RFP2613_Addendum_1__CT3TelecomAsBuilt__Site_Plan.pdf

PDF 2 MB Posted

Attached to
Cruise Terminal 3 West Parking Garage Design Build
Solicitation number
RFP-26-13
Issued by
Florida

About this file

This is an addendum to a Request for Proposals (RFP 26-13) issued by the Canaveral Port Authority for the Design-Build construction of the Cruise Terminal 3 West Parking Garage at Port Canaveral, Florida. The addendum consists of a site plan document titled "Partial Communications Site Plan - Structured Cabling" (Sheet T100.1, Revision 8, dated June 4, 2019) that illustrates the telecommunications and structured cabling infrastructure for the project located at 200 Christopher Columbus Drive, Cape Canaveral, Florida 32920. The document includes design specifications prepared by multiple professional firms: Bermello Ajamil & Partners, Inc. serving as the architectural and structural/MEP engineer; a civil engineer located in Orlando, Florida; a surveying data consultant in Pensacola, Florida; a geotechnical consultant in Orlando, Florida; and a security consultant in Orlando, Florida. The site plan identifies the limit of work, curb conditions, and emergency vehicle access routes relevant to the parking garage construction. The drawing references numerous Requests for Information (RFIs) managed through the project management platform Procore, indicating ongoing design clarifications and coordination throughout the permitting phase.

The addendum provides technical documentation necessary for bidders to understand the project's telecommunications infrastructure requirements and site-specific conditions. The site plan designation as "Permit Set" indicates this document was prepared for regulatory approval and permitting purposes. No specific pricing information, funding amounts, or contract terms are detailed within this addendum; rather, it serves as a supporting exhibit to clarify site conditions and design requirements that proposers must incorporate into their Design-Build proposals. Bidders are required to review this addendum in conjunction with the primary RFP documents to ensure comprehensive understanding of all project requirements, including communications systems design and structured cabling installations as part of the overall parking garage construction scope.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

E M

E R

G E

N C

Y

V

E H

I C

L E

S

O

N L

Y

FL

US

H

CU

RB

TRANSITION

RA

IS

ED

C

UR

B

FLUSH CURB FLUSH CURB

LIMIT OF WORK

SHEET NO.

PROJECT ADDRESS:

STRUCTURAL & MEP ENGINEER:

PROJECT NAME:

SHEET NAME

BA, INC. PROJECT NUMBER:

T: (305) 859-2050 F: (305) 860-3700

2601 SOUTH BAYSHORE DRIVE,

SUITE 1000, MIAMI, FL 33133

DATE:

CIVIL ENGINEER:

17063.00

D E

S I G

N

P

R O

P E

R T

Y

O

F

A

N D

C

O P

Y R

I G

H T

B

E R

M E

L L

O

A

J A

M I L

P

A R

T N

E R

S

I N

C

ARCHITECTURE:

T: (407) 422-1118 F: (407) 841-9149

605 EAST ROBINSON STREET,

SUITE 210, ORLANDO, FL 32801

T: (407) 893-5800 F: (407) 648-2128

301 EAST PINE STREET,

SUITE 350, ORLANDO, FL 32801

1605 CHASE HAMMOCK ROAD,

MERRITT ISLAND, FLORIDA 32953

T: (321) 454-6310

SURVEYING

DATA CONSULTANT

410 WEST NINE MILE ROAD, SUITE A

PENSACOLA, FLORIDA 32534

T (850) 469-0405 x306

8008 S. ORANGE AVENUE,

ORLANDO, FL 32809

T: (407) 855-3860

GEOTECHNICAL CONSULTANT

PORT CANAVERAL

TERMINAL 3

01.04.2019

200 Christopher Columbus Dr, Cape

Canaveral, FL 32920

PERMIT SET

SECURITY CONSULTANT

255 S. ORANGE AVENUE, SUITE 1600

ORLANDO, FLORIDA 32801

T (407) 841-9050

REVISION SCHEDULE

REV. # DESCRIPTION DATE

T100.1

PARTIAL COMMUNICATIONS SITE

PLAN - STRUCTURED CABLING

8 REVISION 8 06/04/19

RFI 21901-389

RFI 21901-086

RFI 21901-183

RFI 21901-102

RFI 21901-348RFI 21901-748

RFI 21901-264

RFI 21901-527 RFI 21901-373R1

RFI 21901-373RFI 21901-642

RFI 21901-379

jerem Pen

IO

jerem Pen

BG

https://app.procore.com//736904/project/rfi/show/6492173 https://app.procore.com//736904/project/rfi/show/5538215 https://app.procore.com//736904/project/rfi/show/5597264 https://app.procore.com//736904/project/rfi/show/5295811 https://app.procore.com//736904/project/rfi/show/6425696 https://app.procore.com//736904/project/rfi/show/8072081 https://app.procore.com//736904/project/rfi/show/6249122 https://app.procore.com//736904/project/rfi/show/7128488 https://app.procore.com//736904/project/rfi/show/6812757 https://app.procore.com//736904/project/rfi/show/6713341 https://app.procore.com//736904/project/rfi/show/7653597 https://app.procore.com//736904/project/rfi/show/6731734 https://app.procore.com/736904/project/drawing_areas/494858/drawing_log/74119356

File details come from the government source that posted it. Updated .