Appendix D - Subcontractor Safety and Quality Assurance Program Review.pdf

PDF 360 KB Posted

Attached to
RFP SC-26-699 TASF Concrete Sidwalk Repair with Addendum 1
Solicitation number
RFP-26-699
Issued by

About this file

This is a Subcontractor Safety & Quality Assurance Program Review form (Form 10200.140, Revision 3) used by Ames National Laboratory to evaluate subcontractors' safety and quality capabilities.

The safety section requires subcontractors to provide three years of Experience Modification Rate (EMR) data from their Worker's Compensation carrier and detailed injury/illness information from OSHA 300 logs, including recordable cases, lost workday cases, lost workdays, fatalities, and employee hours worked. Rate calculation formulas are provided to determine OSHA recordable case rates, lost time accident rates, and days lost rates. The form also assesses whether the subcontractor maintains written safety policies signed by company officers, established written safety plans, and Hazard Communication Programs. It evaluates the frequency of accident report distribution to management, site safety meetings for field supervisors, craft toolbox meetings, and safety inspections. The form includes a comprehensive checklist of new hire orientation topics (head protection, fall protection, trenching, electrical safety, rigging, and hazard recognition) and a separate section for newly hired/promoted foremen training programs covering safe work practices, safety supervision, emergency procedures, and accident investigation.

The quality assurance section requires reviewers to determine whether the subcontractor has a documented Quality Assurance Program meeting requirements (required for Level III Activities), has committed to following Ames National Laboratory's Quality Assurance Program Plan (required for Level II Activities), or lacks adequate documentation. The form concludes with an extensive checklist of construction trade categories, allowing reviewers to identify whether work is performed by the company directly or subcontracted, covering site work, concrete, masonry, metals, thermal and moisture protection, doors and windows, finishes, furnishings, mechanical systems, wood and plastics, conveying systems, equipment, and electrical work. The form requires ESH and QA signatures for approval, conditional approval, or rejection with resubmission requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 10200.140 Rev 3, 09/08/2025 1

SUBCONTRACTOR SAFETY & QUALITY ASSURANCE

PROGRAM REVIEW

Contract #

Project Name

Subcontractor

Address

Phone Contact # Email

1. List your firm's interstate Experience Modification Rate (EMR) for the past three consecutive years.

NOTE: This information can be obtained from your Worker's Compensation carrier.

Year

2. Using the information from the OSHA No. 300 log, provide the following information on injuries and illnesses for the past three consecutive years.

Year Year Year

A. Total number of recordable cases (e.g., sutures, fractures, burns, rashes, foreign body in eye, etc.) including cases involving lost time

B. Number of lost workday cases

C. Number of lost workdays

D. Number of fatalities

E. Employee hours worked each year

Rate Calculation Formulas:

A) Number of OSHA Recordable Cases x 200,000

Number of Hours Worked Per Year

B) Number of Lost Time Accidents x 200,000

Number of Hours Worked Per Year

C) Number of Days Lost x 200,000

Number of Days Worked Per Year

Approved

Approved as noted

Not approved – Resubmit

ESH Signature

Identify your Worker's Compensation carrier:

Address:

Phone:

Rev 3, 09/08/2025 2

3. How often are accident reports (OSHA 300) and report summaries sent to the following:

Never Monthly Quarterly Annually

Field Superintendent

Vice President of Construction

President/CEO

4. Does your firm:

Have a written company safety policy signed by a company officer? Yes No Have an established written safety plan? Yes No Have a written Hazard Communication Program? Yes No

5. Identify by name and title the person within your firm directly responsible for your firm's safety program:

Name/Title: Phone:

6. How often do you hold site safety meetings for field supervisors?

Weekly Monthly Never Bi-Weekly as Required

7. How often do you hold craft “tool box” safety meetings?

Weekly Monthly Never Bi-Weekly as Required

8. How often do you conduct safety inspections?

Who performs this inspection?

9. Do you have orientation for new hires? Yes No If yes, does it include:

Yes No Head Protection

Eye Protection

Hearing Protection

Respiratory Protection

Safety Belt and Lifeline (Fall Protection)

Scaffolding/Work Platform, Competent Person

Perimeter Guarding/Floor, Wall and Roof Openings

Housekeeping

Fire Protection

First-Aid

Emergency Procedures – Rescue/Evacuation

Toxic Substances Trenching and Excavation, Competent Person

Signs, Barricades, Flagging

Electrical Safety, Lockout/Tagout Procedures

Rigging and Crane Safety

Hazard Recognition

Rev 3, 09/08/2025 3

10. Do you have a program for newly hired/promoted foremen? Yes No If yes, does it include:

Yes No Safe Work Practices

Methods of Safety Supervision

Toolbox Meetings

Emergency Procedures

First-Aid

Accident Investigation

Fire Protection and Prevention

New Worker Orientation

QUALITY ASSURANCE PROGRAM

Ames National Laboratory Quality Assurance has reviewed the subcontractor’s Quality Assurance program, if applicable, and made the determination:

1. Subcontractor has a documented Quality Assurance Program that adequately addresses quality requirements applicable to the work to be performed (1 is required for Level III Activities).

2. Subcontractor currently does not have a documented Quality Assurance Program, but has reviewed and committed to performing work in accordance with the Ames National Laboratory Quality Assurance Program Plan (Either 1 or 2 is required for Level II Activities).

3. Subcontractor currently does not have an adequately documented Quality Assurance Program and has not committed to performing work in accordance with the Ames National Laboratory Quality Assurance Program Plan (Either 1 or 2 is required for Level II Activities).

QA Signature Date

Rev 3, 11/01/2024

Check all blocks that apply to this contract:

(1) Work to be performed by your Company

(2) Work to be performed by a Sub-Contractor to your Company

1 2 Site Work

Demolition Earthwork Site Improvements Landscaping Paving and Surfacing

Concrete

Cast-in Place Concrete Precast Concrete Cementitious Decks Restoration and Cleaning

Masonry

Unit Masonry Stone Restoration

Metals

General Structural Metal Framing Joists Decking Miscellaneous and Ornamental

1 2 Thermal and Moisture Protection

Waterproofing Insulation Fireproofing Preformed Siding Flashing and Sheet Metal Roofing (General) Shingles and Roofing Tiles Preformed Roofing Membrane Roofing

Doors and Windows

Metal Doors and Frames Wood and Plastic Doors Special Doors Entrances and Store Fronts Metal Windows Wood and Plastic Windows Special Windows Hardware and Specialties Glazing

Finishes

Lath and Plaster/Drywall Acoustical Treatment Wood Flooring Stone and Brick Flooring Resilient Flooring Carpeting

Painting Wall Covering

Rev 3, 11/01/2024

1 2 Furnishings

Cabinets and Casework Window Treatment Furniture and Accessories

Special Construction

Clean Rooms Insulated Rooms Radiation Protection Pre-engineered Structures Liquid and Gas Storage Tanks Industrial/Process Control Systems Fire Suppression/Supervisory Systems

Mechanical

Insulation Special Process Piping Systems Plumbing and Sewerage Fire Protection Power or Heat Generation Air Distribution Controls and Instrumentation

1 2 Wood and Plastics

Rough Carpentry Heavy Timber Construction Prefabricated Structural Wood Finish Carpentry Architectural Woodwork

Conveying Systems

Elevators Hoists and Cranes Lifts Material Handling Systems

1 2 Equipment

Waste Handling Equipment Water Supply and Treatment

Equipment Communication Systems Fluid Waste Disposal and Treatment

Equipment Laboratory Equipment

1 2 Electrical

Substations Primary Distribution Secondary Distribution Lighting Cathodic Protection Controls

1:
2:
3:
4:
1_2:
2_2:
3_2:
4_2:
1_3:
2_3:
3_3:
4_3:
Do you have orientation for new hires: Off
contract number:
project name:
subcontractor:
ESH approved: Off
ESH Approved as noted: Off
address:
ESH Not approved Resubmit: Off
phone number:
email:
Year 1:
Year 2:
Year 3:
EMR 1:
EMR 2:
workers comp carrier:
wc address:
wc phone:
EMR 3:
osha log year 1:
osha log year 2:
osha log year 3:
5:
5_2:
5_3:
fs 1: Off
fs 2: Off
fs 3: Off
fs 4: Off
vp 1: Off
vp 2: Off
vp 3: Off
vp 4: Off
pres 1: Off
pres 2: Off
pres 3: Off
pres 4: Off
safety policy: Off
safety plan: Off
haz com: Off
name of safety rep:
phone of safety rep:
weekly: Off
monthly: Off
never: Off
bi-weekly: Off
as req'd: Off
weekly 7: Off
monthly 7: Off
never 7: Off
bi-weekly 7: Off
as req'd 7: Off
frequency of safety inspections:
who performs:
yes1: Off
no1: Off
yes2: Off
no2: Off
yes3: Off
no3: Off
yes4: Off
no4: Off
yes5: Off
no5: Off
yes6: Off
no6: Off
yes7: Off
no7: Off
yes8: Off
no8: Off
yes9: Off
no9: Off
yes10: Off
no10: Off
yes11: Off
no11: Off
yes12: Off
no12: Off
yes13: Off
no13: Off
yes14: Off
no14: Off
yes15: Off
no15: Off
yes16: Off
no16: Off
yes17: Off
no17: Off
foremen training: Off
box 1: Off
box 2: Off
box 3: Off
box 4: Off
box 5: Off
box 6: Off
box 7: Off
box 8: Off
box 9: Off
box 10: Off
box 11: Off
box 12: Off
box 13: Off
box 14: Off
box 15: Off
box 16: Off
qa program: Choice2
QA Date:
Demolition: Off
Earthwork: Off
Site Improvements: Off
Landscaping: Off
Paving and Surfacing: Off
Castin Place Concrete: Off
Precast Concrete: Off
Cementitious Decks: Off
Restoration and Cleaning: Off
Unit Masonry: Off
Stone: Off
Restoration: Off
General: Off
Structural Metal Framing: Off
Joists: Off
Decking: Off
Miscellaneous and Ornamental: Off
Demolition2: Off
Earthwork2: Off
Site Improvements2: Off
Landscaping2: Off
Paving and Surfacing2: Off
Castin Place Concrete2: Off
Precast Concrete2: Off
Cementitious Decks2: Off
Restoration and Cleaning2: Off
Unit Masonry2: Off
Stone2: Off
Restoration2: Off
General2: Off
Structural Metal Framing2: Off
Joists2: Off
Decking2: Off
Miscellaneous and Ornamental2: Off
Waterproofing: Off
Insulation: Off
Fireproofing: Off
Preformed Siding: Off
Flashing and Sheet Metal: Off
Roofing General: Off
Shingles and Roofing Tiles: Off
Preformed Roofing: Off
Membrane Roofing: Off
Metal Doors and Frames: Off
Wood and Plastic Doors: Off
Special Doors: Off
Entrances and Store Fronts: Off
Metal Windows: Off
Wood and Plastic Windows: Off
Special Windows: Off
Hardware and Specialties: Off
Glazing: Off
Lath and PlasterDrywall: Off
Acoustical Treatment: Off
Wood Flooring: Off
Stone and Brick Flooring: Off
Resilient Flooring: Off
Carpeting: Off
Waterproofing1: Off
Insulation1: Off
Fireproofing1: Off
Preformed Siding1: Off
Flashing and Sheet Metal1: Off
Roofing General1: Off
Shingles and Roofing Tiles1: Off
Preformed Roofing1: Off
Membrane Roofing1: Off
Metal Doors and Frames1: Off
Wood and Plastic Doors1: Off
Special Doors1: Off
entrances and1: Off
Metal Windows1: Off
Wood and Plastic Windows1: Off
Special Windows1: Off
Hardware and Specialties1: Off
Glazing1: Off
Lath and PlasterDrywall1: Off
Acoustical Treatment1: Off
Wood Flooring1: Off
Stone and Brick Flooring1: Off
resilient flooring1: Off
Carpeting1: Off
Cabinets and Casework: Off
Window Treatment: Off
Furniture and Accessories: Off
Clean Rooms: Off
Insulated Rooms: Off
Radiation Protection: Off
Preengineered Structures: Off
Liquid and Gas Storage Tanks: Off
IndustrialProcess Control Systems: Off
Fire SuppressionSupervisory Systems: Off
General_2: Off
Insulation_2: Off
Special Process Piping Systems: Off
Plumbing and Sewerage: Off
Fire Protection: Off
Power or Heat Generation: Off
Air Distribution: Off
Controls and Instrumentation: Off
Cabinets and Casework1: Off
Window Treatment1: Off
Furniture and Accessories1: Off
Clean Rooms1: Off
Insulated Rooms1: Off
Radiation Protection1: Off
Preengineered Structures1: Off
Liquid and Gas Storage Tanks1: Off
IndustrialProcess Control Systems1: Off
Fire SuppressionSupervisory Systems1: Off
General_2-1: Off
Insulation_2-1: Off
Special Process Piping Systems1: Off
Plumbing and Sewerage1: Off
fire protection1: Off
Power or Heat Generation1: Off
Air Distribution1: Off
Controls and Instrumentation1: Off
Rough Carpentry: Off
Heavy Timber Construction: Off
Prefabricated Structural Wood: Off
Finish Carpentry: Off
Architectural Woodwork: Off
Elevators: Off
Hoists and Cranes: Off
Lifts: Off
Material Handling Systems: Off
Waste Handling Equipment: Off
Water Supply and Treatment: Off
Communication Systems: Off
Fluid Waste Disposal and Treatment: Off
Laboratory Equipment: Off
Rough Carpentry1: Off
Heavy Timber Construction1: Off
Prefabricated Structural Wood1: Off
Finish Carpentry1: Off
Architectural Woodwork1: Off
Elevators1: Off
Hoists and Cranes1: Off
Lifts1: Off
Material Handling Systems1: Off
Waste Handling Equipment1: Off
Water Supply and Treatment1: Off
Communication Systems1: Off
Fluid Waste Disposal and Treatment1: Off
Laboratory Equipment1: Off
General_3: Off
Substations: Off
Primary Distribution: Off
Secondary Distribution: Off
Lighting: Off
Cathodic Protection: Off
Controls: Off
General_31: Off
Substations1: Off
Primary Distribution1: Off
Secondary Distribution1: Off
Lighting1: Off
Cathodic Protection1: Off
Controls1: Off
Painting: Off
Wall Covering: Off
Painting1: Off
Wall Covering1: Off

File details come from the government source that posted it. Updated .