Appendix D - Subcontractor Safety and Quality Assurance Program Review.pdf
PDF 360 KB Posted
- Solicitation number
- RFP-26-699
- Issued by
-
Department of Energy Ames Laboratory
About this file
This is a Subcontractor Safety & Quality Assurance Program Review form (Form 10200.140, Revision 3) used by Ames National Laboratory to evaluate subcontractors' safety and quality capabilities.
The safety section requires subcontractors to provide three years of Experience Modification Rate (EMR) data from their Worker's Compensation carrier and detailed injury/illness information from OSHA 300 logs, including recordable cases, lost workday cases, lost workdays, fatalities, and employee hours worked. Rate calculation formulas are provided to determine OSHA recordable case rates, lost time accident rates, and days lost rates. The form also assesses whether the subcontractor maintains written safety policies signed by company officers, established written safety plans, and Hazard Communication Programs. It evaluates the frequency of accident report distribution to management, site safety meetings for field supervisors, craft toolbox meetings, and safety inspections. The form includes a comprehensive checklist of new hire orientation topics (head protection, fall protection, trenching, electrical safety, rigging, and hazard recognition) and a separate section for newly hired/promoted foremen training programs covering safe work practices, safety supervision, emergency procedures, and accident investigation.
The quality assurance section requires reviewers to determine whether the subcontractor has a documented Quality Assurance Program meeting requirements (required for Level III Activities), has committed to following Ames National Laboratory's Quality Assurance Program Plan (required for Level II Activities), or lacks adequate documentation. The form concludes with an extensive checklist of construction trade categories, allowing reviewers to identify whether work is performed by the company directly or subcontracted, covering site work, concrete, masonry, metals, thermal and moisture protection, doors and windows, finishes, furnishings, mechanical systems, wood and plastics, conveying systems, equipment, and electrical work. The form requires ESH and QA signatures for approval, conditional approval, or rejection with resubmission requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form 10200.140 Rev 3, 09/08/2025 1
SUBCONTRACTOR SAFETY & QUALITY ASSURANCE
PROGRAM REVIEW
Contract #
Project Name
Subcontractor
Address
Phone Contact # Email
1. List your firm's interstate Experience Modification Rate (EMR) for the past three consecutive years.
NOTE: This information can be obtained from your Worker's Compensation carrier.
Year
2. Using the information from the OSHA No. 300 log, provide the following information on injuries and illnesses for the past three consecutive years.
Year Year Year
A. Total number of recordable cases (e.g., sutures, fractures, burns, rashes, foreign body in eye, etc.) including cases involving lost time
B. Number of lost workday cases
C. Number of lost workdays
D. Number of fatalities
E. Employee hours worked each year
Rate Calculation Formulas:
A) Number of OSHA Recordable Cases x 200,000
Number of Hours Worked Per Year
B) Number of Lost Time Accidents x 200,000
Number of Hours Worked Per Year
C) Number of Days Lost x 200,000
Number of Days Worked Per Year
Approved
Approved as noted
Not approved – Resubmit
ESH Signature
Identify your Worker's Compensation carrier:
Address:
Phone:
Rev 3, 09/08/2025 2
3. How often are accident reports (OSHA 300) and report summaries sent to the following:
Never Monthly Quarterly Annually
Field Superintendent
Vice President of Construction
President/CEO
4. Does your firm:
Have a written company safety policy signed by a company officer? Yes No Have an established written safety plan? Yes No Have a written Hazard Communication Program? Yes No
5. Identify by name and title the person within your firm directly responsible for your firm's safety program:
Name/Title: Phone:
6. How often do you hold site safety meetings for field supervisors?
Weekly Monthly Never Bi-Weekly as Required
7. How often do you hold craft “tool box” safety meetings?
Weekly Monthly Never Bi-Weekly as Required
8. How often do you conduct safety inspections?
Who performs this inspection?
9. Do you have orientation for new hires? Yes No If yes, does it include:
Yes No Head Protection
Eye Protection
Hearing Protection
Respiratory Protection
Safety Belt and Lifeline (Fall Protection)
Scaffolding/Work Platform, Competent Person
Perimeter Guarding/Floor, Wall and Roof Openings
Housekeeping
Fire Protection
First-Aid
Emergency Procedures – Rescue/Evacuation
Toxic Substances Trenching and Excavation, Competent Person
Signs, Barricades, Flagging
Electrical Safety, Lockout/Tagout Procedures
Rigging and Crane Safety
Hazard Recognition
Rev 3, 09/08/2025 3
10. Do you have a program for newly hired/promoted foremen? Yes No If yes, does it include:
Yes No Safe Work Practices
Methods of Safety Supervision
Toolbox Meetings
Emergency Procedures
First-Aid
Accident Investigation
Fire Protection and Prevention
New Worker Orientation
QUALITY ASSURANCE PROGRAM
Ames National Laboratory Quality Assurance has reviewed the subcontractor’s Quality Assurance program, if applicable, and made the determination:
1. Subcontractor has a documented Quality Assurance Program that adequately addresses quality requirements applicable to the work to be performed (1 is required for Level III Activities).
2. Subcontractor currently does not have a documented Quality Assurance Program, but has reviewed and committed to performing work in accordance with the Ames National Laboratory Quality Assurance Program Plan (Either 1 or 2 is required for Level II Activities).
3. Subcontractor currently does not have an adequately documented Quality Assurance Program and has not committed to performing work in accordance with the Ames National Laboratory Quality Assurance Program Plan (Either 1 or 2 is required for Level II Activities).
QA Signature Date
Rev 3, 11/01/2024
Check all blocks that apply to this contract:
(1) Work to be performed by your Company
(2) Work to be performed by a Sub-Contractor to your Company
1 2 Site Work
Demolition Earthwork Site Improvements Landscaping Paving and Surfacing
Concrete
Cast-in Place Concrete Precast Concrete Cementitious Decks Restoration and Cleaning
Masonry
Unit Masonry Stone Restoration
Metals
General Structural Metal Framing Joists Decking Miscellaneous and Ornamental
1 2 Thermal and Moisture Protection
Waterproofing Insulation Fireproofing Preformed Siding Flashing and Sheet Metal Roofing (General) Shingles and Roofing Tiles Preformed Roofing Membrane Roofing
Doors and Windows
Metal Doors and Frames Wood and Plastic Doors Special Doors Entrances and Store Fronts Metal Windows Wood and Plastic Windows Special Windows Hardware and Specialties Glazing
Finishes
Lath and Plaster/Drywall Acoustical Treatment Wood Flooring Stone and Brick Flooring Resilient Flooring Carpeting
Painting Wall Covering
Rev 3, 11/01/2024
1 2 Furnishings
Cabinets and Casework Window Treatment Furniture and Accessories
Special Construction
Clean Rooms Insulated Rooms Radiation Protection Pre-engineered Structures Liquid and Gas Storage Tanks Industrial/Process Control Systems Fire Suppression/Supervisory Systems
Mechanical
Insulation Special Process Piping Systems Plumbing and Sewerage Fire Protection Power or Heat Generation Air Distribution Controls and Instrumentation
1 2 Wood and Plastics
Rough Carpentry Heavy Timber Construction Prefabricated Structural Wood Finish Carpentry Architectural Woodwork
Conveying Systems
Elevators Hoists and Cranes Lifts Material Handling Systems
1 2 Equipment
Waste Handling Equipment Water Supply and Treatment
Equipment Communication Systems Fluid Waste Disposal and Treatment
Equipment Laboratory Equipment
1 2 Electrical
Substations Primary Distribution Secondary Distribution Lighting Cathodic Protection Controls
| 1: |
| 2: |
| 3: |
| 4: |
| 1_2: |
| 2_2: |
| 3_2: |
| 4_2: |
| 1_3: |
| 2_3: |
| 3_3: |
| 4_3: |
| Do you have orientation for new hires: Off |
| contract number: |
| project name: |
| subcontractor: |
| ESH approved: Off |
| ESH Approved as noted: Off |
| address: |
| ESH Not approved Resubmit: Off |
| phone number: |
| email: |
| Year 1: |
| Year 2: |
| Year 3: |
| EMR 1: |
| EMR 2: |
| workers comp carrier: |
| wc address: |
| wc phone: |
| EMR 3: |
| osha log year 1: |
| osha log year 2: |
| osha log year 3: |
| 5: |
| 5_2: |
| 5_3: |
| fs 1: Off |
| fs 2: Off |
| fs 3: Off |
| fs 4: Off |
| vp 1: Off |
| vp 2: Off |
| vp 3: Off |
| vp 4: Off |
| pres 1: Off |
| pres 2: Off |
| pres 3: Off |
| pres 4: Off |
| safety policy: Off |
| safety plan: Off |
| haz com: Off |
| name of safety rep: |
| phone of safety rep: |
| weekly: Off |
| monthly: Off |
| never: Off |
| bi-weekly: Off |
| as req'd: Off |
| weekly 7: Off |
| monthly 7: Off |
| never 7: Off |
| bi-weekly 7: Off |
| as req'd 7: Off |
| frequency of safety inspections: |
| who performs: |
| yes1: Off |
| no1: Off |
| yes2: Off |
| no2: Off |
| yes3: Off |
| no3: Off |
| yes4: Off |
| no4: Off |
| yes5: Off |
| no5: Off |
| yes6: Off |
| no6: Off |
| yes7: Off |
| no7: Off |
| yes8: Off |
| no8: Off |
| yes9: Off |
| no9: Off |
| yes10: Off |
| no10: Off |
| yes11: Off |
| no11: Off |
| yes12: Off |
| no12: Off |
| yes13: Off |
| no13: Off |
| yes14: Off |
| no14: Off |
| yes15: Off |
| no15: Off |
| yes16: Off |
| no16: Off |
| yes17: Off |
| no17: Off |
| foremen training: Off |
| box 1: Off |
| box 2: Off |
| box 3: Off |
| box 4: Off |
| box 5: Off |
| box 6: Off |
| box 7: Off |
| box 8: Off |
| box 9: Off |
| box 10: Off |
| box 11: Off |
| box 12: Off |
| box 13: Off |
| box 14: Off |
| box 15: Off |
| box 16: Off |
| qa program: Choice2 |
| QA Date: |
| Demolition: Off |
| Earthwork: Off |
| Site Improvements: Off |
| Landscaping: Off |
| Paving and Surfacing: Off |
| Castin Place Concrete: Off |
| Precast Concrete: Off |
| Cementitious Decks: Off |
| Restoration and Cleaning: Off |
| Unit Masonry: Off |
| Stone: Off |
| Restoration: Off |
| General: Off |
| Structural Metal Framing: Off |
| Joists: Off |
| Decking: Off |
| Miscellaneous and Ornamental: Off |
| Demolition2: Off |
| Earthwork2: Off |
| Site Improvements2: Off |
| Landscaping2: Off |
| Paving and Surfacing2: Off |
| Castin Place Concrete2: Off |
| Precast Concrete2: Off |
| Cementitious Decks2: Off |
| Restoration and Cleaning2: Off |
| Unit Masonry2: Off |
| Stone2: Off |
| Restoration2: Off |
| General2: Off |
| Structural Metal Framing2: Off |
| Joists2: Off |
| Decking2: Off |
| Miscellaneous and Ornamental2: Off |
| Waterproofing: Off |
| Insulation: Off |
| Fireproofing: Off |
| Preformed Siding: Off |
| Flashing and Sheet Metal: Off |
| Roofing General: Off |
| Shingles and Roofing Tiles: Off |
| Preformed Roofing: Off |
| Membrane Roofing: Off |
| Metal Doors and Frames: Off |
| Wood and Plastic Doors: Off |
| Special Doors: Off |
| Entrances and Store Fronts: Off |
| Metal Windows: Off |
| Wood and Plastic Windows: Off |
| Special Windows: Off |
| Hardware and Specialties: Off |
| Glazing: Off |
| Lath and PlasterDrywall: Off |
| Acoustical Treatment: Off |
| Wood Flooring: Off |
| Stone and Brick Flooring: Off |
| Resilient Flooring: Off |
| Carpeting: Off |
| Waterproofing1: Off |
| Insulation1: Off |
| Fireproofing1: Off |
| Preformed Siding1: Off |
| Flashing and Sheet Metal1: Off |
| Roofing General1: Off |
| Shingles and Roofing Tiles1: Off |
| Preformed Roofing1: Off |
| Membrane Roofing1: Off |
| Metal Doors and Frames1: Off |
| Wood and Plastic Doors1: Off |
| Special Doors1: Off |
| entrances and1: Off |
| Metal Windows1: Off |
| Wood and Plastic Windows1: Off |
| Special Windows1: Off |
| Hardware and Specialties1: Off |
| Glazing1: Off |
| Lath and PlasterDrywall1: Off |
| Acoustical Treatment1: Off |
| Wood Flooring1: Off |
| Stone and Brick Flooring1: Off |
| resilient flooring1: Off |
| Carpeting1: Off |
| Cabinets and Casework: Off |
| Window Treatment: Off |
| Furniture and Accessories: Off |
| Clean Rooms: Off |
| Insulated Rooms: Off |
| Radiation Protection: Off |
| Preengineered Structures: Off |
| Liquid and Gas Storage Tanks: Off |
| IndustrialProcess Control Systems: Off |
| Fire SuppressionSupervisory Systems: Off |
| General_2: Off |
| Insulation_2: Off |
| Special Process Piping Systems: Off |
| Plumbing and Sewerage: Off |
| Fire Protection: Off |
| Power or Heat Generation: Off |
| Air Distribution: Off |
| Controls and Instrumentation: Off |
| Cabinets and Casework1: Off |
| Window Treatment1: Off |
| Furniture and Accessories1: Off |
| Clean Rooms1: Off |
| Insulated Rooms1: Off |
| Radiation Protection1: Off |
| Preengineered Structures1: Off |
| Liquid and Gas Storage Tanks1: Off |
| IndustrialProcess Control Systems1: Off |
| Fire SuppressionSupervisory Systems1: Off |
| General_2-1: Off |
| Insulation_2-1: Off |
| Special Process Piping Systems1: Off |
| Plumbing and Sewerage1: Off |
| fire protection1: Off |
| Power or Heat Generation1: Off |
| Air Distribution1: Off |
| Controls and Instrumentation1: Off |
| Rough Carpentry: Off |
| Heavy Timber Construction: Off |
| Prefabricated Structural Wood: Off |
| Finish Carpentry: Off |
| Architectural Woodwork: Off |
| Elevators: Off |
| Hoists and Cranes: Off |
| Lifts: Off |
| Material Handling Systems: Off |
| Waste Handling Equipment: Off |
| Water Supply and Treatment: Off |
| Communication Systems: Off |
| Fluid Waste Disposal and Treatment: Off |
| Laboratory Equipment: Off |
| Rough Carpentry1: Off |
| Heavy Timber Construction1: Off |
| Prefabricated Structural Wood1: Off |
| Finish Carpentry1: Off |
| Architectural Woodwork1: Off |
| Elevators1: Off |
| Hoists and Cranes1: Off |
| Lifts1: Off |
| Material Handling Systems1: Off |
| Waste Handling Equipment1: Off |
| Water Supply and Treatment1: Off |
| Communication Systems1: Off |
| Fluid Waste Disposal and Treatment1: Off |
| Laboratory Equipment1: Off |
| General_3: Off |
| Substations: Off |
| Primary Distribution: Off |
| Secondary Distribution: Off |
| Lighting: Off |
| Cathodic Protection: Off |
| Controls: Off |
| General_31: Off |
| Substations1: Off |
| Primary Distribution1: Off |
| Secondary Distribution1: Off |
| Lighting1: Off |
| Cathodic Protection1: Off |
| Controls1: Off |
| Painting: Off |
| Wall Covering: Off |
| Painting1: Off |
| Wall Covering1: Off |
File details come from the government source that posted it. Updated .