Appendix D - Contractor Safety and Quality Assurance Information Questionnaire.pdf
PDF 345 KB Posted
- Attached to
- Request for Proposals -Spedding Hall Room 10 Remodel with Addendum 2 Federal contract opportunity
- Solicitation number
- RFP-A23-1484
- Issued by
- Department of Energy Ames Laboratory
About this file
This document is a contractor safety and quality assurance questionnaire for Ames Laboratory related to RFP-A23-1484 for the Spedding Hall Room 10 Remodel project. The questionnaire collects information on the contractor's safety program, including experience modification rates, OSHA recordable incident rates, safety training programs, inspection procedures, and quality assurance processes. Contractors must indicate whether work will be performed by their company or subcontractors for various construction disciplines involved in the project such as demolition, concrete, masonry, metals, thermal and moisture protection, doors and windows, finishes, furnishings, special construction, conveyances, and electrical. Levels of quality assurance documentation are defined, with higher levels requiring submittal of quality manuals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP A23-1484 Addendum 2 with attachments.pdf | ||
| RFP A23-1484 Addendum 1 with attachment.pdf | ||
| Appendix A - Fixed Price Construction Terms and Conditions rev. 01-2020.pdf | ||
| Appendix G - SF1413-13d.pdf | ||
| RFP A23-1484 Sph Room 10 Remodel Project.pdf | ||
| Appendix B - Contractor Requirements - May 2023 Rev.0.pdf | ||
| Appendix C - WD IA20230074 Mod.6 dated 06-09-2023.pdf | ||
| Appendix F - Reps and Certs Supplemental 12-8-2022.pdf | ||
| Appendix A2 - Updates to Fixed Price Construction Terms and Conditions - Supplement.pdf | ||
| Appendix A1 - COVID-19 Workplace Safety and Reentry Framework Rev 1.3 3-17-2022.pdf | ||
| Appendix E - Safety Requirements and Deliverables.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form 10200.140
ESH&A, 4-9769
Rev 1.3, 04/01/2017 1
APPENDIX D - AMES LABORATORY
CONTRACTOR SAFETY & QUALITY ASSURANCE
INFORMATION QUESTIONNAIRE
RFP #
Project Name
Contractor
Address
Phone Contact # Email
1. List your firm's interstate Experience Modification Rate (EMR) for the past three consecutive years.
NOTE: This information can be obtained from your Worker's Compensation carrier.
Year
Year
Year
2. Using the information from the OSHA No. 300 log, provide the following information on injuries and illnesses for the past three consecutive years.
Year Year Year
A. Total number of recordable cases
(i.e., sutures, fractures, burns, rashes, foreign body in eye, etc.) including cases involving lost time.
B. Number of lost workday cases.
C. Number of lost workdays.
D. Number of fatalities.
E. Employee hours worked each year.
Rate Calculation Formulas:
A) Number of OSHA Recordable Cases x 200,000
Number of Hours Worked Per Year
B) Number of Lost Time Accidents x 200,000
Number of Hours Worked Per Year
C) Number of Days Lost x 200,000
Number of Days Worked Per Year
Approved
Approved as noted
Not approved – Resubmit
ESH&A
Signature
Identify your Worker's Compensation carrier:
Address:
Phone:
Rev 1.3, 04/01/2017 2
3. How often are accident reports (OSHA 300) and report summaries sent to the following:
Never Monthly Quarterly Annually
Field Superintendent
Vice President of Construction
President/CEO
4. Does your firm:
Have a written company safety policy signed by a company officer? Yes No
Have an established written safety plan? Yes No
Have a written Hazard Communication Program? Yes No
5. Identify by name and title the person within your firm directly responsible for your firm's safety program: Phone:
6. How often do you hold site safety meetings for field supervisors?
Weekly Monthly Never
Bi-Weekly As Required
7. How often do you hold craft “tool box” safety meetings?
Weekly Monthly Never
Bi-Weekly As Required
8. How often do you conduct safety inspections?
Who performs this inspection?
9. Do you have orientation for new hires? Yes No
If yes, does it include:
Yes No
Head Protection
Eye Protection
Hearing Protection
Respiratory Protection
Safety Belt and Lifeline (Fall Protection)
Scaffolding/Work Platform, Competent Person
Perimeter Guarding/Floor, Wall and Roof Openings
Housekeeping
Fire Protection
First-Aid
Emergency Procedures – Rescue/Evacuation
Toxic Substances
Trenching and Excavation, Competent Person
Signs, Barricades, Flagging
Electrical Safety, Lockout/Tagout Procedures
Rigging and Crane Safety
Hazard Recognition
Rev 1.3, 04/01/2017 3
10. Do you have a program for newly hired/promoted foremen? Yes No
If yes, does it include:
Yes No
Safe Work Practices
Methods of Safety Supervision
Toolbox Meetings
Emergency Procedures
First-Aid
Accident Investigation
Fire Protection and Prevention
New Worker Orientation
QUALITY ASSURANCE
Check one of the following boxes:
LEVEL 1
Contractor has a documented quality assurance program.
LEVEL 2
Contractor has a documented Quality Assurance Program that adequately addressed the quality requirements applying to work normally performed.
LEVEL 3
Contractor currently does not have a documented Quality Assurance Program, but has successfully performed construction activities at the Ames Laboratory.
LEVEL 4
Contractor currently does not have a documented Quality Assurance Program, and has not previously performed construction activities at the Ames Laboratory.
If you check the block in either 1 or 2 above, please enclose a copy of your Quality Assurance Manual.
Rev 1.3, 04/01/2017
Check all blocks that apply to this contract:
(1) Work to be performed by your Company
(2) Work to be performed by a Sub-Contractor to your Company
1 2 Site Work
Demolition
Earthwork
Site Improvements
Landscaping
Paving and Surfacing
Concrete
Cast-in Place Concrete
Precast Concrete
Cementitious Decks
Restoration and Cleaning
Masonry
Unit Masonry
Stone
Restoration
Metals
General
Structural Metal Framing
Joists
Decking
Miscellaneous and Ornamental
1 2 Thermal and Moisture Protection
Waterproofing
Insulation
Fireproofing
Preformed Siding
Flashing and Sheet Metal
Roofing (General)
Shingles and Roofing Tiles
Preformed Roofing
Membrane Roofing
Doors and Windows
Metal Doors and Frames
Wood and Plastic Doors
Special Doors
Entrances and Store Fronts
Metal Windows
Wood and Plastic Windows
Special Windows
Hardware and Specialties
Glazing
Finishes
Lath and Plaster/Drywall
Acoustical Treatment
Wood Flooring
Stone and Brick Flooring
Resilient Flooring
Carpeting
Painting
Wall Covering
1 2 Furnishings
Cabinets and Casework
Window Treatment
Furniture and Accessories
Special Construction
Clean Rooms
Insulated Rooms
Radiation Protection
Pre-engineered Structures
Liquid and Gas Storage Tanks
Industrial/Process Control Systems
Fire Suppression/Supervisory Systems
Mechanical
Insulation
Special Process Piping Systems
Plumbing and Sewerage
Fire Protection
Power or Heat Generation
Air Distribution
Controls and Instrumentation
Rev 1.3, 04/01/2017
1 2 Wood and Plastics
Rough Carpentry
Heavy Timber Construction
Prefabricated Structural Wood
Finish Carpentry
Architectural Woodwork
Conveying Systems
Elevators
Hoists and Cranes
Lifts
Material Handling Systems
1 2 Equipment
Waste Handling Equipment
Water Supply and Treatment
Equipment
Communication Systems
Fluid Waste Disposal and Treatment
Equipment
Laboratory Equipment
1 2 Electrical
Substations
Primary Distribution
Secondary Distribution
Lighting
Cathodic Protection
Controls