04- RFP-200-1171-SC- RRC SOW Aug 07 Mod 1 SCR RMT Feb 12 .pdf

PDF 103 KB Posted

Attached to
Residential Reentry Center (RRC) services within the city limits of El Paso, Texas or up to five miles outside the city limits within the United States
Solicitation number
RFP-200-1171-SC
Issued by

About this file

04- RFP-200-1171-SC- RRC SOW Aug 07 Mod 1 SCR RMT Feb 12

View the file

Other files

File Type Posted
Amendment 002 RFP-200-1171-SC.pdf PDF
Amendment 003 RFP-200-1171-SC.pdf PDF
Amendment 002 to RFP-200-1171-SC.pdf PDF
Amendment 001 RFP-200-1171-SC.pdf PDF
13 - RFP-200-1171-SC Section J Attachment 8 - RRC Cert of Compliance.pdf PDF
08 - RFP-200-1171-SC Section J Attachment 3 - Community Notification Letter.pdf PDF
01- RFP 200-1171-SC- Cover Letter.pdf PDF
11 - RFP-200-1171-SC Section J Attachment 6 - Business Management Questionnaire.pdf PDF
03- RFP-200-1171-SC- Solicitation.pdf PDF
14 - RFP-200-1171-SC Section J Attachment 9 - Local Area Concerns.pdf PDF
15- RFP-200-1171-SC Section J Attachment 10- Wage Determination No.1995-0812 Rev.28 dated 06-13-2011.pdf PDF
06 - RFP-200-1171-SC Section J Attachement 1 - Environmental Certification.pdf PDF
17 - RFP-200-1171-SC Section J Attachment 12 - FBOP Subcontracting Plan.pdf PDF
07 - RFP-200-1171-SC Section J Attachment 2 - Environmental Checklist.pdf PDF
02-RFP 200-1171-SC Bid Cover Sheet.pdf PDF
04 - RFP-200-1171-SC - RRC SOW Aug 2007 Rev 07 February 2012.pdf PDF
10 - RFP-200-1171-SC Section J Attachment 5 - Bank Notification Letter.pdf PDF
16- RFP-200-1171-SC Section J Attachment 11- Sample Contractor Evaluation Form.pdf PDF
12 - RFP-200-1171-SC Section J Attachment 7 - Compliance Matrix.pdf PDF
05 - RFP 200-1171-SC Section E3 - Performance Summary Table.pdf PDF
09 - RFP-200-1171-SC Section J Attachment 4 - Client Notification Letter.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment - Summary of Page Changes

STATEMENT OF WORK (SOW)

RESIDENTIAL REENTRY CENTER

August 2007

Revision 01, December 2007, CCB

Revision 02, December 2008, CCB

Revision 03, February 2010, CCB

Revision 04, May 2010, CCB

Revision 05, May 2011, CCB

Revision 06, January 2012, RRMB

Revision 07, February 2012, RRMB

Modification 01, February 2012, SCR RMT

Change #1: Chapter 10 - Programs, Page 48 02/2012

On page 48 of the Statement of Work, the following sentence:

If electronic monitoring equipment is to be used, the contractor must notify the CCM of the type of operational specification standards.

Has been replaced with the following bolded paragraph:

If electronic monitoring equipment is to be used, the contractor must utilize a program with GPS equipment, for residents who have been determined to require this enhanced monitoring. Determination to place inmates on electronic monitoring will be made on an individual basis with the RRM being the approving official. The contractor must notify the RRM of the type of operational specification standards. The contractor must be able to accommodate at least 10% of their overall population (quota) on GPS. If desired by the contractor, the contractor could have all other inmates on

Home Detention on a different electronic monitoring system.

Change #2: Chapter 11 - Security & Accountability, Page 62

02/2012

The following paragraph on "Monitoring Accountability", found on page 62 of the attached Statement of Work, has been modified with the addition of the bolded language outlined below:

1. MONITORING ACCOUNTABILITY. The contractor will be able to locate and verify the whereabouts of offenders at all times. Written procedures will be established to guide staff in meeting this requirement. The contractor will contact the offender either telephonically or in-person at random times at work, home, or at authorized destinations to maintain accountability. This should occur at a frequency that ensures accountability and should be commensurate with the accountability needs of each individual offender. The contractor may provide an electronic monitoring system, which must have GPS capability, for residents who have been determined to require this enhanced monitoring. The RRM will determine the appropriate placement with the GPS equipment. When the contractor utilizes an electronic monitoring system with GPS capability the contractor may request and RRM may modify the daily contacts if it is in the best interest of offender accountability and program objectives. The RRM has the authority to increase or decrease the number of required accountability checks.

Change #3: Chapter 11 - Security & Accountability, Page 68

02/2012

Two changes made under section e. Alcohol testing on page 68.

First change made in the Alco-Sensor Model numbers II, III deleted, and only IV kept.

Second change made is the addition of one sentence at the end of the paragraph which is bolded.

The new paragraph reads as follows:

A reliable testing instrument such as the one used by the BOP

(Alco-Sensor Model IV), or comparable instrument/ device, will be used for testing. An adequate number of devices will be kept and calibrated, at least monthly, in accordance with manufacturer standards. These checks will be documented in the test log. Any testing instrument used must have a filter which eliminates false positive results due to the presence of ketones/acetone from diabetic offenders.

File details come from the government source that posted it. Updated .