RFP A23-1484 Addendum 1 with attachment.pdf

PDF 1 MB Posted

Attached to
Request for Proposals -Spedding Hall Room 10 Remodel with Addendum 2 Federal contract opportunity
Solicitation number
RFP-A23-1484
Issued by
Department of Energy Ames Laboratory

About this file

This document package includes specifications and drawings for a room remodel project at Ames National Laboratory. The project involves remodeling Room 10 in Spedding Hall including new cabinets, countertops, sinks, electrical and plumbing installations. The contractor will be responsible for demolishing existing fixtures and installing new casework, plumbing and electrical systems per the specifications. Drawings show proposed cabinet layouts, sink locations, and rough-in requirements for mechanical, electrical and plumbing systems. The project is solicited under RFP A23-1484 by the Department of Energy's Ames Laboratory. Contractors should follow the submission instructions and requirements in the specifications document.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ames National Laboratory is operated by Iowa State University for the U.S. Department of Energy.

AMENDMENT NO. 1 DATE OF AMENDMENT:

TO 7/10/2023

REQUEST FOR PROPOSAL NO. RFP A23-1484 Spedding Hall Room 10 Remodel Project

SENT VIA EMAIL

The purpose of this amendment to RFP is to:

1. Add drawings to Appendix B – Contractor Requirements (See Attached)

ALL OTHER TERMS AND CONDITIONS OF THE SOLICITATION REMAIN UNCHANGED.

Please direct all questions to:

Ames National Laboratory Procurement Representative

Andrew Saxton Contract Manager 515-294-4191 saxton@ameslab.gov

Appendix B - Contractor Requirements For

Spedding 10 Room Prep May 1, 2023

1 Rev. 0

1. GENERAL CONDITIONS

a. All asbestos and decontamination work by Ames Lab

b. If a contractor wants to park in an ISU or Ames Labs parking lot the contractor will obtain a parking permit from ISU parking division. This will be at the Contractor expense.

c. Ames Labs FES will allow contractor to unload material at the Spedding (SPH) and

Wilhelm (HWH) docks. Contractor then will have to move to a permit parking lot or the Ames labs shop area to park.

d. The intent of this spec is to accomplish a finished/completed room. In light of this Ames Labs expects the contractor to assure the room is finished completely. Examples of this are Silicone the counter edge and or backsplash to the walls, installing filler panels as needed, replacing floor tile if they get damaged during construction, etc.

2. Ames Labs personnel will remove all cabinets, cupboards, lighting and machinery before the contractor enters the sight. Ames Lab personnel will clean all areas of the room and test for legacy contamination prior to the contractor entering the work area.

3. Measurements are to be field verified by the contractor.

4. Install plumbing utilities to sink and hoods

a. Contractor to build/Install Unistrut wall supports or floor supports for utilities behind the cabinets. Contractor to install supports with lead anchors into mortar lines of the wall or floor mount the Unstrut.

NOTE: Plumbing contractor to build utility holders slightly longer than needed for electrical.

b. DI water piping to be approved for DI water. PEX for DI water-(all pipe and fittings by contractor). Three locations, two hoods and one sink. DI water from Chase 10S to sink and hoods.

c. Install hot and cold domestic water to sink and two hoods.

d. Install compressed air to two hoods from chase. Pipe to be ½ iron or copper. All pipe and fittings by contractor. If copper is used, install ½ dielectric union in the pipe chase as close to the iron pipe as possible.

Spedding 10 Room Prep May 1, 2023

2 Rev. 1

e. Sewer piping by contractor for sink and two hoods to be cast iron pipe. All installation, hangers, fittings and pipe by contractor. Use lower sewer pipe for drain and upper pipe for a vent system chase 10S.

f. Demo and cap 7 pipes in chase 4E that come out into room West wall chase.

i. Two sewer lines, drain and vent

ii. DI water line

iii. Compressed air

iv. Hot and Cold water lines

v. Natural gas line

5. Contractor installation. Equipment provided via Ames Labs Safety shower and eyewash.

a. Eye wash Water Saver EW849LH-L deck mounted swing down “Auto Flow” Style

b. Safety shower Water Saver ES643 Emergency Shower, Horizontal Mounted.

c. Mixing valve is already installed in Chase at SPH 25 utility closet.

i. A 1 inch copper pipe is already in the room located on the North wall at the concrete beam at ceiling height at the center of the room.

1. Contractor to isolate the water system and install 1 inch copper pipe to the eyewash and shower.

2. Tuck pipe in around hood, electrical and exhaust system.

3. Contractor to supply labor, copper pipe and fittings, hangers.

4. Contractor to Install the sign for eyewash and safety shower on the wall.

6. Fire Protection Fire Sprinkler piping rework

a. Remove two fire protection pipes and the 4 heads.

b. Reroute and rework the pipes so they will not hit the hoods on the North wall. We may have to reroute the sprinklers to feed from the West wall.

c. Install 4 new sprinkler heads in the room. Match style and temp of existing units.

7. Contractor to furnish and Install 2 rails for cylinder rack holders. UNIStrut brackets North East Corner along the hood side and wall by the double doors. One at 2.5 ft. high and one at 3ft 6” high.

Spedding 10 Room Prep May 1, 2023

3 Rev. 0

8. Fill holes in glazed tile and grout lines. Fill holes that are visible when new cupboards and cabinets are hung. There also seems to be a lot of holes in the ceiling and beams. Fill in with cementitious material prior to finishing.

Recess or remove anchors in grout lines as needed and fill with color matching cementitious material. NOTE: There are some holes in the colored block surface of the tile that will need to be filled with the same material.

9. Demo Electrical

a. Remove unused Conduit

b. Rework the lighting conduit to be flush with the ceiling.

c. There are many conduits in the room that will need to be removed back to Wireway.

d. Electrical box on the North wall that will need to be removed. Work with Ames Labs on the box removal it shows to have a circuit not being used in the box.

10. Electrical lighting in the room.

a. Install and wire 8-qty 4 foot LED fixtures. These will most likely hang West to East but confirm with Ames Labs prior to hanging.

b. Contractor to cut back the conduits on the ceiling to be flush with the ceiling. Remove wires and cut conduits as flush as possible to the ceiling. Install new 4X4 boxes as needed to reinstall the wires.

c. Contractor to install covers over existing ceiling boxes so they can be painted with the ceiling.

d. Install lights using a single anchor hanger with double aircraft wire cable. See room 15 SPH for light style and hanger system. Install lights at the same height as 15 SPH.

e. Add light switches to the East door area for this room (entrance of 15 SPH). Tie the switches into front door switches 3-way switches (10 SPH)

11. Electrical for the room

a. Outlets for room

i. 208 volt single phase to front of hood 20 amp each. 20 Amp twist lock style outlet

ii. Convenience outlets on hoods 120 volt 1 circuits per hood 20 amps-2 outlets on hoods. 2 total 20 amp 120 volt circuits for the two hoods. ALL GFCI

iii. Four hanging pendants in the center of the room. 2 duplex in each pendant.

8 qty circuits 20 amps each. Use yellow covers for hanging outlets like the KH INDUSTRIES Pendant Drop Outlet Box, include stress relief hangers and rubber electrical cord rated for pendant drops.

https://www.grainger.com/product/KH-INDUSTRIES-Pendant-Drop-Outlet-Box-25-13M208

4 Rev. 0

iv. Two 120 20 amp circuits one in each vacuum pump cabinet under the hoods.

v. Frig in the South West corner will need a dedicated 120 volt 20 amp circuit.

vi. Convenience outlets North side at sink and cabinet between the hoods 1 circuit

120 volts. ALL GFCI

vii. Convenience outlets above the cabinets South Wall 2 circuits 120 volt 4 duplex quads, space out above the cabinets.

viii. Convenience outlets on the East wall below the windows 1 circuit 120 volts 2 duplex quads.

ix. Convenience outlets on the West wall (GFCI) 1 circuit 120 volts 2 duplex quads

NOTE: Contractor will be responsible to run conduit and appropriate wire to each device. Ames Labs will supply the circuits and wire to Electrical raceway-contractor will run conduit and wire from raceway to the devices. Mark all outlets with a label maker with breaker and breaker box info.

12. Painting the ceiling, ducts and conduit.

a. Contractor to paint the ceiling and beams.

b. Contractor to paint ducts, conduits and electrical boxes with Sherwin Williams paint to match existing color. Do not paint the extension rings, just the box.

c. Contractor to paint both sides of the doors and frames of doors 10 SPH and 15 SPH doors. Also paint the chase door and frame outside SPH 10 door.

d. Paint Exhaust Duct for hoods. DO NOT PAINT THE HOOD DAMPER SUPPLIED via

Johnson Controls.

e. Contractor to fill in holes for steel window frames and paint both sides to match.

f. Contractor to paint cover plates for chase ways and the raceway (as needed).

g. Ames labs will inform the contractor of all colors. Sherwin Williams paint.

13. Exhaust Ductwork for two hoods

a. Contractor to build and install ductwork 10 inch for two hoods. All transitions, duct, connections, supports, by contractor.

i. Ames Labs will have to assist in installation of take off from the vertical shaft due to legacy contamination.

ii. Contractor to install damper in exhaust duct for both hoods.

1. Contractor to install damper and duct the East hood to North exhaust port by door 15 SPH

2. Contractor to install damper to West hood and to West exhaust port near the door 10 SPH

3. Tuck duct and dampers as tight to ceiling as possible.

5 Rev. 0

iii. Dampers and controls supplied by Johnson Controls.

iv. Programming of hood controls via Johnson Controls.

b. Contractor to purchase diffuser for North wall East vent hole.

i. Roughly 26 X 6?

14. Network conduit in the room.

a. Install 1 inch conduit to three locations from an 8X8 box that Ames Labs will mount on the wall. Box most likely will be in the South West corner of the room.

b. Conduit four locations in room

i. Phone at door 10. South side along side the door frame wall mount 4X4 box

ii. South side cabinets just above the cabinets 4X4 box

iii. Center of room 2X4 box mounted on the ceiling beam or the side of beam.

iv. North side of room between the two hoods above the countertop. 4X4 box.

v. Ames Labs will supply the 6A wire and install wire to the 8X8 box in the room.

Contractor will run wire from the 8X8 box through conduit and to the 4X4 box.

Contractor to tag each wire with appropriate identification markings. Ames labs will terminate and test each wire.

Ames Labs Responsibility:

15. Ames Labs Responsibility, Flooring via contractor Ames Labs will set up. Flooring AZROCK 12 X 12 inch VCT floor tile in room 10 SPH.

a. Prep floor as needed to make the floor smooth for installation of tile. Clean floor prior to installing VCT tile. Installation, glue, levelers, cracks filler by contractor.

b. Flooring to be installed prior to Cabinet installation.

c. Install floor tight to wall so that vinyl wall base is not needed. Tile under cabinets and hoods.

d. Install 4” black floor base around cabinets and hood. Installation, wall base, and glue by contractor.

e. Contractor to supply a Brown colored transition from VCT tile to VCT tile in the hallway door (if needed).

16. Ames Labs will have a separate contract with the cabinet, countertop, and hood company.

Installation of 2- new hoods, upper/lower cabinets and new counter tops 10 SPH as per plan.

Installation by Wynn Jones

a. Schedule installation with Ames Labs Construction Manager. Installation by Wynn Jones.

b. Install 2” x 2” L angle sheet metal support on wall to support counter tops as per plan.

Angle built by Ames Labs personal

6 Rev. 0

c. Install cabinets using sheet metal strap to attach cabinets to the “L” brackets

d. The cabinets will need to be placed about 1 ft. +- from the wall. Contractor to do measuring and installation of panel. Dimension is set via countertop depth. See plans.

e. Silicone under toe kicks to floor to create a dam to stop water.

f. Install floor 4” base (black) on toe kicks of cabinets and hood. Contractor Supplied.

g. Install new epoxy resin countertops and backsplashes.

h. Install new Drop-in Sink with supplied black epoxy.

i. Install sheet metal filler panels on cabinets with exposed sewer, DI, and water lines.

i. Filler panels by Wynn Jones and installed by Contractor.

PROJECT INFORMATION SHIPPING / BILLING INFORMATION PROJECT DESIGNATION

PROJECT STATUS

DRAWING INDEX

G-1 - GENERAL INFORMATION

W-1 - WALL GROUND SECTIONS

D-1 - DETAILS

D-2 - DETAILS

R-1 - ROUGH-IN 1ST FLOOR

R-2 - ROUGH-IN 2ND FLOOR

R-3 - ROUGH-IN 3RD FLOOR

R-4 - ROUGH-IN 4TH FLOOR

A-1 - ELEVATION ITEMS 1-4

A-2 - ELEVATION ITEMS 5-8

A-3 - ELEVATION ITEMS 9-13

A-4 - ELEVATION ITEMS 14-18

A-5 - ELEVATION ITEMS 19-21

A-6 - ELEVATION ITEMS 22-24

A-7 - ELEVATION ITEMS 25-29

A-8 - ELEVATION ITEMS 30-34

A-9 - ELEVATION ITEMS 35-37

A-10 - ELEVATION ITEMS 38-40

S-1 - WINDOW SILLS

ARCH / G.C.

VERIFY

PRELIMINARY DESIGN

SUBMITTED FOR APPROVAL

REVISED AND RESUBMITTED

VERIFIED DIMENSIONS

FABRICATION/INSTALLATION SET

FINAL RECORD SET

X

DRAWING INFORMATION

DETAIL SYMBOLS

ABBREVIATIONS

A.F.F. ABOVE FINISH FLOOR

ARCH. ARCHITECT

C CENTER LINE

COJ CUT ON JOB

CTR. CENTER

DIA. DIAMETER

DIM. DIMENSION

DWG. DRAWING

ELEV. ELEVATION

E.C. ELECTRICAL CONTRACTOR

G.C. GENERAL CONTRACTOR

N.I.C. NOT IN CONTRACT

O.F.O.I. OWNER FURNISHED, OWNER INSTALLED

P.C. PLUMBING CONTRACTOR

P.LAM. PLASTIC LAMINATE

REQ'D REQUIRED

SPEC. SPECIFICATION

S.S. STAINLESS STEEL

U.N.O. UNLESS NOTED OTHERWISE

V.I.F. VERIFY IN FIELD

HPL HIGH PRESSURE LAMINATE

L

GENERAL CONTRACTOR NOTES

1. REVIEW AND RESPOND TO ALL CLOUDED "ARCH / G.C. NOTE" LOCATED

THROUGHOUT THE SUBMITTAL DRAWINGS.

2. COORDINATE CASEWORK CONSTRUCTION / INSTALLATION WITH ALL OTHER

SURROUNDING TRADES TO ALLOW FOR PROPER INSTALLATION OF

CASEWORK, COUNTERTOPS AND ALL SERVICE FIXTURES.

3. EXAMINE ALL LABORATORY FURNISHING PLANS AND COORDINATE WITH

REFLECTED CEILING PLANS FOR PROPER CEILING HEIGHTS. COORDINATE

WITH TRADES IF ADDED STRUCTURAL SUPPORT IS REQUIRED TO SUPPORT

SERVICE CHASES OR OVERHEAD SERVICE CARRIERS.

4. LOCATION OF FUME HOODS, OVERHEAD SERVICE CARRIERS, SERVICE CHASES

OR ANY OTHER OBSTRUCTIONS THAT MAY INTERFERE WITH LIGHTING,

STRUCTURAL OR MECHANICAL SYSTEMS MUST BE COORDINATED. IF

DISCREPANCIES EXIST, NOTIFY AFFECTED TRADES PRIOR TO PROCEEDING

WITH WORK.

5. ALL CASEWORK SUBMITTAL DRAWINGS MUST BE RETURNED ALONG WITH AN

EXPLANATION OF HOW TO PROCEED. PLEASE REFER TO THE SUBMITTAL

LETTER FOR ADDITIONAL INFORMATION, THE SUBMITTAL LETTER IS INCLUDED

WITH EACH SET OF DRAWINGS.

ARCHITECT NOTES

1. REVIEW AND RESPOND TO ALL CLOUDED "ARCH / G.C. NOTE" LOCATED

THROUGHOUT THE SUBMITTAL DRAWINGS.

2. FINISHES ARE REQUIRED WHERE IT IS NOTED "TO BE SELECTED" ON THE

GENERAL INFORMATION SHEETS. PLEASE PROVIDE SELECTIONS WITH THE

RETURNED APPROVED SUBMITTAL PACKAGE.

3. SAMPLES WILL BE PROVIDED AS NEEDED / REQUIRED PER THE PROJECT

SPECIFICATION. IF OTHER SAMPLES ARE REQUIRED PLEASE CONTACT THE

WYNN O. JONES & ASSOCIATES PROJECT MANAGEMENT TEAM.

4. ALL CASEWORK SUBMITTAL DRAWINGS MUST BE RETURNED ALONG WITH AN

EXPLANATION OF HOW TO PROCEED.

INSTALLATION NOTES

1. AT WALL TO WALL CONDITIONS; FILLER PANELS, KNEESPACE PANELS AND

RAILS MUST BE CUT DOWN TO FIT BUILDING CONDITIONS AS NEEDED ON THE

JOB SITE BY CASEWORK INSTALLER.

2. VERIFY RECEIPT OF ALL MATERIALS PER INSTALLATION DRAWINGS. CONTACT

WYNN O. JONES AND ASSOCIATES, INC. WITH ANY INQUIRIES AS TO MISSING

OR DAMAGED MATERIAL ON SITE PRIOR TO INSTALLATION.

3. ALL DIMENSIONS NOTED AS "VERIFY" ON THE TOP AND ELEVATION DRAWINGS

MUST BE FIELD VERIFIED BY INSTALLER/ G.C. OR REPRESENTATIVE OF WYNN

O. JONES AND ASSOCIATES, INC. IF THE DIMENSIONS THAT ARE NOTED AS

"VERIFY" ON THE DRAWINGS ARE TO BE HELD PER DRAWINGS SUCH WILL BE

NOTED ON THE INSTALLATION DRAWINGS.

4. MATERIAL THAT NEEDS TO BE FIELD CUT TO FIT ON THE JOB SITE WILL BE

NOTED ON THE INSTALLATION DRAWINGS SUPPLIED BY WYNN O. JONES AND

ASSOCIATES, INC. PRIOR TO INSTALLATION.

5. CONFIRM PRIOR TO CASEWORK DELIVERY THAT INSTALLERS WILL HAVE

UNOBSTRUCTED ACCESS TO AREAS REQUIRING MATERIAL SO THAT

UNLOADING CAN BE DONE IN A TIMELY AND EFFORTLESS MANNER.

6. CONFIRM ALL ROUGH-IN INFORMATION PRIOR TO CASEWORK INSTALLATION.

ROUGH-IN AREAS MUST BE LAID OUT ACCURATELY REFLECTING THE FINAL

DESIGN INTENT.

7. ALL COUNTERTOP AND CURB / BACKSPLASH FACES AND EDGES THAT ARE

ADJOINING THE BUILDING CONDITION NEED TO BE SEALED WITH SILICONE

SEALANT PROVIDED BY THE INSTALLER.

8. ALL INSTALLATION TOOLS, EQUIPMENT, FASTENING DEVICES, STRIPPING,

BLOCKING, FURRING, AND COLOR FILL ARE ALL PROVIDED BY THE INSTALLER

UNLESS NOTED OTHERWISE.

DATE BYREV. REVISION DESCRIPTION

AMES LABORATORY

SPEDDING HALL - RM #10

AMES, IA

5/5/23

DATE:PRINT DATE:

ARCHITECT APPROVAL GENERAL CONTRACTOR APPROVAL

PROJECT#

PROJECT #

PROJECT NAME:

AMES LABORATORY

SPEDDING HALL - RM #10

ELEVATION NUMBER

SHEET NUMBER

REVISION NUMBER

SECTION NUMBER

SECTION NUMBER

SHEET NUMBER

ELEVATION MARKER

REVISION MARKER

SECTION MARKER

DETAIL MARKER

X

X

X

4 2A-XX

X

X

XELEVATION MARKER

ELEVATION LETTER

WALL BLOCK DETAIL MARKER

DETAIL NUMBER

SHEET NUMBER

X W-1

(SEE ELEVATION PLANS FOR DEPTH)

1"

CONT. DRIP

GROOVE

1"TH. EPOXY RESIN COUNTERTOP w/ 4" BUTT STYLE CURB

NOTE: FINISH ALL EXPOSED SURFACES AND EDGES SMOOTH

*SEE ELEVATION PLANS FOR SINK LOCATIONS AND CUTOUT SIZES

CHAMFERED

FRONT EDGE

BUTT CURB

(SEE ELEVATION PLANS FOR DEPTH)

CONT. DRIP

GROOVE

1"TH. EPOXY RESIN COUNTERTOP

NOTE: FINISH ALL EXPOSED SURFACES AND EDGES SMOOTH

*SEE ELEVATION PLANS FOR SINK LOCATIONS AND CUTOUT SIZES

CONT. DRIP

GROOVE

CHAMFERED

FRONT EDGE

(SEE ELEVATION PLANS FOR DEPTH)

/4

CONT. DRIP

GROOVE

1-1/4"TH. DISHED EPOXY RESIN FUME HOOD COUNTERTOP

NOTE: FINISH ALL EXPOSED SURFACES AND EDGES SMOOTH

*SEE ELEVATION PLANS FOR SINK LOCATIONS AND CUTOUT SIZES

CHAMFERED

FRONT EDGE

CASEWORK CONSTRUCTION

GENERAL INFORMATION

GENERAL NOTES

1. MOTT MANUFACTURING

CABINETRY AND FUME HOODS.

2.

A. BASE CABINET HEIGHTS: 28 3/4" (SITTING HT.), 31 3/4" (ADA HT.) AND 34 3/4"

(STANDING HT.)

B. WALL CABINET HEIGHTS: 24", 30", 36" AND 48"

C. TALL CABINET HEIGHT: 84"

D. BASE CABINET DEPTHS: 22" (STANDARD) AND 18" (SPECIALTY CABINETS)

E. WALL CABINET DEPTHS: 14" AND 18"

F. TALL CABINET DEPTHS: 14", 18" AND 22"

3. BLACK PVC BY CASEWORK CONTRACTOR.

4. PROVIDED BY OTHERS.

5. PROVIDED BY OTHERS

EXCEPT AT PRE-PIPED AND PRE-WIRED FUME HOODS AND SERVICES.

6. PROVIDED BY OTHERS.

MATERIAL SELECTION

STEEL CABINET SHELL (BASE) COLOR TO BE SELECTED

STEEL CABINET DRS / DRAWERS (ACCENT) COLOR TO BE SELECTED

FUME HOOD SUPER STRUCTURE (BASE) COLOR TO BE SELECTED

FUME HOOD LOUVER PANELS (ACCENT) COLOR TO BE SELECTED

FUME HOOD LINERS WHITE FRP

FUME HOOD ELECTRICAL DEVICES COLOR TO BE SELECTED

FUME HOOD SERVICE FIXTURES BRASS WITH EPOXY COATING

FIXTURES (WATER) SEE DETAIL SHEET

FIXTURES (ELECTRICAL) BLACK POWDER COAT

POLYPROPYLENE CABINETS COLOR TO BE SELECTED

EPOXY RESIN COUNTERTOPS BLACK

EPOXY RESIN SINKS AND CUPSINKS BLACK

EPOXY RESIN PEGBOARDS BLACK W/ WHITE PEGS

TOUCH-UP PAINT / STAIN MATCH COLOR SELECTED

FINISH SELECTIONS

LOCK SEQUENCE

A M

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

IA

NTS

5/5/23

DATE:

PRINT DATE:

SCALE:

DRAWN BY:

SHEET

G-1

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

BLACK PLASTIC

PLUG BUTTON

2 1/2" THREADED

LEVELER BOLT WITH

HEX HEAD

LEVELING PLATE

CABINET SIDES

REMOVABLE BACK

REAR RAIL

DRAWER BODY

FRONT RAIL

ROLLER BEARING WITH

NYLON RACEWAY

DRAWER LINER SOUND

DEADENING MATERIAL

EXPANDED POLYSTYRENE

DRAWER FRONT

WIRE PULL

ROLLER

CATCH

DOOR FRONT

ENCLOSED TOE SPACE

CABINET BOTTOM

HINGE

DOOR LINER

DRAWER RUNNER

DRAWER RUNNER

SUPPORT

ADJUSTABLE

SHELF

GENERAL CABINET DETAIL

COUNTERTOP GENERAL NOTES AND DETAILS

DETAIL

1. CERTAIN BASIC

MINIMUMS SHOULD BE MAINTAINED TO ENSURE THE COUNTERTOP FITS

PROPERLY AND INDUSTRY WIDE STANDARDS ARE UPHELD. TOLERANCES

RELATE TO PRODUCT ONLY, INSTALLATION STANDARDS SHOULD BE

REVIEWED FOR FURTHER CLARIFICATION.

1. OVERALL LENGTH, WIDTH AND THICKNESS ±1/16" (1.587mm)

2. FABRICATION CUTOUT TOLERANCES

A. LOCATIONS: ±1/4" IF CRITICAL

B. SIZES OF THE FABRICATION CUTOUTS:

SINK CUTOUT SIZE: ±1/8"

CUPSINK CUTOUT SIZE: ±1/8"

ELECTRICAL BOX CUTOUT: ±1/8"

COLUMN CUTOUT: +1/8"; -0 (+1/4" IF COVERED BY AN APPLIED CURB)

SERVICE DRILLING SIZE: +1/8"; -0

2. :

1" THICK EPOXY RESIN TOP AND 4" BUTT STYLE CURB / SPLASH (ALL

EXPOSED EDGES ARE TO BE FINISHED U.N.O).

1 1/4" THICK DISHED EPOXY RESIN FUME HOOD TOP (ALL EXPOSED EDGES

ARE TO BE FINISHED U.N.O).

3. OVERHANG 1" AT OPEN ENDS AND 1" FROM THE FRONT OF

BASE CABINETS AND TABLES. SINK AND SERVICE FIXTURE CUTOUTS PER

SCHEDULES OR PER CATALOG CUTS SUPPLIED BY ARCHITECT OR GENERAL

CONTRACTOR. COUNTERTOP SEAM LOCATIONS TO BE DETERMINED BY THE

COUNTERTOP MANUFACTURER AT TIME OF FABRICATION U.N.O.

4. EPOXY RESIN WITH OUTLETS.

5. ALL COUNTERTOP CUTOUTS FOR THE SINKS AND FIXTURES

ARE TO BE FACTORY CUT BY COUNTERTOP MANUFACTURER U.NO.

6. ALL SINKS AND OUTLETS ARE TO BE INSTALLED AND

SEALED BY CASEWORK CONTRACTOR AND CONNECTED BY PLUMBING

CONTRACTOR.

7. PROVIDED, INSTALLED AND SEALED BY PLUMBING /

ELECTRICAL CONTRACTORS.

☐ INSET (STANDARD)

☐ PLAIN COLD ROLL STEEL (STANDARD)

☐ 100 LB. FULL EXTENSION (STANDARD)

☐ 5-KNUCKLE STAINLESS STEEL

(OPTION 23)

☐ VERTICAL ON DOORS/HORIZ. ON

DRAWERS (STD.)

☐ 4” STAINLESS STEEL WIRE PULL

(OPTION 61)

☐ NYLON ROLLER (STANDARD)

☐ NONE

☐ NONE

☐ TEMPERED

STEEL BASE CABINET

SECTION

SEE ELEV.

S E

E

E L E

V

STEEL WALL CABINET ABOVE

STEEL BASE CABINET SECTION

S E

E

E L E

V

EPOXY PEGBOARD ABOVE

STEEL BASE CABINET SECTION

S E

E

E L E

V

MOTT CYLINDER RESTRAINT

SECTION

16"

W-1 5/5/23

DATE:

PRINT DATE:

SCALE:

DRAWN BY:

SHEET

1" = 1'-0"

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

A M

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

IA

SINK DEPTH: 10" I.D.

U55 - EPOXY RESIN, UNDERMOUNT

PEGBOARDS ARE SUPPLIED WITH

WHITE 2-PRONG POLY PEGS

(30) 5.5" LONG

(15) 6.5" LONG

(9) 8.5" LONG

3.753.753.753.753.753.753.75

6.006.006.00

36.00

3.00

4.00

4.00

4.00

4.00

4.00

5.00

5.00

3.00

1.881.88

30.00

3.753.75

3.751.88

3.753.75

4.001.00

4.00

6.00

3.00

3.00

6.006.00

2.00

1.00

0.75

30.00 2" STAINLESS

STEEL DRIP

TROUGH

0.0000

1-1/2" NPSL

TAKE UP NUT

BUILT-IN STRAINER

PVC STOPPER

3.0000

0.2500

1.8750

1.5000

5/5/23

DATE:

PRINT DATE:

SCALE:

DRAWN BY:

SHEET

D-1

SINK SK1 PURE WATER FAUCETDI1 HOT / COLD WATER FAUCETHCW1 EYE WASH @ SINKEW1

SINK OUTLET (FOR SK1)SO1 PEG BOARD & SS DRIP TROUGHPB1 -- DETAIL DESCRIPTIONES1 NTS

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

3 A-2

LAB

18'-2"

3'-3"

9'-4 7/8" 11'-4 7/8"

/2

A-1

/2

6' 1'-6" 6' 2'-3"

/8

5'-3"

3'-10"

2'

1'-2 1/4"

10'-11 1/2" 11'-0 1/2"

/2

22'

2' 8'

5'

7'-8"

REFRIGE

B.O.

DRY GLOVEBOX

DRY GLOVEBOX

/2

/2

R-11/2" = 1'-0"

5/5/23

DATE:

SHEET

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

IA

ROUGH-IN INFORMATION

ROUGH-IN DRAWINGS ARE PROVIDED TO COORDINATE ACCESS TO SHUT-OFFS, TRAPS, SERVICE LINES AND ELECTRIC JUNCTION BOXES. THE ROUGH-IN DRAWINGS

SHALL NOT BE USED AS AN AUTHORITY TO MAKE ANY CHANGES IN MECHANICAL OR ELECTRICAL CONTRACTS OR SUB CONTRACTS ALREADY HELD BY THOSE DOING

WORK FOR THE OWNER. FURTHERMORE, VARIATIONS FROM THE ROUGHING-IN AREAS SHOWN (MADE NECESSARY BY BEAMS OR OTHER BUILDING CONDITIONS

SHALL IN NO WAY BE CONSIDERED A LIABILITY RESULTING FROM THE PREPARATION AND SUBMISSION OF THE ROUGH-IN DRAWINGS

1. AREAS DEPICTED WITH A CROSS-HATCH DENOTE ROUGH-IN SPACE, 7" Dp. U.N.O.. ALL SERVICES MUST BE STUBBED IN WITHIN THESE BOUNDARIES.

2. PLUMBER, ELECTRICIAN AND HVAC CONTRACTORS ARE TO COORDINATE SPECIFICATIONS, ARCHITECTS MECHANICAL DRAWINGS AND DRAWINGS ATTACHED FOR

SERVICES REQUIRED AT EACH ASSEMBLY.

3. ROUGH-IN FOR ASSEMBLIES NIC ARE NOT SHOWN ON THE ROUGH IN PLANS.

4. ALL WASTE PIPE OUTLETS ARE 1 1/2" UNO.

5. ALL FINAL CONNECTIONS FOR MECHANICAL, PLUMBING AND ELECTRICAL ARE TO BE PROVIDED BY APPROPRIATE TRADES (NOT BY CASEWORK CONTRACTOR).

ROUGH-IN ADVISORY NOTE

ROUGH-IN INFORMATION

PARTIAL FLOOR PLAN - ROOM #10

NORTH

E

1"THK. EPOXY RESIN TOP & CURB

D O

O R W

A Y

ITEM

ARCH. ELEV.

QTY-

RM#1

ELEVATION

W-1 TYP.

/2

C U

R R

E N

T D

R O

P C

L G

/8

136 3/4" VERIFY

14 1/4"

VERIFY

113" VERIFY

7441010

PRO BENCH - COMBO SASH

WITH FRP LINER, PRE-PIPE DOWN

22"D.

1110044

174 1/2"

36" 102 1/2"

/2

S-FPS9072-(H15.5)

CEILING ENCLOSURE

CURRENT

DROP CLG

/4

/4

E

63"

72" 18" 72"

E 1- 1/4"THK. ER TOP W/ CUPSINK E 1- 1/4"THK. ER TOP W/ CUPSINK

/4

32 5/8"

ACID ACID

1431011-VK

18"D.

INSULATED

KEEP FIRE AWAYKEEP FIRE AWAY

1432011-83

18"D.

SELF-CLOSING/

LATCHING DOOR

LIGHT

SWITCH

HW

CW

GFCI

GAS

AIR

ITEM

ARCH. ELEV.

QTY-

RM#2

ELEVATION

SECTION AT

STANDING HEIGHT

/4

/4

"4

13"22"1"

36"

/2

SECTION AT

EMERGENCY SHOWER

24"

SECTION AT

FUME HOOD

11"18"1"

30"

/2

/2

M A

X S

A S

H

O P

E N

/8

S A

S H

O P

E N

/4

7 1/16"

3 X 6

CUP SINK

G.C./OWNER NOTE:

VERIFY FIRE SPRINKLER SUPPLY

LINES CLEAR FUME HOODS

G.C./OWNER NOTE:

VERIFY FIRE SPRINKLER SUPPLY

LINES CLEAR FUME HOODS

72"

264"

18"36"18"

63"

18"

E C S

18" 72" 39"

36"42"

22"D.

1818022-90

22"D.

1110022

F F L

3"

/2

/2

39"24"

W-1 TYP.

PB1

DI1 EW1

36"

ES1

NOTE:

PER OWNER, FAUCET AND EYEWASH HOLES TO

BE LOCATED AND DRILLED BY OTHERS.

113P222

18"

113P222

18" 18"

22"D.

1110022

22"D.

1110022

AFA1000

(ALARM

INCLUDED IF

CAV HOOD)

7441010

PRO BENCH - COMBO SASH

WITH FRP LINER, PRE-PIPE DOWN

LIGHT

SWITCH

HW

CW

GFCI

GAS

AIR

3 X 6

CUP SINK

AFA1000

(ALARM

INCLUDED IF

CAV HOOD)

(2) 120v, 20A

GFCI DUPLEX

AT BOTH

LOWER POSTS

RGT POST

PUNCH OUT

BLANK FOR

FUTURE POWER

AND COVER W/

FACE PLATE

PROVIDE ALT#1 PRICE FOR

LATTICE ROD ASSY SIDE WALL

MOUNTED IN BACK OF HOOD

A-1 5/5/23

DATE:

PRINT DATE:

SCALE:

DRAWN BY:

SHEET

1/2" = 1'-0"

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

D O

O R W

A Y

ITEM

ARCH. ELEV.

QTY-

RM#3

ELEVATION

W-1 TYP.

169 1/2"

30"8"

E

1"THK. EPOXY RESIN TOP & CURB

218"

W-1 TYP.

218"

264"

36"

22"D.

1410097

36"36"

22"D.

1410097

36"

22"D.

1410097

36" 1"

87 1/2"

/2

131 1/2" 86 1/2"

/2

46"

36"

5420040-ZR-46

14"D.

36"

5420040-ZR-46

14"D.

36"

5420040-ZR-46

14"D.

ITEM

ARCH. ELEV.

QTY-

RM#4

ELEVATION

SECTION AT

STANDING HEIGHT

14"

/4

/4

"4

7"22"1"

30"

/2

22 1/2"

/4

RACEWAY BY OTHERS RACEWAY BY OTHERS

W-1 TYP.

SECTION AT

STANDING HEIGHT

/4

21 1/2"22"1"

44 1/2"

/2

MOTT CYLINDER

RESTRAINT

E

264"

44" 7

G.C./OWNER NOTE:

VERIFY NO WALL CABINETS ON

THIS WALL BECAUSE OF DEPTH OF

WORK SURFACE BELOW

22"D.

1410011

REFRIGERATOR

BY OTHERS

22"D.

1410022

36"

22"D.

1410022

E C S

F F L

1"

C S R

5/5/23

DATE:

PRINT DATE:

SCALE:

DRAWN BY:

SHEET

A-21/2" = 1'-0"

D A

T E

B Y

R E

V

R E

V

IS

IO

N

D E

S C

R

IP

T

E S

L A

B O

R A

T O

R Y

S P

E D

D

IN

G H

A L L

R

M

A M

E S

RFP A23-1484 Addendum 1
Appendix B - Contractor Requirements and Drawings - Rev 1.
Appendix B - Contractor Requirements - May 2023 Rev.0
Drawings - Spedding Hall Rm#10 dated 06-27-2023

File details come from the government source that posted it. Updated .