RFP937400-01 Final.pdf
PDF 8 MB Posted
- Attached to
- CHMHI Gym Conditioning & Ceiling Repair
- Solicitation number
- RFP937400-01
- Issued by
- Cherokee County, Iowa
About this file
This is a Request for Proposals (RFP) issued by the Iowa Department of Administrative Services (DAS) seeking professional design services for the Cherokee Mental Health Institute (CHMHI) Gym Conditioning & Ceiling Repair project. The RFP solicits design services for installing air conditioning in the gym and repairing plaster ceilings, with a comprehensive scope including HVAC, electrical, mechanical, plumbing, architectural, and structural design elements. The pre-proposal conference is scheduled for May 8, 2024, at 11:00 AM CST, with proposals due by May 21, 2024, at 2:00 PM CST. The project timeline includes design development documents due by July 23, 2024, with construction anticipated from August to December 2024. The contract will be a modified ConsensusDOC 803, and the selected design firm will be prohibited from bidding on the subsequent construction contract.
The RFP requires a lump sum proposal with a breakdown by design phase and requests additional unit pricing for construction site visits beyond the seven included in the base scope. Targeted Small Businesses are encouraged to submit proposals, and the evaluation criteria will consider the design team's qualifications, proposed approach, project schedule, and fee structure. The selected firm must have sufficient qualified staff, including a licensed engineer, landscape architect, or registered architect, and demonstrate financial stability and capability to complete the project efficiently. Professional liability insurance of $2 million will be required, and the contract will be negotiated after the top-ranked firm is selected, with DAS reserving the right to negotiate with alternative respondents if an agreement cannot be reached.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP937400-01 - Addendum #01.pdf | ||
| RFP937400-01 Final.pdf | ||
| 1229263-event.pdf | ||
| RFP937400-01 - Addendum #01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IOWA
REQUEST FOR PROPOSALS
PROFESSIONAL DESIGN SERVICES
RFP COVER SHEET
Administrative Information
RFP Number RFP937400-01 Title of RFP CHMHI Gym Conditioning & Ceiling Repair
Agency Iowa Department of Administrative Services (DAS)
Project
Description
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for the design and construction of air conditioning to the Cherokee Mental Health Institute’s gym and repairs to the plaster ceilings.
State Issuing Officer:
Michael Bradbury
Issuing Officer
Iowa Department of Administrative Services
Hoover State Office Building, Level 3
1305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327
Email: construction.procurement@iowa.gov
PROCUREMENT TIMETABLE—Event or Action Date/Time (Central Time)
State Posts Notice of RFP on TSB website 4/29/2024
State Issues RFP 5/01/2024
Pre-Proposal Conference Location and Address:
Is Pre-Proposal Conference mandatory? No
If a map is needed, contact the Issuing Officer.
05/08/2024 at 11:00 AM CST
1251 W Cedar Loop, Cherokee, IA 51012
See Exhibit A for Site Map
An online option is available using Teams:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00O TgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2
/0?context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85-
5776fb004a49%22%2c%22Oid%22%3a%223363 3937-6386-4570-a498-305d5540a589%22%7d
Meeting ID: 234 050 816 891
Passcode: wiwVax Phone: +1 515-612-9860, 627619288#
Questions, requests for clarification, and suggested changes from Respondents due to Construction Procurement
05/09/2024 at 2:00 PM CST mailto:construction.procurement@iowa.gov tel:+15156129860,,627619288
Proposals Due 05/21/2024 at 2:00 PM CST
Relevant Websites
Website where Addenda to this RFP will be posted http://bidopportunities.iowa.gov
Website where contract terms and conditions are posted https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf
Number of Copies of Proposals Required to be Submitted: 1 Digital
Firm Proposal Terms
The minimum number of days following the deadline for submitting Proposals that the firm guarantees all proposal terms, including price, will remain firm is 120 Days.
http://bidopportunities.iowa.gov/ https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf
1.1 INTRODUCTION
The Iowa Department of Administrative Services (DAS) is seeking proposals from qualified and available
Design companies for services, per RFP cover page, and as outlined in the following (Sections 1.2 - 1.3).
The successful proposal must:
● For the staff that will be assigned, identify and describe qualifications, experience, and expertise in providing services for similar, or relevant, projects.
● For the staff that will be assigned, provide a list of past similar or relevant projects completed in the last 5 years, and include brief descriptions of what the projects entailed and a contact name and phone number (reference). In addition provide estimated project cost, final project cost at acceptance, and whether it was completed on time.
● Describe the composition of your team. Identify staff to be assigned. Provide resumes of key individual(s) including education, relevant experience, and certifications/licensing.
NOTE: Any responding company and/or consultant that is part of the project design services cannot receive an award from the resulting request for bid of construction services.
● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.
● Describe computer program/software capabilities and expertise you utilize. Please describe your experience.
● Provide a copy of your organizational chart.
● Describe your experience, if any, on designing similar or relevant projects for the State of Iowa.
● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.
● Identify desired reimbursable charges (the State has limitations, per State of Iowa Accounting Policies and Procedures 210.245), and all other charges.
1.2 SCHEDULE
DAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence.
Execution of Designer’s Contract Week of June 3, 2024
Tentative Design Kick-Off Meeting Week of June 3, 2024
100% Design Development Documents To Be Coordinated
50% Construction Documents and Cost Opinion By To Be Coordinated
95% Construction Documents and Cost Opinion By July 9, 2024
100% Construction Documents and Cost Opinion By July 23, 2024
Contractor Bidding July – August 2024
Execution of Contractor’s Contract(s) August 2024
Submittals, Procurement and Construction August, 2024 to December, Close out January, 2024
1.3 PROJECT DESCRIPTION
Construction Manager (DCI Group) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of the addition of air conditioning to the Cherokee Mental Health Institution and plaster ceiling repairs.
Design services shall include:
1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract.
1.3.2 All design disciplines necessary to complete the scope of work.
1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the
Owner, Construction Manager, and Owner’s maintenance staff.
1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner.
1.3.5 Anticipated scope of services:
1.3.5.1 See Exhibit B for an existing report conducted by Genisis Architecture, evaluating the plaster ceiling deterioration.
1.3.5.2 Evaluation of existing Owner provided air-conditioning unit and condensing unit for use on this project. Units were manufactured in 2011 and 2012 but have never been installed. Model numbers are as follows and pictures can be found in Exhibit C.
1.3.5.2.1 Air Conditioner:
1.3.5.2.1.1 Thermal Zone
1.3.5.2.1.2 Model Number TZHGL240ZL
1.3.5.2.1.3 208/230/460 Volts, 3-Phase, 60 Hertz
1.3.5.2.2 Condensing Unit:
1.3.5.2.2.1 Thermal Zone
1.3.5.2.2.2 Model Number TZAL-240CA
1.3.5.2.2.3 208/230 Volts, 3-Phase, 60 Hertz
1.3.5.3 Design shall include all electrical, mechanical, plumbing, and controls installations.
1.3.5.4 Design shall include architectural and structural construction as needed to accommodate placement of air conditioning and condensing units.
1.3.5.5 Includes architectural modifications to interior and exterior walls as necessary for ducting and piping of units.
1.3.5.6 The existing ceiling plaster has begun to deteriorate. It is assumed this deterioration is due to lack of cooling and humidity control within the space. Design shall include repairs to ceiling plaster. See Exhibit B for existing report with recommendations.
Designer shall review the existing conditions and provide a recommendation based on best value.
1.3.6 Field examination of the existing buildings.
1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.
1.3.8 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal.
1.3.9 Designer shall include any and all survey work required for completion of project.
1.3.10 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required.
1.3.11 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule.
1.3.12 Designer shall assist Construction Manager in the evaluation of long lead times.
1.3.13 Quality control during Design, Preconstruction and Construction.
1.3.14 Compliance with all Federal, State, and applicable AHJ codes.
1.3.15 Completion of State building and energy code documents, as required.
1.3.16 Design review will be conducted at 100% design development documents, 50% construction documents, and 95% construction documents. Dates for design review meetings to be coordinated with the design and project team and set no later than the design kickoff meeting. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions.
1.3.17 Review with the Department of Inspections, Appeals, and Licensing’s Building Code
Bureau for approval of plans or exemption from review. All fees associated with the
Bureau are the responsibility of the designer.
1.3.18 Develop and distribute agendas and meeting minutes for all meetings during the design phase.
1.3.19 Designer shall provide any information necessary to obtain utility rebates where applicable.
1.3.20 Construction cost opinions provided by the Design Professional team during Design (
100% design development documents, 50% construction documents, and 95% construction documents) with a Final Estimate for construction included with bid documents, per Iowa Code.
1.3.21 Construction drawings, specifications (the Construction Manager will produce Divisions
00 and 01), and addenda.
1.3.22 Provide bid alternates as determined during the course of design and bid package development.
1.3.23 Assist Owner and Construction Manager in obtaining bids from qualified contractors.
1.3.24 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental
Instructions for design revisions, and punch lists within the construction management software program.
1.3.25 Participation with project team during construction progress meetings as required.
Designer shall participate in bi-weekly conference calls during the construction period.
1.3.26 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit.
1.3.27 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project.
1.3.28 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing, mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes.
1.3.28.1 Design Development Documents
1.3.28.2 Construction Documents
1.3.28.3 Bidding or Negotiation Assistance
1.3.28.4 Construction Phase
Include at a minimum, seven (7) site visits. Design kick off/Building evaluation, Pre-bid meeting, Construction Field Observation (2), Substantial completion/punch list development, Punch list/Final Completion approval, and one year warranty correction period visit. Design Reviews at 100% design development, 50% documents, 95% construction document development will be conducted via conference call. Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made.
1.4 ATTACHMENTS
1.4.1 Exhibit A – Pre-Proposal Site Map
1.4.2 Exhibit B – Genisis Existing Report
1.4.3 Exhibit C – Existing Photos
EXHIBIT A – PRE-PROPOSAL SITE MAP
Date: 05/07/2024
Time: 11:00 AM CST
Location: 1251 W Cedar Loop, Cherokee, IA 51012
An online option is available using Teams:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00OTgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2/0?
context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85- 5776fb004a49%22%2c%22Oid%22%3a%2233633937-6386-4570-a498-305d5540a589%22%7d
Meeting ID: 234 050 816 891
Passcode: wiwVax
Phone: +1 515-612-9860, 627619288# https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00OTgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2/0?context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85-5776fb004a49%22%2c%22Oid%22%3a%2233633937-6386-4570-a498-305d5540a589%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00OTgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2/0?context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85-5776fb004a49%22%2c%22Oid%22%3a%2233633937-6386-4570-a498-305d5540a589%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00OTgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2/0?context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85-5776fb004a49%22%2c%22Oid%22%3a%2233633937-6386-4570-a498-305d5540a589%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWRiYmJiNjYtY2MwNy00OTgwLTkwZTktODRlOTBhOWI3NTVj%40thread.v2/0?context=%7b%22Tid%22%3a%2253f2f9ee-ba23-4c21-ac85-5776fb004a49%22%2c%22Oid%22%3a%2233633937-6386-4570-a498-305d5540a589%22%7d tel:+15156129860,,627619288
939 O f f i ce Pa rk Road , Su i t e 101 , Wes t Des Mo ines , I owa 50265 Te l : 515-440-1681 Fax : 515-440-1687
CHMI GYM CEILING EVALUATION
EXISTING GYM CEILING CONDITIONS:
On January 4, 2024 Edward Matt with Genesis Architectural Design conducted an on-site inspection of the gymnasium ceiling. Purpose of the visit is to inspect the existing ceiling conditions and make recommendations for repairs.
The existing ceiling system is 3/4 inch thick cement plaster over 12”x16” in concrete reinforced clay tile spanning between steel trusses. The steel trusses have a sloped vaulted bottom cord. The ceiling has a number of cracks in the plaster and places where paint is blistering and separating from the plaster. The cracks displayed somewhat of a pattern where the cracks are typically running up the ceiling in fairly straight lines at 10-ft centers intervals that closely matches the spacing of the roof steel trusses in the attic. At the south center of the ceiling there is an area that is approximately a 4 foot square where the plaster has separated from the concrete roof deck. A lift was provided by the facility and the exposed plaster and concrete tile were observed.
The plaster around the small exposed area was loose and was not tapped on much for concerns that a lot more of it might drop and fall. Visually you could see that some of the areas around the damaged area were loose so more plaster is likely to fall in the future. The loose plaster is a safety concern since more plaster could separate and fall. It is recommended that gym not be occupied until the ceiling is repaired.
I also went into the attic space from the third floor corridor ceiling hatch. The peak inside the attic has a large octagon shaped venting cupola. There are three dormers in the attic, one on the east, one on the west, and one on the hip at the south end of the gym. Each of these dormers has a 12 inch by 16 inch static louver vent to allow convection air to move into the attic space and vent out at eh peak through the louvered ridge cupola. There is one layer of 8 inch fiberglass batt insulation in the attic over the gym ceiling structure.
There is a manually powered exhaust ventilator mounted on the wall in the southwest corner the gym.
The exhaust vent was switched on and the fan powered up but the outside louvers did not open. This fan could remove some of the humid air out of the gym space, but it was not working. It was also observed that there were a couple of box fans on the floor by the hallway doors to help move air in the gym during summer months. There is no ventilation air cooling the large gym space, only steam heating.
The gymnasium was originally designed with windows along the sides. These windows likely had operable sections to allow for cross ventilation. The window openings have been infilled and are covered inside with gypsum board so there is no longer any ventilation in the space now.
RECOMMENDATIONS:
Patching and repairing the existing ceiling plaster will not hold up long term and will continue to be a maintenance and safety concern. Covering the existing plaster with drywall will also not hold up long term as the drywall will still take on moisture and the joints and paint will separate.
After assessing the conditions of the existing gym ceiling I would offer the following recommendations:
1) We recommend that the State considers covering the entire vaulted portion of the gym ceiling with Tectum wood fiber panels. These can be purchased prefinished in white and can simply be screw applied over the existing plaster with wood furring strips and attached to clay tile clay tile ceiling structure.
Applying tectum panels would provide three benefits:
RFP937400-01 EXHIBIT B 1
Michael Steen Image
939 O f f i ce Pa rk Road , Su i t e 101 , Wes t Des Mo ines , I owa 50265 Te l : 515-440-1681 Fax : 515-440-1687
a) A new finish to cover and hold up the existing plaster.
b) It would improve the acoustics by sound deadening the gym space.
c) The panels are easy to install and wouldn't require patching the existing plaster. The missing plaster area could be furred out flush. Verify the screw length fasteners for attaching the Tectum panels with the manufacturer.
2) Another recommendation is to install a temperature-controlled thermostat regulated power roof ventilator in the attic space at the base of the cupola to help pull hot air up and out the top in the cupola. A temperature controlled exhaust fan help pull hot air out of the attic space. The combination of hot humid attic air with the dead air space in the gym is allowing humidity to migrate in through the attic ceiling system. The three dormer louvers would provide intake air through the 12”x16” louvers. The cupola power roof ventilator should be size by an engineer for proper exhaust venting.
3) The third recommendation is to re-establish air movement in the gymnasium to remove the humidity. A short-term solution would be to reinstall some small operable windows in the original window openings and then to get the existing exhaust fan in the southwest corner running, adding one or two more additional exhaust fans to pull the humid air out of the gym. Exhaust fans in the gum can be installed with humidistat controls so that they would turn on when the humidity in the gym reaches a set height. This could be also be set up to turn on and power a couple of high mounted ceiling fans. This solution will move air in the space, but it will also bring in warm air in the summer.
4) The ideal long-term solution for this problem is to install permanent an HVAC cooling system to move air and remove humidity in the gym. If this route is being budgeted towards, the windows and exhaust fans would not need to be installed.
Please contact me at 515-440-1681 with any questions.
Sincerely, Edward L. Matt, AIA, NCARB, Principal GENESIS Architectural Design
Planning | Architecture | Preservation Building Envelope Consulting | Architectural Forensics
Encl. Tectum Panels and Timberwool brochures
RFP937400-01 EXHIBIT B 2
TechLine 877 276-7876 armstrongceilings.com/tectumdirect
Tectum Direct-Attach High NRC ceiling panels in White
Tectum® Direct-Attach and Direct-Attach High NRC ceiling panels provide durable, sustainable, acoustical options for a wide variety of applications.
KEY SELECTION ATTRIBUTES
• �Tectum Direct-Attach panels now have
UL® Certified acoustics with acoustical testing and reporting that align with industry-wide best practices
• �Tectum Direct-Attach High NRC panels have a proprietary factory-applied acoustical backer, adding sound absorption that is certified by UL
• �CleanAssure™ family of products – includes disinfectable panels, suspension systems, and trim (standard colors only)
• �Select products included in the FAST134 program – ready to ship in 4 weeks or less
• �Sustainable Beyond Standard: Custom sizes in 1" thickness and all standard panels are part of the Sustain® portfolio and meet the most stringent industry sustainability compliance standards today
• �Install 1"-thick Tectum® Direct-Attach on Trusses and I-Beams for added acoustics while maintaining an exposed structure visual on the deck
• �Long edges beveled, short edges beveled available as a standard option
• �Great retrofit solution for noise reduction
• �Excellent sound absorption – NRC up to 0.85 (1" panel, C-40 Mounting)
DETAILS
1 2
COLORS Due to printing limitations, shade may vary from actual product.
Natural
(TNA)
White
(TWH)
Custom Colors Available*
* �For Tectum Direct-Attach only. Colors that are pre-qualified to meet Sustain portfolio requirements are available upon request.
Other made-to-order colors must be evaluated if sustainability criteria is required. Lead time will increase.
TECTUM® Direct-Attach TECTUM Direct-Attach High NRC Acoustical Ceiling Panels coarse texture
1X Furring Strips 24" O.C. or Equal
Tectum® Direct-Attach Panel
Laid On 3/4" Furring Strips
• ��Can be field painted up to 6 times without impacting acoustic or fire performance
• �Variety of made-to-order color options available
• �Can be mechanically fastened to a wide variety of surfaces including masonry, drywall, drywall grid system, wood, trusses, I-Beams, and more
• �USDA Biobased content: 98%
1. �Tectum Direct-Attach panel in White (TWH)
2. �Tectum Direct-Attach panel in White (TWH)
3. �Tectum Direct-Attach High NRC panel with proprietary acoustical backer armstrongceilings.com/tectumcreate
TECTUMTECTUM®® CREATE! CREATE!™™
CUSTOM CEILINGS AND WALLS
CAD/Revit® drawings at:
armstrongceilings.com/cadrevit
RFP937400-01 EXHIBIT B 3
http://armstrongceilings.com/tectumdirect http://armstrongceilings.com/tectumcreate http://armstrongceilings.com/cadrevit
TechLine 877 276-7876 armstrongceilings.com/tectumdirect
DIRECT-TO
-STRUCTURE – Standard
Panel Thickness
UL Classified
Acoustics Mounting Method
1" 0.40
0.45
0.80 •
0.85 •
A
D-20
C-20
C-40
1-1/2" 0.50
0.55
0.90 •
0.90 •
2" 0.65
0.70
0.95 •
1.00 •
Dots represent high level of performance.
TECTUM® Direct-Attach TECTUM Direct-Attach High NRC Acoustical Ceiling Panels coarse texture 98%
VISUAL SELECTION PERFORMANCE ACOUSTICAL INFORMATION
(White only)
Bio- Block
Humi- Guard+
Ce rti fie d
Lo w
VO
C Em is si on s CleanAssure™ DURABILITY
Disinfectable Panels
-Y r W ar ra nt y
Item No. ◆
Dimensions W x L x H (Inches)
Fi re
Ra tin g
Li gh t Re fle ct
An ti-
M ol d/ M ild ew
Sa g
Re si st
Fo g
Im pa ct
Sc ra tc h
TECTUM®
Direct-Attach Ceiling Panels (FSC® Certified)
Long Edges Beveled/ Short Edges Square
8182T10_ _ _ 23-3/4 x 48 x 1" Class A
Up to 0.75
8181T10_ _ _ 23-3/4 x 96 x 1" Class A
Up to 0.75
8180T10_ _ _ 47-3/4 x 96 x 1" Class A
Up to 0.75
Long Edges Beveled/ Short Edges Beveled*
8175T10_ _ _ 23-3/4 x 48 x 1" Class A
Up to 0.75
8174T10_ _ _ 23-3/4 x 96 x 1" Class A
Up to 0.75
8173T10_ _ _ 47-3/4 x 96 x 1" Class A
Up to 0.75
Other Size Panels
W 23-3/4" – 48" L: 12" – 144" 1", 1-1/2", or 2" thickness
Class A
Up to 0.75
N/A N/A N/A • • • •
FAST134 program items ready to ship from manufacturer in 4 weeks or less.
Up-to-date lead times and product options (sizes and colors) at armstrongceilings.com/fast134
| ◆ | � When specifying or ordering, include the appropriate 3-digit color suffix TNA = Natural TWH = White (e.g. 8182T10 T W H ) | |
| * | Four-sided beveled edge panels are recommended in adjoining panel installations. |
PHYSICAL DATA
Material Cementitious Wood Fiber; FSC-certified. For more information about FSC-certified fire-retardant products, or to view our FSC-certification letter, contact TechLine at 1 877 276-7876.
Tectum® High NRC panels have an acoustical fleece.
Surface Finish Factory-applied latex paint on abuse-resistant silicate surface coating. Natural finish is unpainted but, after coating is applied, panels may appear light in color.
Panels are painted on the edge, however due to fibrous texture of panels, certain angles and lighting conditions will make edge appear less or more painted.
Can be field painted up to 6 times without impacting acoustic or fire performance. See installation instructions for details on paint and application method.
Fire Performance Class A per IBC. Flame Spread Index 25 or less and Smoke Developed Index 50 or less when tested in accordance with ASTM E84.
CAN/ULC S102 surface burning characteristics.
Flame Spread Index of 25 or less and Smoke Developed Index of 50 or less.
VOC Emissions Third-party certified compliant with California Department of Public Health CDPH/EHLB/Standard Method Version 1.2, 2017. This standard is the guideline for low emissions in LEED®, WELL Building Standard™, CalGreen Title 24, ANSI/ASHRAE/USGBC/IES Standard 189; ANSI/GBI Green Building Assessment Protocol.
Humidity/Sag Resistance HumiGuard® Plus performance panels are recommended for areas subject to high humidity, up to, but not including, standing water and outdoor applications.
Anti-Mold/Mildew Ceiling panels with BioBlock® performance resist the growth of mold and mildew on the panel surface.
Installation Considerations Panels must be mechanically attached to approved substrate per installation instructions. To achieve proper finished visual, panels should be installed in an ashlar pattern. Four-sided beveled edge panels are recommended in adjoining panel installations.
Use caution and wear appropriate hand, eye, and dust mask protection when cutting and installing Tectum panels. Refer to installation instructions for complete details and cutting recommendations.
Primary (Embodied) Energy See all LCA information on our EPDs.
Application Considerations Color variation among panels is common due to the natural characteristics of the wood on White and Natural panels.
Wood fibers may appear orange on natural-colored panels due to the characteristics of the wood.
Design Considerations Maximum panel size for Truss and I-Beam application is 24 x 48 x 1".
Seismic Restraint Tectum Direct-Attach panels are approved for application in all seismic areas when installed per the seismic guidelines in the Armstrong Ceilings Installation Instructions.
Cleaning and Disinfecting Cleaning and CDC approved disinfecting options available on armstrongceilings.com/cleaning Warranty 30-Year Warranty. Details at armstrongceilings.com/warranty FAST134 Program Considerations Size of Job Matters: Big jobs over 2500 SF, or 50 pieces for shapes/vertical elements, will have longer lead times.
Location Matters: Transit time not included. We are ready to ship in 1 week on FAST1 items. However, transit to the states west of Wyoming may add time.
Distributor Truck Schedule Matters: We rely on distribution to help move products around the country. When speed matters, work with your local distributor to ensure FAST134 service.
Stock vs Made-to-Order Matters: FAST3 & FAST4 items are made-to-order and will ship direct to distributor. FAST1 (stocked items) will go through distribution and depend on distributor truck schedules.
Weight, Pcs and SF/Pallet 1" – 1.65 lbs/SF 1-1/2" – 2.53 lbs/SF 2" – 3.3 lbs/SF 8180T10, 8173T10 – 36 pcs/pallet; 1,152 SF/pallet 8181T10, 8174T10 – 72 pcs/pallet; 1,152 SF/pallet 8182T10, 8175T10 – 72 pcs/pallet; 572 SF/pallet 5338W4L08T10, 5338W4L04T10, 5338W2L08T10, 5338W2L04T10 – sold by the piece
ACCESSORIES See next page for full list of accessories.
en er gy m an ag em en t re cy cl ab le ex te nd ed pr od uc er re sp m at er ia l in gr ed ie re po rt in g re cy cl co en t so ur ci ng o f ra w m at er ia ls lo w e m itt in g/ at er ia ls lig ht in g qu al ity
FS
C®
(f or w oo d) bi ob as er ia ls re gi on al er ia ls de si gn fo r fle xi bi lit y co ns tr uc tio n w as te m gm t
EP
D ac ou st ic s
| ▲ | |
| LOCATION DEPENDENT |
W
EL
L™ L
BC
For LEED contribution contact TechLine
L
EE
D®
RFP937400-01 EXHIBIT B 4
http://armstrongceilings.com/tectumdirect http://armstrongceilings.com/fast134 http://armstrongceilings.com/cleaning http://armstrongceilings.com/warranty
SECONDSKINAUDIO.COM
1.800.679.8511
SERVICE@SECONDSKINAUDIO.COM
TIMBERWOOL S PE C S H E E T
Wood fiber acoustical panels
Absorb echo and reduce reverb
Eco-friendly, simple base materials
Cut shapes to fit your design
Primed and ready to paint
C U T A N D PA I N T L I K E W O O D !
Material:
Patterns:
Features:
Application:
Thickness:
Sizes:
Shapes:
Edges:
Weight:
Color:
Flammability:
Installation:
Wood Fibers, Portland Cement, Water
Cementitious Wood Wool Fibers
Absorb Airborne Sound, Manufactured from Natural Products, Cut and Paint like Wood, Cost-Effective, Fire Resistant
Offices, schools, music practice rooms, gymnasiums, convention centers, entertainment venues, airports, bars, restaurants, pools, houses of worship, and manufacturing facilities
1” & 2”
24” x 96”, 24” x 48”, Cuttable to Any Size
Rectangles, Squares, Hexagons, Cut to Any Shape
Square, Bevel, Tegular (ceiling grids)
24” x 96” x 1” – 32 lbs, 24” x 96” x 2” – 64 lbs
Primed Clear, Primed White, Paintable
ASTM e84, Class A | Passes NFPA 286
Mechanical Fasteners
RFP937400-01 EXHIBIT B 5
http://www.secondskinaudio.com http://www.secondskinaudio.com mailto:service%40secondskinaudio.com?subject=Inquiry%20from%20Celluzorbe%20Spec%20Sheet
TO ORDER THIS PRODUCT VISIT:
secondskinaudio.com/acoustics/timberwool
Noise Reduction Coefficient
Size Mount 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz NRC
1” Timberwool™ Wood Fiber Panel Wall Mounted 0.08 0.12 0.26 0.52 0.89 0.60 0.45
2” Timberwool™ Wood Fiber Panel Wall Mounted 0.11 0.29 0.74 7.08 0.85 1.02 0.75
1” Timberwool™ Wood Fiber Panel 3/4” Airspace 0.10 0.14 0.38 0.78 0.68 0.63 0.50
2” Timberwool™ Wood Fiber Panel 3/4” Airspace 0.10 0.34 0.93 0.91 0.81 0.96 0.75
HORIZON PINSTRIPES CHECKERBOARD HALF
DIAMOND
DIAGONAL
LEFT
DIAGONAL
RIGHT
CRISSCROSS DOUBLE
DIAMOND
Available Patterns
RFP937400-01 EXHIBIT B 6
http://www.secondskinaudio.com http://www.secondskinaudio.com/acoustics/timberwool
Description
Taken Date Uploaded By
04/10/2024 at 12:27 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am E0C3328F-97BB-4C95-B8B0-A8D…
Description
Taken Date Uploaded By
04/10/2024 at 12:27 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am FDC06A77-6334-402D-B0FF-7900…
Description
Taken Date Uploaded By
04/10/2024 at 12:26 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 02F6EDCD-09E8-4A31-919F-7FFB…
Description
Taken Date Uploaded By
04/10/2024 at 12:24 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am AC32A65D-709C-441B-87DB-12D…
State of Iowa - Department of Administrative Services
Printed on Mon Apr 22, 2024 at 10:52 am CDT
Job #: 9374.00 HHS CHMHI Gym Ceiling Repair 1251 W Cedar Loop
Cherokee, Iowa 51012 7122252594 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EG8FTWCAKHS69YHQ9TM?sig=692e2ba5e07d26acfacc38bcc7628a1fa923b681359a46a060d3c4b22df96841 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EFTKGQX1BTHKV6D2HDK?sig=037a3d0069941f0841e9f3960615130db0986c5cd8f689123377fd2c346c2aa2 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EFCV4K328G766NEXJM3?sig=63d9957581b6688d98fe3a3f1857a67dc60f45fc9205f815ee2372415f0c6364 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FF1HWDBQNP14X2W3PHD?sig=b3475adaf0cd7c82dc0727828480d3cfba320aa7c99ff6242e449548bea12a89 Michael Steen Image
04/10/2024 at 12:24 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 55C5C587-2A16-4D5C-987A-02C…
Description
Taken Date Uploaded By
04/10/2024 at 12:16 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am AF6540A0-7EC6-463F-9A52-7CA4…
Description
Taken Date Uploaded By
04/10/2024 at 12:14 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 7AE5E52A-C8D2-4F5A-9482-9A1…
Description
Taken Date Uploaded By
04/10/2024 at 12:14 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 284E96E9-3BD3-43AC-BEC4-E31…
State of Iowa - Department of Administrative Services
Printed on Mon Apr 22, 2024 at 10:52 am CDT
Job #: 9374.00 HHS CHMHI Gym Ceiling Repair 1251 W Cedar Loop
Cherokee, Iowa 51012 7122252594 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EE5HP5X57P9GYWKR9SA?sig=49d7ed5152aa50c7c6283512bfd4637efe9d15e8f17e1ad572ea450bb02179af https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EQPYJW37R1HJZH9DT5A?sig=3806be9dddaf3ef2247d503cdfab970c9046a8865a6da9c36da4bfe1b3ddc5b6 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309ERA09577DYW8EPFQXQJ?sig=e9d3d865269482471e876795629d6ca2c3c2ed77eff6062f91aecdb33267da05 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309ESPY2Y687MSFHFAYAKV?sig=fd0a1cedd2b30a1ba466332dfe2bac369efe1f1b2e39475a54ec3470255d48c9
04/10/2024 at 12:12 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 2EB2537B-4284-4B32-A8AD-4BE…
Description
Taken Date Uploaded By
04/10/2024 at 12:12 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am F49C256F-F7A1-4C3D-9074-A2C3…
Description
Taken Date Uploaded By
04/10/2024 at 12:12 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 73F8874F-D1E4-4DA6-9774-E420…
Description
Taken Date Uploaded By
04/10/2024 at 12:11 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am E535EFC4-7E52-4CE5-A0D6-E7B…
State of Iowa - Department of Administrative Services
Printed on Mon Apr 22, 2024 at 10:52 am CDT
Job #: 9374.00 HHS CHMHI Gym Ceiling Repair 1251 W Cedar Loop
Cherokee, Iowa 51012 7122252594 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309ETWA37RBNJ2QFRR8FJD?sig=a170fb96ccc3c11a6689b4eaa961ce7f35521b5059f0e36224daf543dc1dc299 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309ETPT3J4P9XH10S121DR?sig=6e0b25fd31df6f07285eab1129856901fecfd69a725640eb49002e864dc56615 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309ETR9WDFHQP87XEG3H1D?sig=3c5efee848d43666c282892eee319dc1c89da848e98236bc3ff38ffcf96f0d28 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309F25JG1G1VQX1N7N96P6?sig=4bac4c69deddcdbf1e0dc7d9dbbdd9a2218aece274a70c994cf298e6807b1bdc
04/10/2024 at 12:11 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am D9DF4EA6-4536-4337-B560-940…
Description
Taken Date Uploaded By
04/10/2024 at 12:10 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 4FFF0F7F-75E8-4E72-8BCB-1488…
Description
Taken Date Uploaded By
04/10/2024 at 12:10 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 8F441271-99CE-43D3-B451-CB9…
Description
Taken Date Uploaded By
04/10/2024 at 12:10 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 250692CF-1027-4201-B269-C8D…
State of Iowa - Department of Administrative Services
Printed on Mon Apr 22, 2024 at 10:52 am CDT
Job #: 9374.00 HHS CHMHI Gym Ceiling Repair 1251 W Cedar Loop
Cherokee, Iowa 51012 7122252594 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FEA0288FSM1Y0M9XQDM?sig=83821b1eac975cd7b4835498e8d5d151f03dad89f50d7def4d1df973aa7747a1 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EF7TQPAPD36XC8CKP7V?sig=33ece6f108fd8ee3c0caac984613e34f01afb30a19d72e916f40f3bb359c5adb https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309EDVTR6K18KKTMYPDRB0?sig=6f9dd621ffdfab0b5b7e36e837ed24c3c70123e34f6b5749dda2db9759192cf7 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FD3YXQTNHR352C2FMGS?sig=bc8bd90201c6b94d160f72004a351788669a49657d23961ea5afd2210a17881a
04/10/2024 at 12:10 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am 84880638-E372-48EE-BD62-B607…
Description
Taken Date Uploaded By
04/10/2024 at 12:10 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am EA90F421-D4F9-4A91-9966-67D…
Description
Taken Date Uploaded By
04/10/2024 at 12:09 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am BD49ADF5-86D3-4128-8B22-EE5…
Description
Taken Date Uploaded By
04/10/2024 at 12:09 pm Michael Steen
Upload Date File Name
04/22/2024 at 08:35 am E79C62B8-E3FD-4AF6-8A60-1265…
State of Iowa - Department of Administrative Services
Printed on Mon Apr 22, 2024 at 10:52 am CDT
Job #: 9374.00 HHS CHMHI Gym Ceiling Repair 1251 W Cedar Loop
Cherokee, Iowa 51012 7122252594 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FEJ2BR8H8T68MRYJF2G?sig=0e47617e8e05980665422a9771ef1e30fef6a208d1c12fec6cb128975ab127f4 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FP68TPFTS9K09DBX0RZ?sig=da3c6cf0173c103e660d140b9dfaaa950260f22b1e9f8475bad122d9936c7bb9 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FEGHCK2H19NBJJYCM1G?sig=2c48c48c17af85b3d95932d8af9d8ced1c200d816950abb73d571d96f45702a8 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HW309FFBEZ4H8ERSBZQ070RJ?sig=1b66e067e091e07bd5aae7ba1f159576e091074cef93e5f00d7e06f8ee3834d1
2 – ADMINISTRATIVE ISSUES
2.1 GENERAL INFORMATION
2.1.1 DAS will evaluate the qualifications, experience, and other relevant information from companies interested in contracting with the State of Iowa to provide the necessary services to complete the project described in this RFP.
2.1.2 Companies certified as Targeted Small Businesses are encouraged to submit Proposals. The Iowa Department of Economic Development administer the Targeted Small Business (TSB) Program. Businesses meeting the requirements of the program are approved and registered with the Department of Economic Development and are considered Targeted Small Businesses for purposes of this RFP and most other solicitations issued by DAS. Questions concerning the TSB Program and for identification of companies certified as Targeted Small Businesses, contact the TSB Certification office in the Department of Economic Development at (515) 348- 6159.
2.2 INQUIRIES
2.2.1 All inquiries concerning this RFP shall reference the RFP number and shall be provided (via email) to the issuing officer email address identified on the cover page of this RFP. Addenda type questions must be submitted per Schedule, Section 1.2.
2.2.2 Any information provided by prospective companies orally shall not be considered part of the companies Proposal.
2.2.3 DAS assumes no responsibility for representations concerning conditions made by its officers or employees prior to the execution of a contract. Oral discussions pertaining to modifications or clarifications of this RFP shall not be considered part of this RFP and are not binding.
2.3 PREPARATION OF THE PROPOSAL
2.3.1 Proposals must be submitted on the Iowa IMPACS Electronic Procurement System.
Prospective companies are solely responsible for timely submission.
2.4 DATE, TIME AND PLACE TO SUBMIT PROPOSALS
2.4.1 As stated above the proposal must be submitted on the Iowa IMPACS Electronic
2.4.2 The Proposal must be submitted into IMPACS, on or before 2:00 pm, central time on the
2.5 ECONOMY OF PRESENTATION
Proposals shall address the specific RFP requirements. All questions posed by the RFP shall be answered clearly and concisely.
Procurement System
Proposal due date.
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa
2.6 RFP CHANGES AND ADDENDA
Written Addenda will serve to amend the RFP documents accordingly.
2.7 CERTIFICATION OF INDEPENDENT PRICE DETERMINATION
By submission of a response to this Proposal, the Company certifies, and in the case of a joint Proposal, each party thereto certifies as to its own organization, that in connection with this procurement:
2.7.1 Any prices or hourly rates in this Proposal have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any competitor.
2.7.2 Unless otherwise required by law, any prices or hourly rates which have been provided in this Proposal shall not knowingly be disclosed by the Firm, directly or indirectly, to any competitor prior to the notice of intent to award a contract for services.
2.7.3 No attempt has been made or shall be made by the Company to induce any other person or Company to submit or not to submit a Proposal for the purpose of restricting competition.
2.7.4 Each person signing this Proposal certifies that:
2.7.4.1 He/she is the person in the Firm’s organization responsible within that organization for the decision as to any prices being offered herein, or
2.7.4.2 He/she is not the person in the Firm’s organization responsible within that organization for the decision as to any prices being offered herein, but that he/she has been authorized in writing to act as agent for the persons responsible for such decision, and
2.7.4.3 Any offer made by the submitted Proposal and any clarifications to that Proposal shall be signed by an officer of the offering Company or a designated agent empowered to bind the Company in a contract.
2.8 NOTICE OF INTENT TO AWARD
After the successful Company has been selected, a copy of the Notice of Intent to Award will be issued to all Companies who submitted Proposals in response to this RFP.
2.9 WITHDRAWAL OF PROPOSALS
Prospective Companies may withdraw, modify, and/or resubmit at any time prior to the date and time set for the receipt of Proposals. Once the time set for receipt of Proposals has passed, a Company shall not withdraw a Proposal for a period of sixty (60) days following the issuance of the Notice of Intent to Award a contract. Proposals shall remain open and valid for consideration by DAS throughout this period of sixty days, and until such time thereafter that written request to withdraw a Proposal is received by DAS.
2.10 DISPOSITION OF PROPOSALS
All Proposals become the property of DAS and disposition of the Proposals shall be at the sole discretion of DAS.
2.11 DISCLOSURE OF PROPOSAL CONTENT
Proposals will be placed in the public domain and be available for examination by interested parties.
No Proposals shall be disclosed until after a Notice of Intent to Award has been issued. DAS reserves the right to destroy all Proposals if the RFP is withdrawn or otherwise in the normal course of business.
Trade secrets or proprietary information legally recognized as such and protected by law may be withheld if they are clearly and conspicuously labeled “Proprietary” in the margin of each individual page where they appear in the Proposal. Pricing information is not normally considered proprietary.
Public Records and Requests for Confidential Treatment.
The Agency’s release of public records is governed by Iowa Code chapter 22. Contractors are encouraged to familiarize themselves with Chapter 22 before submitting a Proposal. The Agency will copy and produce public records upon request as required to comply with Chapter 22 and will treat all information submitted by a Contractor as non-confidential records unless Contractor requests specific parts of the Proposal be treated as confidential at the time of the submission as set forth herein AND the information is confidential under Iowa or other applicable law.
Failure to request information be treated as confidential as specified herein shall relieve Agency and State personnel from any responsibility for maintaining the information in confidence.
Contractors may not request confidential treatment with respect to pricing information and transmittal letters. A contractor’s request for confidentiality that does not comply with this section or a contractor’s request for confidentiality on information or material that cannot be held in confidence as set forth herein are grounds for rejecting contractor’s Proposal as non-responsive.
Requests to maintain an entire Proposal as confidential will be rejected as non-responsive.
If Agency receives a request for information that Contractor has marked as confidential and if a judicial or administrative proceeding is initiated to compel the release of such material, Contractor shall, at its sole expense, appear in such action and defend its request for confidentiality. If Contractor fails to do so, Agency may release the information or material with or without providing advance notice to Contractor and with or without affording Contractor the opportunity to obtain an order restraining its release from a court possessing competent jurisdiction. Additionally, if Contractor fails to comply with the request process set forth herein, if Contractor’s request for confidentiality is unreasonable, or if Contractor rescinds its request for confidential treatment, Agency may release such information or material with or without providing advance notice to Contractor and with or without affording Contractor the opportunity to obtain an order restraining its release from a court possessing competent jurisdiction.
2.12 PROPOSAL EVALUATION AND AWARD
The contract shall be awarded to the Company determined to be the best qualified to provide the services required under this RFP and the best value to the State.
2.13 GRATUITIES
The laws of Iowa provide that it is a felony to offer, promise, or give anything of value or benefit to a State employee with the intent to influence that employee’s acts, opinions and judgment or exercise the discretion with respect to that employee’s duties. Evidence of violations of this statute will be turned over to the proper prosecuting attorney.
Note: The State provides reimbursement to its employees for their transportation, lodging, meals, and miscellaneous expenses that are deemed necessary.
2.14 CONFLICTS BETWEEN TERMS
DAS reserves the right to accept or reject any exception taken by a prospective Company to the terms and conditions of this RFP. Should a prospective Company take exception to the terms and conditions required by DAS, the Firm’s exceptions may be rejected and the entire Proposal declared non-responsive. DAS may elect to negotiate with the Company regarding contract terms or the contents of the Firm’s Proposal.
2.15 IOWA STATUTES AND RULES
The terms and conditions of this RFP, the resulting contract, or activities based upon this RFP shall be construed in accordance with the laws of Iowa.
2.16 COSTS FOR PREPARATION OF PROPOSALS
No payments will be made to cover costs incurred by any Company in the preparation or the submission of this RFP, nor for any other associated costs.
2.17 NEWS RELEASES
News releases or other materials made available to the public, the Firm’s clients, or potential clients pertaining to this procurement or any part of the Proposal shall not be made without prior written approval from DAS.
2.18 MISCELLANEOUS
2.18.1 DAS reserves the right to accept or reject any part of any Proposal, and to accept or reject any or all Proposals without penalty.
2.18.2 DAS reserves the right to waive minor deficiencies and informalities if, in the judgment of DAS, the best interests of the State of Iowa will be served.
2.18.3 DAS reserves the right to make a written request for additional information from a Company to assist in understanding or clarifying a Proposal. Any information received shall not be considered in the evaluation of the Firm’s Proposal if it materially alters the content of said Proposal.
Section 3 – CONTRACT TERMS AND CONDITIONS
3.1 ELEMENTS OF CONTRACT
3.1.1 No contract relationship is created or implied by DAS from the acceptance of a proposal or an interview with a company in response to this RFP.
3.1.2 No contract relationship is created or implied by DAS from the acceptance of a proposal or an interview with a company in response to this RFP.
3.1.3 The proposed form of contract between the Company and the State will be a revised Consensus Doc 803, which will be modified to include the following:
3.1.3.1 Incorporation, by reference, of this Request for Proposal and subsequent addenda and the Proposal submitted by the successful Firm in response to this RFP.
3.1.3.2 Professional liability insurance in the amount of $2 million will be required. See Exhibit A – Sample Insurance Certificate.
3.1.3.3 The proposed project fee, start dates, and scheduling of the selected Firm’s services shall be established during negotiations.
3.1.3.4 Iowa Code Section 8.47, The Accountable Government Act, requires that the terms and conditions of service contracts shall include the following:
3.1.3.4.1 The amount or basis for paying consideration to the party based on the party’s performance under the service contract.
3.1.3.4.2 Methods to effectively oversee the party’s compliance with the service contract.
3.1.3.4.3 Methods to effectively review performance of a service contract.
3.1.3.5 Other terms, mutually agreeable to the State and the Firm, may be developed during negotiations with the selected Firm.
Other contract forms, as mutually agreeable, may be utilized as appropriate for additional services directly associated with this project.
3.1.4 This RFP does NOT establish a statewide contract.
Section 4 –REQUIREMENTS
All services to be provided by the Firm shall take into account the following assumptions:
4.1 MINIMUM FIRM QUALIFICATIONS
4.1.1 Firms, other than Sole Proprietorships and General Partnerships, shall be registered with the Office of the Iowa Secretary of State.
4.1.2 The selected Firm shall have sufficient, qualified staff to deliver the services needed.