Summary of Addendum No. 1 to RFP SC-26-699

This is an addendum to Request for Proposal No. SC-26-699 issued by AMES National Laboratory dated June 18, 2026. The addendum extends the proposal due date from June 19, 2026 at 4 p.m. CDT to June 23, 2026 at 4 p.m. CDT, providing four additional days for submission. The addendum also documents seven questions and answers from the mandatory pre-proposal meeting held on June 4, 2026, addressing technical and specification requirements for concrete work at two locations: TASF and Metals Development.

Key technical specifications clarified include: fiber reinforcement requirements (steel or synthetic fibers comprising approximately 1% volume per ASTM C1116/C1116M); joint sealant application limited to isolation joints between existing and new concrete, excluding sawcut control joints; and all new handrails and accessories to be quoted with suitable replacements. For TASF, contractors must provide quotes for two concrete color options (Red & Gray replacement in-kind, and Grey); for Metals Development, only Grey concrete is required with standard saw cuts rather than matching existing patterns. Paint lines on the Metals Development entryway do not require maintenance. Crane work at the Metals Development south entrance is estimated to remain on-site through July 31, 2026. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1 DATE OF AMENDMENT:

TO 6/18/2026

REQUEST FOR PROPOSAL NO. SC-26-699 SENT VIA EMAIL

The purpose of this amendment to RFP SC-26-699 is to:

1. Provide all questions submitted and all answers to the questions submitted.

2. Extends the Proposal Due date from 06/19/2026 at 4 p.m. CDT to 06/23/2026 at 4 p.m. CDT.

THIS ADDENDUM CONSISTS OF 1 PAGES.

Questions from Mandatory Pre-Proposal Meeting held on Thursday, June 4, 2026

1. What type of fiber reinforcement is needed for this project?

a. Steel or synthetic fibers comprising around 1% of the volume in accordance with ASTM

C1116/C1116M.

2. Is joint sealant only to be placed at building joints and surrounding structures or is it also to be placed at cut lines?

a. Apply joint sealant at the isolation joints between the existing and new concrete. The joint sealant does not need placed at the sawcut control joints.

3. Considering the current state of the handrails and accessories, should the project be quoted with all new accessories?

a. Yes, project should be quoted with all new accessories. Submittals with suitable replacements is ideal.

4. What is the anticipated completion date for the crane work outside of the south entrance of Metals

Development?

a. The crane is estimated to be on-site through July 31, 2026.

5. What color of concrete is desired for both locations?

a. TASF – Provide quote for two options

i. Option 1: Red & Gray (replacement in-kind)

ii. Option 2: Grey

b. Metals Development – Provide quote for one option

i. Option 1: Grey

6. Should Metals Development saw cuts be standard or match the existing?

a. The saw cuts for the Metals Development entryway should be standard.

7. Is there a need to maintain the paint lines on the concrete in the Metals Development entryway?

a. No, the paint lines do not need to be maintained.