RFP27007054 Cost Proposal Form.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
URI OPM Biomedical Sciences Building
Solicitation number
RFP27007054
Issued by
Providence County, Rhode Island

About this file

This is a Cost Proposal Form for Owner's Program Management (OPM) services for the University of Rhode Island's Biomedical Sciences Building project located in Kingston, Rhode Island. The University of Rhode Island is requesting an Owner's Project Manager and Owner's Progress Inspector (OPI) to provide project oversight throughout the anticipated 30-month construction phase beginning upon issuance of the construction contract. The OPM services are structured as part-time engagement, with reduced hours during an initial pre-construction transition period in Contract Year 1 (700 evaluation hours), followed by approximately 20 hours per week during the full construction phases in Years 2 and 3 (1,040 and 860 evaluation hours respectively). The OPI services, offered as an add alternate, consist of part-time on-site field observation and reporting at approximately 10 hours per week, with evaluation hours of 350 in Year 1, 520 in Year 2, and 430 in Year 3, running from construction mobilization through completion.

Offerors must provide fully burdened hourly rates for both the OPM and OPI positions, with all costs including salary, benefits, overhead, profit, administrative support, equipment, communications, and routine travel incorporated into a single rate with no additional markups permitted. The University has established fixed allowances totaling $45,000 for contract services, including $20,000 for third-party estimating services, $15,000 for additional third-party services, and $10,000 for authorized reimbursable expenses. All allowance expenditures require prior University authorization and supporting documentation, with unused balances retained by the University. A single qualified individual may be proposed to fulfill both OPM and OPI roles provided qualifications are met and pricing is clearly delineated. The cost proposal must be certified by an authorized representative confirming that proposed rates are fully burdened and that the proposed personnel match those identified in the technical proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BSB OPM Cost Proposal

COST PROPOSAL FORM
Owner’s Program Management Services – Biomedical Sciences Building Project
Offeror:
Proposed OPM:
Proposed OPI:
PRICING INSTRUCTIONS
Provide fully burdened hourly rates for the individuals proposed as the assigned Owner’s Project Manager (OPM) and Owner’s Progress Inspector (OPI). The fully burdened rates shall include all salary, benefits, overhead, profit, administrative and clerical support, office and management support, computers, software, equipment, communications, routine local travel, and other normal or incidental costs required to perform the services. No separate markup, multiplier, overhead, profit, or administrative charge will be permitted.

URI anticipates part-time OPM services beginning upon issuance of the construction contract or purchase order to the Construction Contractor, with a reduced level of effort during the initial pre-construction transition period and an average level of effort of approximately twenty (20) hours per week during the anticipated thirty (30) month construction phase.

OPI services, if authorized, are anticipated to consist of part-time on-site field observation and reporting services averaging approximately ten (10) hours per week during the anticipated thirty (30) month construction phase, beginning at construction mobilization and continuing through Construction Completion, in accordance with the evaluation assumptions identified in the Cost Proposal Section of the RFP Scope of Work and Requirements.

The Offeror may propose a single individual to provide both OPM and OPI services, provided that the individual satisfies the qualifications required for each role and the Cost Proposal clearly delineates the separate OPM and OPI services and pricing for evaluation purposes.

UNIVERSITY-ESTABLISHED BASE COST EVALUATION HOURS
Contract PeriodFully Burdened OPM Hourly RateEvaluation Hours - OPMEvaluated CostNotes
Contract Year 1 (1/1/27 - 12/31/27)$0.00700$0.00OPM Part-time: Includes reduced pre-construction transition period and construction-phase OPM services
Contract Year 2 (1/1/28 - 12/31/28)$0.001040$0.00OPM Part-time / 20 hrs. per week - 52 wks.
Contract Year 3 (1/1/29 - 12/31/29)$0.00860$0.00OPM Part-time / 20 hrs. per week - 43 wks.
TOTAL EVALUATED SERVICES COST$0.00
UNIVERSITY-ESTABLISHED CONTRACT ALLOWANCES
AllowanceAmountUse
Contract Allowance – 3rd Party Estimating Services as identified in the SOW.$20,000.00URI-directed estimating services
Contract Allowance – 3rd Party Services as identified in the SOW.$15,000.00URI-directed third-party services
Contract Allowance – Reimbursables$10,000.00Authorized reimbursable project expenses
TOTAL CONTRACT ALLOWANCES$45,000.00

TOTAL PROPOSED BASE COST $45,000.00

UNIVERSITY-ESTABLISHED ADD ALTERNATE EVALUATION HOURS
Contract PeriodFully Burdened OPI Hourly RateEvaluation Hours - OPIEvaluated CostNotes
Contract Year 1 (1/1/27 - 12/31/27)$0.00350$0.00OPI Part-time / 10 hrs. per week - 35 wks.
Contract Year 2 (1/1/28 - 12/31/28)$0.00520$0.00OPI Part-time / 10 hrs. per week - 52 wks.
Contract Year 3 (1/1/29 - 12/31/29)$0.00430$0.00OPI Part-time / 10 hrs. per week - 43 wks.
TOTAL EVALUATED SERVICES COST$0.00

TOTAL PROPOSED COST INCLUDING ADD ALTERNATE $45,000.00

The University-established allowances are identical for all Offerors and should be included in the Total Proposed Contract Value. Expenditures from these allowances require prior URI authorization and appropriate supporting documentation. Unused allowance balances remain with URI. The URI Evaluation Hours are provided for proposal comparison and do not guarantee actual hours, contract value, or minimum expenditure.

CERTIFICATION
By submitting this Cost Proposal, the Offeror certifies that the proposed rates are fully burdened as described above; the proposed OPM and OPI are the same individuals identified in the Technical Proposal; and the Offeror accepts the pricing assumptions and allowance requirements stated in the RFP and Cost Proposal Requirements.
Authorized Representative:
Title:
Signature:Date: