This Request for Proposal (RFP2026-09CM) is issued by Belknap County, New Hampshire for a flooring replacement project at the Belknap County Superior Court's Probation & Parole Offices located at 64 Court Street, Laconia, New Hampshire. The project scope includes removal and disposal of existing flooring materials, surface preparation and floor leveling, furnishing and installation of new Mohawk Mycotexture 2.5 flooring in Sawdust color (approximately 3,294 square feet), installation of approximately 800 linear feet of 6-inch cove base, installation of transitions and edge treatments, and comprehensive cleanup and debris disposal. The contractor must provide all labor, tools, equipment, transportation, supervision, and incidentals necessary for complete installation. A mandatory pre-bid site visitation is required prior to proposal submission. Proposals are due by May 27, 2026, at 12:00 pm and should be submitted via email to Jon T. Bossey, Facilities Director, at jbossey@belknapcounty.gov. The contractor shall provide an estimated project schedule including mobilization date, material lead times, estimated work duration, and proposed completion date.

The contractor is responsible for all floor preparation including removal of adhesives, patching, crack repair, surface leveling, and moisture mitigation as required. Work hours are limited to Monday through Friday from 6:00 AM to 8:00 PM unless otherwise approved, though the County reserves the right to require phased work, after-hours work, night work, or weekend work to accommodate court operations during occupancy. The contractor must coordinate all work with Belknap County representatives, protect adjacent finishes and building components, maintain a clean and safe work area, comply with OSHA regulations and local building codes, and provide manufacturer-recommended adhesives and materials. Upon project completion, the contractor shall provide both manufacturer warranties and workmanship warranties. The RFP does not specify pricing terms, set asides, funding sources, or contract amounts in the provided document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal

RFP2026-09CM

LVT Flooring Belknap County Superior Court

Belknap County Commissioners’ Office Jon T. Bossey, Facilities Director

34 County Drive, Laconia, NH 03246

(603) 737-2391

BELKNAP COUNTY

REQUEST FOR BID

RFP 2026-09CM

Proposals may be submitted via email to:

Jon Bossey, Facilities Director, Belknap County jbossey@belknapcounty.gov

The County reserves the right to accept or reject any and all bids, in whole or in part, for any reason deemed to be in the best interest of the County. The County reserves the right to waive any informalities, irregularities, or technical defects in any bid when such waiver is determined to be in the best interest of the County and does not compromise the fairness of the competitive bidding process.

REQUEST FOR PROPOSALS (RFP)

Flooring Replacement Project

Belknap County Superior Court – Probation & Parole

Issued By: Belknap County

Project Location: 64 Court Street, Laconia, New Hampshire – Probation & Parole Offices

Proposal Due Date – May 27, 2026, at 12:00 pm

1. INTRODUCTION

Belknap County is seeking proposals from qualified flooring contractors to furnish all labor, materials, supervision, equipment, and related services necessary for the removal and replacement of flooring at the Belknap County Superior Court located at 64 Court Street, Laconia, New Hampshire.

The County intends to select a qualified contractor capable of completing the project in accordance with the specifications, project schedule, and requirements outlined in this Request for Proposals

(RFP).

2. PROJECT OVERVIEW

The scope of work generally includes, but is not limited to:

Removal and disposal of existing flooring materials.

Surface preparation and floor leveling as required.

Furnishing and installation of new flooring materials.

Furnishing and installation of new 6-inch cove base.

Installation of required transitions and edge treatments.

Cleanup and disposal of all construction debris.

Coordination of work activities to minimize disruption.

The selected contractor shall provide all labor, tools, equipment, transportation, supervision, and incidentals required for a complete and operational installation.

3. FLOORING SPECIFICATIONS

The proposed flooring system shall meet or exceed the following:

Flooring Material

Manufacturer: Mohawk Product Line: Mycotexture 2.5 Color: Sawdust Approximate Quantity: 3,294 square feet

Cove Base

Approximately 800 linear feet of 6-inch cove base.

Cove base color shall be coordinated with the County.

Floor Preparation

The contractor shall inspect all existing conditions and provide all necessary floor preparation required to ensure proper and warrantable installation.

Preparation may include:

Removal of adhesives Patching Crack repair Surface leveling Moisture mitigation if required Transition installation

The contractor shall verify all dimensions and existing site conditions prior to submission of proposal.

4. CONTRACTOR RESPONSIBILITIES

The contractor shall:

Field verify all measurements and existing conditions.

Coordinate all work with Belknap County representatives.

Protect adjacent finishes, furniture, and building components.

Maintain a clean and safe work area at all times.

Remove and legally dispose of all debris and demolished materials.

Provide all manufacturer-recommended adhesives and installation materials.

Complete all work in compliance with applicable OSHA regulations and local building codes.

Repair any damage caused by contractor operations.

Provide manufacturer warranties and workmanship warranties upon project completion.

5. WORK HOURS AND SCHEDULING

The contractor shall coordinate all work schedules with Belknap County to minimize disruptions. The project area will remain occupied during installation, and night and weekend work may be necessary to accommodate court operations.

Contractor work hours shall be limited to Monday through Friday from 6:00 AM to 8:00 PM unless otherwise approved by the County. The County reserves the right to require phased work, after-hours work, night work, or weekend work depending on operational needs.

The contractor shall provide an estimated project schedule including:

Mobilization date Material lead times Estimated duration of work Proposed completion date

6. SITE VISIT

A mandatory pre-bid site visitation is required prior to submission of proposals. Contractors shall review all work areas, existing conditions, access limitations, and project requirements during the site visit.

Contractors are responsible for verifying all existing conditions, measurements, access limitations, and project requirements during the mandatory pre-bid site visitation.

File details come from the government source that posted it. Updated .