This document is Addendum Number 1 for the Ames Laboratory RFP SC-25-672 Magnet Testbed - Phase 2 project. The addendum, issued on 6/27/2025, modifies the original Request for Proposal dated 6/9/2025 and includes updates to project specifications, drawings, and acceptable products. Key modifications include revisions to compressed gas piping testing procedures, changes to electrical and lighting fixture schedules, and updates to the room finish schedule. The proposal due date remains 7/9/2023 at 4:00 p.m. CDT.
The addendum addresses multiple technical aspects of the project, including crane rail adjustments, fire protection plans, and room-specific details for areas such as the Magnet Testbed (Room 160A), Gas Canister Storage (Rooms 285-286), and Control Room (Room 287). It also provides clarifications on several questions raised, such as slab adequacy, equipment installation, and coordination with Arcast for utility needs. Attachments include existing fire protection as-built documents and architectural and fire protection plan drawings.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ames Laboratory RFP SC-25-672 ADDENDUM NUMBER 1
ADDENDUM NUMBER 1
ADDENDUM DATE: 6/27/2025
PROJECT: RFP SC-25-672 Magnet Testbed – Phase 2
PROPOSAL DUE DATE: 7/9/2023 at 4:00 p.m. CDT
ADDENDUM ISSUED DATE: 6/27/2025
The information contained in this Addendum modifies, supplements, or replaces information contained in the RFP dated 6/9/2025 and Bidding Documents dated 6/9/2025 and is hereby made a part of the Contract Documents.
Acknowledge receipt of this Addendum with your proposal submission
Addendum consists of 4 pages and 3 pages of attachments.
ADDENDUM INDEX
GENERAL ITEMS: None.
APPLICABLE TO THE PROJECT SPECIFICATIONS: Items 1 thru 3.
APPLICABLE TO THE DRAWINGS: Items 1 thru 4.
ADDITIONAL ACCEPTABLE PRODUCTS AND SYSTEMS Items 1 thru 2.
QUESTIONS AND ANSWERS Items 1-11.
ATTACHMENTS:
Specifications:
Appendix A Existing Fire Protection As-Built Documents.
Drawing Sheets (1 Sheet each):
2A-101 – LEVEL 1 – ARCHITECTURE.
2FP-101 – LEVEL 1 AND LEVEL 2 – FIRE PROTECTION PLAN
APPLICABLE TO THE PROJECT SPECIFICATIONS
1. SECTION 00 01 00 – TABLE OF CONTENTS
1.1. ADD Appendix A Existing Fire Protection As-Built Documents
2. SECTION 22 15 13 – COMPRESSED GAS PIPING
2.1. Refer to Article 2.1, Paragraph A.1.c REMOVE period from end of email “Jeffrey.Jordan@swagelok.com”
2.2. Refer to Article 3.5, Paragraph C, REVISE sub-paragraph 1 as follows:
1 “Piping Leak Tests: Test new and modified parts of existing piping. Pneumatically test in accordance with ASTM B31.1 that is not less than 1.2 times the system working pressure.
Test pressure shall not exceed maximum pressure for any vessel, pump, valve, or other component in system under test.”
2.3. Refer to Article 3.5, Paragraph C, REVISE sub-paragraph 2 as follows:
“2. The pressure in the system shall gradually be increased to not more than 1/2 of the test pressure, after which the pressure shall be increased in steps of approximately 1/10 of the test pressure until the required test pressure is reached. The pressure shall be continuously maintained for a minimum time of 10 min. It shall then be reduced to the lower of design pressure or 100 psig and held for such time as may be necessary to conduct the examination for leakage. Examination for leakage by soap bubble or equivalent method shall be made of all joints and connections.”
3. ADD APPENDIX A Existing Fire Protection As-Built Documents in its entirety.
APPLICABLE TO THE DRAWINGS
1. DRAWING SHEET A-101 – LEVEL 1 ARCHITECTURE
1.1. Room Finish Schedule:
1.1.1. Room 285-286, REVISE floor finish to CONC-1.
1.2. Drawings D4:
1.2.1. ADD note N9 “REMOVE AND REINSTALL CRANE STOP AT BOTH RAILS SO THAT
THE WEST-MOST PART OF THE CRANE, REGARDLESS OF ELEVATION, STOPS 6"
EAST OF ATOMIZER PLATFORM.”
2. DRAWING SHEET 2FP101 – LEVEL 1 AND LEVEL 2 FIRE PROTECTION PLAN
2.1. ADD detail view A1.
2.2. ADD keyed note FP05.
3. DRAWING SHEET 2ED601 – ELECTRICAL SCHEDULES – DEMOLITION
3.1. REVISE General Note D to the following:
3.1.1. “ALL WORK ASSOCIATED WITH RECIRCUITING OF ROOM 160 MACHINE SHIP
DEVICES AND EQUIPMENT SHALL BE INCLUDED AS PART OF ALTERNATE 01 03.”
4. DRAWING SHEET 2EL102 – LEVEL 2 – LIGHTING PLAN
4.1. REVISE Lighting Fixture Schedule, Equals Column as follows:
4.1.1. F1: COOPER METALUX BAA-8SNX-SL3-LW-UNV-CC83-CD1-PAF
4.1.2. F2: FINELITE HPR LED - A - 2x4 - S - 840 - DCO - 96LG - 277 - SC - FC-10% - C1 - 96LG
4.1.3. F2E: FINELITE HPR LED - A - 2x4 - S - 840 - DCO - 96LG - 277 - SC - FC-10% - C1 -
96LG - LGD10W
ADDITIONAL ACCEPTABLE PRODUCTS AND SYSTEMS
1. 23 34 23 – HVAC POWER VENTILATORS
1.1. ADD JencoFan.
2. 23 21 23 – HYDRONIC PUMPS
2.1. ADD Ebara Pumps
QUESTIONS AND ANSWERS
1. Is the slab in Room 160A adequate to support the Atomizer platform and equipment? Is there a need for footings?
1.1. Yes, the existing 6” slab in Room 160 A is adequate to support the Atomizer platform and equipment without the need for footings. Please note drawings 5A/2G-001 showing the anchoring detail for the platform into the existing slab. – MG, BBS
2. Is the slab in the Gas Canister Storage room adequate to support the equipment? Is there a need for structural modifications/support?
2.1. TBD – MG, BBS
3. Please confirm the MEP drawings and specifications have been coordinated with Arcast for their equipment utility needs.
3.1. Yes. – EK, BBS
4. Please provide the proposed installation duration from Arcast for the Atomizer platform and equipment.
4.1. This is unknown at this time and will be dependent on coordination with the GC and owner for installation and startup of the Atomizer equipment and supporting infrastructure. -MA, Ames Lab.
5. It was mentioned during the site visit that the existing fire protection drawings would be provided. Please provide. ?
5.1. See Appendix A. – EK, BBS
6. Please verify what PSI the piping downstream of the AR compressor needs to be tested at. ?
6.1. Refer to 22 15 13 Article 3.5. – EK, BBS
7. Has Arcast's schedule been taken into account when generating the project milestone schedule in specification section 00 30 00?
7.1. Yes, the Arcast schedule has been coordinate to align with the proposed project milestone schedule. -MA, Ames Lab
8. During the site visit it was noticed that Room 287 has a sink that the drawing doesn't address.
Please advise if it is to remain in place or if it is to be removed?
8.1. If add alternate 1 is not accepted the sink remains, if add alternate 1 is accepted the sink is removed. -MA, Ames Lab
9. Please confirm all furnishing (desks, chairs, etc) will be removed from the spaces prior to the start of construction.
9.1. Yes, all furniture will be removed prior to the start of construction. -MA, Ames Lab
10. Drawing sheet 2A-102 indicates Room 285-286 is to receive concrete sealer. The Room Finish Schedule on drawing sheet 2A-101 indicates Room 285-286 is to receive carpet tile. Please advise which one is correct.?
10.1. Room 285-286 is to receive concrete sealer, not carpet. Room finish schedule will be updated in Add-01. – MG, BBS
11. Has the fire suppression occupancy classification for Room 285-286 been reviewed/re-evaluated to see if the existing fire suppression system can handle to new room use? Is there a new for clean agent system?
11.1. No need for clean agent system. -MA, Ames Lab
11.2. See 2FP101 updated in this addendum. Occupancy classification OF 285-286 IS the same as Magnet Testbed 160A which is the hydraulically most remote area of the building and greater than 1200 square feet. -EK, Ames Lab
Issued 6/27/2025
Appendices
Appendices
THIS PAGE
INTENTIONALLY
LEFT BLANK
UP
9 12 14
N
M
L
La
Lb
2A-102D4
D1
2A-102
160A
26 24 1626 24 1626 24 1626 24 16
160A.1
26 24 16
N4
N4
N4
F V
F V
5 3/4" FV
6' - 4"
5 3/4" FV
6' - 4" 6' - 4"
5 3/4" FV
6' - 4" 6' - 4"
2A-101
D4
ALIGN FACE
OF COLUMN
WITH FACE
OF FRAME
OWNER
PROVIDED
SIGNAGE
D3
2A-102 MAGNET
TESTBED
160A
CORRIDOR
005-S16
MACHINE
SHOP
N7
N5
2G-001
5A TYP
9 12
N
M
L
La
Lb
MACHINE
SHOP
D5
D6
D7
DEMOLITION GENERAL NOTES
A. PERFORM DEMOLITION WITHOUT DAMAGE TO
ADJACENT RETAINED CONSTRUCTION. WHERE SUCH
DAMAGE OCCURS, PATCH, REPAIR, OR OTHERWISE
RESTORE TO ITS ORIGINAL CONDITION.
B. PATCH AND REPAIR ALL OPENINGS AND VOIDS LEFT BY
REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT,
PIPING, DUCTS, CONDUIT, ETC. AS REQUIRED TO
MATCH FINISHED ADJACENT.
C. PROVIDE TEMPORARY SHORING AS REQUIRED FOR
SELECTIVE DEMOLITION.
D. UNLESS SPECIFICALLY INDICATED OTHERWISE,
REMOVE ALL DEMOLISHED MATERIALS FROM THE SITE
AND FOLLOW IOWA DNR AND LANDFILL PROCEDURES
TO PROPERLY SEPARATE AND DISPOSE OF MATERIALS
REMOVED FROM THE SITE.
E. PROVIDE ALL DEMOLITION AND DISPOSAL AS
REQUIRED FOR INSTALLATION OF NEW WORK AS
INDICATED, OR AS REASONBLY IMPLIED BY THESE
CONSTRUCTION DOCUMENTS.
F. STORE AND PROTECT ALL SALVAGED ITEMS NOTED OR
REQUESTED TO BE RETURNED TO OWNER.
COORDINATE WITH OWNER FOR THE LOCATION OF
STORAGE FOR SALVAGED ITEMS.
GENERAL NOTES
A. SCREENED (GRAY-TONE) LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN.
B. BOLD SOLID LINES INDICATE NEW CONSTRUCTION.
C. FIELD VERIFY EXISTING BUILDING CONDITIONS,
ELEVATIONS, AND DIMENSIONS PRIOR TO START OF
WORK. NOTIFY ARCHITECT OF ANY DISCREPANCIES
FOUND IN RELATION TO THE CONTRACT DOCUMENTS.
D. GENERAL CONTRACTOR SHALL COORDINATE WORK
OF ALL TRADES PRIOR TO STARTING ANY DEMOLITION/
CONSTRUCTION.
E. DO NOT SCALE DRAWINGS TO DETERMINE
DIMENSIONS. VERIFY ALL DIMENSIONS. IMMEDIATELY
REPORT ANY DISCREPANCIES TO THE ARCHITECT.
F. ALL DIMENSIONS ARE GIVEN TO THE FACE OF FINISHED
SURFACE, UNLESS NOTED OTHERWISE. ± DIMENSIONS
ALLOW FOR VARIATION DUE TO EXISTING CONDITIONS.
G. ALL DIMENSIONS TO EXISTING STRUCTURE/WALLS ARE
APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY.
H. PROTECT FROM DAMAGE ALL EXISTING
CONSTRUCTION TO REMAIN.
I. MAINTAIN THE BUILDING IN A WEATHER TIGHT
CONDITION AT ALL TIMES.
J. MAINTAIN OPERATION OF ALL EXISTING SERVICES AND
UTILITIES TO THE BUILDING. COORDINATE ANY
DISRUPTIONS OR DISCONTINUATIONS WITH THE
OWNER'S REPRESENTATIVE IN ADVANCE.
K. REFER TO AND COORDINATE WITH MECHANICAL,
PLUMBING, AND ELECTRICAL DRAWINGS FOR EXTENT
OF ASSOCIATED DEMOLITION AND NEW WORK.
L. PATCH AND REPAIR ALL SURFACES ADJACENT TO NEW
WORK ITEMS AS REQUIRED TO MATCH FINISHED
ADJACENT CONSTRUCTION AND PROVIDE A FINISHED
WEATHER TIGHT CONDITION.
M. CONSULT ARCHITECT/STRUCTURAL ENGINEER FOR
ANY AND ALL LOCATIONS WHERE UNFORESEEN OR
UNUSUAL STRUCTURAL CONDITIONS EXIST.
N. PROVIDE BLOCKING AS REQUIRED IN WALLS FOR ALL
BASE AND WALL CABINETS, WALL-HUNG EQUIPMENT,
WALL-APPLIED DOOR HARDWARE, AND OWNER-
PROVIDED EQUIPMENT.
FIRST FLOOR
0"
SECOND FLOOR
12' - 5 3/8"
9 12 14
D1
2A-102
12 35 53.G1
07 92 00.A1
CRANE RAIL
N6
N7
N8 N8 N8
N5
N9
ROOM FINISH NOTES:
1. WALL BASE TO BE INSTALLED IN RM 160 AT LEVEL 2 ON WALL ADJACENT TO PLATFORM
BETWEEN COLUMNS, SEE ELEVATION.
2. WALL BASE AT SEALED CONCRETE, EXTEND WEST TO NEXT DOOR FRAME AT EXISTING
CARPET.
3. PAINT ALL UNPAINTED DUCTWORK, PIPING, CONDUIT, ETC. TO MATCH THE WALL, CEILING, OR
RAILING THEY RUN PARALLEL TO.
4. PROTECT FLOORING FROM DAMAGE WITH PLASTIC SHEETING TOPPED WITH RIGID
HARDBOARD. TAPE SEAMS. (MINIMUM PROTECTION REQUIRED).
DOOR NOTES:
1. EXISTING DOOR -- ADD WIRELESS KEYCARD LATCH HARDWARE.
2. EXISTING DOOR -- TO BE LOCKED AND REMAIN UNUSED.
3. NO LOCK.
D E
SEE SCHED
S E
E S
C H
E D
SEE SCHED
6" 6"
" S E
E S
C H
E D
6" 6"
SEE SCHED
F
SEE SCHED
S E
E S
C H
E D
HM-2
S E
E S
C H
E D
" 2"
SEE SCHED
2"
08 11 13.B1
07 92 00.A1
08 11 13.E1
WALL TYPE, EXISTING
07 92 00.A1
07 92 00.A1
08 11 13.E10
WIDTH, MATCH EXISTING
07 92 00.A1
07 92 00.A2 08 80 00.H1
05 50 00.A5
04 20 00.A2
07 92 00.A1
08 11 13.E10
WIDTH, MATCH EXISTING
07 92 00.A1
07 92 00.A2 08 80 00.H1
04 20 00.A1
WIDTH, MATCH EXISTING
07 92 00.A1
08 11 13.B1
08 11 13.E1
07 92 00.A107 92 00.A107 92 00.A1
05 50 00.A6
WIDTH, MATCH EXISTING
08 11 13.B1
08 11 13.E1
04 20 00.A1
WALL TYPE, EXISTING
08 11 13.B1
08 11 13.E1
07 92 00.A107 92 00.A1
WALL TYPE, EXISTING
FLOOR ABOVE (SECTION)
09 65 00.B5 07 92 00.A1 05 12 00.A1 05 50 00.B1
PLATFORM, NIC
SHEET NUMBER
SHEET TITLE
REVISION DATE
CONSULTANT
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
ISSUE DATE
PROJECT NUMBER
SUBMISSION
/8
/4
/2
/4
A
/2
24x36
2 3 4 5 6 7
C
D
E
F
B
1 2 3 4 5 6 7 8
/2
/2
:0 :3
P
M
C
U s e rs
\M G a u l\ D o c u m e n ts
\R e v it
L o c a l F ile s \2
A m e s L a b M
D M a g n e t
T e s tb e d
A R
C H m a tt h e w g a u l.
rv t
22066
BID
M D
M A
G N
E T
T E
S T
B E
D
P H
A S
E
LEVEL 1 -
ARCHITECTURE
M E
T A
L S
D E
V E
L O
P M
E N
T B
L D
G
P
A M
M E
L D
R A
M E
S
IA
A M
E S
L A
B O
R A
T O
R Y
2A-101
06.09.2025
1/4" = 1'-0"A4 LEVEL 1 - ARCHITECTURE N
N
9 17 35
L
C
A
KEY PLAN1/4" = 1'-0"A1 LEVEL 1 - ARCHITECTURE DEMOLITION
1/4" = 1'-0"D4 ROOM 160A - ELEVATION NORTH
SHEET NOTE LEGEND
D5 SALVAGE CASEWORK TO OWNER.
D6 SALVAGE COUNTER TO OWNER.
D7 DEMO BALCONY, RAILINGS, AND LADDER,
COMPLETELY REMOVE FROM STRUCTURE.
N4 ATOMIZER COLUMNS AND ANCHOR ROD SETTING
BASE BY ARCAST
N5 OWNER INSTALL COUNTER, NOTCHED AT COLUMN TO
LEAVE 1/8" GAP
N6 OWNER SEAL GAP AT COLUMN AT COUNTER AND
CASEWORK
N7 ATOMIZER EQUIPMENT, PLATFORM, STAIRS, AND
RAILINGS BY OWNER, COORDINATE
N8 OWNER REINSTALL SALVAGED CASEWORK, MODIFY
BASE CABINETS TO SIT OVER COLUMN BASE PADS
N9 REMOVE AND REINSTALL CRANE STOP AT BOTH RAILS
SO THAT THE WEST-MOST PART OF THE CRANE,
REGARDLESS OF ELEVATION, STOPS 6" EAST OF
ATOMIZER PLATFORM.
KEYNOTE LEGEND
04 20 00.A1 GROUT SOLID JAMB/SILL
04 20 00.A2 CMU SOAPS TO MATCH WALL, GROUT SOLID
05 12 00.A1 2X3X3/8 STEEL ANGLE
05 50 00.A5 WT5X15, BEAR 8" EA SIDE
05 50 00.A6 4-1/4"X3"X1/4" WELDED TEE, BEAR 8" EA SIDE
05 50 00.B1 1/2" A325 BOLT
07 92 00.A1 SEALANT
07 92 00.A2 SEALANT AS RECOMMENDED BY LAMINATED
GLASS MANUFACTURER
08 11 13.B1 1 3/4" METAL DOOR
08 11 13.E1 DOUBLE RABBET HM DOOR FRAME, 4" HEAD,
MATCH NOMINAL CMU BLOCK SIZE
08 11 13.E10 DOUBLE RABBET HM WINDOW FRAME, MATCH
NOMINAL CMU BLOCK SIZE
08 80 00.H1 1/2" LAMINATED GLASS
09 65 00.B5 4" RESILIENT TOPSET BASE
12 35 53.G1 FILLER PANEL, ALIGN WITH FACE OF COLUMN
26 24 16 ELECTRICAL PANEL, SEE ELECTRICAL
3 ADD-01 06.27.25
ROOM FINISH SCHEDULE - PHASE 2
ROOM NO. ROOM NAME FLOOR BASE
WALLS
CEILING
REMARKS
(KEYED NOTES)NORTH EAST SOUTH WEST
160A MAGNET TESTBED - RB-1 PNT-1 - - - - 1, 4, 3
285-286 GAS CANISTER STORAGE CONC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 PNT-2
287 CONTROL ROOM CPT-1 RB-3 PNT-1 PNT-1 PNT-1 PNT-1 ACP-1
C28 CORRIDOR CONC-1 RB-2 PNT-4 - - - - 2
DOOR SCHEDULE - PHASE 2
DOOR NO ROOM KEY SIDE
DOOR FRAME
RATING
HARDWARE
DESCRIPTION COMMENTSWIDTH HEIGHT TYPE MATL QTY TYPE
285 C28 6' - 0" 7' - 0" F HM 2 HM-2 05 PNT-3
287A C28 3' - 0" 7' - 0" D HM 1 HM-2 03 1, PNT-3
287B C28 3' - 0" 7' - 0" D HM 1 HM-2 - 2, PNT-3
C28C 5' - 0" 7' - 0" E HM 1 HM-2 04 PNT-3
1/4" = 1'-0"
DOOR PANEL TYPES
1/4" = 1'-0"
FRAME TYPES
1 1/2" = 1'-0"D3 HM DR HEAD AT EXIST
1 1/2" = 1'-0"A3 HM WD HEAD AT CMU
1 1/2" = 1'-0"A HM WD JAMB/SILL AT EXIST
1 1/2" = 1'-0"C HM DR HEAD AT CMU
1 1/2" = 1'-0"B3 HM DR JAMB AT CMU
1 1/2" = 1'-0"C3 HM DR JAMB AT EXIST
1 1/2" = 1'-0"E3 PLATFORM TO EXIST
ALTERNATE NO. 2
ALTERNATE NO. 1
ALTERNATE NO. 2
FIRE SUPPRESSION GENERAL NOTES:
A. FIRE SUPPRESSION ENTITIES DRAWN WITH THIS
LINETYPE ( ) INDICATES NEW WORK,
UNLESS NOTED OTHERWISE.
B. FIRE SUPPRESSION ENTITIES DRAWN WITH THIS
LINETYPE ( ) INDICATES EXISTING TO
REMAIN, UNLESS NOTED OTHERWISE.
C. DRAWINGS SHOWING LOCATIONS OF FIXTURES,
EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT
ACTUAL INSTALLATION CONDITIONS. DRAWINGS
SHOW THE GENERAL ARRANGEMENT OF ALL
PIPING, DUCTWORK EQUIPMENT, ETC. AND MAY
NOT INCLUDE ALL OFFSETS AND FITTINGS AS
REQUIRED. THE DRAWINGS SHALL BE FOLLOWED
AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION
AND THE WORK OF OTHERS WILL PERMIT.
D. VERIFY SIZE OF EXISTING PIPING,
APPURTENANCES, FIXTURES AND EQUIPMENT AS
IT RELATES TO NEW WORK.
E. FIRE SUPPRESSION CONTRACTOR SHALL
COORDINATE ALL FIRE PROTECTION PIPING WITH
ALL DUCTWORK, PIPING AND OTHER TRADES
PRIOR TO COMMENCEMENT OF WORK.
F. FURNISH AND INSTALL FIRE SUPPRESSION
PRODUCTS IN COMPLIANCE WITH LOCAL BUILDING
CODES AND THE AUTHORITY HAVING
JURISDICTION, AND IN ACCORDANCE WITH
GENERALLY ACCEPTED INDUSTRY STANDARDS
AND PRACTICES AND MANUFACTURERS
RECOMMENDATIONS.
G. VERIFY ACTUAL LOCATIONS OF SPRINKLERS
HEADS AND DEVICES WITH ARCHITECTURAL.
H. FIRE CAULK ALL PIPING PENETRATIONS AT FIRE
RATED WALLS, SEE CODE PLAN FOR FIRE RATED
WALL LOCATIONS.
I. IN ROOMS WHERE SPRINKLER HEADS ARE NOT
SHOWN, HEADS MAY BE LOCATED WHEREVER
PRACTICABLE, IN ACCORDANCE WITH NFPA13.
COORDINATE WITH OTHER TRADES.
J. WHERE SPRINKLER MAINS OR BRANCHES ARE
NOT SHOWN, INSTALL IN ACCORDANCE WITH
NFPA, COORDINATING WITH OTHER TRADES.
K. ALL SPRINKLER PIPE SIZING SHALL BE BY
SPRINKLER SUBCONTRACTOR.
9 12 14 17
N
M
Lb
La
L
OH-1
315 SF
FP01
FP02
FP02
FP02
FP03
EX 3" SPRINKLER MAIN
MACHINE SHOP
MAGNET TESTBED
160A
CORRIDOR
005-S16
FP04
RM 160
7 9
N
M
Lb
La
L
GAS CANISTER
STORAGE
285-286
CORRIDOR
C28
CONTROL ROOM
MAGNET TESTBED
160A
FP05
EX 3" MAIN
SHEET NUMBER
SHEET TITLE
REVISION DATE
CONSULTANT
LOCATION
PHONE
WEBSITE
219 EIGHTH STREET
DES MOINES, IOWA 50309
515-244-7167
WWW.BBSAE.COM
ISSUE DATE
PROJECT NUMBER
SUBMISSION
/8
/4
/2
/4
A
/2
24x36
2 3 4 5 6 7
C
D
E
F
B
1 2 3 4 5 6 7 8
/2
/2
:5 :4
P
M
C
U s e rs
\E K o n ra d \D o c u m e n ts
\2
A m e s L a b M
D M a g n e t T e s tb e d
M E
C H e k o n ra d M
C L T
.r v t
22066
BID
M D
M A
G N
E T
T E
S T
B E
D
P H
A S
E
LEVEL 1 - FIRE
PROTECTION
PLAN
M E
T A
L S
D E
V E
L O
P M
E N
T B
L D
G
P
A M
M E
L D
R A
M E
S
IA
A M
E S
L A
B O
R A
T O
R Y
2FP101
06.09.2025
1 ADD-01 06.27.2025
KEYED NOTES
FP01 PROVIDE SPRINKLERS BELOW NEW STEEL
PLATFORM.
FP02 ROUTE BRANCH PIPING TIGHT TO PLATFORM
COLUMNS, AWAY FROM WALKING PATHWAYS AND
EQUIPMENT.
FP03 PROVIDE SPRINKLERS BELOW NEW STEEL PLATFORM
STAIR ASSEMBLY.
FP04 3" SPRINKLER MAIN TO LEVEL 1, WEST HALF ZONE
VALVE. REFER TO KEY PLAN FOR APPROXIMATE
LOCATION NEXT TO ROOM 105.
FP05 OCCUPANCY HAZARD IN 285-286 MODIFIED FROM
LIGHT HAZARD TO ORDINARY HAZARD GROUP 1.
RECONFIGURE HEADS AND BRANCH PIPE SIZES AS
REQUIRED.
1/4" = 1'-0"A3 LEVEL 1 - FIRE PROTECTION PLAN
KEY PLAN
N
ZONE VALVE LOCATION
1/4" = 1'-0"A1 LEVEL 2 - FIRE PROTECTION PLAN
| RFP SC-25-672 Addendum 1 |
| 2. SECTION 22 15 13 – COMPRESSED GAS PIPING |
| 1 “Piping Leak Tests: Test new and modified parts of existing piping. Pneumatically test in accordance with ASTM B31.1 that is not less than 1.2 times the system working pressure. Test pressure shall not exceed maximum pressure for any vessel, pump, v... |
| 3. ADD APPENDIX A Existing Fire Protection As-Built Documents in its entirety. |
| 1. DRAWING SHEET A-101 – LEVEL 1 ARCHITECTURE |
| 2. DRAWING SHEET 2FP101 – LEVEL 1 AND LEVEL 2 FIRE PROTECTION PLAN |
| 3. DRAWING SHEET 2ED601 – ELECTRICAL SCHEDULES – DEMOLITION |
| 4. DRAWING SHEET 2EL102 – LEVEL 2 – LIGHTING PLAN |
| 1. 23 34 23 – HVAC POWER VENTILATORS |
| 2. 23 21 23 – HYDRONIC PUMPS |
| 2.1. ADD Ebara Pumps |
| 1. Is the slab in Room 160A adequate to support the Atomizer platform and equipment? Is there a need for footings? |
| 1.1. Yes, the existing 6” slab in Room 160 A is adequate to support the Atomizer platform and equipment without the need for footings. Please note drawings 5A/2G-001 showing the anchoring detail for the platform into the existing slab. – MG, BBS |
| 2. Is the slab in the Gas Canister Storage room adequate to support the equipment? Is there a need for structural modifications/support? |
| 2.1. TBD – MG, BBS |
| 3. Please confirm the MEP drawings and specifications have been coordinated with Arcast for their equipment utility needs. |
| 3.1. Yes. – EK, BBS |
| 4. Please provide the proposed installation duration from Arcast for the Atomizer platform and equipment. |
| 4.1. This is unknown at this time and will be dependent on coordination with the GC and owner for installation and startup of the Atomizer equipment and supporting infrastructure. -MA, Ames Lab. |
| 5. It was mentioned during the site visit that the existing fire protection drawings would be provided. Please provide. ? |
| 5.1. See Appendix A. – EK, BBS |
| 6. Please verify what PSI the piping downstream of the AR compressor needs to be tested at. ? |
| 6.1. Refer to 22 15 13 Article 3.5. – EK, BBS |
| 7. Has Arcast's schedule been taken into account when generating the project milestone schedule in specification section 00 30 00? |
| 7.1. Yes, the Arcast schedule has been coordinate to align with the proposed project milestone schedule. -MA, Ames Lab |
| 8. During the site visit it was noticed that Room 287 has a sink that the drawing doesn't address. Please advise if it is to remain in place or if it is to be removed? |
| 8.1. If add alternate 1 is not accepted the sink remains, if add alternate 1 is accepted the sink is removed. -MA, Ames Lab |
| 9. Please confirm all furnishing (desks, chairs, etc) will be removed from the spaces prior to the start of construction. |
| 9.1. Yes, all furniture will be removed prior to the start of construction. -MA, Ames Lab |
| 10. Drawing sheet 2A-102 indicates Room 285-286 is to receive concrete sealer. The Room Finish Schedule on drawing sheet 2A-101 indicates Room 285-286 is to receive carpet tile. Please advise which one is correct.? |
| 10.1. Room 285-286 is to receive concrete sealer, not carpet. Room finish schedule will be updated in Add-01. – MG, BBS |
| 11. Has the fire suppression occupancy classification for Room 285-286 been reviewed/re-evaluated to see if the existing fire suppression system can handle to new room use? Is there a new for clean agent system? |
| 11.1. No need for clean agent system. -MA, Ames Lab |
| 11.2. See 2FP101 updated in this addendum. Occupancy classification OF 285-286 IS the same as Magnet Testbed 160A which is the hydraulically most remote area of the building and greater than 1200 square feet. -EK, Ames Lab |
| SC-25-672 Addendum 1 - Attachments |
| Appendix A Existing Fire Protection As-Built Drawings |
| 22066 - Ames Lab MD Magnet Testbed - ARCH_matthew_gaul |
| 2FP101 |
File details come from the government source that posted it. Updated .