Appendix B - Specifications and Drawings dated 06-09-2025.pdf

PDF 7 MB Posted

Attached to
RFP SC-25-672 MD160A Magnet Test Bed Phase 2 (Addendum 1&2 Added)
Solicitation number
RFP-SC-25-672
Issued by

About this file

This document is an extensive Request for Proposal (RFP) for the MD Magnet Testbed - Phase 2 project at Ames Laboratory in Iowa. The solicitation seeks a construction contractor to renovate two office/storage rooms and perform work in a laboratory space within the Metals Development Building to support the installation of owner-provided laboratory equipment. The project involves selective demolition, mechanical and electrical modifications, and finishing work.

Key dates include the RFP being issued on 06/09/2025, with a pre-proposal meeting on 06/23/2025, questions due by 06/25/2025, and proposals due by 07/09/2025. The projected Notice of Award is 07/16/2025, with a contractor start date estimated for 08/08/2025. The project has a substantial completion deadline of 12/01/2025 and a final completion date of 12/12/2025. The total project involves work on Rooms 160, 160A, and adjacent spaces, with specific requirements for electrical recircuiting, floor repairs, and installation of owner-supplied equipment like an Argon storage and handling system.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MD MAGNET TESTBED - PHASE 2

Ames Laboratory

Metals Development Building 2415 Pammel Drive

Ames, Iowa 50011

APPENDIX B

RFP SC-25-672

BID SPECIFICATIONS AND DRAWINGS

ISSUE FOR BID: June 09, 2025

THIS PAGE

INTENTIONALLY

LEFT BLANK

BBS 22066

Ames Laboratory 107 - 1 MD Magnet Testbed – Phase 2 Issue for Bid

MD MAGNET TESTBED – PHASE 2

Ames Laboratory 2415 Pammel Drive

Ames, Iowa 50011

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.

I am a duly licensed Architect under the laws of the State of Iowa.

_ Matthew A Cole, AIA _ Printed or Typed Name

Signature Date

License Number: ____05829____

License expires: June 30, 2026_ Date issued: _ _

Specification Divisions covered: __01-14 ______________________

I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

_______________________________________________, 20________

Holly Elbert, P.E.

License number: 17968_________

My license renewal date is December 31, 2025

Discipline __Mechanical Engineering__

Specification Divisions covered: _______21-25_____________________

Date issued ___ __

I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

_______________________________________________, 20________

Robert A. Hedgepeth, P.E

License number: 14212 _____________

My license renewal date is December 31, 2025

Discipline ____Electrical Engineering__________

Specification Divisions covered: _____________26-28 ______

Date issued __ _

BBS 22066

Ames Laboratory 107 - 2 MD Magnet Testbed – Phase 2 Issue for Bid

BBS 22066 TABLE OF CONTENTS

Ames Laboratory 000110 - 1 MD Magnet Testbed – Phase 2 Issue for Bid

MD Magnet Testbed – Phase 2

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENT GROUP

DIVISION 00 – INTRODUCTORY INFORMATION

00 01 07 Seals Page

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets

00 10 00 Procurement and Contracting Requirements (Ames Lab Section)

00 20 00 Supplementary Conditions (Ames Lab Section)

00 30 00 Special Conditions (Ames Lab Section)

00 74 13 Project Requirements

GENERAL REQUIREMENTS SUBGROUP

DIVISION 1 – GENERAL REQUIREMENTS

01 10 00 Summary

01 20 00 Price and Payment Procedures

01 23 00 Alternates

01 30 00 Administrative Requirements

01 33 00 Submittal Procedures

01 40 00 Quality Requirements

01 50 00 Temporary Facilities and Controls

01 60 00 Product Requirements

01 60 01 Substitution Request Form

01 60 02 Buy American Act – Exception Form

01 70 00 Execution

01 73 29 Cutting and Patching

01 74 19 Construction Waste Management

01 77 00 Closeout Procedures

01 78 00 Closeout Submittals

01 78 39 Project Record Documents

01 79 00 Start-Up, Demonstration, and Training

Ames Laboratory 000110 - 2 MD Magnet Testbed – Phase 2 Issue for Bid

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITION

02 41 19 Selective Demolition

DIVISION 03 – CONCRETE

03 05 63 Concrete Floor Sealers

03 30 00 Cast-In-Place Concrete

DIVISION 04 – MASONRY

04 20 00 Unit Masonry

DIVISION 05 – METALS (NOT USED)

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 53 Miscellaneous Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 50 50 Membrane Roofing Patching and Repairing

07 84 13 Penetration Firestopping

07 92 00 Joint Sealants

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Doors and Frames

08 71 11 Door Hardware

08 80 00 Glazing

DIVISION 09 – FINISHES

09 01 90.52 Maintenance Repainting

09 06 00 Schedule of Finishes

09 51 13 Acoustical Panel Ceilings

09 60 01 Floor Patching and Leveling

09 65 00 Resilient Base

09 68 13 Tile Carpeting

09 90 00 Painting and Coating

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 – CONVEYING SYSTEMS (NOT USED)

Ames Laboratory 000110 - 3 MD Magnet Testbed – Phase 2 Issue for Bid

FACILITY SERVICES SUBGROUP

DIVISION 21 – FIRE SUPPRESSION

21 05 00 Common Work Results for Fire Suppression

DIVISION 22 – PLUMBING

22 05 29 Hangers and Supports for Plumbing Piping and Equipment

22 05 53 Identification for Plumbing Piping and Equipment

22 07 19 Plumbing Piping Insulation

22 11 16 Domestic Water Piping

22 11 19 Domestic Water Piping Specialties

22 13 16 Sanitary Waste and Vent Piping

22 13 19 Sanitary Waste Piping Specialties

22 15 13 Compressed Gas Piping

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING

23 05 01 Selective Mechanical Demolition and Remodeling

23 05 13 Common Motor Requirements for HVAC Equipment

23 05 19 Meters and Gages for HVAC Piping

23 05 29 Hangers and Supports for HVAC Piping and Equipment

23 05 53 Identification for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 19 HVAC Piping Insulation

23 09 23 Instrumentation and Controls for HVAC

23 21 13 Hydronic Piping

23 21 16 Hydronic Piping Specialties

23 21 23 Hydronic Pumps

23 29 23 Variable Frequency Motor Controllers

23 31 13 Metal Ducts

23 33 00 Air Duct Accessories

23 34 23 HVAC Power Ventilators

23 37 13 Diffusers, Registers, and Grilles

DIVISION 26 – ELECTRICAL

26 05 01 Selective Electrical Demolition

26 05 11 Requirements for Electrical Installations

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 29 Hangers and Supports for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Systems

26 05 53 Identification for Electrical Systems

26 24 16 Panelboards

26 27 26 Wiring Devices

26 28 16 Enclosed Switches and Circuit Breakers

Ames Laboratory 000110 - 4 MD Magnet Testbed – Phase 2 Issue for Bid

DIVISION 27 – COMMUNICATIONS

27 05 26 Grounding and Bonding for Communications Systems

27 05 28 Pathways for Communications Systems

27 15 00 Communications Horizontal Cabling

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

SITE AND INFRASTRUCTURE SUBGROUP (NOT USED)

END OF SECTION

BBS 22066 LIST OF DRAWINGS

Ames Laboratory 00 01 15 - 1 MD Magnet Testbed – Phase 2 Issue for Bid

SECTION 00 01 15

LIST OF DRAWINGS

GENERAL

2G-000 COVER

2G-001 ARCHITECTURAL LEGEND AND DETAILS

2G-002 MEP LEGEND

ARCHITECTURAL

2A-101 LEVEL 1 – ARCHITECTURE

2A-102 LEVEL 2 – ARCHITECTURE

MECHANICAL

2FP101 LEVEL 1 – FIRE PROTECTION PLAN

2PL101 LEVEL 1 AND LEVEL 2 – PLUMBING PLANS

2MP101 LEVEL 1 AND LEVEL 2 – MECHANICAL PIPING PLANS

2MH101 LEVEL 1, LEVEL 2, AND ROOF – HVAC PLANS

2M-501 MECHANICAL CONTROLS

2M-601 MECHANICAL DETAILS AND SCHEDULES

ELECTRICAL

2ED102 LEVEL 2 – ELECTRICAL DEMOLITION

2E-101 LEVEL 1 – POWER AND FIRE ALARM FLOOR PLAN

2E-102 LEVEL 2 – POWER FLOOR PLAN

2E-502 ONE-LINE DIAGRAM

2E-501 ELECTRICAL DETAILS

2E-601 ELECTRICAL SCHEDULES

2EL-102 LEVEL 2 – LIGHTING FLOOR PLAN

END OF LIST

BBS 22066 LIST OF DRAWINGS

Ames Laboratory 00 01 15 - 2

BBS 22066 PROCUREMENT AND CONTRACTING REQUIREMENTS

Ames Laboratory 00 10 00 - 1

SECTION 00 10 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

TABLE OF ARTICLES

1. GENERAL PROVISIONS

2. OWNER

3. CONTRACTOR

4. ADMINISTRATION OF THE CONTRACT

5. SUBCONTRACTORS

6. CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7. CHANGES IN THE WORK

8. TIME

9. PAYMENTS AND COMPLETION

10. UNCOVERING AND CORRECTION OF WORK

11. MISCELLANEOUS PROVISIONS

Ames Laboratory 00 10 00 - 2

ARTICLE 1 - GENERAL PROVISIONS

1.1 BASIC DEFINITIONS

1.1.1 THE CONTRACT DOCUMENTS

The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the Agreement), conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Contract, and any other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work.

1.1.2 THE CONTRACT

The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Design Professional and Contractor, (2) between the Owner and a Subcontractor or Sub-subcontractor or (3) between any persons or entities other than the Owner and Contractor.

1.1.3 THE WORK

The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project.

1.1.4 THE PROJECT

The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors.

1.1.5 THE DRAWINGS

The Drawings are the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams. Drawings are intended to show general arrangements, design, and dimensions of work and are partly diagrammatic. Dimensions shall not be determined by scale or rule. If figured dimensions are lacking, they shall be supplied by the Design Professional on the Contractor’s written request to the Owner’s Representative.

1.1.6 THE SPECIFICATIONS

The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of related services.

1.1.7 THE PROJECT MANUAL

The Project Manual is the volume usually assembled for the Work which may include the bidding requirements, sample forms, Conditions of the Contract and Specifications.

1.1.8 THE DESIGN PROFESSIONAL

The Design Professional is an entity engaged by the Owner to provide professional design services for the Project.

Ames Laboratory 00 10 00 - 3 MD Magnet Testbed – Phase 2 Issue for Bid

1.1.9 THE OWNER

The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Owner" means the Ames Laboratory at Iowa State University or the Laboratory’s authorized representative.

1.1.10 THE CONTRACTOR

The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative.

1.1.11 THE SUBCONTRACTOR

A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor.

1.1.12 THE SUB-SUBCONTRACTOR

A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-subcontractor.

1.1.13 PUNCH LIST

The term “punch list” shall mean the list of items prepared in connection with the inspection of the Project by the Owner’s Representative and/or Design Professional in connection with Substantial Completion of the Work or a portion of the Work which the Owner’s Representative and/or Design Professional has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

1.2 EXECUTION, CORRELATION AND INTENT

1.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. The Contractor represents that it has performed its own investigation and examination of the Work site and its surroundings and satisfied itself before entering into this Contract as to:

.1 conditions bearing upon transportation, disposal, handling, and storage of materials;

.2 the availability of labor, materials, equipment, water, electrical power, utilities and roads;

.3 conditions bearing upon security and protection of material, equipment, and Work in progress;

.4 the extent of the Work site, including the surface and sub-surface conditions;

.5 the extent and nature of Work and materials necessary for the execution of the

Work; and, .6 the means of access to the site and the accommodations it may require.

The Owner assumes no responsibility or liability for the physical condition or safety of the Work site or any improvements located on the Work site. The Contractor shall be solely responsible for providing a safe place for the performance of the Work. The Owner shall not be required to make any adjustment in either the Contract Sum or Contract Time concerning any failure by the Contractor or any Subcontractor to comply with the requirements of this Paragraph.

Ames Laboratory 00 10 00 - 4 MD Magnet Testbed – Phase 2 Issue for Bid

1.2.2 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all;

performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results.

1.2.3 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

1.2.4 Unless otherwise stated in the Contract Documents, words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.

1.2.5 Data in the Contract Documents concerning lot size, ground elevations, present obstructions on or near the site, locations and depths of sewers, conduits, pipes, wires, etc., position of sidewalks, curbs, pavements, etc., and nature of ground and subsurface conditions have been obtained from sources the Design Professional believes reliable.

The Contractor shall verify such data to the extent possible through normal construction procedures, including but not limited to, contacting utility owners and by prospecting after receiving Notice of Award.

1.3 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS

1.3.1 All Drawings, Specifications and other documents, and copies thereof, are and shall remain the Owner's property. They are not to be reproduced or used on any other project.

ARTICLE 2 - OWNER

2.1 INFORMATION AND SERVICES REQUIRED OF THE OWNER

2.1.1 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project.

2.1.2 Except for permits and fees which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities.

2.1.3 Information or services under the Owner's control shall be furnished by the Owner with reasonable promptness to avoid delay in orderly progress of the Work.

2.1.4 Unless otherwise provided in the Contract Documents, the Contractor will be furnished, free of charge, such copies of Drawings and Project Manuals as are reasonably necessary for execution of the Work.

2.1.5 The foregoing are in addition to other duties and responsibilities of the Owner enumerated herein and especially those in respect to Article 6 (Construction by Owner or by Separate Contractors), Article 9 (Payments and Completion).

2.2 OWNER'S RIGHT TO CARRY OUT THE WORK

2.2.1 If the Contractor defaults or neglects to carry out the Work in accordance with the

Contract Documents and fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with

Ames Laboratory 00 10 00 - 5 MD Magnet Testbed – Phase 2 Issue for Bid diligence and promptness, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such deficiencies, including compensation for additional services and expenses made necessary by such default, neglect or failure. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner.

ARTICLE 3- CONTRACTOR

3.1 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR

3.1.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner and shall at once report to the Owner errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to the Owner. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Owner, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.

3.1.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the Owner at once.

3.1.3 Figured dimensions on the Plans shall be used in preference to scaling the Drawings. If

Contractor scales Drawings, dimensions so obtained shall be the sole responsibility of the Contractor.

3.1.4 Where the Work of the Contractor is affected by finish dimensions of manufacturer's equipment, the finish dimensions shall be determined by the Contractor, who shall assume the responsibility for proper coordination.

3.1.5 During the progress of work, the Contractor shall verify all field measurements prior to fabrication of building components or equipment, and proceed with the fabrication to meet field conditions. The Contractor shall consult all Contract Documents to determine the exact location of all work and verify spatial relationships of all work. Any question concerning said location or spatial relationships, shall be submitted to the Owner’s Representative and Design Professional. Specific locations for equipment, pipelines, ductwork and other such items of work, where not dimensioned on plans, shall be determined in consultation with Owner’s Representative and Design Professional. The Contractor shall be responsible for the proper fitting of Work in place.

3.2 SUPERVISION AND CONSTRUCTION PROCEDURES

3.2.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instruction concerning these matters.

3.2.2 The Contractor shall be responsible to the Owner for acts, defaults and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor.

Ames Laboratory 00 10 00 - 6 MD Magnet Testbed – Phase 2 Issue for Bid

3.2.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties performed in the administration of the Contract, or by tests, inspections or approvals required or performed by persons other than the Contractor.

3.2.4 The Contractor shall be responsible for inspection of portions of the Work already performed under this Contract to determine that such portions are in proper condition to receive subsequent work.

3.2.5 The Contractor shall perform the Work so as to cause a minimum of inconvenience to and interruption of the Owner's operations. Any and all interruptions of the operations of the Owner necessary for the performance of the Work shall be noted in the progress schedule and the Contractor shall additionally give the Owner sufficient advance notice of such interruptions as to allow the Owner time to adjust its operations accordingly.

Contractor's failure to give the Owner timely notice of such intentions shall place the responsibility for any resulting delays, additional costs, or other liabilities solely with the Contractor.

3.2.6 The Contractor shall forward all communications to the Owner through the Owner's

Representative.

3.2.7 Prior to commencing the Work under the Contract, the Contractor shall contact all affected entities supplying utilities and arrange for the moving of such utility installations as is necessary for the performance of the Work. It shall be the responsibility of the Contractor to coordinate the Work with that of the affected entities in such a manner as to cause the least possible interference.

3.3 TAXES

3.3.1 Except when sales tax exemption certificates are provided by the Owner in accordance with Paragraph 3.3.2, the Contractor shall pay sales, consumer, use and similar taxes for the Work or portions thereof provided by the Contractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect.

3.3.2 Iowa Construction Sales Tax Exemption Certificates and authorization letters will be provided by the Owner to the Contractor and Subcontractors for use on this project in accordance with the regulations of the Iowa Department of Revenue and Finance. This exemption certificate will authorize suppliers to sell construction materials that will be incorporated into and made part of the Work exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax.

Complete information on qualifying materials can be found on the Iowa Department of Revenue and Finance web site at www.state.ia.us/tax. It is the responsibility of the Contractor and Subcontractors to maintain records identifying the materials purchased and verifying they were used on this project. Any materials purchased tax-free and not used on the project are subject to sales and local option taxes and these taxes must be paid directly to the Iowa Department of Revenue and Finance.

3.4 PERMITS, FEES AND NOTICES

3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when proposals are received or negotiations concluded.

http://www.state.ia.us/tax

Ames Laboratory 00 10 00 - 7 MD Magnet Testbed – Phase 2 Issue for Bid

3.4.2 All construction under this contract shall conform to the requirements of the Iowa State Building Code. The provisions of the Iowa State Building Code will be strictly adhered to and will take precedence over local governmental bodies’ regulations. Work not regulated by the Iowa State Building Code shall be performed in accordance with other applicable local regulations. The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of the Work.

3.4.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the Owner in writing, and necessary changes shall be accomplished by appropriate Modification.

3.4.4 If the Contractor performs the Work knowing it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Owner, the Contractor shall assume full responsibility for such Work and shall bear the attributable costs.

3.5 PROJECT MANAGEMENT PERSONNEL

3.5.1 The Contractor shall employ a competent project manager, superintendent and necessary assistants. The superintendent shall be in attendance at the Project site during performance of the Work and shall represent the Contractor. Communications given to the superintendent shall be as binding as if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case.

3.5.2 The project manager and superintendent shall be approved by the Owner and, unless they cease to be in the employ of the Contractor, shall not be changed without prior consent of the Owner.

3.6 CONTRACTOR'S CONSTRUCTION SCHEDULES

3.6.1 The Contractor promptly after being awarded the Contract, shall prepare and submit for the Owner's approval, a Contractor's construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and the Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

3.6.2 The Contractor shall prepare and keep current, for the Owner's approval, a schedule of submittals which is coordinated with the Contractor's construction schedule and allows the Owner reasonable time to review submittals.

3.6.3 The Contractor shall conform to the most recent schedules.

3.7 DOCUMENTS AND SAMPLES AT THE SITE

3.7.1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record changes and selections made during construction, and in addition approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to the Owner and shall be delivered to the Owner upon completion of the Work.

3.8 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

3.8.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared

Ames Laboratory 00 10 00 - 8 MD Magnet Testbed – Phase 2 Issue for Bid for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

3.8.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.

3.8.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.

3.8.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract

Documents. The purpose of their submittal is to demonstrate for those portions of the Work for which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents.

Review is subject to the limitations of Subparagraph 4.1.5.

3.8.5 The Contractor shall review, approve and submit Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors. Submittals made by the Contractor which are not required by the Contract Documents may be returned without action. At the time of submission the Contractor shall identify in writing any deviation in the Shop Drawings, Product Data or Samples from the requirements of the Contract Documents.

3.8.6 The Contractor shall perform no portion of the Work requiring submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved. Such Work shall be in accordance with approved submittals. Unapproved Shop Drawings shall not be permitted on the job site.

3.8.7 By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

3.8.8 The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically identified in writing such deviation at the time of submittal and has given written approval to the specific deviation.

The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the approval thereof.

3.8.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Owner on previous submittals. The Contractor shall make any corrections required by the Owner and shall resubmit the required number of corrected copies of Shop Drawings, Product Data or new Samples until approved.

3.8.10 Informational submittals upon which responsive action is not expected to be taken may be so identified in the Contract Documents.

3.8.11 When professional certification of performance criteria of materials, systems or equipment is required by the Contract Documents, the Owner shall be entitled to rely upon the accuracy and completeness of such calculations and certifications.

Ames Laboratory 00 10 00 - 9

3.9 USE OF SITE

3.9.1 The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with materials or equipment.

3.9.2 Any additional facilities or areas required for construction operations or storage of materials shall be provided by the Contractor at no additional cost to the Owner.

3.9.3 The Contractor shall take all necessary precautions to prevent damage to pipes, conduits, and other underground structures. The Contractor shall protect from disturbance or damage all monuments and property marks until an authorized agent of the Owner has witnessed or otherwise referenced their location and the Contractor shall not remove such marks or monuments until directed.

3.10 CUTTING AND PATCHING

3.10.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

3.10.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work.

3.11 CLEANING UP

3.11.1 The Contractor shall at all times keep the site of the Work and adjacent premises as free from materials, debris, rubbish and trash as practicable, and shall remove same from any portion of the site if, in the opinion of the Owner, such materials, debris, rubbish or trash constitute a nuisance or are objectionable in any way to the public. The Contractor shall be responsible for the removal of dirt accumulations or any other debris on campus roads and public streets and highways resulting from the Contractor's operations of the Work.

3.11.2 At the completion of the Work, the Contractor shall remove all materials, implements, barricades, equipment, staging, piling falsework, debris and rubbish connected with or caused by operations for such Work immediately upon the completion of that Work and shall leave the premises in perfect condition insofar as affected by the Work under the Contract. Fires for disposal of rubbish on the site are prohibited.

3.11.3 If the Contractor should fail to clean up the premises as required in Subparagraphs 3.11.1 and 3.11.2, the Owner after giving the Contractor forty-eight hours notice, may do so and charge the cost thereof to the Contractor.

3.12 ACCESS TO WORK

3.12.1 The Contractor shall provide the Owner and Design Professional access to the Work in preparation and progress wherever located.

3.12.2 The Contractor shall furnish the Owner and Design Professional all necessary assistance to facilitate inspections throughout the process of manufacture or construction, or for the examination of any materials entering into the Work or for any

Ames Laboratory 00 10 00 - 10 other purpose required in the discharge of the Owner's duties.

ARTICLE 4 - ADMINISTRATION OF THE CONTRACT

4.1 ADMINISTRATION OF THE CONTRACT

4.1.1 The Owner will provide administration of the Contract as described in the Contract

Documents. The Contractor shall forward all communications to the Owner through the Owner's Representative. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner.

4.1.2 The Owner will not have control over or charge of and will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's responsibility as provided in Paragraph 3.2. The Owner will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Owner will not have control over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or employees, or of any other persons performing portions of the Work.

4.1.3 Based on observations and evaluations of the Contractor's Applications for Payment, the Owner will review and certify the amounts due the Contractor.

4.1.4 The Owner will have authority to reject the Work which does not conform to the Contract Documents. Whenever the Owner considers it necessary or advisable for implementation of the intent of the Contract Documents, the Owner will have authority to require additional inspection or testing of the Work in accordance with Paragraphs under section 11.3, whether or not such Work is fabricated, installed or completed.

4.1.5 The Owner may review Contractor's submittals such as Shop Drawings, Product Data and Samples. Action by the Owner will be taken with such reasonable promptness as to cause no delay in the Work or in the activities of the Contractor or separate contractors, while allowing sufficient time in the Owner's judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Owner's review of the Contractor's submittals shall not relieve the Contractor of the obligations under Paragraphs 3.2 and 3.8. The Owner's review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Owner, of any construction means, methods, techniques, sequences or procedures.

4.1.6 The Owner will prepare written amendments to the Contract, Change Orders, Construction Change Directives, and written orders for minor changes in the Work as provided in Paragraph 7.4.

4.1.7 The Owner will conduct inspections to determine the date or dates of Substantial

Completion and the date of Final Completion, receive written warranties and related documents required by the Contract and assembled by the Contractor, and make final payment upon compliance with the requirements of the Contract Documents.

4.2 DUTIES OF THE DESIGN PROFESSIONAL

4.2.1 The Design Professional will advise and consult with the Owner. The Design

Professional will have authority to act on behalf of the Owner only to the extent provided

Ames Laboratory 00 10 00 - 11 MD Magnet Testbed – Phase 2 Issue for Bid herein. The duties, responsibilities and limitations of authority of the Design Professional during construction will not be modified or extended without the written consent of the Owner, the Contractor and the Design Professional.

4.2.2 The Design Professional will visit the site at intervals appropriate to the stage of construction to become familiar with the progress and quality of the Work and to determine in general if the Work is proceeding in accordance with the Contract Documents. On the basis of these on-site observations, the Design Professional will keep the Owner informed of the progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work of the Contractor.

4.2.3 The Design Professional will not be responsible for and will not have control or charge of construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, nor will the Design Professional be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Design Professional will not be responsible for or have control or charge over the acts or omissions of the Contractor, Subcontractors, or any of their agents or employees, or any other person performing any of the Work.

4.2.4 Based on the Design Professional’s observations and an evaluation of the Contractor's applications for payment, the Design Professional will recommend to the Owner the amounts owing to the Contractor and will certify payment supporting such amounts.

4.2.5 The Design Professional will interpret the Contract Documents and judge the performance thereunder by both the Owner and the Contractor as follows:

.1 the Design Professional will render interpretations necessary for the proper execution or progress of the Work with reasonable promptness and in accordance with any time limit agreed upon. Either party to the Contract may make written request to the Design Professional for such interpretations;

.2 claims, disputes and other matters in question between the Contractor and the

Owner relating to the execution or progress of the Work or the interpretation of the Contract Documents shall be referred initially to the Design Professional for recommendation which the Design Professional will render in writing within a reasonable time;

.3 all interpretations and recommendations of the Design Professional shall be consistent with the intent of and reasonably inferable from the Contract Documents and will be in writing or in the form of Drawings. In the Design Professional’s interpretations and judgments, the Design Professional will endeavor to secure faithful performance by both the Owner and the Contractor, will not show partiality to either, and will not be liable for the result of any interpretation or judgment rendered in good faith;

.4 any claim, dispute or other matter in question between the Contractor and the

Owner referred to the Design Professional, except those which have been waived by the making or acceptance of final payment as provided in the Uniform General Conditions of the Contract, shall be subject to arbitration in accordance with the provisions of the Uniform General Conditions of the Contract.

4.2.6 The Design Professional will review Contractor's submittals such as Shop Drawings, Product Data and Samples. The Design Professional’s action will be taken with such reasonable promptness as to cause no delay in the Work or in the activities of the

Ames Laboratory 00 10 00 - 12 MD Magnet Testbed – Phase 2 Issue for Bid

Contractor or separate contractors, while allowing sufficient time in the Design Professional’s judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Design Professional’s review of the Contractor's submittals shall not relieve the Contractor of the obligations under Paragraphs 3.2 and 3.8. The Design Professional’s review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Design Professional, of any construction means, methods, techniques, sequences or procedures.

4.2.7 The Design Professional will conduct on-site observations at substantial completion and final completion, and will receive and forward to the Owner documents required by the Contract and assembled by the Contractor. The Design Professional shall advise the Owner that the Work is complete and in compliance with all the requirements of the Contract Documents.

4.2.8 In case of the termination of the employment of the Design Professional, the Owner shall appoint a Design Professional against whom the Contractor makes no reasonable objection whose status under the Contract Documents shall be that of the terminated Design Professional.

4.3 CLAIMS AND DISPUTES

4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between the Owner and Contractor arising out of or relating to the Contract. Claims must be made by written notice. The responsibility to substantiate Claims shall rest with the party making the Claim.

4.3.2 Claims by either party must be made within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be made by written notice. An additional Claim made after the initial Claim has been implemented by Change Order will not be considered unless submitted in a timely manner.

4.3.3 Should concealed conditions encountered in the performance of the Work below the surface of the ground, or should concealed or unknown conditions in an existing structure be at variance with the conditions indicated by the Contract Documents, or should unknown physical conditions below the surface of the ground or concealed or unknown conditions in an existing structure of an unusual nature be encountered, which conditions differ materially from those ordinarily encountered and generally recognized as inherent in the Work of the character provided for in this Contract, and which will be considered by the Contractor as the basis for a Claim for extra compensation, the Contractor shall immediately notify the Owner of the alleged condition or variance before such conditions are disturbed. By failing to give such notice, the Contractor shall waive all rights to extra compensation of any kind arising out of the unusual conditions. The Owner shall investigate the unusual conditions promptly upon receipt of Contractor's notice and shall determine the Contractor's right to additional compensation and/or additional time. Any and all such changes in Contract Sum or Contract Time arising out of the discovery of unusual conditions shall be treated in accordance with the provisions of this Article.

Ames Laboratory 00 10 00 - 13 MD Magnet Testbed – Phase 2 Issue for Bid

4.4 ARBITRATION

4.4.1 Any questions raised about a decision of the Owner may be submitted to arbitration by mutual agreement of the parties to the Contract. Should the Owner fail to make a decision within a reasonable period, a request for arbitration may then be made as if the Owner's decision had been rendered against the party requesting arbitration. Any request for arbitration shall be in writing, shall state the dollar amount of the request and shall be delivered to the Owner and any adverse party either by personal delivery or by registered mail addressed to the last known address of each within ten (10) days of receipt of the Owner's decision, and in no event after final payment has been made and accepted, subject, however, to any express stipulation to the contrary in the Contract Documents.

4.4.2 No request for arbitration of any claim, dispute, or other matter may be made until the earlier of (1) the date on which the Design Professional has rendered a written recommendation, or (2) the tenth day after the parties have presented their evidence to the Design Professional or have been given a reasonable opportunity to do so, if the Design Professional has not rendered a written recommendation by that date.

4.4.3 If the parties mutually agree to arbitration, and the parties and the DOE’s assigned

Counsel have agreed to a maximum allowable award, the parties shall sign and acknowledge a written agreement specifying what demands are to be submitted to the arbitrators, and the arbitration proceeding shall be limited to such demands.

4.4.4 If the parties mutually agree, the arbitration may be carried out in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association.

Otherwise, the following procedure shall be followed:

.1 if the parties agree, there may be one arbitrator; otherwise there shall be three, one named in writing by each party to this Contract and the third chosen by these two arbitrators. If they fail to select a third within fifteen (15) days, then such arbitrator shall be chosen by the presiding officer of the state or county bar association nearest to the location of the Work. Should the party requesting arbitration fail to name an arbitrator within ten (10) days of its demand, its right to arbitration shall lapse. Should the other party fail to choose an arbitrator within the said ten (10) days then such presiding officer shall appoint such arbitrator.

Should either party refuse or neglect to supply the arbitrators with any papers or information demanded in writing, the arbitrators are empowered by both parties to proceed ex parte;

.2 no one shall be qualified to act as an arbitrator who has, directly or indirectly, any financial interest in the Contract or the Work or who has any business or family relationship with the Owner, the Contractor, or the Owner's Representative. Each arbitrator selected shall be qualified by experience and knowledge of the Work involved in the matter to be submitted to arbitration;

.3 if there be one arbitrator, the award shall be binding; if three, the award of any two shall be binding and may be impeached only for fraud or mistake. Such award shall be a condition precedent to any right of legal action;

.4 the arbitrators, if they deem that the case demands it, are authorized to award to the party whose contention is sustained such sums as they shall deem proper for the time, expense and trouble incident to the arbitration and, if the arbitration was taken without reasonable cause, damages for delay;

Ames Laboratory 00 10 00 - 14 MD Magnet Testbed – Phase 2 Issue for Bid

.5 if there is no provision in the arbitration agreement respecting costs and compensation of arbitrators, the arbitrators shall fix their own compensation, and shall assess the costs of the arbitration upon either or both parties;

.6 the award of the arbitrators shall be in writing and it shall not be open to objection on account of the form of the proceeding or the award.

.7 the proceedings will be conducted in general conformity with 5 USC §§571-580.

ARTICLE 5 - SUBCONTRACTORS

5.1 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK

5.1.1 The Contractor shall furnish in writing to the Owner within forty-eight (48) hours after receipt of the Notice of Award, a list of the names of subcontractors who will work on the Project. The Contractor shall provide an Iowa Contractors registration number for all Subcontractors as well as other requested information from the Laboratory, such as DUNS, address, phone number.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .