URI OPM Biomedical Sciences Building
Solicitation number
RFP27007054
Issued by
Providence County, Rhode Island

About this file

This RFP Scope of Work document issued by the University of Rhode Island solicits Owner's Project Manager (OPM) services for the URI Biomedical Sciences Building construction project in Kingston, Rhode Island. The University seeks one qualified OPM to provide construction-phase management, coordination, oversight, analysis, documentation, and advisory services for an approximately 48,000 gross square foot biomedical research facility with an estimated construction cost of $75.5 million. OPM services will commence upon issuance of the construction contract and continue through construction completion, with an anticipated duration of approximately 32.5 months. The project will also offer an optional Add Alternate Service for one Owner's Progress Inspector (OPI) to provide part-time field observation and reporting services averaging approximately 10 hours per week. The solicitation requires submission of technical proposals (not to exceed 30 pages), cost proposals using a University-provided form, a Supplemental Bidder Attestation Form, and ISBE participation documentation. Proposals must be submitted electronically through Ocean State Procures by November 5, 2026 at 1:00 PM EST. The contract term runs from January 1, 2027 through December 31, 2029, with the Q&A period closed as of October 15, 2026.

The cost proposal must include fully burdened hourly rates for both the OPM and OPI positions with no additional multipliers, markups, overhead, or profit margins applied. The evaluation structure includes three University-established contract allowances totaling $45,000: $15,000 for third-party professional services, $20,000 for third-party estimating services, and $10,000 for approved reimbursable expenses, all requiring prior University authorization. The proposed OPM must possess a minimum of 10 years of relevant project management experience in complex building construction, with professional background in architecture, engineering, construction management, or related disciplines; relevant professional credentials are preferred. Similarly, the proposed OPI must have a minimum of 10 years of experience in construction inspection, administration, field supervision, or construction management. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence), Workers' Compensation ($100,000 each accident), Automobile Liability ($1,000,000 combined single limit), Crime ($500,000 per occurrence), and Professional Liability/Errors and Omissions ($2,000,000 per occurrence and aggregate). The resulting agreement will be based on AIA C172-2014 as amended by the State of Rhode Island and URI. Technical proposals will be evaluated in two phases: Phase 1 written proposal review (maximum 40 points), with a minimum threshold of 30 points required to advance to Phase 2 interview presentations (maximum 30 points). Technical proposals scoring 55 combined points or higher will have cost proposals evaluated for up to 30 points, with ISBE participation eligible for up to 6 bonus points, bringing total possible evaluation points to 106.

View the file

Other files

File Type Posted
RFP27007054_Oct_28_26_solicitation_doc.pdf PDF
RFP27007054_Nov_18_26_solicitation_doc.pdf PDF
RFP27007054_Nov_17_26_solicitation_doc.pdf PDF
RFP27007054_Oct_21_26_solicitation_doc.pdf PDF
RFP27007054_Nov_12_26_solicitation_doc.pdf PDF
RFP27007054_Nov_4_26_solicitation_doc.pdf PDF
RFP27007054_Oct_22_26_solicitation_doc.pdf PDF
RFP27007054 Scope Appendix.pdf PDF
ISBE Form - RFP Appendix B - 12.01.2025.pdf PDF
RFP27007054_Nov_5_26_solicitation_doc.pdf PDF
RFP27007054_Oct_30_26_solicitation_doc.pdf PDF
RFP27007054_Oct_29_26_solicitation_doc.pdf PDF
RFP27007054_Oct_13_26_solicitation_doc.pdf PDF
RFP27007054_Nov_9_26_solicitation_doc.pdf PDF
RFP27007054_Oct_23_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFP27007054_v1_Oct_20_26.pdf PDF
Supplemental Bidder Attestation - 12-01-2025.pdf PDF
RFP27007054_Nov_2_26_solicitation_doc.pdf PDF
RFP27007054_Nov_19_26_solicitation_doc.pdf PDF
RFP27007054_Nov_10_26_solicitation_doc.pdf PDF
RFP27007054_Nov_3_26_solicitation_doc.pdf PDF
RFP27007054 Cost Proposal Form.xlsx XLSX spreadsheet
RFP27007054 Sample AIA C172.pdf PDF
Q&A Center Items - RFP27007054 - Addendum # 1.pdf PDF
RFP27007054_Nov_6_26_solicitation_doc.pdf PDF
RFP27007054_Nov_11_26_solicitation_doc.pdf PDF
RFP27007054_Nov_13_26_solicitation_doc.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 1 of 14 Revised 4/8/2026

RFP - AGENCY SOLICITATION SPECIFICATIONS

HEADER

TITLE: RFP27007054 URI OPM BIOMEDICAL SCIENCES BUILDING

DESCRIPTION: University of Rhode Island is seeking an Owner’s Project Manage for URI Biomedical Sciences Building, Kingston, RI.

PRE-BID/ PROPOSAL CONFERENCE: NO

CONTRACT TERMS:

The initial contract period will begin approximately January 1, 2027. The total anticipated duration of the contract is three (3) years.

Owner’s Project Manager (OPM) services are anticipated to begin upon issuance of the construction contract or purchase order to the contractor selected by the University to perform the construction work (“Construction Contractor”) and continue through Construction Completion, an anticipated duration of approximately thirty-two and one-half (32.5) months.

If authorized by the University as an Add Alternate Service, Owner’s Progress Inspector (OPI) services are anticipated to begin at construction mobilization and continue through Construction Completion, an anticipated duration of approximately thirty (30) months.

Anticipated contract and purchase order duration: January 1, 2027 – December 31, 2029.

INSURANCE REQUIREMENTS:

In accordance with this solicitation and as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13, and General Conditions

- Addendum A, found at https://ridop.ri.gov/about-us/procurement-statutes-and-regulations, the following insurance coverage shall be required of the awarded vendor(s):

General Requirements:

13a) ☒ Commercial General Liability – Combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.

13b) ☒ Workers’ Compensation – $100,000 each accident, $100,000 disease or policy limit and $100,000 each employee.

13c) ☒ Automobile Liability – $1,000,000 each occurrence combined single limit.

https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://ridop.ri.gov/about-us/procurement-statutes-and-regulations

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 2 of 14 Revised 4/8/2026

13d) ☒ Crime – $500,000 per occurrence or 50% of contract amount, whichever is greater.

Professional Services:

13e) ☒ Professional Liability (“Errors and Omissions”) – $2,000,000 per occurrence, $2,000,000 annual aggregate.

AIA Contract:

☒ AIA Contract – The selected Vendor must submit a fully executed AIA C172-2014 as amended by the State of Rhode Island and URI contract. If awarded the contract, the University will finalize and provide a copy of the required AIA.

SECTION A: BACKGROUND

The University of Rhode Island is the State’s flagship land- and sea-grant research institution, with a commitment to urban initiatives. A student-centered research institution, URI actively partners with other organizations globally and locally to advance knowledge and develop informed residents and leaders. URI is committed to high-quality education, community engagement, and solving the world’s most important challenges. Situated on the traditional land and territories of the Narragansett Nation and the Niantic People, URI strives to create a diverse and inclusive environment for researchers, teachers, learners, and community members.

The University received GO Bond funds to allow the University to execute the design and new construction of an approximately 48,000 GSF Biomedical Sciences Building on the URI Kingston campus. The building will be sited south of Ferry Road, on the northern part of the Kingston Campus Science District. This building will enclose the existing three-sided quad.

SECTION B: SCOPE OF WORK AND REQUIREMENTS

General Scope of Work The University of Rhode Island (URI) seeks qualified firms to provide Owner’s Program Management services for the Biomedical Sciences Building at the Kingston Campus.

The selected firm shall assign one (1) qualified Owner’s Project Manager (OPM) to serve as an extension of the University’s project management team during the construction phase of the project. The assigned OPM shall provide Owner representation, project management, coordination, oversight, analysis, documentation, and advisory services beginning upon issuance of the construction contract or purchase order to the Construction Contractor and continuing through Construction Completion, an anticipated duration of approximately thirty-two and one-half (32.5) months.

The assigned OPM is anticipated to provide part-time services beginning upon issuance of the construction contract or purchase order to the Construction Contractor and continuing through Construction Completion. The level of effort is expected to be lower during the initial pre-construction transition period and to average approximately twenty (20) hours per week during the anticipated thirty (30) month construction phase, with actual effort varying based upon project schedule, workload, and University direction.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 3 of 14 Revised 4/8/2026

The selected firm shall provide, as part of its proposed fully burdened hourly rate, all administrative, clerical, office, management, overhead, profit, incidental, and other support reasonably necessary for the assigned OPM to perform the required services. Such support shall be considered incidental to the OPM services and shall not constitute additional project staffing unless specifically authorized by the University.

As an Add Alternate Service, the University is requesting pricing for one (1) qualified Owner’s Progress Inspector (OPI) to provide part-time construction-phase field observation and reporting services. The OPI shall supplement the University’s internal staff and assigned OPM by independently observing and documenting construction progress, site conditions, contractor activities, inspections, testing, logistics, schedule status, and other construction-phase matters requiring Owner awareness.

The assigned OPI is anticipated to provide part-time services averaging approximately ten (10) hours per week, beginning at construction mobilization and continuing through Construction Completion, an anticipated duration of approximately thirty (30) months.

The OPI shall perform services under the coordination of the assigned OPM and at the direction of the University. The OPI’s role shall be observational, reporting, and advisory in nature and shall not relieve the Design Agent, Construction Contractor, testing agencies, commissioning providers, Authorities Having Jurisdiction, or other project participants of their respective contractual, professional, safety, inspection, or code-compliance responsibilities.

The Vendor may propose the same individual to serve as both the assigned OPM and the Add Alternate OPI, provided that the individual demonstrates the qualifications required for each role and the Vendor demonstrates its ability to satisfy the anticipated responsibilities and level of effort associated with both assignments.

Regardless of whether the same individual is proposed for both roles, the OPI shall remain a separate Add Alternate Service and shall be separately identified and priced in the BSB Cost Proposal Form.

Authorization of the OPI Add Alternate Service shall be at the sole discretion of the University.

Inclusion and evaluation of the alternate in the Cost Proposal shall not constitute a guarantee that the alternate service will be awarded or authorized.

Project Scope and Delivery Requirements The Biomedical Sciences Building consists of a new approximately 48,000 gross square foot interdisciplinary research facility located on the northern portion of the Science District at the University of Rhode Island Kingston Campus. The current estimated building construction cost is approximately $75.5 million in 2026 dollars. The building program includes wet-lab research space for fourteen (14) Principal Investigator modules, associated laboratory support spaces, vivarium space, limited office and administrative space, collaboration areas, and building support spaces and amenities.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 4 of 14 Revised 4/8/2026

The project was originally developed for Design-Bid-Build delivery. The University is evaluating the final construction delivery approach and will proceed in accordance with the delivery method authorized for the Project. The assigned OPM is anticipated to begin services upon issuance of the construction contract or purchase order to the Construction Contractor and shall become familiar with the existing project documentation, prior decisions, current budget and schedule status, outstanding issues, procurement activities, regulatory requirements, and other necessary information to effectively represent the University during construction.

Construction activity will occur within the Kingston Campus Science District. The project will require coordination of site access, construction vehicle circulation, material deliveries, staging, laydown areas, temporary conditions, utility coordination, pedestrian circulation, campus operations, and construction activities occurring adjacent to occupied academic and research facilities.

The OPM shall coordinate, as applicable, with URI, the Design Agent and its consultants, Construction Contractor, commissioning agent, third-party consultants, testing and inspection agencies, regulatory authorities, user groups, Facilities Operations, Public Safety, Information Technology, and other University departments and stakeholders.

Owner’s Program Management Services – Specific Activities/Tasks The assigned OPM shall provide construction-phase management, coordination, oversight, analysis, documentation, and advisory services necessary to assist URI in successfully delivering the Biomedical Sciences Building Project.

Services are anticipated to include, but are not limited to:

• Project startup, document review, and Owner representation;

• Construction-phase management and contract administration support;

• Budget, cost, and change-management support;

• Review and tracking of the Construction Contractor’s project schedule;

• Construction procurement and long-lead coordination, as applicable;

• Site logistics, utility coordination, access, staging, and campus impact coordination;

• Coordination of commissioning, testing, special inspections, and regulatory activities;

• Project documentation, records, and reporting;

• Owner-furnished equipment, FF&E, technology, move-in, and Owner training coordination;

• Punch list, turnover, readiness for final acceptance, and construction closeout transition coordination; and

• Add Alternate OPI field observation and reporting services, if authorized by the University.

The OPM shall perform the services identified above within the authorized level of effort and shall, in coordination with and at the direction of URI, prioritize available time toward activities having the greatest potential impact on project cost, schedule, quality, contractual requirements, and the University’s interests.

The OPM shall promptly advise URI when project conditions or workload are expected to exceed the authorized level of effort so that priorities may be adjusted.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 5 of 14 Revised 4/8/2026

The OPM’s review, coordination, and advisory services shall not relieve the Design Agent or other licensed design professionals of responsibility for the adequacy, accuracy, coordination, code compliance, or professional quality of their respective design documents or construction administration services.

Detailed requirements and responsibilities of the OPM and the Add Alternate OPI services are identified in the BSB OPM Scope of Services Appendix, which shall be considered an integral part of this Scope of Work and the resulting agreement.

SECTION C: PROPOSAL MATERIALS

1. Technical Proposal

The Technical Proposal shall demonstrate the Vendor’s qualifications and capacity to provide the required Owner’s Program Management services and the qualifications, experience, judgment, and availability of the individual(s) proposed to serve as the assigned Owner’s Project Manager (OPM) and, if authorized as an Add Alternate Service, the Owner’s Progress Inspector (OPI) for the Biomedical Sciences Building Project.

*Vendors must upload there technical proposals to the “Attach Documents” Technical Evaluation Attachment” section in OSP

The Vendor may propose the same individual to serve as both the OPM and OPI, provided that the individual demonstrates the qualifications required for each role and the Vendor demonstrates their ability to satisfy the anticipated responsibilities and level of effort associated with both assignments.

The Technical Proposal shall be specifically tailored to the Biomedical Sciences Building Project and the construction-phase services described in this solicitation.

The Technical Proposal shall not exceed thirty (30) pages, exclusive of the cover page and table of contents. Resumes, project examples, organizational graphics, and other supporting technical content shall be included within the applicable tab and shall count toward the page limit.

The Technical Proposal shall contain the following sections:

Tab 1 – Cover Letter Tab 2 – Qualifications and Experience of Proposed OPM and OPI Tab 3 – Firm Qualifications and Capacity Tab 4 – Work Plan Tab 5 – Approach / Methodology

Tab 1 – Cover Letter

Provide a brief cover letter that summarizes and highlights the Technical Proposal and provides the evaluation committee with a broad understanding of the Vendor’s suitability for the assignment.

The letter shall identify the individual(s) proposed to serve as the assigned OPM and OPI and shall confirm their availability and commitment to the project for the anticipated duration of their respective services.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 6 of 14 Revised 4/8/2026

Tab 2 – Qualifications and Experience of Proposed OPM and OPI

a. Proposed Owner’s Project Manager Identify the individual proposed to serve as the assigned OPM and provide a resume and relevant project experience demonstrating the individual’s qualifications to manage a project of similar size, complexity, technical requirements, delivery method, and institutional setting.

The proposed OPM shall have a minimum of ten (10) years of relevant project experience managing complex building construction projects. Professional background or experience in architecture, engineering, construction management, or a closely related construction discipline is required. Registration or certification as an Architect, Professional Engineer, Certified Construction Manager, Project Management Professional, or other relevant professional credential is preferred, but not required.

The response should demonstrate relevant experience with complex building construction;

laboratory, research, biomedical, science, higher education, or similarly technical facilities;

public construction delivery methods, including Design-Bid-Build, Construction Manager at Risk, or other collaborative project delivery approaches; construction-phase Owner representation; budget and cost management; project schedule review and tracking;

procurement and buyout coordination; change management; contract administration;

commissioning; testing and inspections; turnover; occupancy; and construction closeout.

Particular emphasis should be placed on the proposed OPM’s personal experience serving in an Owner’s representative, Owner’s Project Manager, or comparable project-management role during construction.

Provide three (3) to five (5) relevant projects personally managed by the proposed OPM.

For each project, identify the client, project scope and construction value, project type and delivery method, project duration or completion status, the proposed OPM’s specific role and responsibilities, significant project challenges and the proposed OPM’s role in addressing them, and a current client reference.

Project examples shall clearly distinguish the proposed OPM’s personal experience from the experience of the Vendor generally.

The response shall also identify the proposed OPM’s anticipated availability and commitment to the Biomedical Sciences Building Project, including availability to begin part-time services upon issuance of the construction contract or purchase order to the Construction Contractor, provide a reduced level of effort during the initial pre-construction transition period, and provide an average level of effort of approximately twenty (20) hours per week during the anticipated thirty (30) month construction phase through Construction Completion.

b. Proposed Owner’s Progress Inspector – Add Alternate Service Identify the individual proposed to serve as the Owner’s Progress Inspector during the construction phase if the Add Alternate Service is authorized by the University.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 7 of 14 Revised 4/8/2026

The proposed OPI shall have a minimum of ten (10) years of relevant experience in construction inspection, construction administration, field supervision, or construction management for complex building construction projects. Professional experience in architecture, engineering, construction management, or a closely related construction discipline is required. Registration or certification as an Architect, Professional Engineer, Certified Construction Manager, or other relevant professional credential is preferred, but not required.

Provide a brief summary of the proposed OPI’s relevant qualifications and experience, including field inspection or site supervision; familiarity with construction drawings and specifications; construction methods, materials, and sequencing; coordination and observation of inspections and testing; preparation of field reports and photographic documentation; monitoring of construction progress and schedule conditions;

identification and documentation of potential nonconforming work or field conditions requiring Owner attention; and experience with institutional, higher education, research, laboratory, or similarly complex facilities.

Provide two (2) to three (3) relevant projects demonstrating the proposed OPI’s field experience. For each project, identify the project, client, construction value, project type, duration, the OPI’s specific role, and the field inspection or construction oversight responsibilities personally performed.

Identify the proposed OPI’s anticipated availability to provide part-time services averaging approximately ten (10) hours per week from construction mobilization through Construction Completion.

The Vendor may propose the same individual to serve as both the assigned OPM and OPI, provided that the individual meets the qualifications required for each role and the Vendor demonstrates its ability to satisfy the responsibilities and anticipated level of effort associated with both assignments.

Tab 3 – Firm Qualifications and Capacity

Describe the Vendor’s qualifications and organizational capacity to support the assigned OPM and, if authorized, OPI throughout the anticipated duration of their respective services.

The response should demonstrate relevant Owner’s Program Management, Owner’s representative, or comparable project-management experience; experience with complex institutional, higher education, laboratory, research, biomedical, science, or similarly technical projects; experience with public construction delivery methods, including Design-Bid-Build, Construction Manager at Risk, and other collaborative project delivery approaches; experience working within public-sector or similarly regulated procurement and administrative environments; current organizational capacity; and the administrative, project-control, management, and other support available to the assigned OPM and OPI.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 8 of 14 Revised 4/8/2026

The response should also describe the Vendor’s ability to maintain continuity of the proposed personnel throughout the anticipated duration of their respective services and how the Vendor would address continuity should either proposed individual become unavailable.

Tab 4 – Work Plan

Provide a detailed work plan describing how the proposed OPM will organize and manage the construction-phase services required by the BSB OPM Scope of Services Appendix.

The Work Plan should address the proposed organization of day-to-day OPM activities;

anticipated part-time OPM presence and availability averaging approximately twenty (20) hours per week; coordination of URI, the Design Agent, Construction Contractor, commissioning agent, consultants, testing agencies, regulatory authorities, and University stakeholders; project meetings, communication, documentation, decision tracking, issue management, and reporting; budget and cost monitoring; change management; review and tracking of the Construction Contractor’s project schedule; construction procurement and long-lead coordination, as applicable; and major OPM activities and management priorities during construction.

The Work Plan should also address coordination of major construction-phase activities affecting University operations and stakeholders; commissioning, testing and inspections;

turnover, FF&E, technology, move coordination, Owner training, occupancy, and construction closeout; key decisions, information, reviews, or participation required from URI to maintain project progress; and, if authorized, coordination and integration of OPI field observations into the OPM’s construction-phase services.

If the same individual is proposed to serve as both OPM and OPI, the Work Plan should describe how the Vendor will distinguish and manage the responsibilities, authorized hours, and reporting expectations associated with each role.

Recognizing the part-time nature of the assignment, the Work Plan should describe how the proposed OPM will prioritize available time toward activities having the greatest potential impact on project cost, schedule, quality, contractual requirements, and the University’s interests, and how the OPM will communicate with URI when project conditions or workload require adjustment of those priorities.

The Work Plan should demonstrate how the proposed OPM will personally organize and manage the assignment rather than relying upon a generic corporate project-management process.

Tab 5 – Approach / Methodology

Describe the proposed OPM’s understanding of the Biomedical Sciences Building Project and the methodology that will be used to perform the required construction-phase services.

The response should specifically address the proposed OPM’s approach to joining an active project upon issuance of the construction contract or purchase order to the Construction Contractor; becoming familiar with existing project documentation, prior decisions, 2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 9 of 14 Revised 4/8/2026 current budget and schedule status, outstanding issues, procurement activities, regulatory requirements, and known project risks; establishing effective working relationships with URI, the Design Agent, Construction Contractor, commissioning agent, consultants, and other project participants; and identifying immediate priorities requiring Owner attention.

The response should also address the proposed OPM’s approach to monitoring project cost and schedule; evaluating changes and potential claims; identifying and managing construction-phase risks; coordinating testing, inspections, commissioning, turnover, and closeout activities; supporting timely University decisions; and protecting the University’s interests while maintaining productive working relationships among project participants.

Recognizing the part-time nature of the assignment, the response should demonstrate how the proposed OPM will exercise judgment in prioritizing issues and allocating available time to the activities most critical to project cost, schedule, quality, contractual requirements, and successful project delivery.

If the Add Alternate OPI Service is authorized, the response should describe how OPI field observations and reporting will be incorporated into the OPM’s overall approach to construction-phase oversight.

The response should demonstrate practical judgment and a project-specific understanding of the Biomedical Sciences Building rather than generic methodology or standard corporate procedures.

Additional Technical Information

Vendors may include other materials necessary to demonstrate the qualifications of the proposed OPM and OPI or the Vendor’s ability to perform the required services. The Technical Proposal should remain succinctly focused on the qualifications and approach most relevant to the Biomedical Sciences Building Project and the construction-phase services described in this solicitation.

Cost Information

No indication or discussion of proposed fees or rates shall be included in the Technical Proposal.

2. Cost Proposal

The Vendor shall submit a separate Cost Proposal for the Owner’s Program Management services described in this RFP and the BSB OPM Scope of Services Appendix using the University-provided BSB Cost Proposal Form.

*Vendors must upload there cost proposals to the “Attach Documents” Price Evaluation Attachment” section in OSP

The Cost Proposal shall reflect the cost of providing the individual(s) identified in the Technical Proposal as the assigned Owner’s Project Manager (OPM) and Owner’s Progress Inspector

(OPI).

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 10 of 14 Revised 4/8/2026

The assigned OPM is anticipated to provide part-time services beginning upon issuance of the construction contract or purchase order to the Construction Contractor and continuing through Construction Completion, an anticipated duration of approximately thirty-two and one-half

(32.5) months. The level of effort is expected to be lower during the initial pre-construction transition period and to average approximately twenty (20) hours per week during the anticipated thirty (30) month construction phase.

The assigned OPI shall be priced separately as an Add Alternate Service and is anticipated to provide part-time services averaging approximately ten (10) hours per week beginning at construction mobilization and continuing through Construction Completion, an anticipated duration of approximately thirty (30) months.

The Vendor may propose the same individual to serve as both the OPM and OPI; however, the OPI Add Alternate Service shall remain separately identified and priced on the BSB Cost Proposal Form.

Authorization of the OPI Add Alternate Service shall be at the sole discretion of the University and shall not be guaranteed by inclusion in the Cost Proposal.

The individual(s) identified and priced in the Cost Proposal shall be the same individual(s) proposed for the respective roles in the Technical Proposal.

a. Fully Burdened Hourly Rates The Vendor shall provide separate fully burdened hourly rates for the assigned OPM and OPI for each applicable contract period identified on the BSB Cost Proposal Form. Separate rates shall be provided for each role regardless of whether the same individual is proposed to serve as both OPM and OPI.

The fully burdened hourly rates shall include all costs necessary for the selected firm to provide the assigned OPM and OPI and perform the required Scope of Services, including, but not limited to:

• Salary and employee benefits;

• Payroll taxes and insurance;

• Firm overhead;

• Profit;

• Administrative and clerical support;

• Office and management support;

• Computers, software, equipment, and supplies;

• Telephone and communications;

• Routine local travel and mileage; and

• Other normal and incidental expenses associated with performance of the OPM and OPI services.

Administrative, clerical, office, management, and other routine support provided by the selected firm shall be considered incidental to the OPM and OPI services and shall not be separately billable to the University.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 11 of 14 Revised 4/8/2026

No additional multiplier, markup, overhead, profit, or administrative charge shall be applied to the proposed fully burdened hourly rates.

b. Evaluation Hours For purposes of Cost Proposal evaluation, the University will apply the evaluation hours identified on the BSB Cost Proposal Form to each Vendor’s proposed fully burdened hourly rates.

The evaluation hours are established solely to provide a common basis for comparison of Cost Proposals and do not constitute a guarantee of actual hours, contract value, minimum expenditure, or duration of services.

The selected firm shall invoice the University only for authorized services actually performed in accordance with the resulting agreement.

c. Contract Allowances The Cost Proposal shall include the University-established and controlled contract allowances identified below. These allowances are intended to provide a controlled mechanism for funding limited project-specific costs that may arise during performance of the OPM services but are not appropriate to include within the OPM’s fully burdened hourly rate.

i. Third-Party Services Allowance The Cost Proposal shall include a University-established Contract Allowance for Third-Party Services in the amount of $15,000. This allowance may be used only for third-party professional or specialty services specifically authorized in advance by the University. Such services may include, but are not limited to, scheduling review, specialty technical review, or other project-specific professional services requested by

URI.

ii. Third-Party Estimating Allowance The Cost Proposal shall include a University-established Contract Allowance for Third-Party Estimating Services in the amount of $20,000. This allowance may be used only for independent third-party cost estimating services, specifically authorized in advance by the University. The third-party estimator may provide independent cost review, evaluation of proposed changes, estimate reconciliation, or other construction-phase cost-management services as requested by URI.

iii. Reimbursables Allowance The Cost Proposal shall include a University-established Contract Allowance for Reimbursables in the amount of $10,000. This allowance may be used for approved project-specific reimbursable expenses that are not otherwise included in the OPM or OPI’s fully burdened hourly rate. The Reimbursables Allowance shall not be used for salary, benefits, administrative or clerical support, normal office expenses, computers or equipment, communications, routine local travel, overhead, profit, or other normal and incidental costs required for the selected firm to provide the assigned OPM and

OPI.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 12 of 14 Revised 4/8/2026

Expenditures from any allowance shall require prior written authorization by the University, shall be supported by appropriate invoices and documentation, and shall be reimbursed at actual authorized cost without additional markup, overhead, or profit.

d. Add Alternate – Owner’s Progress Inspector The Cost Proposal shall separately identify the cost of providing the proposed OPI as an Add Alternate Service.

For proposal purposes, the Add Alternate shall be based upon the evaluation hours identified on the BSB Cost Proposal Form and the proposed fully burdened OPI hourly rate.

The OPI Add Alternate Service shall remain separately identified and priced regardless of whether the same individual is proposed to serve as both the OPM and OPI.

The Cost Proposal Form shall separately identify:

1. Total Proposed Base Cost – OPM services plus all University-established contract allowances; and

2. Total Proposed Cost Including Add Alternate – OPM services, all University-established contract allowances, and the OPI Add Alternate Service.

The University reserves the right to award the base OPM services without the OPI Add Alternate Service or to include the OPI Add Alternate Service in the resulting award, subject to available funding and the University’s determination of project needs.

e. Additional Services Additional services outside the established Scope of Services shall require prior written authorization by the University.

Unless otherwise established in the resulting agreement, authorized additional services performed by the assigned OPM or OPI shall be compensated using the applicable fully burdened hourly rate identified on the BSB Cost Proposal Form that is in effect at the time the services are performed.

No additional services shall be performed or invoiced without prior written authorization by the University.

3. Supplemental Bidder Attestation Form

See Appendix A on the “Overview” tab in Ocean State Procures™ for information. Vendors are required to complete, sign and submit this form with their proposal.

*Vendors must upload there Supplemental Bidder Attestation Form to the “Attach Documents” Technical Evaluation Attachment” section in OSP as a separate attachment – DO NOT include with your technical proposal

4. ISBE Proposal

See Appendix B on the “Overview” tab in Ocean State Procures™ for information and the MBE, WBE and/or Disability Business Enterprise Participation Plan form(s). Vendors are required to complete, sign and submit these forms with their overall proposal. Please complete separate forms

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 13 of 14 Revised 4/8/2026 for each MBE, WBE, and/or Disability Business Enterprise subcontractor to be utilized on the solicitation.

*Vendors must upload there ISBE Form to the “Attach Documents” Price Evaluation Attachment” section in OSP as a separate attachment – DO NOT include with your cost proposal

SECTION D: EVALUATION AND SELECTION - SOLICITATION SPECIFIC

Proposals will be reviewed by a Technical Review Committee (“TRC”) comprised of staff from URI/State Agencies. The TRC shall first consider technical proposals.

The evaluation of Technical Proposals will be split into two phases; the first phase will be the review and scoring of the written Technical Proposal by the TRC, and the second phase will be the scoring of the Interview Presentation for the services offered.

In Phase 1, the TRC will score the submitted Written Proposals. Written Proposals that meet or exceed a minimum threshold of 30 out of a maximum of 40 points will advance to Phase 2. Any Written Proposal scoring less than 30 points shall be disqualified.

In Phase 2, URI will require selected suppliers to attend an Interview Presentation with the TRC.

Interview presentations will be scored up to a maximum score of 30 points.

Following the scoring of Phase 2, points for Phase 1 and 2 will be combined. Technical Proposals scoring 55 points or higher out of a possible 70 points, will have the cost proposals evaluated and assigned up to a maximum of 30 points in the cost category, bringing the total potential evaluation score to 100 points.

The University of Rhode Island reserves the right to select the supplier(s) or firm(s) (“vendor”) that it deems to be most qualified to provide the goods and/or services as specified herein; and, conversely, reserves the right to cancel the solicitation in its entirety in its sole discretion.

2023-1.v3.04082026 RFP – Agency Solicitation Specifications Page 14 of 14 Revised 4/8/2026

Proposals shall be reviewed and scored based upon the following criteria:

Additional evaluation criteria can be found at:

• For those with an OSP account, see the “Requirements” tab of this solicitation in OSP for additional information on the evaluation and selection process in the “RFP Standard Specification” section.

• For those without an OSP account, public access to the full bid can be found at https://ridop.ri.gov/vendors/bidding-opportunities. Search for this solicitation, open the record, click on the “Print/Download Solicitation Summary” button in the upper right corner for all the solicitation requirements and supporting documents are found at the bottom of the page in the “Solicitation Attachments” section.

Please note that URI is exempt from the contract administrative fee instituted under R.I. Gen. Laws § 37-2-12.

Criteria Possible Points Phase 1: Evaluation of the Written Proposal Qualifications and Experience of Proposed OPM and OPI 20 Capability, Capacity, and Qualifications of the Vendor 5 Work Plan 5 Approach and Methodology 10

Total Possible Points for Phase 1 40 Phase 2: Interview (Proposed OPM must personally participate) Understanding of the Biomedical Sciences Building Project and Construction-Phase Challenges 8

OPM Management Approach, Judgment, and Problem Solving 10 Communication, Coordination, and Owner Representation 7 Responsiveness to TRC Questions and Overall Demonstrated Capability 5

Total Possible Points for Phase 2 30

Total Possible Technical Points 70 Cost Proposal 30

Total Possible Evaluation Points 100 ISBE Participation 6 Bonus Points

Total Possible Points 106 https://ridop.ri.gov/vendors/bidding-opportunities

SECTION A: BACKGROUND
SECTION B: SCOPE OF WORK AND REQUIREMENTS
SECTION C: PROPOSAL MATERIALS
1. Technical Proposal
The Technical Proposal shall demonstrate the Vendor’s qualifications and capacity to provide the required Owner’s Program Management services and the qualifications, experience, judgment, and availability of the individual(s) proposed to serve as the ...
*Vendors must upload there technical proposals to the “Attach Documents” Technical Evaluation Attachment” section in OSP
The Vendor may propose the same individual to serve as both the OPM and OPI, provided that the individual demonstrates the qualifications required for each role and the Vendor demonstrates their ability to satisfy the anticipated responsibilities and ...
The Technical Proposal shall be specifically tailored to the Biomedical Sciences Building Project and the construction-phase services described in this solicitation.
The Technical Proposal shall not exceed thirty (30) pages, exclusive of the cover page and table of contents. Resumes, project examples, organizational graphics, and other supporting technical content shall be included within the applicable tab and sh...
The Technical Proposal shall contain the following sections:
Tab 1 – Cover Letter Tab 2 – Qualifications and Experience of Proposed OPM and OPI Tab 3 – Firm Qualifications and Capacity Tab 4 – Work Plan Tab 5 – Approach / Methodology
Tab 1 – Cover Letter
Provide a brief cover letter that summarizes and highlights the Technical Proposal and provides the evaluation committee with a broad understanding of the Vendor’s suitability for the assignment.
The letter shall identify the individual(s) proposed to serve as the assigned OPM and OPI and shall confirm their availability and commitment to the project for the anticipated duration of their respective services.
Tab 2 – Qualifications and Experience of Proposed OPM and OPI
a. Proposed Owner’s Project Manager
Identify the individual proposed to serve as the assigned OPM and provide a resume and relevant project experience demonstrating the individual’s qualifications to manage a project of similar size, complexity, technical requirements, delivery method, ...
The proposed OPM shall have a minimum of ten (10) years of relevant project experience managing complex building construction projects. Professional background or experience in architecture, engineering, construction management, or a closely related c...
The response should demonstrate relevant experience with complex building construction; laboratory, research, biomedical, science, higher education, or similarly technical facilities; public construction delivery methods, including Design-Bid-Build, C...
Particular emphasis should be placed on the proposed OPM’s personal experience serving in an Owner’s representative, Owner’s Project Manager, or comparable project-management role during construction.
Provide three (3) to five (5) relevant projects personally managed by the proposed OPM. For each project, identify the client, project scope and construction value, project type and delivery method, project duration or completion status, the proposed ...
Project examples shall clearly distinguish the proposed OPM’s personal experience from the experience of the Vendor generally.
The response shall also identify the proposed OPM’s anticipated availability and commitment to the Biomedical Sciences Building Project, including availability to begin part-time services upon issuance of the construction contract or purchase order to...
b. Proposed Owner’s Progress Inspector – Add Alternate Service
Identify the individual proposed to serve as the Owner’s Progress Inspector during the construction phase if the Add Alternate Service is authorized by the University.
The proposed OPI shall have a minimum of ten (10) years of relevant experience in construction inspection, construction administration, field supervision, or construction management for complex building construction projects. Professional experience i...
Provide a brief summary of the proposed OPI’s relevant qualifications and experience, including field inspection or site supervision; familiarity with construction drawings and specifications; construction methods, materials, and sequencing; coordinat...
Provide two (2) to three (3) relevant projects demonstrating the proposed OPI’s field experience. For each project, identify the project, client, construction value, project type, duration, the OPI’s specific role, and the field inspection or construc...
Identify the proposed OPI’s anticipated availability to provide part-time services averaging approximately ten (10) hours per week from construction mobilization through Construction Completion.
The Vendor may propose the same individual to serve as both the assigned OPM and OPI, provided that the individual meets the qualifications required for each role and the Vendor demonstrates its ability to satisfy the responsibilities and anticipated ...
Tab 3 – Firm Qualifications and Capacity
Describe the Vendor’s qualifications and organizational capacity to support the assigned OPM and, if authorized, OPI throughout the anticipated duration of their respective services.
The response should demonstrate relevant Owner’s Program Management, Owner’s representative, or comparable project-management experience; experience with complex institutional, higher education, laboratory, research, biomedical, science, or similarly ...
The response should also describe the Vendor’s ability to maintain continuity of the proposed personnel throughout the anticipated duration of their respective services and how the Vendor would address continuity should either proposed individual beco...
Tab 4 – Work Plan
Provide a detailed work plan describing how the proposed OPM will organize and manage the construction-phase services required by the BSB OPM Scope of Services Appendix.
The Work Plan should address the proposed organization of day-to-day OPM activities; anticipated part-time OPM presence and availability averaging approximately twenty (20) hours per week; coordination of URI, the Design Agent, Construction Contractor...
The Work Plan should also address coordination of major construction-phase activities affecting University operations and stakeholders; commissioning, testing and inspections; turnover, FF&E, technology, move coordination, Owner training, occupancy, a...
If the same individual is proposed to serve as both OPM and OPI, the Work Plan should describe how the Vendor will distinguish and manage the responsibilities, authorized hours, and reporting expectations associated with each role.
Recognizing the part-time nature of the assignment, the Work Plan should describe how the proposed OPM will prioritize available time toward activities having the greatest potential impact on project cost, schedule, quality, contractual requirements, ...
The Work Plan should demonstrate how the proposed OPM will personally organize and manage the assignment rather than relying upon a generic corporate project-management process.
Tab 5 – Approach / Methodology
Describe the proposed OPM’s understanding of the Biomedical Sciences Building Project and the methodology that will be used to perform the required construction-phase services.
The response should specifically address the proposed OPM’s approach to joining an active project upon issuance of the construction contract or purchase order to the Construction Contractor; becoming familiar with existing project documentation, prior...
current budget and schedule status, outstanding issues, procurement activities, regulatory requirements, and known project risks; establishing effective working relationships with URI, the Design Agent, Construction Contractor, commissioning agent, co...
The response should also address the proposed OPM’s approach to monitoring project cost and schedule; evaluating changes and potential claims; identifying and managing construction-phase risks; coordinating testing, inspections, commissioning, turnove...
Recognizing the part-time nature of the assignment, the response should demonstrate how the proposed OPM will exercise judgment in prioritizing issues and allocating available time to the activities most critical to project cost, schedule, quality, co...
If the Add Alternate OPI Service is authorized, the response should describe how OPI field observations and reporting will be incorporated into the OPM’s overall approach to construction-phase oversight.
The response should demonstrate practical judgment and a project-specific understanding of the Biomedical Sciences Building rather than generic methodology or standard corporate procedures.
Additional Technical Information
Vendors may include other materials necessary to demonstrate the qualifications of the proposed OPM and OPI or the Vendor’s ability to perform the required services. The Technical Proposal should remain succinctly focused on the qualifications and app...
Cost Information
No indication or discussion of proposed fees or rates shall be included in the Technical Proposal.
2. Cost Proposal
*Vendors must upload there cost proposals to the “Attach Documents” Price Evaluation Attachment” section in OSP
a. Fully Burdened Hourly Rates
b. Evaluation Hours
c. Contract Allowances
d. Add Alternate – Owner’s Progress Inspector
e. Additional Services
3. Supplemental Bidder Attestation Form
*Vendors must upload there Supplemental Bidder Attestation Form to the “Attach Documents” Technical Evaluation Attachment” section in OSP as a separate attachment – DO NOT include with your technical proposal
4. ISBE Proposal

SECTION D: EVALUATION AND SELECTION - SOLICITATION SPECIFIC

File details come from the government source that posted it. Updated .