This document is Addendum Number 2 for Request for Proposal (RFP) SC-25-672 for the Ames Laboratory Magnet Testbed – Phase 2 project. The addendum, issued on 7/3/2025, modifies the original RFP dated 6/9/2025 and provides key updates to the project specifications and drawings. Specifically, the addendum revises the location of a 6-tank storage rack from Room 285-286 to Room 160A, below the Arcast platform north of the platform stairs.
The addendum addresses a previous question regarding the slab in the Gas Canister Storage room, confirming that no structural modifications or support are needed for the 4 gas tank racks being relocated. The proposal due date remains 7/9/2023 at 4:00 p.m. CST, and bidders are required to acknowledge receipt of this addendum with their proposal submission. Additional documentation, including existing fire protection as-built documents and architectural and fire protection plan drawing sheets, are referenced in the addendum.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ames Laboratory RFP SC-25-672 ADDENDUM NUMBER 2
ADDENDUM NUMBER 2
ADDENDUM DATE: 7/3/2025
PROJECT: RFP SC-25-672 Magnet Testbed – Phase
2 PROPOSAL DUE DATE: 7/9/2023 at 4:00 p.m.
CST ADDENDUM ISSUED DATE: 7/3/2025
The information contained in this Addendum modifies, supplements, or replaces information contained in the RFP dated 6/9/2025 and Bidding Documents dated 6/9/2025 and is hereby made a part of the Contract
Documents.
Acknowledge receipt of this Addendum with your proposal submission
Addendum consists of 2 pages and 0 pages of attachments.
ADDENDUM INDEX
GENERAL ITEMS: None.
APPLICABLE TO THE PROJECT SPECIFICATIONS: None.
APPLICABLE TO THE DRAWINGS: Item 1.
ADDITIONAL ACCEPTABLE PRODUCTS AND SYSTEMS None.
QUESTIONS AND ANSWERS Item 1.
ATTACHMENTS:
Specifications:
Appendix A Existing Fire Protection As-Built Documents.
Drawing Sheets (1 Sheet each):
2A-101 – LEVEL 1 – ARCHITECTURE.
2FP-101 – LEVEL 1 AND LEVEL 2 – FIRE PROTECTION PLAN
APPLICABLE TO THE PROJECT SPECIFICATIONS
NONE
APPLICABLE TO THE DRAWINGS
1. DRAWING SHEET 2PL101 – LEVEL 1 AND LEVEL 2 – PLUMBING PLANS
1.1. A1 – LEVEL 2 – PLUMBIN PLAN:
1.1.1. Room 285-286, REVISE location of “6-TANK STORAGE RACK BY OWNER (TYP. 4. 24
TANKS TOTAL)” from Room 285-286 to Room 160A, below Arcast platform immediately north of Gridline M (north of platform stairs).
Ames Laboratory RFP SC-25-672 ADDENDUM NUMBER 2
1.2. A1 – LEVEL 1 – PLUMBIN PLAN:
1.2.1. Room 160A, REVISE location of “6-TANK STORAGE RACK BY OWNER (TYP. 4. 24
TANKS TOTAL)” from Room 285-286 to Room 160A, below Arcast platform immediately north of Gridline M (north of platform stairs).
QUESTIONS AND ANSWERS
2. Question #2 from Addendum 1: Is the slab in the Gas Canister Storage room adequate to support the equipment? Is there a need for structural modifications/support?
2.1. There is no need for structural modifications or support. The 4 gas tank racks will be relocated from room 285-286 to room 160A. The associated piping from the compressor in room 285-286 will need to be rerouted to this revised location. Drawings for this relation will be provided post bidding. – MG, BBS