This is a Standard Form 30 Amendment to an Indefinite Delivery, Indefinite Quantity (ID/IQ) contract for Electromagnetic Spectrum (EMS) Services, Applied Engineering, Spectrum, and Electromagnetic Environmental Effects (E3) Engineering Analysis Support. The amendment, effective April 9, 2026, makes four primary modifications: updates subcontractor facility clearance and NATO access requirements in Sections M2.1.1 and L1.2.2; revises Section J by adding revised Attachment 1 (DD254), Attachment 12 (Government answers to RFP Q&A), and Attachment 13 (Word Document versions of Sections I and K); makes minor corrections to the Performance Work Statement in Section C for Tasks 6.1 and 6.2; and updates Section L2.2.0 and Table 1.1 to include a Glossary of Abbreviations and Acronyms. All other terms and conditions remain unchanged.

The underlying ID/IQ contract, awarded by the Defense Information Systems Agency (DISA), is a single-award, full and open competition utilizing a Best Value Trade-Off (BVTO) methodology. The contract employs a hybrid pricing model combining Firm-Fixed-Price (FFP), Cost Reimbursement (CR), and Cost-Plus-Fixed-Fee (CPFF) CLINs determined at the task order level. The base ordering period spans five years from award (estimated August 3, 2026) with an optional six-month extension under FAR 52.217-8. Key personnel include a Senior Program Manager and Senior Spectrum Engineer, both requiring specific education and experience qualifications. The contractor must maintain a final Top-Secret Facility Clearance with NATO access from the Defense Counterintelligence and Security Agency. Performance is primarily at Fort George G. Meade, Maryland (6910 Cooper Avenue), with limited local telework flexibility permitted. The statement of work encompasses eight primary tasks: TO Management, EMC and E3 Analyses, Spectrum Supportability Risk Assessments, Equipment Spectrum Certification, Spectrum Measurement Support, Protection of International Spectrum Usage, Spectrum Standards Support, and Transition-In/Transition-Out activities. Pricing is submitted using fully burdened labor rates applied to Government-provided use-case scenarios for evaluation purposes, with estimated base-period material and travel costs of $100,000 and $350,000 respectively.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

A) The purpose of this amendment is to:

1. Update subcontractor facility clearance and NATO access requirements for Sections M2.1.1 and L1.2.2;

2. Update Section J w ith a revised Attachment 1 (DD254) and to add Attachment 12 (Government answ er to RFP Q&A) and 13 (Word

Document version of Section I and K);

3. Make minor corrections to the Performance Work Statement in Section C for Tasks 6.1 and 6.2; and

4. Update Section L2.2.0 and Table 1.1 to include the Glossary of Abbreviations and Acronyms.

B) All other terms and conditions remain unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 43

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Apr-2026

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC104726R0015

X 9B. DATED (SEE ITEM 11)

26-Mar-2026

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Apr-2026

CODE

DISA/DITCO-NCR

P.O. BOX 549

FT. MEADE MD 20755-0549

HC1047 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HC104726R00150001c Spectrum (EMS) Services Applied Engineering, Spectrum, and Electromagnetic

Environmental Effects (E3) Engineering Analysis Support

Page 2 of 43 Pages

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

PERFORMANCE WORK STATEMENT (PWS)

Award/Mod Effective Version Date

Award TBD

Contract Number: TBD

Contractor Name TBD

Tracking Number: 632572927

Follow-on to Previous Contract and

Task Order (TO) Number:

HC104721D0002

1. Contracting Officer’s Representative (COR).

a. Primary COR. See DITCO Additional Text G1 - Points of Contact

b. Alternate COR. See DITCO Additional Text G1 - Points of Contact

c. Property Administrator See DITCO Additional Text G1 - Points of Contact

2. Contract Title. Electromagnetic Spectrum (EMS) Services, Applied Engineering, Spectrum, and Electromagnetic

3. Background.

The Defense Information Systems Agency (DISA) is a recognized center of excellence for Department of Defense

(DoD) spectrum matters. One of DISA’s missions is to provide spectrum, electromagnetic environmental effects

(E3) engineering, and analysis support services on a reimbursable, customer-funded basis to DoD Components, Federal Agencies, Non-Federal Government Organizations, and to foreign entities when authorized by the DoD

Chief Information Officer (CIO), the Chairman of the Joint Chiefs of Staff (CJCS), or the Foreign Military Sales

(FMS) process through the Defense Security Cooperation Agency. DISA also provides E3 engineering support services on a reimbursable basis prior to the installation of new or substantially upgraded Commercial

Telecommunications Services (CTS) on Federal property when requested by DoD components or Federal Agencies.

This requirement is required to execute DoD spectrum policy as delineated in DoD Instructions (DoDI) 4650 and

DoDI 3222.

4. Objectives:

Engineering support related to spectrum operations is an integral part of the overall information battlespace. In future operational environments, it is essential that spectrum-dependent (S-D) systems perform as expected to help achieve mission objectives. The challenges faced in meeting these objectives include:

• Rapidly changing technologies associated with S-D systems

• Competing demands for spectrum access

• Adversaries utilizing advanced technologies and computer hacking

Page 3 of 43 Pages

• Coordinating and collaborating with all pertinent stakeholders (e.g., services, intelligence community, commercial, academia)

• Providing timely and accurate information for decision makers at the appropriate level

• Working efficiently across multiple mission areas and organizations

A thorough understanding of the physics and technologies related to S-D systems and ramifications to operations is essential in supporting this effort. This shall include a thorough understanding in the following:

• Spectrum related phenomenology (e.g., electromagnetic propagation, non-linear effects, antennas, near field conditions, Electromagnetic Pulse (EMP)) across the electromagnetic spectrum and system performance considerations (e.g., digital signal processing, software defined radios, encryption technologies, system vulnerabilities), software tools (e.g., engineering, scenario) applications and limitations

• Testing and measurement tools, processes and limitations

There are integrated operational, technical and policy (e.g., regulations generated by the World

Radiocommunication Conference) aspects of the tasking. The following DISA mission elements shall be provided by the contractor:

a. Technical support in the planning, research and development, design acquisition, and testing of spectrum-dependent systems in the operational electromagnetic environment (EME).

b. Spectrum supportability and E3 risk assessments for developmental and operational platforms, systems, and equipment.

c. Spectrum certification support including spectrum certification and supportability planning nationally and internationally, frequency band selection, host nation compatibility support, and performance of Military

Standards (MIL-STD) testing.

d. Testing and measurement support to evaluate system performance in the operational EME including MIL-

STD, E3, electromagnetic interference (EMI), and hazards of electromagnetic radiation to ordnance

(HERO) testing. Support shall be provided during all programming phases from the research and development through the operational stage.

e. Comprehensive management support in the areas of project planning, scheduling, monitoring, reporting and other resources.

To achieve the objectives of this PWS, it is imperative that an integrated approach across DISA and its customer base be taken. The integrated approach must consider technical, operational, policy, and acquisition factors. Close communications with all stakeholders are imperative to ensure requirements and expectations are met. An integrated approach shall:

• Promote and leverage a multi-disciplinary, highly skilled workforce with technical, analytical, and operational expertise in DoD E3 engineering. The workforce shall have experience using the classified

Government spectrum management databases.

• Encourage collaboration to strengthen partnerships across diverse domains.

• Align business processes, management practices, and tools to best serve the broader community.

5. Scope.

i. E3 and Spectrum Engineering Support – The contractor shall analyze equipment and systems for potential E3 problems and recommend solutions. In addition, the contractor shall provide E3 and spectrum engineering support, including:

• Radio frequency (RF) measurements

• E3 assessments to assisting the acquisition community

• Determining and evaluating frequency bands

• Assistance in acquiring Host Nation (HN) approval for equipment operation

Page 4 of 43 Pages

ii. Technical Advice Support – The contractor shall analyze national and international electromagnetic spectrum issues and provide technical advice to executive decision-makers on the technical viability of policy and implementation options.

The Government may require surge support during the base or any option period for any TOs awarded under this contract. Surge modifications will be within the scope of the contract and all TOs awarded under this contract and will provide increased support for the defined task areas in the contract and TO PWS. The not to exceed percentage for surge support will be determined at the TO level and shall exclude any six-month extension of services pursuant to FAR 52.217-8.

6. Performance Requirements.

6.1 Task 1 – TO Management. The contractor shall provide management, personnel, planning, and coordination support necessary to accomplish all work requirements specified at the contract and TO level. The contractor shall provide a program manager to oversee, coordinate, and provide leadership and the controls necessary to manage all

TO activities under the base Indefinite Delivery, Indefinite Quantity (ID/IQ) contract. The contractor shall manage deliverable targets, maintain staffing at levels required to satisfy customer requirements, team, and/or subcontract as needed.

The contractor shall supply all programmatic and subject matter expertise required to accomplish all tasks specified at the contract and TO level.

For understanding and planning purposes, the contractor’s list of key personnel shall include the following:

• Senior Program Manager (SPM)

• Senior Spectrum Engineer (SSE)

Key personnel shall be documented in the Program Management Plan. No changes in key personnel shall be made unless the contractor can demonstrate that the qualifications of prospective replacement personnel are equal to or higher than the qualifications of the person to be replaced and the contractor shall notify the Contracting Officer’s

Representative (COR) and the Contracting Officer (KO) of any key personnel changes within three (3) business days. All changes in key personnel must be approved by the Government. The Government reserves the right to designate additional key personnel throughout the life of this contract. The Program Management Plan shall be managed at the ID/IQ level.

The SPM shall oversee, coordinate, and provide leadership and the controls necessary to manage all TO activities under the ID/IQ contract. The SPM shall manage deliverable targets, maintain staffing at levels required to satisfy customer requirements, team and/or subcontract as needed, budget, risks, and interface directly with Government leaders for all supported areas, and exercise control over assigned task personnel. The SPM shall ensure all work complies with policies, regulations, and requirements at the ID/IQ contract and TO level. The SPM shall have the appropriate security clearance to access up to Top Secret (TS)/Secret Compartmented Information (SCI).

The sPM shall have the following minimum requirements:Master of Arts/Master of Science with 10+ years of program management experience; or a Bachelor of Arts/Bachelor of Science with 12+ years of program management experience.

The SSE serves as the main point of contact with external customers and stakeholders; provides technical guidance to project engineers, plans and performs E3 analysis and spectrum measurement surveys of the electromagnetic environment, develops and reviews all outgoing technical reports and analyses prior to delivery to the customers, works with the PM to track performance, schedules, and identifies risks and provides mitigations to keep programs on target.

The SSE shall have the following minimum qualifications: Master of Science in Electrical Engineering (or similar) and 8+ years of spectrum-related experience; or Bachelor of Science in Electrical Engineering (or similar) and 12+ years of spectrum-related experience.

Page 5 of 43 Pages

Types of deliverables (specified in individual TOs) may include, but are not limited to: kick-off meeting materials, Non-Disclosure Agreements (NDAs), weekly activity reports, monthly status reports, project management review documents, program management plan, financial accounting, property accounting, invoices, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.2. Task 2- Electromagnetic Compatibility (EMC) and E3 Analyses. The contractor shall perform EMC and E3 analyses in support of DoD Components, Federal Agencies, and FMS countries to ensure that S-D systems in the research and development stage or the fielded/operational stage are spectrum supportable in their intended training, test, and operational environments. The contractor shall provide technical review support of spectrum-related documentation and shall participate in working groups (Research, Development, Test, and Evaluation (RDT&E), and fielding), technical interchanges, and other meetings.

6.2.1. Subtask 1 – Environmental Analyses. The contractor shall determine the EMC of S-D systems with other systems in their intended EME. This tasking is done at all potential stages of a system lifecycle, from the research and development phase through system fielding. The analyses will employ Government supplied worldwide frequency assignment databases, extensive equipment parameter databases, and sophisticated analysis models that can predict potential interference for terrestrial, air, ship, and space-borne systems. Analyses may also include determining electromagnetic radiation (EMR) levels, i.e., determining average/peak power densities and field strengths in the EME and communications planning by providing coverage plots and path profiles.

6.2.2. Subtask 2 – Cosite Analyses. The contractor shall determine the EMC of S-D systems operating on the same platform or in proximity to other S-D systems. The analyses will employ specialized equipment parameter databases, sophisticated coupling models, and interference prediction tools designed specifically to predict if, and when, cosite interference could occur, and how to mitigate any subsequent EMI.

6.2.3. Subtask 3 – Electromagnetic Vulnerability (EMV) Analyses. The contractor shall perform EMV analyses of S-D systems to determine system vulnerability to interception and jamming. The analyses will employ sophisticated tools to predict the impact of both friendly and unfriendly environmental equipment on system performance.

6.2.4. Subtask 4 – Radiation Hazards (RADHAZ) Analyses. The contractor shall perform RADHAZ analyses to determine the potential hazards of electromagnetic radiation to personnel (HERP), volatile materials/fuels (HERF), and ordnance (HERO), and to determine the impact of EMP, lightning, and electrostatic discharge (ESD) on the S-D systems performance.

Types of deliverables (specified in the individual TOs) may include but are not limited reports on environmental analyses, cosite analyses, EMV Analyses, RADHAZ Analyses, consulting reports, briefings, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.3. Task 3 - Spectrum Supportability Risk Assessments (SSRAs). The contractor shall perform SSRAs in accordance with DoDI 4650.01 (Policy and Procedures for Management and Use of the Electromagnetic Spectrum), the Joint Services Guide, and service specific regulations. The SSRAs shall be developed for S-D systems and shall address the spectrum risks associated with a system’s potential to obtain the spectrum necessary to operate compatibly within its intended operational EME. The SSRAs shall address the spectrum risks involved in the regulatory, technical, operational, and E3 aspects of the system life cycle. SSRAs are living document that progresses as the system moves through the life cycle from an RDT&E system to a fully fielded and operational system.

6.3.1. Subtask 1 - SSRA Regulatory Component. The contractor shall document the regulatory component of the SSRA the relative regulatory status of the system with respect to the radio services authorized within the Tables of Allocations of the US, European Union and intended Host Nations (HNs), as well as the

International Telecommunication Union (ITU), and the stage and status of all S-D equipment that are part of the acquisition process. The contractor shall address in the regulatory component the spectrum risks associated with current and future spectrum regulations and reallocations and shall develop recommendations for mitigation of identified regulatory risks.

Page 6 of 43 Pages

6.3.2. Subtask 2 – Technical Component. The contractor shall document the technical component of the

SSRA, the candidate technologies and technical parameters of the S-D system, and other S-D systems expected to be in the operational environment. The contractor shall include an initial analysis of the S-D system’s performance and the impact on other S-D systems.

6.3.3. Subtask 3 – Operational Component. The contractor shall document the operational component of the SSRA, an extensive analysis of the performance of the S-D system with the full complement of S-D systems anticipated to be in the operational environment. The contractor shall identify spectrum risks associated with the operational environment and develop recommendations for mitigation of operational risks.

6.3.4. Subtask 4 – E3 Assessment. The contractor shall document the E3 Assessment of the SSRA an analysis of EMC, EMI, and EMV to determine the potential for interactions, as well as the effects on performance, between the proposed system and the operational EME. The contractor may include, at the discretion of the government, additional E3 disciplines such as HERP, HERF, HERO, EMP, lightning, and

ESD.

Types of deliverables (specified in the individual TOs) may include but are not limited to: Consulting Reports and briefings, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.4. Task 4 - Equipment Spectrum Certification (ESC) and Supportability. The contractor shall perform ESC in support of DoD Components to ensure that S-D systems being developed will be able to obtain the spectrum necessary to accomplish their mission both nationally, as well as HN coordination internationally. The contractor

ESC support shall include the identification of the S-D system spectrum requirements, optimum frequency band selection, frequency allocation application support, and performance of MIL-STD-461G testing required during the allocation process.

6.4.1. Subtask 1 – Frequency Allocation Support. The contractor shall review or develop the DD Form 1494, Frequency Allocation Application, reflecting the spectral requirements of the S-D system, the technical parameters of the system, the operational employment plans for the system, and measured data as it becomes available for the system. The contractor shall employ automated tools as directed by the government to expedite the review or development of the DD Form 1494.

6.4.2. Subtask 2 – HN Support Assessments. The contractor shall determine the feasibility of obtaining spectrum approval from HNs worldwide to operate S-D candidate systems.

The contractor shall:

• Determine the countries suitable for operational deployment of the system.

• Determine the conformance of the S-D system’s radio service with each HN Table of Allocation.

• Review the comments on US systems with the same radio service with similar technical characteristics from prior submissions to HNs.

• Determine the EMC of the system within the EME of the HN.

• At the direction of the Government, the contractor shall brief the HNs on the technical aspects of the S-D system and the predicted EMC impact on the HN’s existing EME.

Types of deliverables (specified in the individual TOs) may include but are not limited to: DD Form 1494s, briefings, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.5. Task 5 - Spectrum Measurement Support. The contractor shall provide measurement support to DoD

Components, Federal Agencies, and FMS countries to ensure that S-D systems can operate compatibly with intended operational and test environments. The contractor shall perform measurements that may include the definition of the EME at test and operational sites, testing the spectrum characteristics of the S-D systems, and testing the S-D systems to identify conformance with US MIL-STDS and/or applicable HN regulations. This

Page 7 of 43 Pages tasking is done at all potential stages of a system lifecycle, i.e. from the research and development phase through system fielding.

Types of deliverables (specified in the individual TOs) may include but are not limited to test data, test plans, consulting reports, briefings, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.6. Task 6 - Protection of International Usage of the Spectrum. The contractor shall support the research and development of S-D systems that are intended for worldwide deployment by monitoring spectrum allocation changes that are being proposed at the ITU. The contractor shall evaluate ITU WRC Action Items (AIs) that may impact the international spectrum usage of S-D systems and the related North Atlantic Treaty Organization (NATO) positions for those AIs. The contractor shall work with the program developer, the service Spectrum Management

Organization (SMO), and the DISA to develop technical papers to be presented in international forums to protect spectrum usage by S-D systems.

Types of deliverables (specified in the individual TOs) may include but are not limited to consulting reports, meeting minutes, briefings, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

6.7. Task 7 – Spectrum Standards Support. The contractor shall review, assess, and assist the Government in updating DoD, Service and Joint Staff (JS) instructions, policies, and directives for adequate HERO, HERP, and

HERF operational and acquisition policy guidance. The contractor shall provide technical and programmatic support for the development of new and current DoD instructions and directives regarding all aspects of HERO. The contractor shall develop necessary documents (operating procedures, test methodologies, etc.) and develop changes to existing service documents in coordination with affected services, to provide the basis for safe and effective conduct of joint operations. The contractor shall provide technical support to DISA and other service organization ordnance and E3 working groups. The contractor shall provide support in the development of issue/point papers, coordination of ordnance/HERO community response to issues, assistance in resolving action items, assistance in developing presentation material, attendance at related meetings, if requested by DISA.

Types of deliverables (specified in the individual TOs) may include but are not limited to briefings, slides, consulting reports, meetings minutes, and any other deliverable identified on the Contract Data Requirements List

(CDRL) provided with individual TOs.

6.8. Task 8 – Transition-In/Transition-Out of Contract and Continuity of Services.

The objective of the transition-in and transition-out task area is to ensure continuity of services during the transition between the ID/IQ effort and/or specific TOs.

6.8.1 Transition-In: The contractor shall execute a smooth and seamless transition-in, ensuring continuity of services as specified, if appropriate, at the TO level.

6.8.2 Transition-Out: The contractor shall execute a smooth and seamless transition-out, ensuring continuity of services as specified, if appropriate, at the TO level.

Types of deliverables (specified in the individual TOs) may include but are not limited to transition-in plans, transition-out plan, final index of deliverables, and final compilation of deliverable, and any other deliverable identified on the Contract Data Requirements List (CDRL) provided with individual TOs.

7. Performance Standards.

Page 8 of 43 Pages

Performance Standard Acceptable Quality Level (AQL) Methods of

Calculation

Tasks 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, and 6.8

• Briefings

• Slides

• DD Form 1494

• Monthly status reports

• Kick-Off Meeting

• Management &

Staffing Plan

• Transition In/Out

Plans

• All other documentation prepared for

Program acquisition

Executive (PAE)

Transport

Technical Requirements: Percentage of technical requirements contained in the PWS that were met by the contractor.

In addition, deliverables must be complete and free from major technical errors before being accepted by the Government. Meeting

95% of the requirements and being complete and free of major technical errors is an

AQL.

All documents should contain only minor technical errors that require correction prior to final delivery to a sponsor. Minor technical errors should have no or minor impact on final conclusions drawn in the report.

All relevant data must be included in the report. Conclusions must be fully supported by data and information in the report. The report must be accurate. Reports shall reflect innovative solutions or unique insights to resolve problems.

Reports shall not require multiple returns to the contractor for editorial re-work prior to being accepted by PAE Transport, user, or sponsor. Re-work of the documents must not result in unacceptable schedule delays. The schedule will be specified at the TO level.

Reports must be presented in a logical, easy to read, and unambiguous manner. The flow of the information in the reports shall be relevant and support the conclusions provided in the analysis. All figures and tables provided in the analysis shall be properly marked and easy to read and comprehend.

PAE Transport approved report format should be used unless other provisions are stipulated at the beginning of the task.

Minimal report rework post-delivery is an

AQL.

Schedule Requirement: AQL is report delivered on time and will be specified at the TO level. The delivery date is the date the contractor provides the final deliverable to the Government.

Cost Requirement (if applicable): AQL is achieved when the invoices charged do not exceed 105% of planned costs.

Refer to Specific

TO.

Page 9 of 43 Pages

Task 6.2

• Environmental

Analyses

• Cosite Analyses

• EMV Analyses

• RADHAZ

Analyses

Technical Support AQL: Performance occurs with no required re-performance or re-work at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

Adequate preparation and participation in meetings and conferences is expected. If materials are presented for meetings and presentations or documents prepared, they must be accurate and professional and must require minimal editorial rework.

If database entries/outputs are required, the entries and outputs must be accurate and in the appropriate format. If ad hoc analyses are performed, the analyses must be accurate and meet the sponsor's requirements, as defined in the TO PWS.

Appropriate response (in-house analytical and deployed staff) must be provided to resolve interference events.

TO

Task 6.3

• SSRA

Regulatory

Component

• Technical

Component

• Operational

Component

• E3 Assessment

Performance occurs with no required reperformance of analyses or re-work of final deliverable at least 95% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

Reperformance and re-work must not result in unacceptable schedule delays. The schedule will be specified at the TO level.

Task 6.4

• Frequency

Allocation

Support

• HN Support

Assessments

Performance occurs with no required re-performance of analyses or re-work of final deliverable at least 95% of the time.

Problems that occur are minor and are resolved in a satisfactory manner.

Task 6.5, Spectrum

Measurement Support

Performance occurs with no required re-performance of analyses or re-work of final deliverable at least 95% of the time.

Page 10 of 43 Pages

Task 6.6, Protection of

International Usage of the Spectrum

Performance occurs with no required re-performance of analyses or re-work of final deliverable at least 95% of the time.

Task 6.7, Spectrum

Standards Support

Performance occurs with no required re-performance of analyses or re-work of final deliverable at least 95% of the time.

8. Incentives. TOs may be Firm-Fixed-Price or Cost-Plus-Fixed Fee, with cost-reimbursable Travel and Other Direct

Costs (ODC). Specific incentives will be identified in individual TOs. The Government will make determinations for option period awards based on contract performance under executed TOs.

9. Place of Performance.

Mission Location(s): 6910 Cooper Avenue, Fort George G. Meade, MD 20755-7901 with possible local travel to

2204 Turbot Landing, Annapolis MD 21402-5064.

**Please note, only unclassified work may be performed at the contractor’s locations. Classified and unclassified work shall be performed only at a Government location, as specified above. **

The maximum number of seats available in the government site for this effort is four (4) (space waiver tracking #

J4FL22202602 for Government use only).

Place of Performance: Alternative work sites allow for regular telework or remote work flexibilities. Regardless of where work is performed, the contractor shall ensure that work is completed effectively and that mission needs and requirements are met, without degradation of services. Also, the contractor may be required to account for the physical location of their personnel should this information be requested by the COR. The contractor shall propose on-site rates for all work performed at an alternative work site. Incidental charges incurred while working at an alternative work site (e.g., electricity, internet) are not allocable to the contract and shall not be billed to the

Government.

Local travel to and around the mission location (or place of performance if the PWS does not include a list of places of performance), (add mission location such as DISA HQ Ft. Meade include contractor’s facility as well if that is part of the place of performance) may be required throughout the period of performance; this travel will not be reimbursed. Long-distance travel within CONUS may be required to support the requirements of this PWS. Long distance (non-local) travel within CONUS must be pre-approved in writing by the COR prior to the Contractor incurring the cost in support of this contract. All long-distance travel within CONUS shall be planned and conducted in support of the individual tasks contained in the specified TO.

Page 11 of 43 Pages

Secondary Place of Performance – Contingency Only. As determined by the Contracting Officer’s Representative

(COR), contractor employees may be required to work at a secondary place of performance (e.g., home, the contractor's facility, or another approved activity within the local travel area) in cases of unforeseen conditions or contingencies (e.g., pandemic conditions, exercises, government closure due to inclement weather). Additionally, the contractor may be required to account for the physical location of their personnel should this information be requested by the COR. Non-emergency/non-essential contractors should not report to a closed government facility.

Contractor shall prepare all deliverables and other contract documentation utilizing contractor resources. To the extent possible, the contractor shall use best efforts to provide the same level of support as stated in the PWS. In the event the services are impacted, reduced, compromised, etc., the Contracting Officer or the contractor may request an equitable adjustment pursuant to the Changes clause of the contract.

10. Period of Performance. The period of performance of this contract will be a one five-year base ordering period from the date of award, excluding any potential extension under FAR 52.217-8. The rates utilized for the additional six-month period in accordance with FAR 52.217-8 shall be identical to the rates utilized in the final year of the contract before the 52.217-8 clause is exercised.TOs may be issued at any time during this period of performance.

Performance of TOs may extend up to one (1) year beyond the expiration of this contract, but no new TOs can be issued once the contract has expired. Rates in the final year of base ordering period shall be the max rates utilized in performance beyond the expiration of the contract. The period of performance for each TO awarded under the ID/IQ contract shall be specified in the TO.

Recognized Federal Holidays: The contractor is not required to perform services on Federal Holidays (as specified on the U.S. Office of Personnel Management website), unless otherwise specified by the COR.

Unplanned Federal Government Closure: In the event an authorized official, by either executive or legislative order, declares Federal offices closed (treated as a holiday for pay and leave purposes), the order only applies to Federal employees (unless otherwise stated in the order).

11. Security Requirements.

This section supplements Block 13 of the Government provided DD Form 254, Contract Security Classification

Specification. The following security requirements shall apply to this effort.

NOTE: This Indefinite Delivery Contract’s security requirements/DD254 will cover all future TOs; DD254s will not be required for individual TOs.

The contractor shall coordinate visits with site Point of Contract (POC)s providing at least a 72-hour notice (or according to each site security requirements) prior to any site access. Contractor personnel without security clearances performing any task under this PWS must be escorted by cleared DISA personnel (civilian, military, or contractor).

References:

a. DISA End User Access Agreement

b. DISA Instruction 240-240-01, External Peripheral Devices Authorized for Network Connectivity

c. DISA Instruction 240-110-8, Information Security

d. DISA Instruction 240-110-34, Controlled Unclassified Information (CUI)

e. DISA Instruction 240-110-36, Personnel Security

f. DISA Instruction 240-110-38, Industrial Security

g. DISA Instruction 240-110-43, Counterintelligence

h. DISA Instruction 240-110-43, Insider Threat Program

i. DISA Instruction 630-230-19, Cybersecurity

j. DoD Manual 5200.01, Vol. 1 and 3, DoD Information Security Program, 17 January 2025

k. DoD Manual 5200.01, Vol. 2, DoD Information Security Program, 28 July 2020

l. DoD Instruction 5200.48, Controlled Unclassified Information (CUI), 6 March 2020

m. DoD Manual 5200.02, Procedures for the DoD Personnel Security Program (PSP), 3 April 2017, Change 1, 29 October 2020

Page 12 of 43 Pages

n. 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), 24 February 2021

o. DoD Directive 5240.06, Counterintelligence Awareness and Reporting (CIAR), 17 May 2011, Change 3, 31 August 2020

p. DoD Instruction O-5240.24, Counterintelligence (CI) Activities Supporting Research, Development, and

Acquisition (RDA), 8 June 2011, Change 2, 15 July 2020

q. DoD Instruction 5205.16, “The DoD Insider Threat Program,” December 20, 2024

r. DoD Instruction 5230.24, Distribution Statements for DoD Technical Information, 10 January 2023

s. DoD Instruction 8510.01, Risk Management Framework for DoD Systems, 19 July 2022

t. DoD Manuel 5400.07, DoD Freedom of Information Act (FOIA) Program, 25 January 2017

u. Security Executive Agent Directive 3 (SEAD 3) Reporting Requirements for Personnel With Access To

Classified Information or Who Hold Sensitive Position, 12 June 2017

v. Security Executive Agent Directive 4 (SEAD 4), National Security Adjudicative Guidelines, 8 June 2017

w. DISA Instruction 240-15-4 United States Security Authority for North Atlantic Treaty Organization Affairs

x. DISA Instruction 240-110-35 Sensitive Compartmented Information (SCI)

y. DoD Manual 5105.21, Vol. 1-3, Sensitive Compartmented Information (SCI) Administrative Security

Manual, 19 October 2012, Change 2, 06 October 2020

11.1 Facility Security Clearance. Work performed under this contract/order is up to the Top-Secret level and will require Sensitive Compartmented Information (SCI) access eligibility for some personnel. Therefore, the company must have a final Top Secret Facility Clearance from the Defense Counterintelligence and Security Agency (DCSA)

Facility Clearance Branch.

11.1.2 Invalidated Facility Clearance. Companies with invalidated facility clearances (including those in partnerships, subcontracts, and Joint Ventures) are not eligible to bid on or be awarded any new or additional DISA classified contracts, subcontracts, or receive additional classified information except for information necessary for the completion of your current classified contracts. In addition, those companies with invalidated facility clearances will not be permitted access to all DISA networks. Performance on any DISA classified contracts, at any location, will not be authorized until it has been granted a Facility Security Clearance (FCL) at the appropriate level by

DCSA.

11.2 Security Clearance. All personnel performing on or supporting a DISA contract/order in any way shall be

United States citizens. The personnel security requirements for this contract/order cover the individuals supporting the Task Areas delineated in the table below. Contractor personnel must possess the interim or final security clearance eligibility delineated in the table below when performance starts.

PWS Task /

Subtask

Number of Security

Clearance Levels Access Justification for Access to Classified

All Tasks Security clearance levels required:

(8) CONFIDENTIAL (8)

SECRET

(5) TOP SECRET

(5) TOP SECRET SCI

NIPRNet, SIPRNet, DODNet-J(JWICS), NATO, SCI

Confidential, Secret, Top-Secret, Top-

Secret SCI, NIPRNet, SIPRNet, SCI, and

DODNet-J(JWICS) accesses are required to develop, review, and comment on classified documents, military standards, technical reports, and participate in technical meetings and other forums.

NATO access is required to support: The contractor shall evaluate ITU WRC Action

Items (AIs) that may impact the international spectrum usage of S-D systems and the related North Atlantic

Treaty Organization (NATO) positions for those AIs.

11.2.1 Top Secret SCI Requirements. Individuals located onsite at Government locations listed in the place of performance and supporting PWS Tasks / Subtasks that require(s) a final Top-Secret security clearance will, immediately upon hire, require SCI access eligibility adjudicated by the Department of Defense (DoD) Adjudication

Page 13 of 43 Pages and Vetting Services (AVS) or other federal AVS facility to perform their duties. Individuals located offsite who cannot provide valid justification in support of PWS Tasks / Subtasks will not be eligible for SCI Indoctrination.

Processing for SCI eligibility will be coordinated with the supporting Government Special Security Representative and will begin immediately upon start of duty performance under this contract/order.

All SCI* work under this contract/order will be monitored by COR and ACOR.

IAW DoDM 5105.21-Volume 3:

Contracting Officer’s Representative/Contract Monitor (COR/CM). The COR/CM must be a Government employee (military or civilian) who is appropriately cleared and SCI indoctrinated for all access required by the contract. An alternate COR/CM should be appointed to assist the COR/CM whenever the COR/CM is not available.

11.3 Investigation Requirements. All personnel requiring Final Top Secret and SCI access under this contract and all TOs awarded under this contract shall undergo a favorably adjudicated Tier 5 (T5) investigation (formerly known as a Single Scope Background Investigation (SSBI)) as a minimum requirement. Enrollment into Continuous

Evaluation current within 5 years and reflected in Defense Information System for Security (DISS), would meet the requirement for a current Periodic Reinvestigation (PR).

11.3.1 All personnel requiring Secret access under this contract/order shall undergo a favorably adjudicated Tier 3

(T3) Investigation formerly known as a National Agency Check, Local Agency Check and Credit Check or Access

National Agency Check and Inquiries as a minimum investigation. Enrollment into Continuous Evaluation current within 5 years and, reflected in DISS, would meet the requirement for a current PR.

11.3.2 The contractor is required to have personnel cleared with an interim or final Top Secret or Secret (as specified in the table located in section 11.2) at contract start date. If contractor personnel are replaced during performance of the contract, replacement personnel should also have interim or final clearance Top Secret or Secret (as specified in the table located in section 11.2).

11.4 Visit Authorization. Visit requests shall be processed and verified through the DISS to the Security

Management Office (SMO) DKABAA10. DISS visits for contracts/orders are identified as “Other” or “Temporary

Additional Duty (TAD)/Temporary Duty (TDY)” and will include the Contract/Order Number of the contract/order in the Additional Information section. Contractors that do not have access to DISS may submit visit authorizations by e-mail in a password protected portable document format file (.pdf) to the COR/ACOR specified in PWS/SOW

Section 1.0.

11.4.0 SCI visit requests: shall be processed and verified through DISS to SMO DKABAA2. For visits to DISA

Headquarters, all visitors shall be placed in the Visitor Eligibility Tool (VET) prior to their arrival. Ensure the visit level is set at SCI in the VET to ensure that it is routed to the DISA SSO for review and clearance verification. SCI

VET submissions without a corresponding SCI visit request are subject to denial. For SCI visits to DISA Field Sites, follow the equivalent visitor procedures specific to that site.

*Prior coordination with the DISA COR should be made via email to ensure the Visit Authorization Letter

(VAL)/ Visit Authorization Request (VAR)/ Visit Termination Notification (VTN) process is agreed upon and properly secure.

11.4.1 VAR Package. VAR Centers must receive VAR packages from the Security Manager (via email and require pre-approval from the assigned DISA COR) at a minimum of five business days in advance of the initial report date or renewal. For option years, VARs should be renewed 30-90 days prior to the expiration date unless modified sooner for changes such as name, COR/sponsor, contract modification, etc. As an option, a VAR can be approved for up to a maximum of three (3) years within the POP for contractors. The VAL/VAR/VTN should be sent via email to the appropriate COR. The VAL/VAR/VTN should be sent using in a locked “Zip” file in one e-mail and then followed up by another e-mail with the password to unlock the Zipped file, because it contains sensitive information covered by the Privacy Act.

Documents to include in the VAR Package (DISA Field Sites may have site specific VAR requirements):

Page 14 of 43 Pages

1. Inter-office Memorandum (IOM)

2. DD Form 254 Prime and/or Sub (Good Standing approval emails for current option year)

3. PWS/SOW/Sub Memo

4. DISS verification of Visit Authorization by Security Manager

5. (Optional: see NOTE below) Contractor VAL signed by the Contractor Facility Security Officer (FSO)

NOTE: If DISS is not available, the VAL must contain the following information on company letterhead:

• Company name, address, telephone number, facility security clearance

• Commercial and Government Entity Code (CAGE CODE)

• Contract/Order Number

• Name, Social Security Number (SSN), date and place of birth, and citizenship of the employee intending to visit, email address, and phone number

• Certification of personnel security clearance and any special access authorizations required for the visit

(type of investigation & date and adjudication date & agency)

• Name of COR/Alt COR

• Dates or period the VAL is to be valid (i.e., Start date / End date)

11.4.2 VTN Package. The Contractor FSO will forward a VTN letter to the DISA COR identified in the

PWS/TO/Sub for all employees leaving the contract/TO/subcontract.

11.4.2.1 In addition, the DISA CORs and security managers shall inform the DISA Security Office when contractor personnel are removed for cause from a contract supporting DISA. This step is to identify contractor personnel removed for security related issues in case of a return to DISA without appropriate vetting. This step will also provide security with pertinent information to make an informed decision regarding potential contractor employees’ access to secure facilities and sensitive information. “For Cause” is information regarding an individual that falls into one or more of the actions or incidents that are within one of the 13 adjudicative guidelines as cited in the

Security Executive Agent Directive (SEAD) 4:

a. Allegiance to the United States

b. Foreign Influence

c. Foreign Preference

d. Sexual Behavior

e. Personal Conduct

f. Financial Considerations

g. Alcohol Consumption

h. Drug Involvement and Substance Misuse

i. Psychological Conditions

j. Criminal Conduct

k. Handling Protected Information

l. Outside Activities

m. Use of Information Technology

Other actions:

• Incidents involving violence in the workplace or harassment.

• Misuse of time.

• Inspector General or General Counsel related inquiries.

• Failure to comply with security policies and procedures.

• Other reasons that prompted removal of a contractor.

The VTN must contain the following information on company letterhead:

• Company name, address, telephone number, facility security clearance

• CAGE CODE

• Contract/Order Number

Page 15 of 43 Pages

• Name, SSN, date and place of birth, and citizenship of the employee, email address, phone number

• Date contractor Common Access Card (CAC) was collected

• Name of COR/Alt COR

• Termination Date

• Reason for Termination: <insert reason from the 13 adjudicative guidelines, other actions, or type “No longer working on contract”>

*Any VAL/VAR submitted without the above information will be denied. *

11.5 Security Contacts. DISA Security Personnel can be contacted for Industrial or Personnel Security related issues at the following:

Defense Information Systems Agency Defense Information Systems Agency

ATTN: J-16, Industrial Security ATTN: J-16, Personnel Security

Command Building Command Building

6910 Cooper Ave. 6910 Cooper Ave.

Fort Meade, MD 20755-7088 Fort Meade, MD 20755-7088 disa.meade.j1.mbx.mp6-industrial-security@mail.mil disa.meade.j-1.list.mp6-personnel-security@mail.mil

For Center or Directorate-specific security related matters, contact the Directorate or Center Security Manager at:

Name: Michael Wilson

Phone Number: 410-919-2712

E-mail: michael.wilson99.civ@mail.mil

11.6 Information Security and other miscellaneous requirements.

11.6.1 Contractor personnel shall comply with all local security requirements including entry and exit control for personnel and property at the Government facility.

11.6.2 Contractor employees shall be required to comply with all Government security regulations and requirements.

Initial and periodic safety and security training and briefings will be provided by Government security personnel.

Failure to comply with Government security regulations and requirements shall require the company to provide the

Government with a written remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract/order.

11.6.3. Contractor employees with an incident report in DISS who have had their access to classified suspended will not be permitted to fill positions requiring access to classified information on a DISA contract/order.

11.6.4 The Contractor shall not divulge any information, classified or unclassified, about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

11.6.5 The authority for the contractor personnel to regain access must be granted by DISA Chief of Security.

11.6.5.1 DISA retains the right to request removal of contractor personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the

Government.

11.6.5.2 DISA retains the right to revoke access to DISA facilities…