.
• Application depth changes automatically by field position using VRI sector programming.
• Endgun, stop in slot, and auto reverse controlled and set from pivot point electronically and remote control ready.
• Automatic start up on water pressure for 480-volt systems.
• Beacon light located at pivot point indicating operation status.
3. SPRINKLER PACKAGE:
The system shall be designed and installed to meet the following criteria:
• Design flow of 5.6 GPM/ACRE minimum but the well pumps 800 GPM currently.
• The pivot is serviced by 480 volts at the pivot point.
• Top inlet pressure 30 to 35 PSI, End pressure 20 to 25 PSI with Nelson Rotators.
• Sprinkler package – Standard outlet spacing for the system. Preference for an above pipe sprinkler package. Sprinkler packages for perennial pasture should be of type and/or design that will not apply water on tower wheel tracks.
• A Nelson SR-100 (or equal) end gun with pressure booster pump (2 horsepower), sized to match water distribution of main spans. The end gun must achieve a minimum throw of 110-130 feet while maintaining correct pressure and flow of 800 Gallons per Minute.
This end gun shall include slow-reverse or impact drive design.
• One copy of sprinkler package design printout shall be provided for each pivot.
• The systems will be used on primarily level upland Hastings and Crete silty clay loams.
4. Specifications for Hydrostatic drive center pivot systems:
• Hydrostatic drive systems shall meet all the structural, control features and general specifications previously described and the following:
• Irrigation system should be equipped with swivel pivot point.
• The Contractor shall evaluate the existing pivot point (as described in the Site Visitation section of this SOW). If the existing concrete pad is found to be cracked, undersized, or otherwise incompatible with the new hydraulic pump mounting, the Contractor shall provide and install a new separate or attached concrete pad as part of the turnkey installation
• All necessary hydraulic and electrical hookups shall be made by the successful bidder.
5. Specifications for electric drive center pivot systems:
• Electric drive systems shall meet all the structural, control features and general specifications previously described and the following:
• All electrical controls and installations should meet or exceed NEMA specifications.
Systems shall be properly grounded in accordance with the National Electric Code.
• Surge and over current protection: Lightning arrestor.
• All necessary electrical hookups shall be made by the successful bidder.
C. Deliverable/Schedule/Address:
Normal business hours are anticipated for installation, but 1 weeks’ notice of prior approval to install the pivot is required. Installation should take between 30 to 45 days from time of award.
• Place of Performance
USMARC
844 Road 313 Clay Center, NE 68933
D. Site Visit Information
• Date/Time: 9am, Friday 4/3/26
• Meeting Location: Specify meeting location
• POC for Access: Danny Trausch, 402-762-4120, danny.trausch@usda.gov
• Inquiries: The POC is for site visit coordination and physical access only. The POC is not authorized to discuss the RFQ, technical specifications, or contract terms. All formal inquiries and Requests for Information (RFIs) must be submitted in writing to the Contract Specialist at Richard.hawthorne@usda.gov. Any information obtained from unauthorized sources is unofficial and non-binding. Bidders who attempt to bypass formal RFI procedures or seek an unfair competitive advantage through unauthorized technical contact may have their proposals found non-responsive.
Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.
Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)
☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)
☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov
2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025) ☐ Alternate I (Mar 2020).
☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☒ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010 ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)
☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☒ 52.223-23 Sustainable Products and Services ☒ 52.225-1 Buy American-Supplies (Nov 2025)
☐ Alternate I (Oct 2022) of 52.225-1 ☒ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)
☐ Alternate II (Nov 2025) of 52.225-3.
☐ Alternate III (Nov 2025) of 52.225-3.
☐ Alternate IV (Oct 2022) of 52.225-3
☐ 52.225-5 Trade Agreements (Nov 2023) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.240-92 Security Requirements (Nov 2025)
Other Applicable Clauses
52.247-34 F.O.B. Destination (Jan 1991)
AGAR Clauses
452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec
(a) By entering into this contract, the Contractor certifies that:
(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.
(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the Contractor and any subcontractor or teaming partner will not do so for the duration of the contract.
(b) If the Contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the Contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
(c) The Contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the Contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.
(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.
(e) Submission of a knowing false statement relating to Contractor’s compliance with the above requirements and/or eligibility for the contract may subject the Contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.
(f) The Contractor must include the provisions of this clause in all subcontract solicitations.
(g) Failure on the part of the Contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.
(End of Clause)
452.204–70 Modification for Contract Closeout (Nov 2025)
(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The Contracting Officer shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation.
The contractor will receive a copy of the modification and will be required to provide a signature.
(The Contracting Officer may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 60 days, the Contracting Officer shall release the modification as unilateral and proceed with contract close-out upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a ‘‘Contractor Release of Claims’’ and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 120 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(End of Clause)
(END OF CLAUSES)
52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (Sep 2025) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Sep 2025) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)
The following provisions are applicable if checked:
☐ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) ☒ 52.204-7 System for Award Management—Registration (Nov 2025)
☐ Alternate I (Nov 2025) to 52.204-7
☐ 52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts) (Aug 2024) ☐ 52.223-4 Recovered Material Certification (May 2008) ☒ 52.225-2 Buy American Certificate (Oct 2022) ☒ 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025) ☐ 52.225-6 Trade Agreements-Certificate (Feb 2021)
Other Applicable FAR Provisions
52.225-18 Place of Manufacture (Aug 2018)
AGAR Provisions
452.203-70 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Certification (Dec
(a) By submission of its offer, the offeror certifies that:
(3) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution.
(4) Neither it nor any proposed subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution.
(b) If the offeror participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, by submission of its offer, the offeror certifies that it is compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
(c) The offeror affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.
(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.
(e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.
(f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default.
(End of Provision)
452.211-70 Brand Name or Equal (Sep 2025)
(a) If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.
(b) To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must-
(5) Meet the salient physical, functional, or performance characteristics specified in this solicitation;
(6) Clearly identify the item by-
i. Brand name, if any; and
ii. Make or model number;
(7) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(8) Clearly describe any modifications the offeror plans to make to a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.
(End of provision)
(END OF PROVISIONS)
NOTICE FOR FILING AGENCY PROTESTS
United States Department of Agriculture (USDA) Ombudsman Program
The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner.
The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO.
Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.
Informal Forum with the Ombudsman
1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.
2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.
3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman
1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.
2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.
3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.
4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3).
Failure to submit the required information may result in a delay or dismissal of the protest.
5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.
6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.
Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.
mailto:SPE.inquiry@usda.gov
IPP.gov
How to enroll in IPP
Vendors that are required to submit an invoice through IPP do not need to contact IPP to enroll.
Enrollment will be initiated by the agency they are doing business with and will be completed by IPP.
Once enrolled, vendors will receive two emails with an IPP login ID and a temporary password.
If you already have an IPP.gov account, but do not know your login info, please have your Tax ID Number (TIN) ready when your reach out to IPP.
What happens next?
• After an account is established, you will receive two emails. The first one will include your IPP User ID, and 12 to 24 hours later a second email will give you a 12-character password. Use the ID and password to log onto IPP. You will be asked to change the temporary password to one of your own choosing, agree to the rules for using IPP, and set up the answers to security questions.
As a vendor who provides goods or services to a government agency, once logged in you will be granted access to IPP's Collector module which will allow you to view purchase orders, submit invoices, access payment information, and more.
• Please note that only one Administrator can be initially enrolled in your IPP vendor profile. The Administrator can then add additional users as necessary.
• Allow 5 to 10 business days for registration.
• All government vendors must register and continue to maintain their account data in the System for Award Management (SAM) registry and activate it annually. Please visit http://www.SAM.gov/ for more information.
E-mail notifications of payments are sent when a payment is distributed to your bank account and will include all pertinent payment information. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding bank holidays) from 8:00AM - 6:00PM ET, including answering any questions related to accessing IPP or completing the registration process. Their tollfree number is (866) 973-3131 or they can be reached at: IPPCustomerSupport@fiscal.treasury.gov
| Statement of Requirement |
| ADPC57E.tmp |
| A. BACKGROUND AND PURPOSE: |
| 1. GENERAL SPECIFICATIONS |
| Design flow of 5.6 GPM/ACRE minimum but the well pumps 800 GPM currently. |
| The pivot is serviced by 480 volts at the pivot point. |
| Top inlet pressure 30 to 35 PSI, End pressure 20 to 25 PSI with Nelson Rotators. |
| Sprinkler package – Standard outlet spacing for the system. Preference for an above pipe sprinkler package. Sprinkler packages for perennial pasture should be of type and/or design that will not apply water on tower wheel tracks. |
| 4. Specifications for Hydrostatic drive center pivot systems: |
| Irrigation system should be equipped with swivel pivot point. |
| The Contractor shall evaluate the existing pivot point (as described in the Site Visitation section of this SOW). If the existing concrete pad is found to be cracked, undersized, or otherwise incompatible with the new hydraulic pump mounting, the Co... |
| All necessary hydraulic and electrical hookups shall be made by the successful bidder. |
| 5. Specifications for electric drive center pivot systems: |
| All necessary electrical hookups shall be made by the successful bidder. |
| Normal business hours are anticipated for installation, but 1 weeks’ notice of prior approval to install the pivot is required. Installation should take between 30 to 45 days from time of award. |
| Place of Performance |
| USMARC |
| 844 Road 313 |
| Clay Center, NE 68933 |
File details come from the government source that posted it. Updated .