RFP950400-01 - Addendum #1.pdf
PDF 303 KB Posted
- Solicitation number
- RFP950400-01
- Issued by
- Dallas County, Iowa
About this file
This Addendum No. 1 document addresses questions and answers from the pre-proposal meeting held on February 11, 2026, for the Food Service Elevator Replacement project (Project 9504.00) at the Woodward Resource Center in Woodward, Iowa, issued by the Iowa Department of Administrative Services. The addendum clarifies key project scope uncertainties raised during the pre-proposal conference, indicating that numerous elevator system components—including hydraulic equipment, controllers, hoistway devices, doors, frames, cab materials, signal devices, and fire protection upgrades—require evaluation and determination by the design team during the investigation phase. The addendum confirms that the facility has a limited sprinkler system in the basement only, a sump pit with sump pump in the elevator pit, and existing fire call communications, while clarifying that passengers are not currently permitted in the elevator and may only be allowed in the replacement elevator if there is no additional cost. The document addresses design and code compliance considerations, including fire alarm system modifications to meet code requirements, hoistway lighting compliance, and confirmation that access control integration is not anticipated.
The addendum provides minimal pricing information, focusing instead on technical clarifications necessary for proposal development. Key project deliverables remain the phased construction documents with submission deadlines of 50 percent by April 24, 2026, 95 percent by May 22, 2026, and 100 percent by June 5, 2026, with design kickoff scheduled for the week of March 27, 2026. The document confirms that the elevator study referenced in the RFP was limited in scope and was included as page 6 of the original RFP. No information regarding budget allocation, set-asides, incumbents, or specific funding sources is provided in this addendum, as it serves exclusively to address technical questions raised during the pre-proposal meeting and clarify scope elements to be determined during design investigation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO.1
Food Service Elevator Replacement
Woodward, Iowa
Date: February 13th, 2026
Project: 9504.00 Food Service Elevator Replacement
QUESTIONS AND ANSWERS FROM THE PRE-PROPOSAL MEETING:
Q1.) Will we receive drawings of the previous projects at this facility?
A1.) Please refer to note 1.3.6 in the RFP regarding drawing availability.
Q2.) Are there any items in the hoist way that will need to be removed with the project?
A2.) This is unknown and will need to be determined during design investigation.
Q3.) Is there a sprinkler system in the building and does that need to be upgraded with this project?
A3.) There is a limited sprinkler system in a portion of the basement, and there is not a sprinkler system on the main level. It is not expected that any sprinkler work will be included in this design.
Q4.) Are any modifications to the fire alarm system needed?
A4.) Any modification to the fire alarm that is needed to meet code should be included.
Q5.) Are passengers allowed in the elevator now and do you want them to be allowed in the replacement elevator?
A5.) Passengers are not allowed now. They may be allowed in the future replacement elevator only if there is no additional related cost.
Q6.) Per the RFP, under 1.4 it states there is an attachment of an Elevator study by ATIS consulting. I am not seeing that posted. Is that available?
A6.) The Elevator study was very limited and was included as page 6 of the RFP.
Q7.) In the elevator machine room, do the controller, remote elevator monitoring, and emergency fire service items require replacement or installation?
A7.) This will need to be evaluated and determined by the design team during investigation.
Q8.) In the elevator, will controllers, controls, buttons, and indicators need replaced?
A8.) This will need to be evaluated and determined by the design team during investigation.
Q9.) Will any hydraulic equipment need to be replaced such as the power unit?
A9.) This will need to be evaluated and determined by the design team during investigation.
WRC Food Service Elevator Replacement
Pre-Proposal Meeting
Q10.) Has the in-ground hydraulic jack been reviewed by the elevator manufacturer?
A10.) A new jack was installed in 2011. This will need to be evaluated by the design team during investigation.
Q11.) Are we replacing hoist way devices, buffers, or pit ladder?
A11.) This will need to be evaluated and determined by the design team during investigation.
Q12.) Any concern with water in the elevator pit?
A12.) This will need to be evaluated and determined by the design team during investigation.
Q13.) Does the existing hoist way have a sump pit?
A13.) Yes, there is a sump pit with a sump pump.
Q14.) Will doors, frames, car guides need to be replaced?
A14.) This will need to be evaluated and determined by the design team during investigation.
Q15.) Will the cab be replaced with stainless steel?
A15.) This will need to be evaluated and determined by the design team during investigation.
Q16.) Are signal devices required to be tamper proof?
A16.) Controls are not expected to be tamper proof.
Q17.) Does the elevator currently have communications for fire call and video call?
A17.) Elevator currently has fire call.
Q18.) Is battery backup required?
A18.) This will need to be evaluated and determined by the design team during investigation.
Q19.) Will signal devices and position switch need to be replaced?
A19.) This will need to be evaluated and determined by the design team during investigation.
Q20.) Is the hoist way code compliant with required hoist way lighting?
A20.) This will need to be evaluated and determined by the design team during investigation.
Q21.) Should improvements include condensing units, oil minder controls, sump pumps, fire protection upgrades, lighting, and access control integration?
A21.) This will need to be evaluated and determined by the design team during investigation to make sure the new installation is code compliant. There is no current access control integration and none is anticipated to be needed.