RFP952000-01 Addendum #01.pdf

PDF 5 MB Posted

Attached to
Design Services - DOC NCCF Perimeter Light Pole & Yard Light Pole Replacement
Solicitation number
RFP952000-01
Issued by
Calhoun County, Iowa

About this file

This is an Addendum #01 to Request for Proposal (RFP) 952000-01 issued by the Iowa Department of Administrative Services (DAS) for professional design services at the North Central Correctional Facility (NCCF) in Rockwell City, Iowa. The project involves the inspection and replacement study of approximately 94 light poles (62 wood perimeter poles and 32 fiberglass interior yard poles) exhibiting deterioration, rot, decay, or damage. Design services include field inspection and documentation of all poles, identification of deficiencies with photographs, recommendations for repair or replacement, and coordination with the Construction Manager (McGough Construction). A non-mandatory pre-proposal conference was held on April 1, 2026, from 11:00 AM to 12:00 PM Central Time, offered both in-person at the facility and virtually via Microsoft Teams. Written questions and clarifications must be submitted by April 6, 2026, at 2:00 PM, with proposals due April 15, 2026, at 2:00 PM Central Time. The designer contract execution is anticipated for the week of April 20, 2026, with design kickoff the week of April 27, 2026. The design schedule includes multiple review milestones (100% Design Evaluation by May 27, 2026, and 100% Construction Documents thereafter), followed by contractor bidding in July 2026 and construction from August through November 2026. The RFP requires a modified ConsensusDocs 803 Form of Agreement with a Professional Liability insurance policy of $2,000,000 with a $25,000 deductible. Proposals must include project-specific schedules, resumes for all technical staff, anticipated hours and rates by position, and lump sum fees broken down by schedule of values across five phases: Design Evaluation, Design Development, Construction Documents, Bidding/Negotiation Assistance, and Construction Phase. A unit price per construction inspection visit is also required as an additive or deductive component. All proposals must be submitted through the IMPACS Electronic Procurement System in digital format. The addendum includes pre-proposal meeting minutes, additional site plan drawings and photos of light poles, and a revised RFP clarifying that the primary deliverable is a Light Pole Replacement Study with an option to extend into full design services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 for RFP 952000-01

Project Name: DOC NCCF Perimeter Light Pole & Yard Light Pole Replacement

RFP #: 95200-01

DAS Project #: 9520.00

Date: 4/10/2026

Bid Due: 4/15/2026 at 2:00pm

Addendum No. 1 Items:

1. Include the Pre-Proposal Conference meeting minutes from April 1st Meeting that took place in-person and on teams.

a. See attachment

2. Include additional existing site plan drawings and photos of light poles

a. See attachment

3. Includes updated RFP, making changes to RFP sections providing clarity to better reflect the intent that proposing design firms will be providing a Light Pole Replacement Study.

a. See attached RFP with modifications.

END OF ADDENDUM

State of Iowa - Department of Administrative Services 109 SE 13th St.

Des Moines, Iowa 50319 P: (515) 281-7260

Project: 9520.00 DOC NCCF Perimeter Light Pole & Yard Light Pole Replacement

313 Lanedale Rockwell City, Iowa 50579

P: 712-297-7521

RFP Pre-Proposal Minutes: Meeting #1

Meeting Date Apr 1, 2026 Meeting Time 11:00 am - 12:00 pm Central Time (US & Canada)

Meeting Location Virtual & On Site

Overview Meeting to allow prospective design firms to visit the project site, when possible, and learn more about the scope.

Notes

Attachments

Scheduled Attendees

Name Company Phone Number Email Attendance

Noah Thelen McGough Construction P: (515) 639-3853 noah.thelen@mcgough.com Present

Wade Hammen North Central Correctional Facility P: (515) 574-4700 wade.hammen@iowa.gov Present

Jennie Elliott State of Iowa - Department of Administrative Services jennie.elliott@iowa.gov Present

Introduction

No. Mtg Origin Title Assignment Due Date Priority Status

1.1 1 Introductions Open

Description Attendance

Official Documented Meeting Minutes Online:

James Deeds (RCE)

In Person:

Noah Thelen (McGough) Wade Hammen (NCCF) Jennie Elliott (DAS)

Project Overview

2.1 1 Scope Review Open

Description Replacement of perimeter security wood light poles and interior yard fiberglass light poles at the North Central Correctional Facility 7464, 313 Lanedale, Rockwell City, IA 50579. This work will consist of field inspecting and documenting all light poles both interior yard and perimeter roughly (60 total) that show signs of deterioration and/or rot that would require replacement. Fiberglass poles are located inside the facility

(30) and Wood Poles located outside around road (30), multiple poles have already fallen down due to weather and snowplow damage.

State of Iowa - Department of Administrative Services Page 1 of 3 Printed On: Apr 2, 2026 11:02 AM CDT

Field Inspection of all existing wood poles, Identification of poles exhibiting rot, decay, splitting, insect damage and hardware deterioration, Documentation of deficiencies with photographs, remaining service life where feasible and recommendations for repair, reinforcement or replacement. This service can be provided by designer or accompanied by 3rd Party if needed.

Official Documented Meeting Minutes Scope was reviewed by NCCF that the current count of light poles is 62-Wood and 32-Fiberglass for a total of 94 poles that need reviewed.

NCCF and DAS is looking for additional drawings, it was mentioned that the kitchen addition should be the newest showing some added lighting and site layout.

The fiberglass poles have a tag showing 06/92 assuming these poles have been installed/manufactured in 1992.

James wanted to confirm if this is a proposal for design or just a Study/report for the deliverable. DAS discussed and it was noted that this will primarily be for a Study with an option to move into design, this will be clarified in the addendum. It was discussed that a site plan might need to be drafted, but ultimately a preliminary study needs to be completed to identify which poles need replaced for contractor to come in and make replacements. DAS is unable to have a subcontractor identify/test poles and perform the replacement.

It was discussed if any electrical design or review is needed for the lighting. DAS/NCCF determined we would plan on re-using the new LED lights on the Wood Poles but look at upgrading the fiberglass poles to LED when replacing since they are original. lack of lighting is not a big concern from NCCF so no need to add additional poles at this time.

The fiberglass poles are measuring 25ft tall from ground to top, and wood is measuring 25ft from ground to top. The group is assuming 30ft total if you count the in-ground portion.

2.2 1 Schedule Review Open

Description

• Questions Due to construction.procurement@iowa.gov: 4/6/2026 by 2:00pm

• Addendum Issued: Week of 4/6/2026

• Proposals Due: 4/15/2026 by 2:00pm

• Selection of Designer/Issue NOI: Week of 4/20/26

• Execution of 803 Contract: Week of 4/20/26

• Tentative Design Kickoff Meeting: Week of April 27th, 2026

• 100% DD: TBD

• 50% CD and budget: TBD

• 95% CD: TBD

• 100% CD and budget: June 12th, 2026

• Contractor Bidding: June, 2026

• Execution of Contractor's Contract(s): July, 2026

• Submittals, Procurement and Construction: August 2026 - November 2026

• Closeout: November 2026 - December 2026

Official Documented Meeting Minutes James had some concern on the 6 week schedule if a full design was needed. But if just a Study is needed this time frame will be OK and some travel/trips could be eliminated.

RFP Overview

Meeting #1 - RFP Pre-Proposal Project: 9520.00 DOC NCCF Perimeter Light Pole & Yard Light Pole Replacement

State of Iowa - Department of Administrative Services Page 2 of 3 Printed On: Apr 2, 2026 11:02 AM CDT mailto:construction.procurement@iowa.gov:

3.1 1 RFP Requirements Review Open

Description

• All questions to be directed to construction.procurement@iowa.gov

• DAS uses Procore online project management system for all projects, at no cost to the designer.

• DAS uses a modified ConsensusDocs 803 Form of Agreement

• DAS requires a project-specific Certificate of Insurance and specifies a Professional Liability policy of $2,000,000 with a deductible of $25,000 o Must note in proposal if deductible is different and provide a letter of financial stability from bank o Must provide COI prior to contract execution

• Ensure the following items are included in the proposal:

o Project-specific schedule o Resumes for all technical staff that will be assigned to the project o Anticipated hours and rates for each person on the design team o Lump sum broken down by schedule of values

• Proposals shall be uploaded through the IMPACS Electronic Procurement System (do not email to Procurement).

o Link and information is in the RFP o Designers will need to register prior to submission o Designer should complete the registration process and ensure the ability to log in as soon as possible to ensure proposals can be submitted on the due date.

o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.

Official Documented Meeting Minutes James was aware of all the designer requirements and did not need any additional questions.

Conclusion

4.1 1 Designer Questions Open

Description Any questions?

Meeting #1 - RFP Pre-Proposal Project: 9520.00 DOC NCCF Perimeter Light Pole & Yard Light Pole Replacement

These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.

Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.

State of Iowa - Department of Administrative Services Page 3 of 3 Printed On: Apr 2, 2026 11:02 AM CDT noah.thelen Image noah.thelen Image noah.thelen Image

STATE OF IOWA

REQUEST FOR PROPOSALS

PROFESSIONAL DESIGN SERVICES

RFP COVER SHEET

Administrative Information

RFP Number RFP952000-01 Title of RFP DOC NCCF Perimeter Light Pole & Yard Light Pole

Replacement

Agency Iowa Department of Administrative Services (DAS)

Project

Description

The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for the inspection and replacement of light poles at North Central

Correctional Facility in Rockwell City, Iowa.

State Issuing Officer:

Michael Bradbury

Issuing Officer

Iowa Department of Administrative Services

Hoover State Office Building, Level 3

1305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327

Email: construction.procurement@iowa.gov

PROCUREMENT TIMETABLE—Event or Action Date/Time (Central Time)

State Posts Notice of RFP on TSB website 3/16/2026

State Issues RFP 3/18/2026

Pre-Proposal Conference Location and Address:

Is Pre-Proposal Conference mandatory? No

Virtual Option Link RFP952000-01 DOC NCCF Perimeter Light Pole & Yard

Light Pole Replacement - Pre-Proposal Meeting | Meeting-Join |

Microsoft Teams

If a map is needed, contact the Issuing Officer.

April 1st, 2026 at 11:00am

Location North Central

Correctional Facility

Questions, requests for clarification, and suggested changes from

Respondents due to Construction Procurement 4/6/2026 by 2:00pm

Proposals Due 4/15/2026 by 2:00pm

Relevant Websites

Website where Addenda to this RFP will be posted http://bidopportunities.iowa.gov

Website where contract terms and conditions are posted https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf

Number of Copies of Proposals Required to be Submitted: 1 Digital

Firm Proposal Terms

The minimum number of days following the deadline for submitting Proposals that the firm guarantees all proposal terms, including price, will remain firm is 120 Days.

1.1 INTRODUCTION

The Iowa Department of Administrative Services (DAS) is seeking proposals from qualified and available

Design companies for services, per RFP cover page, and as outlined in the following (Sections 1.2 - 1.3).

The successful proposal must:

● For the staff that will be assigned, identify and describe qualifications, experience, and expertise in providing services for similar, or relevant, projects.

● For the staff that will be assigned, provide a list of past similar or relevant projects completed in the last 5 years, and include brief descriptions of what the projects entailed and a contact name and phone number (reference). In addition provide estimated project cost, final project cost at acceptance, and whether it was completed on time.

● Describe the composition of your team. Identify staff to be assigned. Provide resumes of key individual(s) including education, relevant experience, and certifications/licensing.

NOTE: Any responding company and/or consultant that is part of the project design services cannot receive an award from the resulting request for bid of construction services.

● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.

● Describe computer program/software capabilities and expertise you utilize. Please describe your experience.

● Provide a copy of your organizational chart.

● Describe your experience, if any, on designing similar or relevant projects for the State of Iowa.

● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.

● Identify desired reimbursable charges (the State has limitations, per State of Iowa Accounting Policies and Procedures 210.245), and all other charges.

1.2 SCHEDULE

DAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence.

Execution of Designer’s Contract Week of April 20th, 2026

Tentative Design Kick-Off Meeting Week of April 27th, 2026

100% Design Development Documents To Be Coordinated

50% Construction Documents and Cost Opinion By To Be Coordinated

100% Design Evaluation and Cost Opinion By May 27th, 2026

100% Construction Documents and Cost Opinion By To be Coordinated

Contractor Bidding July, 2026

Execution of Contractor’s Contract(s) August, 2026

Submittals, Procurement and Construction September, 2026 to

November, 2026

Close out November 2026 to December,

1.3 PROJECT DESCRIPTION

Construction Manager (McGough Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of the replacement of perimeter security wood light poles and interior yard fiberglass light poles at the North Central

Correctional Facility 7464, 313 Lanedale, Rockwell City, IA 50579. This work will consist of field inspecting and documenting all light poles both interior yard and perimeter roughly (62 wood and 32 fiberglass) that show signs of deterioration and/or rot that would require replacement.

After design evaluation DAS will consider extending contracts to incorporate further project design.

Design services shall include:

1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract.

1.3.2 All design disciplines necessary to complete the scope of work.

1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the

Owner, Construction Manager, and Owner’s maintenance staff.

1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner.

1.3.5 Wood Light Pole Evaluation & Replacement Study

1.3.5.1 Field Inspection of all existing wood poles and fiberglass, Identification of poles exhibiting rot, decay, splitting, insect damage and hardware deterioration, Documentation of deficiencies with photographs, remaining service life where feasible and recommendations for repair, reinforcement or replacement.

1.3.6 Field examination of the existing buildings.

1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.

1.3.8 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal.

1.3.9 Designer shall include any and all survey work required for completion of project.

1.3.10 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required.

1.3.11 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule.

1.3.12 Designer shall assist Construction Manager in the evaluation of long lead times.

1.3.13 Quality control during Design, Preconstruction and Construction.

1.3.14 Compliance with all Federal, State, and applicable AHJ codes.

1.3.15 Completion of State building and energy code documents, as required.

1.3.16 Design review will be conducted at 100% Design Evaluation 100% design development documents, 50% construction documents, and 95% construction documents. Dates for design review meetings to be coordinated with the design and project team and set no later than the design kickoff meeting. Review will be conducted with DAS Owner

Representative, Construction Manager, and Facility Representative, at a minimum.

Drawings, specifications and cost opinions shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions.

1.3.17 Review with the Department of Inspections, Appeals, and Licensing’s Building Code

Bureau for approval of plans or exemption from review. All fees associated with the

Bureau are the responsibility of the designer.

1.3.18 Develop and distribute agendas and meeting minutes for all meetings during the design phase.

1.3.19 Designer shall provide any information necessary to obtain utility rebates where applicable.

1.3.20 Construction cost opinions provided by the Design Professional team during Design 100%

Evaluation. Additional estimates to be negotiated (at 50% construction documents, and

95% construction documents) with a Final Estimate for construction included with bid documents, per Iowa Code.

1.3.21 Construction drawings, specifications (the Construction Manager will produce Divisions

00 and 01), and addenda.

1.3.22 Provide bid alternates as determined during the course of design and bid package development.

1.3.23 Assist Owner and Construction Manager in obtaining bids from qualified contractors.

1.3.24 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental

Instructions for design revisions, and punch lists within the construction management software program.

1.3.25 Participation with project team during construction progress meetings as required.

Designer shall participate in bi-weekly conference calls during the construction period.

1.3.26 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit.

1.3.27 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project.

1.3.28 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing, mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes.

1.3.28.1 100% Design Evaluation

1.3.28.2 Design Development Documents

1.3.28.3 Construction Documents

1.3.28.4 Bidding or Negotiation Assistance

1.3.28.5 Construction Phase

Include at minimum the following site/virtual visits:

In-Person Virtual

Design Kickoff/Building Evaluation 1 2 -

100% Design Development - 1

50% Construction Documents - 1

95% Construction Documents - 1

100% Design Evaluation - 1

100% Construction Documents - -

Pre-Bid Meeting 1 -

Construction Field Observation 3 -

Substantial Completion/Punch List

Development 1 -

Final Completion/Punch List

Verification 1 -

One Year Warranty Correction Period

Visit 1 -

2 1

Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made.

File details come from the government source that posted it. Updated .