Appendix_A__Potable_Water.pdf
PDF 391 KB Posted
- Solicitation number
- RFP-26-13
- Issued by
- Florida
About this file
This document is the Appendix A Technical Provisions and Standard Details for potable and reclaimed water infrastructure projects under the City of Cocoa Utilities Department in Florida. The scope of work encompasses the complete installation of potable water and reclaimed water mains and appurtenances in accordance with the City's Technical Provisions, Standard Details, and approved plans. Contractors must furnish all labor, materials, tools, and equipment necessary for construction; obtain and pay for all permits, inspections, and official fees; arrange a mandatory pre-construction conference with the Engineering Inspection Division; schedule materials inspections, pressure/leakage tests, and final inspections; and provide comprehensive documentation including As-Built Drawings, Bills of Sale, and Easements. The specification requires compliance with American Water Works Association (AWWA) standards and includes detailed requirements for pipe materials (PVC, Ductile Iron, and High Density Polyethylene), valves, backflow preventers, fittings, fire hydrants, and service connections ranging from 0.75" to 2" in diameter.
The technical provisions establish mandatory specifications for all materials and components, with an extensive approved materials list identifying specific manufacturers and part numbers for compliance. Testing requirements are rigorous and include hydrostatic pressure testing at 150 psi, leakage testing with allowable loss calculations based on pipe size and diameter, flushing and swabbing with specialized pigs at defined flow rates, and bacteriological testing requiring two consecutive days of satisfactory results for potable water mains. Disinfection procedures must follow AWWA C651 specifications using 50 ppm chlorine concentration maintained for twenty-four hours, with the contractor bearing all testing fees. Connection procedures to existing systems require temporary jumper assemblies with approved backflow preventers, and all tapping and linestops must be performed by City-approved contractors with specified equipment and disinfection procedures. The City charges fees established by City Council resolution, which are subject to change without notice, and contractors are responsible for all restoration, debris removal, and property protection throughout the project duration.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
1. WATER – POTABLE AND RECLAIMED
June 1, 2017
1.1 SCOPE OF WORK
1.1.1 GENERAL
All potable water and reclaimed water mains and appurtenances must be installed in accordance with the City of Cocoa Utilities Department's Technical Provisions and Standard Details, the City of Cocoa Utilities Department Utilities Handbook and the approved plans, for the Construction of the Water Distribution System and the Water Reclamation System.
Contractor requirements include:
Furnishing all labor, materials, tools and equipment necessary or incidental tothe construction.
Obtaining and paying for all permits, inspections, and other official fees in connection with the work.
Arranging a pre-construction conference with the Engineering Inspection Division. All fees must be paid prior to pre-construction meeting. It is required that the pre-construction meeting be held prior to ordering materials.
Scheduling materials inspection (24 hours notice), open ditch inspection, pressure/leakage test, and final inspection.
Provide all documents per the project requirement letter, including but not limited to As Built Drawings, Bills of Sale, Easements, etc.
Any deviation from these requirements must be approved in writing by the UtilitiesDirector or his designee prior to commencement of construction.
Fees charged by the City are set by City Council by resolution and are listed on the appendix "Water Service Rates and Charges" made a part of the Utilities Handbook. Fees are subjectto change without notice. The most current fees will becharged.
The Utilities Department and Engineering Division are located at 351 Shearer Blvd., Cocoa, Florida, 32922. The Dispatch telephone number is (321) 433-8718; facsimile number is(321) 433-8708.
1.1.2 DEFINITIONS
The term "approved equal" is used to mean a part or item that has been approved in writing by the Technical Provision and Standard Details Advisory Committee or the Utilities Director. A written request must be made in order to have an item accepted as an approved equal. Written specifications on the part or item must be furnished with therequest.
Approved Tapping/Linestop Contractor - A Contractor who has been approved by the Engineering Division to perform taps or linestops within the Cocoa Water System. Some contractors are only allowed to perform .75” – 2.00” taps for themselves on their on Projects, they may not perform taps for anybody else.
Backflow Preventer Assembly - A Backflow assembly is an approved, testable assembly composed of two independently acting, approved check valves, including tightly closing resilient seated shutoff valves attached at each end of the assembly and fitted with properly located resilient seated test cocks.
Bonafide Tapping Contractor - Means the Contractor is in the business of doing taps or line stops.
Canal - A trench, the bottom of which is normally covered by water, with the upper edges of its two sides normally above water.
City - Means the City of Cocoa.
Collection Mains – Wastewater gravity mains.
Competent Person - A person who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
Distribution Main – Any water twelve inches (12”) and smaller.
Domestic - Means made or manufactured in the USA.
Drainage Ditch or Irrigation Ditch - A man-made trench which is dug for the purpose of draining water from the land or for transporting water for use on the land and which is not built for navigational purposes.
Force Main – Wastewater main under pressure.
Manual - City of Cocoa Utilities Technical Specification and Standard DetailsManual
Normal Working Day - Monday through Friday, excluding CITY holidays.
Normal Working Hours - Hours are between the hours of 8:00 a.m. to 5:00 p.m. of aNORMAL
WORKING DAY.
Passivated – Treated orcoated metal to reduce the chemical reactivity of its surface.
Stainless Steel - A steel alloy with a minimum of 10.5% to 11% chromium.
Substantial Completion - The point when the construction project has been finished to the point that the City of Cocoa can use the project for the purpose it was intended.
Swale - A man-made trench which:
A. Has a top width-to-depth ratio of the cross-section equal to or greater than 6:1, or side slopes equal to or greater than three feet horizontal to one foot vertical;
B. Contains contiguous areas of standing or flowing water only following arainfall event;
C. Is planted with or has stabilized vegetation suitable for soil stabilization, stormwater treatment, and nutrient uptake;
D. Is designed to take into account the soil erodibility, soil percolation, slope, slope length, and drainage area so as to prevent erosion and reduce pollutant concentration of any discharge.
Technical Provision and Standard Details Committee - Committee whose members shall consist of the manager, or their designee, of the following UTILITIES divisions: Engineering, Inspections, WFO, Wastewater. The committee evaluates and proposes revisions for the design standards, specifications, drawings, products and procedures for the TPSD.
Transmission Main – Any water main sixteen inch (16”) and larger. Fourteen inch (14”) pipelines are not acceptable.
Utilities - Utilities Department of the City of Cocoa, Cocoa, Florida, and/or its designated representative(s).
Whenever a specification from a specific source is cited, the most current revision of that specification will be used. The word "shall" is mandatory, and the word "may" is permissive.
Unless otherwise specified, "City" means City of Cocoa; "Utilities Department" means City of Cocoa Utilities Department; "Engineering Division" means City of Cocoa Utilities Department, Engineering Division, “Inspections” means City of Cocoa Engineering Inspections Division.
1.1.3 ABBREVIATIONS
American Association of State Highway and Transportation Officials - AASHTO Asbestos Cement - AC Association of PVC Pipe Manufacturers - Uni-Bell American National Standards Institute - ANSI American Society of Civil Engineers - ASCE American Society of Mechanical Engineers - ASME American Society for Testing and Materials - ASTM American Water Works Association - AWWA American Water Works Association Tapered Thread - CC American Society of Sanitary Engineers - ASSE Automatic Transfer Switch - ATS City of Cocoa - CoC Copper Clad Steel - CCS Copper Development Association - CDA Dimension Ratio - DR Double Check Detector Assemblies - DCDA Dry Film Thickness - DFT Ductile Iron Pipe Research Association - DIPRA Ductile Iron Pipe - DIP Engineer of Record - EOR Florida Administrative Code - FAC Florida Department of Environmental Protection - FDEP Florida Department of Transportation - FDOT
Florida East Coast Rail Road - FECRR Foundation for Cross-Connection Control and Hydraulic Research - FCCCHR Flange - Fl Factory Mutual - FM Horizontal Directional Drilling - HDD Jack and Bore - J&B Maintenance of Traffic - MOT Manual On Uniform Traffic Control Devices - MUTCD National Association of Corrosion Engineers - NACE National Fire Protection Association - NFPA National Sanitation Foundation - NSF National Standard Thread - NST Non-rising stem - NRS Original Equipment Manufacturer - OEM Outside Screw and Yoke - OS&Y National Pollution Discharge Elimination System - NPDES
Polyvinylchloride - PVC Portable Changeable Message Signs - PCMS Precautionary Boil Water Notice - PBWN Project Manager - PM Pounds per Square Inch - PSI Raised Pavement Marker - RPM Reduced Pressure Zone Assembly - RPZ Reinforced Concrete Pipe - RCP Stainless Steel - SS Technical Provision and Standard Details - TPSD Traffic Control Plan - TCP Underwriters Laboratories - UL Unified Numbering System - UNS Utilities Department - UD Variable Frequency Drive - VFD
1.2 MATERIAL SPECIFICATIONS
1.2.1 PIPE
1.2.1.1 Polyvinyl Chloride Pressure Pipe, 4"-12"
Polyvinyl chloride pressure pipe (sizes 4" through 12") will be cast iron pipe equivalent outside diameter Class 235 (DR 18) conforming to the American Water Works Association's (AWWA) specification C900 and will be blue or white in color.
Pipe will be in standard 20-foot lengths. All joints will be of the elastomeric-gasket type with thickened, integral solid-wall bell or coupling with the same DR as the barrel. All PVC pipe and couplings will bear the UL label and NSF approval for potable water.
1.2.1.2 Fusible Polyvinyl Chloride Pipe, 4” thru 12"
Polyvinyl chloride pressure pipe (size 4" through 12”) will be cast iron pipe equivalent outside diameter and a pressure rating of 235 p.s.i. (DR 18)conforming to AWWA specification C900 and will be blue or white in color. Fusible PVC pipe shall be supplied by Underground Solutions, Inc. It shall be installed in accordance with the suppliers’ specifications. All PVC pipe will bear the UL label and NSF approval for potable water.
1.2.1.3 Ductile Iron Pipe
Ductile iron pipe will be cement-lined pressure Class 350 for 12-inch diameter and smaller and Class 250 for 14-inch and larger conforming to AWWA specification C151. Water main and storm drain crossing conflicts will be properly designed by the project engineer and approved by the Utilities Department prior to installation. Water mains that are less than 10 feet apart from building foundations or other permanent objects will be ductile iron pipe. In no case will water mains be located less than 5 feet from foundations. The above distanceswill be doubled for water mains larger than 8" in diameter. Polyethylene sleeve conforming to AWWA specification C105 will be provided for all installations. The polyethylene sleeve will be sealed with tape, and shall be blue for water mains.
1.2.1.4 High Density Polyethylene (HDPE) Pipe
HDPE pipe is generally not accepted in the City of Cocoa water system, except asa carrier pipe for a pressurized utility main.
1.2.1.5 Reclaimed Water
PVC pipe installed in reclaimed water systems will be Class 235 (DR 18) conforming to AWWA specification C900 and will be purple in color. Ductile iron pipe installed in the reclaimed water system will be pressure Class 350 for 12" and smaller and pressure Class 250 for 14" and larger, provided 3 feet of cover can be maintained.
Where cover is less than 3 feet, pressure Class 350 is required. Polyethylenesleeve conforming to AWWA specification C105 will be provided for all installations. The polyethylene sleeve will be sealed with tape, and shall be purple for reclaimed water mains.
1.2.2 VALVES, VALVE BOXES AND VALVE EXTENSIONS
1.2.2.1 Resilient Seat Gate Valves, 4"- 36"
Resilient seat gate valves will have mechanical joint ends as manufactured by American Flow Control; AVK; M&H; U.S. Pipe; Clow; Mueller or an approved equal. The resilient seat gate valves must conform to AWWA specification C509 or C515 and be manufactured in the U.S.A. Resilient seats will be of natural or synthetic rubber and be fully encapsulated to gate. Valves will have 18-8 Type 304 Stainless Steel bolts and nuts. The interior and exterior of the valve body will be fusion bonded epoxy coated in accordance with AWWA specification C550 inorder to provide a corrosion-resistant seat. The coating must be applied in a manner to withstand the action of line fluids and operation of the sealing gate under long-term service. Valve seats must seal by compression only. Wedging or sliding of the resilient seat is not acceptable. Valves will be supplied with 2"-square operating nuts and be designed to provide a bubble tight seal regardless of direction of flow.
Opening the valve will be in the counterclockwise direction. Valves 16” and larger will have Bevel Gear Operators. For gate valves 16” and larger to be stood up straight, the 2” operating nut must have 12” of cover. Engineer of Record or Contractor must demonstrate the 12” of cover over the 2” operating nut can be achieved by showing all pertinent dimensions. Tapping valves shall have a centering ring.
1.2.2.2 Butterfly Valves, 16" and larger
Butterfly valves shall be used for above ground service. Butterfly valves shall have flanged ends, be rubber seated, 90o tight closing type, short body. The interior and exterior will be fusion bonded epoxy coated in accordance with AWWA specification C550. The valve shaft will be of 316 Stainless Steel. Body dimensions and minimum shaft diameter will be in accordance with Tables 3 and 4 of AWWA specification C504. The valve seat will be of molded natural or synthetic rubber, will be mechanically secured to the disc or to the valve body, and will mateagainst a stainless steel seat surface. The gear ratio will be such as to require not more than 50 foot pounds of input torque to operate the valve against the worst case of a water flow velocity of 10 feet per second at a pressure of 100 psi differential. A torque-limiting device will be supplied if the allowable operator input is less than
450 foot pounds. Butterfly valves will have a factory installed handwheel. The valve will open when the operator nut is turned counterclockwise. Butterflyvalves will not be used for buried service.
1.2.2.3 Valves, 2"
Two-inch valves for use with the 2" blow-off gate valve will be rated at 125 SWP or 200 WOG. All 2" gate valves must meet all EPA and DEP requirements regarding lead and zinc contents. Brass fittingsand 2" brass wheel valves are shall be used on blow-offs. All valves must be manufactured in the U.S.A.
1.2.2.4 Valve Boxes
Valve boxes and lids must be manufactured in the U.S.A. Boxes and lids must be structurally equal to those produced by East Jordan Iron Works or Tyler and must have 5-1/4" minimum inside diameter. Cast iron valve boxes will consist of a circular cast iron top and bottom section. The depth must be determined and the appropriate valve box must be installed. No PVC or Ductile is permitted in the valve box. Boxes must be set flush with finished ground surface in such a manner as to permit easy use of a valve wrench and to prevent surface loads from being transmitted to the valve or pipe. Box sections must be telescopic and adjustable.
Valve box lids should have the word "WATER" or "SEWER" or "REUSE", as appropriate, cast on the top. A concrete pad (24" L x 24" W x 4" D) will be poured around all boxes at finished grade level unless the valve is located in a paved roadway or parking lot.
1.2.2.5 Valve Extensions
If the depth of the valve nut is greater than 48" below grade, or 30" below grade and under the water table, a valve extension stem will be required. The extension will have a centering collar and will be mechanically attached to the valve operating nut, such as extensions manufactured by the General Engineering Company, Model #4840-0001-3, or an approved equal to be determined by the Engineering Supervisor or his/her designee.
1.2.2.6 Valve Box Debris Shield
All buried valves 4-inch through 12-inch requiring a valve box shall be furnished with a valve box shield (alignment device). The device shall minimize debris infiltration and center the valve box over the operating nut. The device shall be of HDPE or plastic and colored white or black. It shall be furnished in two pieces that will lock together under the operating nut without requiring the removal of the operating nut. The device shall not affect the operation of the valve. No one-piece device will be accepted. The device shall be Box Lok, American or approved equal.
1.2.2.7 Insert Valve Specification
The Insert Valve shall conform to thefollowing:
The Ductile Iron 250 p.s.i.g. Insert Valve shall be a Resilient Wedge Gate Valve designed for use in potable water, raw water, reclaimed water, wastewater and backflow control systems. The host pipe shall not be a permanent component of the Insert Valve. The ductile iron body, bonnet and wedge provide strength and a pressure rating that meets or exceeds the requirements of AWWA C515. Insert Valve shall be ductile iron construction meeting ASTM A536 Grade 65-45-12.Sizes 12" and smaller must be capable of working on Cast/Grey Iron or Ductile Iron Class A, B, C and D, IPS PVC, C900 and C909 PVC, Steel, AC pipe diameters without changing either top or bottom portion of split valve body. The Insert Valve shall have a 250 psig maximum working pressure. The pressure rating markings must be cast into the body of the insert valve. The construction of the Resilient Wedge shall comply with AWWA C509 requirements. The ductile iron wedge shall be fully encapsulated with EPDM rubber by a high pressure and high temperature compression or injection mold process. The resilient wedge shall seat on the valve body and not the pipe to obtain the optimum seating and flow control results. The resilient wedge shall be totally independent of the carrier pipe. The resilient wedge shall not come into contact with the carrier pipe or depend on the carrier pipe to create a seal. The Resilient wedge must ride inside the body channels to maintain wedge alignment throughout its travel. The insert valve is fully epoxy coated on the interior and the exterior. Valve shall be coated with a minimum of 10 mils epoxy in compliance with AWWA C550 and certified to ANSI/NSF-61.The stuffing box, operating stem and resilient wedge (complete bonnet and all moving parts) shall be removable, repairable and or replaceable underpressure.
See Appendix “A” Approved Materials for approved Insert gate valves.
1.2.3 BACKFLOW PREVENTERS
1.2.3.1 Fireline Check Valves
Check valves for fire line systems will be the Double Check Detector Assemblies (DCDA) manufactured by Febco, Watts, Ames, Apollo or Wilkins, in accordance with AWWA specification C510, ASSE 1048, UL 1469. Check valves must have bronze seats. DCDA must be supplied with a ¾-inch by-pass assembly. DCDA will be accepted as a complete approved assembly in accordance with the section on "Cross-Connection Control and Backflow Prevention" in the Utilities Handbook.
The Utilities Department will inspect the interior of the DCDA prior to installation.
DCDA must be installed horizontally above ground in a grassed or non-traffic area.
The DCDA will be installed with 24" minimum and 30” maximum clearance from finished grade. “N” shaped DCDA will be accepted on a case-by-case basis. Fire
Page lines requiring an RPZ will be handled on a case by case base. The Utilities Department shall paint the DCDA, to be paid for by the Developer/Contractor.
1.2.3.2 Meter Station Backflow Preventer
Backflow Preventers for the large meter stations are a Reduced Pressure Zone Assembly and manufactured in accordance with AWWA C-511. The assembly will be installed so as the relief valve opening will be a minimum of 12” above concrete slab. If the meter station is in a planter, the top of the planter is considered the flood rim and the relief valve opening shall be 12” above the flood plain rim. The Utilities Department shall paint the meter station assembly, to be paid for by the Developer/Contractor.
1.2.3.3 Backflow Preventer Certification Test
The Contractor will provide test certifications on the jumper backflowpreventer before jumper is placed into service. Backflow preventers on fire-line and meter stations will have test certifications submitted and approved prior to final inspection.
1.2.4 FITTINGS
All fittings must be of the mechanical joint type with an approved joint restraint, or push-on joint with a gasket joint field restraint system, such as "Field Lok" as manufactured by U.S. Pipe or an approved equal. All fittings must be manufactured in the U.S.A.
1.2.4.1 Cast Iron
Cast iron fittings will be AWWA specification C110; Class 250, cement lined with inside seal coating. The fittings will be bituminous coated on the outside and be wrapped with 6 mil polyethylene (sealed with tape).
1.2.4.2 Ductile Iron, 4"-16"
Ductile iron compact fittings (sizes 4" through 16") must conform to AWWA specification C153. Ductile iron compact fittings will be mechanical joint withan interior cement lining with seal coating and an exterior bituminous coating. All fittings will be wrapped with 6 mils polyethylene (sealed withtape).
1.2.4.3 Bolts
All buried mechanical joint bolts and nuts must be CORTEN Steel. All above ground bolts and nuts for flanged fittings must be 18-8 Type 304 stainless steel. Never-seize/Anti-seize shall be applied to all SS bolts and nuts.
Page
1.2.4.4 Tapping Sleeve
Tapping sleeves on mains 4" to 12" in diameter will be ductile ironbody mechanical joint type or All Stainless Steel Sleeve.
The All Stainless Steel Sleeve shall be fabricated from 304 Stainless Steel. They shall have a pass through bolt design and full circumferential gasket to provide 360° seal around the pipe. The tapping sleeve is to be fully passivated to return the stainless steel to its highest corrosion resistance stage.
Sleeves on mains 16" to 24" in diameter will be fabricated steel with O-ring seal, fusion bonded, epoxy coated with 304 stainless steel nuts and bolts or M.J. ductile iron body. Sleeves on mains larger than 24” will be handled on a case-by-case basis.
Tapping Sleeves for reinforced concrete mains will be handled on a case-by-case basis. The sleeves will have a fusion bonded epoxy coating on the entire body and throat assembly. The straps and bolts shall be 18-8 Type 304 stainlesssteel.
The tapping valve must have centering ring and conform to Section 2.2.1 -Resilient Seat Gate Valves in these Technical Provisions.
Tapping saddles to be placed on asbestos concrete (AC) pipe shall be a JCM 432 All Stainless Steel Sleeve or equal.
1.2.4.5 Line Stop Sleeve Specifications
Sizes 4” through 12”
Sleeve/Body
The entire Line Stop sleeve shall be fabricated from 304 Stainless Steel. They shall have a pass through bolt design and provide 360° seal around the pipe. The line stop sleeve is to be fully passivated to return the stainless steel to its highest corrosion resistance stage. Outlet on sleeve will be full port, ie. on 8” sleeve, outlet will be 8”, on 6” sleeve, outlet will be 6”.
Bolts, Nuts & Washers
18-8 Type 304 Stainless Steel, the bolts shall be track head type and furnished with permanently lubricated heavy-hex nuts and stainless washers.
Gasket
The full circumferential gasket shall be molded of synthetic rubber compounded for use with water salt solutions, mild acids, bases and sewage. The gasket shall have a gridded surface, be a full 1/4" thick with 304 stainless steel bridgeplates
Page molded flush into the gasket and have a raised hydromechanical outlet seal toseal against line surges and water hammer.
Pressure Rating
The sleeves shall be rated at 150 PSI hydrostatic with a test pressure of 200 PSI on pipe with a full circumferential break.
Line Stop Sleeves shall be JCM 440 Line Stop Sleeve or approved equal.
1.2.5 FIRE HYDRANTS
Fire hydrants must be manufactured in accordance with AWWA specification C502. Hydrants must have bronze-to-bronze main seat threading surfaces. They will be traffic type with drain holes plugged at the factory. Fire hydrants will have 18-8 Type 304 Stainless Steel bolts and nuts (bonnet, traffic flange and shoe).
Hydrants will have a minimum 5-1/4" main valve opening, with one 4-1/2" pumper nozzle, and two 2-1/2" hose nozzles. Nozzles to have NST threads. Stem couplings are to be cast iron or stainless steel. The upper valve plate must be bronze. The hydrant shoe will be coated inside with fusion bonded epoxy, 6 mil minimum. All hydrants will be painted at the factory with Rustoleum high-performance epoxy 9100 system, non-lead, dry film thickness 5 to 8 mils,color #9143 Yellow. City crews will apply finish paint to each new fire hydrant after the Contractor has paid the appropriate fees.
Finish grade is to be established and the proper length hydrant installed be installed by the Contractor prior to acceptance by the City. All nozzles will be a minimum of 18" and a maximum of 24" above finished grade. A 6" mechanical joint hydrant connection will be provided using a hydrant valve-anchoring tee with integrally cast standard mechanical joint gland on 6" plainend branch. The Contractor will not be allowed to install risers on hydrants. At final inspection, if it is determined that a fire hydrant is not at grade, the Contractor shall purchase a proper length hydrant and install it under the direction of Utilities InspectionDepartment.
1.2.6 SERVICE CONNECTIONS, 3/4"-2"
All service connections will be single connections. Services that are 3/4" and 1" are to be type K annealed temper soft copper. All connections are to be of the flare type. 1-1/2" and 2" services are to be of type K drawn temper in straight lengths or annealed temper if furnished in coils.
Absolutely no lead-based solder joints will be accepted. Any repairs of service lines will be by flare-to-flare coupling. No compression fittings will be accepted. Taps in the pipe will be the same nominal diameter as the service line. Service taps in PVC pipe will be drilled with a shellcutter designed to cut PVC pipe, the PVC plug will beremoved.
Page
On January 4, 2014 the following specifications will be in effect for all brass fittings in contact with potable water.
Brass goods furnished under this specification shall be new and unused. All fittings shall conform to ANSI/AWWA Standard C800, latest revision.
All brass components in contact with potable water must be made from either CDA/UNS Brass Alloys C89520 or C89833 with a maximum lead content of .25% by weight. Brass alloys not listed in ANSI/AWWA C800 Paragraph 4.1.2 are not approved. All service fittings shall be certified as suitable for contact with drinking water by an ANSI accredited organization in accordance with ANSI/NSF Standard 61. All fittings shall be stamped or embossed with a mark or name indicating that the product is manufactured from the low-lead alloy as specified above.
Brass saddles shall be made from CDA/UNS C83600 and are exempt from the “no lead” requirement.
1.2.6.1 Saddles
Saddles must be used for all connections to PVC, AC and D.I. pipe. Saddles mustbe all brass with “CC” threads as manufactured by Mueller Company, Ford Meter Box Company, or Smith-Blair Company. The pipe sizes for these manufacturers are noted below:
MUELLER: For pipe sizes 4" to 12", for 3/4" and 1" services, the single strap design must be used. For 1-1/2" and 2" services, the double strap design must beused.
FORD: For pipe sizes 4" to 12", for 3/4" and 1" services, the style 101B single strap design must be used. For 1-1/2" and 2" services, the style 202B double strap design must be used. For pipe sizes 16" and larger, for 3/4", 1", 1-1/2," and 2" services, the style 202B double strap design must beused.
SMITH-BLAIR: For pipe sizes 4" to 12", for 3/4" and 1" services, the 321 series single strap design must be used. For pipe sizes 4" and larger, for 1-1/2" and 2" services, the 323 series double strap design must beused.
An approved equal may be used in lieu of any of the above-listeddesigns/models.
1.2.6.2 Curb Stops, 3/4" - 2"
Curb stops 3/4" and 1" in size will be Flare-by-Meter Coupling. Curb stops must have locking wings and a swivel meter nut. Curb stops that are 1-1/2" or 2" will be flare-by-flange with locking wing or an approved equal. All curb stops shall be centered in the meter box and installed in a horizontalposition.
Page
1.2.6.3 Corporation Stops, 3/4" - 2"
All corporation stops for water service ¾” thru 2” will be brass and have “CC” inlet threads and copper flare outlet. 2” Corporation stops for “jumpers” will be “CC”-by- F.I.P.
1.2.6.4 Meter Boxes
Meter boxes are to be plastic with an iron flipper lid with a full pin hinge, Service locations will be permanently cut and painted on concrete curb or the street with a blue "W" for potable water or a purple "R" for reclaimed. Reclaimed services will be located at the opposite lot corner from water services where practical or with five feet minimum separation.
For larger 1-1/2 and 2-inch meters, 17” x 30” meter boxes shall be used.
For areas that are anticipated for high traffic areas, a traffic rate H-20 meter box shall be used. Reclaimed Water services will be set in purple meter boxes per section 2.6.4 above. They are also required to have a 3" x 5" permanent plastictag, secured to the curb stop with a nylon tie wrap, will be supplied. Tags will be inscribed, "RECLAIMED WATER DO NOT DRINK". Brass fittings used for Reclaimed Water are exempt from the “no lead” requirement.
1.3 PROTECTION OF PROPERTY AND OBSTRUCTIONS
1.3.1 PROTECTION
Temporary supports and/or adequate protection and maintenance must be provided on all underground and surface structures encountered in the progress of the work. Structures that have been disturbed will be restored to a condition equal to their original state upon completion of the work.
1.3.2 OBSTRUCTIONS
All utility owners must be notified prior to beginning construction. Any known obstructions will be shown on the plans. The utmost caution will be taken in all operations to avoid damage to existing obstructions whether or not shown on the plans. Damage to other utilities will be at the Contractors expense.
If the contractor encounters any unforeseen obstructions during construction, he shall immediately cease work in that area and notify the project engineer. The project engineer shall design and provide detailed drawings to correct the situation. The drawings shall be submitted
Page to the Engineering Division for approval. After approval by the Engineering Division a set of approved drawings will be given to the contractor and they may resumework.
1.3.3 EXISTING ASBESTOS CEMENT WATERMAINS
In areas where existing asbestos cement water mains are existing, water main relocations or replacements may be necessary. If new construction of facilities is over, under, or near asbestos cement water mains, it shall require that the asbestos cement water main be changed out to poly vinyl chloride pipe or ductile iron pipe. New pipe material shall depend upon the type and location of the facilities being constructed. The Developers Engineer shall design the replacement and submit it for the Utilities Department approval. The Developer is responsible for all design, materials, labor, equipment, testing, and costs for the replacement. Contractor shall remove and dispose of AC pipe in accordance with FAC Codes 62-204.800 and62-257.
1.4 TRENCH PREPARATION
1.4.1 EXCAVATION
A trench will be opened so that the pipe can be installed to the alignment and depth required.
It will be excavated only so far in advance of pipe placement as necessary. The trench will be excavated to the depth required so as to provide a uniform and continuous bearing support for the pipe or undisturbed ground. Bell holes will be provided at each joint to permit jointing to be made and inspected properly.
During excavation, if ashes, cinders, muck or other organic material considered unsuitable uncovered at the bottom of the trench at sub-grade, it will be removed and backfilled with approved material. This material will be compacted in layers to provide a uniform and continuous bearing characteristic of that area's soil condition. Where the bottom of the trench at sub-grade consists of unstable material to such a degree that it cannot be removed and replaced with an approved material to support the pipe properly, a suitable foundation must be constructed. Excavated material will be piled in such a manner that it will not endanger work or obstruct natural watercourses, sidewalks or driveways. Fire hydrants under pressure, valve boxes, or other utility controls will be left unobstructed and accessible at all times. Gutters will be kept clear or other satisfactory provisions will be made for streetdrainage.
1.4.2 SHORING AND BRACING
Open cut trenches must be sloped, shored or braced as required by all governing State law, municipal ordinances, OSHA Standards, and as may be necessary to protect life, property,or the work. Trench bracing may be removed after backfilling has been completed or has been
Page brought up to such an elevation as to permit its safe removal. The use of a trenching box may be used in place of sheeting and bracing where appropriate. Contractor is required to have a Competent Person designated and in charge at all times while workers are in thetrench.
1.4.3 DE-WATERING
Excess water must not be allowed in the trench at any time. An adequate supply of well points, headers or pumps, all in first-class operating condition, may be used to remove the water. The use of gravel and pumps will also be an acceptable means of removing the water. The trench will be excavated no more than the available pumping facilities are capable of de-watering.
Discharge from pumps will be accommodated in accordance with the St. Johns River Water Management District's requirements. The Contractor is responsible for obtaining all de-watering permits such as NPDES permit.
1.5 PIPE LINE CONSTRUCTION
1.5.1 GENERAL
All water mains, service lines and appurtenances must be installed as specified on the approved plans and in accordance with the Standard Detail Sheet. Installation will conform to AWWA specification C600 except as modified herein.
Domestic water service can only come from a Distribution main. When water service is requested and the only water main available is a Transmission main, a large tap and section of pipe shall be installed on the Transmission Main for the water service.
The minimum size tap on a Transmission Main shall be a six (6) inch.
1.5.2 MATERIAL HANDLING
1.5.2.1 Precautions
Every precaution will be taken to prevent injury to pipe and piping materials during transportation and delivery to the work site. Under no condition will pipe be dropped, bumped, dragged or picked up by inserting forks into end of pipe.
Pipe lifted by placing forks into pipe shall be removed from jobsite.
1.5.2.2 Damaged Materials
If in the process of transportation, unloading or handling, any pipe or fittingis damaged, it will be rejected and removed from the site.
Page
1.5.2.3 Storage
Pipe fittings and specials will be stored in a manner which will assurethe protection of the material from damage and which will keep it clean.
1.5.3 INSPECTION OF MATERIALS
Materials delivered to the job site will be subject to inspection by the Utilities Inspection Department prior to installation. Contractor shall notify Inspections 24 hours in advance. All materials found to be defective or not meeting specifications during inspection or during the progress of the work will be rejected and removed from the job site without delay. All materials delivered to the job site will be in accordance with the materials specifications. Materials not inspected by the Utilities Department prior to installation will be uncovered by the Contractor at his/her expense to verify compliance with these specifications. The Contractor will furnish copies of the packing list(s) for materials upondemand.
1.5.4 PIPE PLACEMENT
The bottom of the trench will not be excavated below the specified grade. If undercutting occurs, the bottom of the trench will be brought up to the original grade with approved material and thoroughly compacted, as directed by the Utilities Department. Before placing pipe into the trench, the outside of the spigot and the inside of the bell will be wiped clean, dry, and free from oil and grease. Every precaution will be taken to prevent foreign material from entering the pipe. During placement operation, no debris, tools, clothing or other material will be placed in the pipe.
All mechanical joints will be made up in strict accordance with the manufacturer's specifications. Beveled ends will be removed from PVC pipe entering a mechanical joint. The bell will be carefully cleaned before the gasket is inserted. Gaskets must be evenly seated, the gland placed in position with the bolts, and evenly tightened. All slip joints will be made up in strict accordance with the manufacturer's specifications.
After placing a length of pipe in the trench, the spigot end will be centered in the bell, the pipe forced home, brought to correct alignment, and covered with an approved backfill material.
Ductile iron pipe will be backfilled to the centerline of the pipe and compacted to ninety-five percent (95%) of standard Proctor T-99.
Pipe will be installed with 30" minimum cover. Maximum cover of 42" will be accepted. Cover depth will be determined from proposed finish grade as indicated on the plans. At times when pipe placement is not in progress, the open ends of pipe must be closed by a water-tight plug or other approved means. This provision will apply during the lunch hour as well as overnight. If water is in the trench, the seal will remain in place until the trench is pumped completely dry.
Page
Pipe installed under swale shall be D.I. and have 3 feet minimum cover. D.I. pipe to be centered on swale. If more than one joint of pipe is necessary, restrained joint pipe is required. See “Swale Crossing” detail and definitions.
Pipe installed under canal or drainage ditch shall conform to all FDEP requirements. Pipe shall be restrained joint D.I. pipe with gate valves on both sides of canal/ditch. D.I. pipe shall have 5 feet minimum cover with a concrete cap. See “Canal or Drainage Ditch Crossing” detail and definitions.
1.5.5 LOCATING WIRE
A #12 Copper Clad Steel (CCS) wire that allows for the location of the pipe using an induced current line locator will be installed on all potable water, reclaimed water, and wastewater mains. The wire must be placed on the top of the pipe and taped approximately every ten feet.
A run of wire must run from the main to each hydrant. Each fire hydrant must have one wrap of the wire around the barrel located at final grade.
Wire color shall be blue for water, green for wastewater, and purple forreclaimed.
A run of wire will also be brought up in each valve box. The wire will have 4 feet of excess length. Wire is to be connected together using an underground wire nut with a silicone-based sealant.
The CCS wire shall meet the following requirements. HDPE Insulation of 30 mils, #12 AWG conductor, maximum Ohms resistance of 7.565 ohms per 1000 ft., breaking load 256 lbs.
When directional drilling is used, one continuous #12 CCS extra high strength locator wire shall be installed. The CCS wire shall meet the following requirements. HDPE Insulation of 45 mils, #12 AWG conductor, maximum Ohms resistance of 7.565 ohms per 1000 ft., breaking load 1150 lbs.
1.5.6 SERVICE LINE LOCATION
Service lines will be located at alternating lot lines outside the sidewalk within two feet of the right-of-way line as shown on approved plans or in a grassed area behind the curb if located in other than a subdivision.
Reclaimed service line is to be located adjacent to sewercleanouts.
1.5.7 BACKFILLED MATERIAL AND INSPECTION
All backfilling material will be free from cinders, ashes, refuse, vegetable or organic material, boulders, rocks, stones, or other material which is considered unsuitable. When backfill
Page material is not specified on the plans, backfilling with the excavated material may be acceptable provided that such material is suitable for backfilling. Pipe should be backfilled as soon as possible to minimize the length of open trench. Pipe joints, valves, fittings, and thrust blocks will be left uncovered until inspection by the Utilities Department has beencompleted.
1.5.8 VALVES AND FITTINGS
All valves and fittings will be set and joined to the pipe in the proper location as shown on the plans. Valves should be installed outside of the pavement where practical. A roadway valve box will be provided for every valve. This valve box must not transmit shock or stress to the valve.
Valve will have alignment ring installed and valve box centered and plumb over the wrench nut of the valve. The box cover is to be flush with the surface of the finished pavement or grade level as specified in the plans. A 24"-square concrete pad 4" in thickness will be poured around the valve box when it is located outside of pavement. A bronze or stainless steel disc will be cast into the pad for all valves 12" or larger. Valve nomenclature to be stamped into the disc will include the valve size, type, manufacturer's initials, number of turns, and direction to open the valve. (Example: 12" G.V. U.S.P. 20 c.c.w.)
All valves will be located within two feet of the tee, see detail GATE VALVE AND FITTING
DETAIL.
When solid sleeves or couplings are used to join/tie-in pipelines, a SPACER PIECE shall be installed if there is a gap in the pipeline.
1.5.9 FIRE HYDRANTS
All fire hydrants (hydrants) will be located as shown on the plans and marked on the pavement with a blue reflector. On unpaved streets, a blue reflector will be affixed to a post and placed as close to the edge of the road as feasible so as to be easily visible. The hydrants will be located in such a manner as to provide complete accessibility and in a manner so that the possibility of damage from vehicles or injury to pedestrians will be minimized. All hydrants must stand plumb and the bury line of the hydrant at the finished grade. Hydrants installed in State highway rights-of-way will be placed in accordance with any F.D.O.T. requirements. Contractors shall not turn or add risers to hydrants. All hydrants will be connected to the main in the manner shown on the Standard Detail Sheet. If the installation of the hydrant requires the hydrant to be greater than 40 ft. away from the fire hydrant valve, an additional valve shall be installed. If the fire hydrant valve ends up in asphalt of a major road (not subdivision) an additional hydrant valve regardless of distance shall be installed.
Page
1.5.10 RESTRAINED PIPE JOINTS
The Engineer of Record shall provide a restrained joint detail on drawings submitted tothe City for approval. Restraining is to apply to all new fittings installed as part of the job, including tapping saddles.
1.5.11 THRUST BLOCKS AND COLLARS
Thrust blocks may only be used with the City’s prior approval at bends, fire hydrants, and as specified on the plans, in accordance with the Standard Detail Sheet. Restrained joint systems are the preferred method. Metal harnesses, tie rods, or clamps of adequate strength to prevent movement may be installed at locations where thrust blocks are not practical. Rods and clamps will be stainless steel. A 20-foot length of ductile iron pipe will be installed at all main endings and a concrete thrust collar will be poured around the pipe at a distance of 10 feet from the end of the joint. In lieu of concrete thrust collar, restrained pipe upstream of the proposed concrete thrust collar may be used.
1.5.12 JACK AND BORE, PIPE INSTALLED IN CASINGS
Pipe to be installed under pavement where open trenching is not permitted will be installed through a steel casing that has been jacked and bored. The casing pipe will be six to eight inches larger than the outside diameter of the bells on the Ductile Iron pipe. The Engineer of Record will design the casing and bore to meet FDOT or FECRR requirements.
Ductile Iron pipe of the appropriate Class will be installed in the casing. Water mains must be pushed or pulled through the casing on stainless steel casing spacers with polyethylene skids attached to the pipe with stainless steel straps. The stainless steel casing spacers with polyethylene skids will be placed in accordance with manufacturer's recommendations. Casing spacers must be manufactured by Cascade or an approved equal. Restrained joints arerequired on mains installed inside casings.
JACK AND BORE
J&B installed under FDOT roadways shall conform to latest FDOT Design Standard. In the FDOT Standard Specifications for Road and Bridge Construction 2013, Section 556 applies. J&B installed under FECRR shall conform to FECRRrequirements.
1.5.13 HORIZONTAL DIRECTIONAL DRILLING
Only DIP and Fusible PVC may be horizontal directional drilled (HDD) under pavement or surface water way crossings. The HDD pipe shall only extend to 10 feet on each side of the crossing. Then the piping will change to the standard pipingmaterial.
Page
HDD installed under FDOT roadways shall conform to latest FDOT Design Standard. In the FDOT Standard Specifications for Road and Bridge Construction 2013, Section 555 applies.
ENGINEERING PROCEDURE HORIZONTAL DIRECTIONAL DRILLS
PRECONSTRUCTION CONFERENCE:
1. A preconstruction conference will be required. The preferred attendeesfor the preconstruction shall be but not limited to:
The directional bore contractor (preferably the Field Superintendent) The permitting agency Engineer of Record Engineering Technician Inspection Supervisor Engineering Inspector for the project
HDD CONTRACTOR:
1. Approval required prior to the HDD, the HDD contractor shall submit a bore plan (see sample drawing in Appendix “B”) to the Engineering Supervisor for approval. The bore plan shall be a scaled drawing or computer generated drawing showing the following information but not limited to: (see drawing typical bore plan)
The entrance and exit location Profile of the bored pipe All utilities including their depths and clearances fromreamer Width of the right of way Pavement width Length of the bore The bore plan shall be signed by the responsible person in charge of the bore.
2. The HDD contractor shall follow the minimum clearances as shown below fromthe bottom of the water main to the top of the reamer:
Water mains 12” and greater minimum clearance is 18” Water mains 10” and less minimum clearance is 12”
3. The HDD contractor will be responsible for obtaining locates for all utilities in accordance with Chapter 556 of the Florida Statutes.
4. The HDD contractor shall notify the City of Cocoa Inspection Division 48 hours in advance of the bore and notify the appropriate permitting agency per the conditions of the permit.
Page
ENGINEERING INSPECTOR:
1. An approved copy of the bore plan will be given to Engineering InspectionDivision.
2. The Inspector for the project will have a copy of the bore plan at the project site.
3. Prior to the HDD the Inspector shall verify that the materials at the project site for the directional bore are in accordance with the City of Cocoa’s latest technical provisions and standard details.
4. The Engineering Inspector shall verify the following prior to the commencement of the
HDD:
a. Verify that the HDD contractor has obtained his/her utilitylocates.
b. Verify that all utilities have been visually spotted by the HDDcontractor.
c. Verify that the permitting agency has been notified of the HDD.
d. Witness the calibration of the sonde.
5. The Inspector shall remain at the project site until completion of the HDD.Any discrepancies shall be immediately reported to one or all of thefollowing:
Engineering Supervisor
Engineering Technician
Inspection Supervisor Once the above persons have been notified by the Inspector, the proper authority will be notified for corrective action.
COMPLETION OF THE BORE:
1. A bore log shall be submitted to the Engineering Division after completion of the bore.
1.5.14 BLOWOFFS
Flushing blow-offs are to be installed and constructed as shown on the Standard Detail Sheet.
Blow-off materials include 2" brass for nipples, brass threaded fittings, 2" brass angle wheel valve, and plastic meter box (purple for reclaimed). The plastic meter box is to be installed at grade over the wheel valve. The angle wheel valve will be within six inches of finished grade and will be plugged with a brass plug. 4" blow-offs will be required on both potable water and reclaimed water mains 12" and larger and must be constructed as shown on the Standard Detail Sheet. A reclaimed tag will be installed on reclaimed main blow-offs in a reclaimed meter box.
Brass used in potable water shall meet the low lead requirements as set forth in Section 2.6
Page
1.6 TIE-INS TO EXISTING SYSTEMS
1.6.1 GENERAL
The Contractor is not to operate any valve or remove any thrust block from City-owned mains except under direct supervision of an Inspector of the Utilities Department. All Contractors must follow the procedures listed below for connecting new mains to existing water systems.
1.6.1.1 Mains 8" and smaller
Tie-in valves will be operated and pressure tested to verify water tightness prior to the tie-in. Valves that are not water tight, shall have a new valve installed immediately adjacent (within 2’) to the existing valve. The Contractor will provide a 2" tap on the new main and a 2" tap on the existing main at the tie-in valve. A 2" jumper equipped with a City supplied meter and contractor supplied backflow preventer (double check) will be installed. The jumper will be utilized for filling the main, flushing the main, providing water for bacteriological sampling, and maintaining pressure in the main after a successful bacteriological test. The tie-in valve is not to be operated and the jumper is not to be removed until clearance has been obtained from FDEP and the City. The Engineer of Record will be required to provide an executed FDEP certificate of completion prior to clearance. After clearance, the tie-in valve will be opened, the jumper removed, and the main thoroughly flushed under the supervision of the City Inspector. All other existing valves closed as part of the job will be opened by the contractor under the supervision of Utilities Department Inspector.
1.6.1.2 Mains 10" and larger
The same procedure as noted for mains 8" and smaller will be used for mains 10" and larger except that the jumper will be utilized only for filling the main,providing water for bacteriological sampling, and maintaining pressure in the main after a successful bacteriological test. The tie-in valve can be opened for flushing and during chlorination only under the supervision of the Engineering Inspection Division. The tie-in valve is not to be operated and the jumper is not to be removed until clearance has been obtained from FDEP and the City. After clearance, the tie-in valve will be opened, the jumper removed, and the main thoroughly flushed under the supervision of the City Inspector. All other existing valves closed as part of the job will be opened by the contractor under the supervision of Utilities Department Inspector.
Page
1.7 TESTING
1.7.1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .