RFP - WCS 2022 Bond - BP 18 ADDENDUM NO. 1.pdf

PDF 1 MB Posted

Attached to
RFP - WCS 2022 Bond - BP 18 SHHS PAC - Addendum 1
Solicitation number
RFP WCS 270000000168 2
Issued by
Macomb County, Westland City, Michigan

About this file

This Addendum No. 1 document modifies the plans and specifications for the Warren Consolidated Schools Sterling Heights High School Performing Arts Center Video Wall project (Bid Pack #18) in Warren, Michigan, issued by Wakely Associates, Inc. on October 28, 2026. The addendum revises architectural, mechanical, and electrical drawings and introduces six line items with associated cost adjustments for bidders to complete. Architectural modifications include removal of a concrete housekeeping pad under a new transformer, revised keynotes, addition of a 48"x48" temporary material loading opening in an existing masonry wall, and new ceiling grid and tile work in specified areas. Mechanical work involves added demolition and keyed notes for return and supply ductwork coordination. Electrical work includes demolition notes, temporary removal and reinstallation of ceiling-mounted devices in corridors H123 and H125, provision of isolator pads for vibration reduction, and relocation of existing conduits and backboxes to accommodate the new architectural wall opening. The addendum specifies field coordination requirements among trades for exact locations and connections.

The addendum establishes six itemized line items (A1, A2, M1, M2, E1, and E2) with blank spaces designated "ADD/DEDUCT/NO CHANGE" for bidders to provide pricing adjustments. No specific pricing information, contract award dates, or contract terms are provided in this addendum document. The document references re-issued drawing sheets (A22.12H, A22.61, MD22.12H, M22.12H, ED22.11H, and E22.12H) and requires extensive field verification and coordination with existing site conditions, including verification of underground utilities, existing equipment locations, and ceiling-mounted devices. The project appears to be publicly funded under Warren Consolidated Schools' 2022 Bond Program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WAKELY ASSOCIATES, INC. ADDENDUM NO. 1

ARCHITECTS WARREN CONSOLIDATED SCHOOLS

30500 Van Dyke Avenue Suite 209 SHHS-PAC-VIDEO WALL-BP#18 Warren, Michigan 48093

Page 1 of 2 (write up only)

October 28, 2026

ADDENDUM NO. 1 to the plans and specifications for the WARREN CONSOLIDATED SCHOOLS, SHHS-PAC-Video WALL, BID PACK #18, Warren, MI, Architect’s Project No. 262123, dated October 02, 2026

The above plans and specifications are modified, supplemented, or augmented as follows, and this ADDENDUM NO. 1, is hereby made a part of the contract documents.

Drawings A22.12H, A22.61, MD22.12H, M22.12H, ED22.11H and E22.12H are being issued with this Addendum.

ARCHITECTURAL ITEMS

ITEM NO. A1: Refer to sheet A22.12H (re-issued):

1. Removed concrete housekeeping pad under the new transformer.

2. Revised new work keynote 2.02.

3. Added new work keynote 2.08.

4. Added location of new material loading opening.

5. Added new work keynote 2.09 and updated floor plan.

ITEM NO. A2: Refer to sheet A22.61 (re-issued):

1. Added upper stage H207 to room finish schedule.

2. Added room finish remark number 7.

MECHANICAL ITEMS

ITEM NO. M1 Refer to sheet MD22.12H (Re-issued):

1. Added Keyed Note #5 to Demolition Keyed Notes.

2. Revised plans and added Keyed Note #5 as indicated.

ADD/DEDUCT/NO CHANGE $_________________________

ITEM NO. M2 Refer to sheet M22.12H (Re-issued):

1. Added Key Note #10 to Keyed Notes.

2. Revised plans and added Keyed Notes #10 as indicated.

WAKELY ASSOCIATES, INC. ADDENDUM NO. 1

ARCHITECTS WARREN CONSOLIDATED SCHOOLS

30500 Van Dyke Avenue Suite 209 SHHS-PAC-VIDEO WALL-BP#18 Warren, Michigan 48093

Page 2 of 2 (write up only)

ELECTRICAL ITEMS

ITEM NO. E1 Refer to sheet ED22.11H (Re-issued):

1. Added Demolition Keyed Note #3.

2. Corridors H123 and H125 – temporary remove and reinstall ceiling tiles and ceiling mounted electrical devices to facilitate mechanical and electrical work above ceiling.

ITEM NO. E2 Refer to sheet E22.12H (Re-issued):

1. Added Keyed Note #2. Provide isolate pads or equal to reducing noise travel to auditorium and accommodate equipment concrete pad eliminated by the architect.

2. Revised approximately luminaires type L1 & L1EM dimension, final shall be location shall be coordinated in the field and mechanical contractor.

3. Relocate existing conduits and backboxes to facilitate the architectural wall opening for the construction of new room.

END OF ADDENDUM NO. 01

Cc: Nick Pitrone, Warren Consolidated Schools Ron Zuhorski, Plante Moran Cresa Sam Gottlieb, Clark Construction Company

S

S

A22.12H

STERLING HEIGHTS

HIGH SCHOOL

NEW WORK PLAN

SECOND LEVEL

AREA 'H'

H200

STAIRS

Match Line 'H'

Match Line 'G'

Ma tch

Li ne

'H

Ma tch

Li ne

'F

Match Line 'F'

Match Line 'G'

SCALE: 1/8" = 1' - 0"

SECOND LEVEL - AREA 'H'

ENLARGED NEW WORK PLAN1

A22.12H

H202

ROOM #E-23

CLASSROOM

H203

ROOM #E-25

CLASSROOM

H204

ROOM #E-27

CLASSROOM

H205

ROOM #E-29

CLASSROOM

H201

CORRIDOR

H209

STAIRS

H215

STAIRS

H210

LANDING

H211

LOOK OUT

H212

STORAGE

H213

SOUND

BOOTH

H214

LANDING

H208

UPPER

AUDITORIUM

H207

UPPER STAGE

H206

CATWALK

NOT TO SCALE

SECOND LEVEL

KEY PLAN

D HB

F

E G

DATE:

262123

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

RAS, DCWCHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

DCW

10/02/2026

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

Years

75Celebrating

BIDS 10-02-26

2.01

H216

H216

ELECTRICAL

SCALE: 1/4" = 1' - 0"

SECOND LEVEL - AREA 'H'

ENLARGED NEW WORK PLAN2

A22.12H

A22.12H

6' -7

5"

14'-6" +/- (V.I.F.)

H216

ELECTRICAL

NEW WORK KEY NOTES - FLOOR PLAN:

2.01 NEW TRANSFORMER. (SEE ELECTRICAL DRAWINGS)

2.02

2.02 PREPARE AND LEVEL EXISTING CONCRETE FLOOR FOR NEW

EPOXY PAINT.

2.03

2.03 NEW ELECTRICAL PANEL. (SEE ELECTRICAL DRAWINGS)

2.04

2.04 FIRE CAULK BOTH SIDES OF ALL ELECTRICAL PENETRATIONS.

NEW AND EXISTING. (SEE ELECTRICAL DRAWINGS)

2.05 EXISTING LIGHT SWITCH AND CONDUIT TO REMAIN.

2.05

2.06 EXISTING ROOF CONDUCTOR PIPING TO REMAIN.

2.06

P-1

2.07 PAINT ALL NEW EXPOSED DUCTWOK, GRILLES AND CONDUITS.

2.07

WALL LEGEND:

P-1 INTERIOR PARTITION WALL: (+/- 12'-0" TALL)

(1) LAYER NEW 58" GYPSUM BOARD (TAPE,

FINISH, & PAINT) ON 35

8" 20GA. METAL STUDS @

16" OVER (1) LAYER 35

8" GYPSUM BOARD (TAPE,

FINISH, & PAINT). STUFF DECK FLUTES W/

MINERAL WOOL AND EXTEND/CUT NEW

GYPSUM WALL BOARD INTO DECK FLUTES.

P-2

LINE OF EXISTING

MASONRY WALL

LINE OF EXISTING

EXTERIOR MASONRY

WALL

LINE OF EXISTING

MASONRY WALL

INTERIOR PARTITION WALL:

(1) LAYER NEW 34" FIRE RETARDANT PLYWOOD

OVER (1) LAYER OF 58" ABUSE RESISTANT

GYPSUM BOARD (TAPE, FINISH, & PAINT) ON 6"

14GA. (600S162-68) METAL STUDS @ 16" O.C.

ADDENDUM NO. 1 10-28-261

4' -0

" M .O

2.08

2.08 REMOVE AND CREATE A 48"x48" TEMPORARY OPENING, ABOVE

EXISTING CONCRETE FLOOR LEVEL, IN EXISTING MASONRY WALL

FOR MATERIAL LOADING. TOOTH-IN AND INFILL OPENING AFTER

MATERIAL IS LOADED ON MEZZANINE. PAINT ENTIRE WALL BLACK

TO MATCH EXISTING.

2.09 REMOVE EXISTING CEILING GRID, TILE, LIGHTING AND ALL

ASSOCIATED DEVICES FOR NEW MECHANICAL WORK. PROVIDE

AND INSTALL NEW GRID AND CEILING TILE TO MATCH EXISTING

AFTER MECHANICAL WORK IS COMPLETE. RE-INSTALL ALL

LIGHTING AND DEVICES THAT WERE REMOVED.

7'-10" +/- (V.I.F.)

'-0

V.

I.F

2.09

A22.61

STERLING HEIGHTS

HIGH SCHOOL

SCHEDULES / DETAILS

DOOR SCHEDULE - SECOND FLOOR

TY

PE

MA

TE

RI

AL

FI

NI

SH

TY

PE

MA

TE

RI

AL

FI

NI

SH

DOOR FRAMEDOOR OPENING

HE

AD

JA

MB

SI

LL

DETAILS

TH

RE

SH

OL

D

U.

L.

LA

BE

L

HA

RD

W

AR

E

SE

T

REMARKS

AREA "A"

WIDTH

7'-0"(2)3'-0" ETR PTF HM ETRH102 PT - - 1,2-

NO. HEIGHT

REMARKS - DOOR SCHEDULE

1 NEW DOOR CORE INSTALLATION & FINAL KEYING BY OWNER.

ABBREVIATIONS

HOLLOW METAL

PAINTED

STAINED

WOOD

HM

PT

STN

WD

FIBER-REINFORCED PLASTICFRP

ALUMINUMAL

EXISTING TO REMAINETR

FRAME ELEVATIONS:

2"

2"

SEE

SCHED.2"

DOOR ELEVATIONS:

PRE-FINISHEDPFN

ROOM FINISH SCHEDULE - FIRST FLOOR

CEILING

MAT'L HEIGHTWALLSBASEFLOORNO. ROOM NAME REMARKS

EX. STAGE

AREA "H"

1. PATCH AND PREP. ALL WALLS PRIOR TO PAINTING.

2. TOUCH-UP EXISTING STAGE FLOOR AS REQUIRED AFTER NEW WALL AND VIDEO WALL IS INSTALLED.

3. PAINT ALL NEW EXPOSED DUCT WORK, GRILLES, AND CONDUITS.

4. PAINT ALL NEW EXPOSED STRUCTURAL STEEL WITH EPOXY PAINT.

5. PAINT NORTH WALL. (CORNER TO CORNER, FULL HGT.)

6. RUBBER BASE AT NEW VIDEO WHERE INDICATED.

7. PAINT SOUTHWEST WALL OF STAGE AFTER MASONRY MATERIAL LOADING ACCESS IS IN-FILLED.

ROOM FINISH SCHEDULE ABBREVIATIONS:

CARPETCPT

EPOXY PAINTEPT

GYPSUM BOARDGB

EXISTING TO REMAINETR

EXPOSED CONSTRUCTIONEXP

2X4 ACOUSTICAL CEILING TILE IN METAL GRIDACT

LUXURY VINYL TILE FLOORLVT

PAINTPT

RESILIENT COVE BASE - REFER TO SCHEDULERB

CONCRETE MASONRY UNITCMU

VENTED BASEVB

SEALED CONCRETESC

2'-0" x 2'-0" TECTUM IN GRID SYSTEMTEC

RUBBER TREADS AND RISERSRTR

WALK-OFF CARPETWC

VINYL FACED ACTVACT

BRICKBR

WOODWD

EXISTING WOOD FLOOR - REFINISHEDEWD-R

6" PORCELAIN CERAMIC TILE COVE BASE6PCT

4" PORCELAIN CERAMIC TILE COVE BASE4PCT

12" x 24" PORCELAIN CERAMIC WALL TILEPCT-3

2" x 2" PORCELAIN MOSAIC TILEPCT-1

8" x 8" PORCELAIN PAVERSPCT-2

1/2" RUBBER FLOORRBF

ACCESS FLOORINGAF

EXISTING PLASTER - PAINTEDEPL-PT

EXISTING ACOUST CLG TILE IN METAL GRIDEX-ACT

ROOM FINISH REMARKS:

WRESTLING MAT FLOORINGMAT

H126 PT6RBETR/PT ETR 1,2,3,5,6ETR

SCALE: 1-1/2" = 1'-0"

JAMB DETAIL

NEW DOOR AND HM FRAME -

CAULK BETWEEN

DISSIMILAR MATERIALS

8" GYP. BRD. EA. SIDE. (FULL

HEIGHT) CUT INTO EXISTIN

DECK FLUTES. FINISH AND

PAINT

8" 20 G.A. METAL STUD. @ 16" O.C.,

RUN TIGHT TO THE UNDERSIDE OF

EXISTING STRUCTURE

NEW HOLLOW METAL

DOOR FRAME. CAULK

BETWEEN ALL DIS-SIMILAR

MATERIALS

J1 A22.61

H1

A22.61 SCALE: 1-1/2" = 1'-0"

HEAD DETAIL

NEW DOOR AND HM FRAME -

CAULK BETWEEN

DISSIMILAR MATERIALS

8" 20 G.A. METAL STUD BOX

HEADER

8" 20 G.A. METAL STUD. @ 16" O.C.,

RUN TIGHT TO THE UNDERSIDE OF

EXISTING STRUCTURE

SOUND ATTENUATING

INSULATION (FULL HGT.)

8" GYP. BRD. EA. SIDE. (FULL

HEIGHT) CUT INTO EXISTIN

DECK FLUTES. FINISH AND

PAINT

SOUND ATTENUATING

INSULATION (FULL HGT.)

ELECTRICALH216 PT6RBEPT PT 1,3,4,6ETR

L

SE

E

SC

H

ED

U

LE

SEE

SCHED.

6"

1' -0

2'

-0 " 6"

NEW

LOUVER

SE

E

SC

H

ED

U

LE

1' -0

'-6 1 8" +

(V

ER

IF

Y W

IT

H

L

ED

M

AN

U

FA

C

TU

R

ER

5'

-5 7 8"

'-0

(V .I.

F.

EQUAL EQUAL

1'-43 8" 47'-31

4" +/- (VERIFY WITH LED MANUFACTURER) 1'-43

8"

50'-0" +/- WALL (V.I.F.)

NEW METAL STUD AND

GYPSUM BOARD WALL

NEW VIDEO DISPLAY

PANELS AND MOUNT (SEE

TECHNOLOGY DRAWINGS)

EXISTING DOOR AND

FRAME TO REMAIN

EXISTING STAGE FLOOR TO

REMAIN (TOUCH-UP FINISH

AS REQUIRED AFTER NEW

VIDEO WALL IS INSTALLED)

C

EN

TE

R

L

IN

E

SCALE: 1/4" = 1'-0"

VIDEO WALL ELEVATION1

A22.11H

CENTER VIDEO WALL IN

PROSCENIUM OPENING

SCALE: 1/4" = 1'-0"

WALL SECTION2

A22.61

1' -0

'-6 1 8"

5' -5

7 8"

'-0

41 4" 3'

-4

3' -4

3'

-4

3' -4

3'

-4

3' -3

3 4" 3'

-4 3 8"

2' -0

8" HIGH ABUSE DRYWALL,

FINISH AND PAINT TOP OF

WALL

8" HIGH ABUSE DRYWALL,

FINISH AND PAINT

4" FIRE RETARDANT PLYWOOD. INSTALL

BEHIND VIDEO WALL SURROUND SO

PLYWOOD IS HIDDEN FROM VIEW

WT 400 WALL TIE SECURE CLIP

BY STEEL CON SYSTEMS OR

APPROVED EQUAL. (MOUNT IN

CENTER OF BLOCK)

LINE OF NEW WALL MOUNT

BY VIDEO WALL

MANUFACTURER

LINE OF NEW PANEL

LINE OF NEW 6" RUBBER

BASE FROM CORNER TO

CORNER

LINE OF EXISTING

CONCRETE FLOOR TO

REMAIN

LINE OF EXISTING

MASONRY WALL TO

REMAIN

37 8"

SCALE: 1/4" = 1'-0"

ELEVATION DETAIL3

A22.11H

41 4" 3'

-4

3' -4

3'

-4

3' -4

3'

-4

3' -3

3 4" 3'

-4 3 8"

37 8"

'-0

8" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 1'-87

8" 35 8"

1'-4" 1'-4" 1'-4"

50'-4"

4'-0"

DATE:

262123

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

RAS, DCWCHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

DCW

10/02/2026

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

Years

75Celebrating

BIDS 10-02-26

7'-0"3'-0" HM PTL HM 1H216 PT J1 -H1 - 1-

F

SE

E

SC

H

ED

U

LE

SEE

SCHED.

FLUSH

ELECTRICALH102 PT6RBEPT ETR 1ETR

2 CONTRACTOR TO FIELD VERIFY LOCATION OF ALL EXISTING HINGE PLACEMENT FOR NEW DOORS.

C .J

C

.J

3"x3"x96" CORNER GUARD

2' -0

2" TITEN HD MASONRY

ANCHOR BY SIMPSON

STRONG TIE (TYPICAL AT

EACH BRACKET)

2" TITEN HD MASONRY

ANCHOR BY SIMPSON

STRONG TIE (TYPICAL AT

EACH BRACKET)

HILTI X-U POWDER

ACTUATED FASTENER @16"

O.C.

WT 400 WALL TIE SECURE CLIP

BY STEEL CON SYSTEMS OR

APPROVED EQUAL. (MOUNT IN

CENTER OF BLOCK)

UPPER STAGEH207 ETR ETR PT ETR ETR 7

ADDENDUM NO. 1 10-28-261

ELECTRICAL GENERAL NOTES

KEYED NOTES

AREA 'H'

AREA 'F'

AREA 'H'

AREA 'G'

H208

UPPER

AUDITORIUM

H207

UPPER STAGE

H206

CATWALK

NOT TO SCALE

KEY PLAN

ELECTRICAL 2ND FLOOR PLAN - AREA 'H' B

A C

D F

E G

H

E22.12H

ELECTRICAL 2ND FLOOR

PLAN - AREA 'H'

HMN / LTD

SET

STERLING HEIGHTS

HIGH SCHOOL

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

SES

Strategic Energy Solutions

Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com

4000 W. Eleven Mile Road Berkley, MI 48072

SES Project #22 0758 05

262123

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

10/02/2026

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

BIDS 10-02-26

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

Years

75Celebrating

ADDENDUM 1 10-28-26

AutoCAD SHX Text

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE RECEPTACLE. 2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF DEVICES. 3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE. 4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE. 5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL. 6. EXIT LIGHTS AND EMERGENCY BATTERY UNITS SHALL BE UNCONTROLLED AND EXIT LIGHTS AND EMERGENCY BATTERY UNITS SHALL BE UNCONTROLLED AND TIED AHEAD OF LOCAL AREA LIGHTING SWITCH, UNLESS CIRCUITED OTHERWISE. 7. WHERE MORE THAN ONE LIGHT SWITCH IS INDICATED TO BE INSTALLED AT THE WHERE MORE THAN ONE LIGHT SWITCH IS INDICATED TO BE INSTALLED AT THE SAME LOCATION, THEY SHALL BE GROUPED UNDER ONE COMMON FACEPLATE. 8. ALL POWER PACKS TO BE LOCATED DIRECTLY ABOVE SWITCH. ALL POWER PACKS TO BE LOCATED DIRECTLY ABOVE SWITCH. 9. LIGHT FIXTURES ARE LOOPED TOGETHER TO INDICATE CONTROL ZONE GROUPS. LIGHT FIXTURES ARE LOOPED TOGETHER TO INDICATE CONTROL ZONE GROUPS. CONNECTED FIXTURES ARE TO BE CONTROLLED TOGETHER. CIRCUITS MAY BE SHARED AMONG SEPARATE CONTROL ZONE GROUPS. MULTIPLE ZONES ZONES MAY BE COMBINED IN SOFTWARE TO FORM SCENES. SEE LIGHTING CONTROL MATRIX: SCENE SCHEDULE (IF PROVIDED), AND PANEL SCHEDULES FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text

1. PROVIDE DEDICATED BREAKER, CIRCUIT AS NOTED AND NEMA SIZE 0 STARTER. PROVIDE DEDICATED BREAKER, CIRCUIT AS NOTED AND NEMA SIZE 0 STARTER. DISCONNECT SWITCH SHALL BE PROVIDED BY THE MANUFACTURER. COORDINATE CONTROL WITH MECHANICAL CONTRACTOR. 2. PROVIDE ISOLATOR BASE, MASON FLOOR MOUNT VIBRATION ISOLATOR OR EQUAL PROVIDE ISOLATOR BASE, MASON FLOOR MOUNT VIBRATION ISOLATOR OR EQUAL FOR THE TRANSFORMER TO REDUCING NOISE TRAVELING DOWN TO AUDITORIUM. 3. RELOCATE EXISTING CONDUITS AND BACKBOXES THAT INTERFERED WITH THE RELOCATE EXISTING CONDUITS AND BACKBOXES THAT INTERFERED WITH THE ARCHITECTURAL WALL OPENING TO FACILITATE THE CONSTRUCTION FOR THE NEW ROOM.

AutoCAD SHX Text F217

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text G235

AutoCAD SHX Text

JAN. CL.

AutoCAD SHX Text G234

AutoCAD SHX Text H200

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text H202

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text H203

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text H204

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text H205

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text H201

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text H209

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text H215

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text H210

AutoCAD SHX Text

LANDING

AutoCAD SHX Text H211

AutoCAD SHX Text

LOOK OUT

AutoCAD SHX Text H212

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text H213

AutoCAD SHX Text

SOUND

AutoCAD SHX Text

BOOTH

AutoCAD SHX Text H214

AutoCAD SHX Text

LANDING

AutoCAD SHX Text H208

AutoCAD SHX Text

UPPER

AutoCAD SHX Text

AUDITORIUM

AutoCAD SHX Text H207

AutoCAD SHX Text

UPPER STAGE

AutoCAD SHX Text H206

AutoCAD SHX Text

CATWALK

AutoCAD SHX Text

T-1AV

AutoCAD SHX Text

OUTLINE OF ELECTRICAL ROOM BELOW

AutoCAD SHX Text

DOWN AND CONTINUE TO ELECTRICAL ROOM

AutoCAD SHX Text S

AutoCAD SHX Text

CONNECT TO THE SAME LIGHTING CIRCUIT IN THE AREA

AutoCAD SHX Text

NEW TRANSFORMER

AutoCAD SHX Text

L2EM

AutoCAD SHX Text T

AutoCAD SHX Text

PANEL PP-1AV

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text J

AutoCAD SHX Text

EF-1, 1AV-32

AutoCAD SHX Text MOUNT LIGHTING FIXTURE IN BETWEEN VIDEO DISPLAY AND RELOCATED DUCTWORK, ROUGHLY ±24'AFF. TYP.COORDINATE WITH MECHANICAL CONTRACTOR PRIOR ROUGH-IN

AutoCAD SHX Text

L1EM

AutoCAD SHX Text L1

AutoCAD SHX Text

L1EM

AutoCAD SHX Text

L1EM

AutoCAD SHX Text L1

AutoCAD SHX Text

MECHANICAL DUCTWORK

AutoCAD SHX Text

1AV-34

AutoCAD SHX Text S

AutoCAD SHX Text (E)

AutoCAD SHX Text

RELOCATED LIGHT. EXTEND AND RECONNECT TO EXISTING WALL SWITCH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

C 2018 SES, INC.

AutoCAD SHX Text R

AutoCAD SHX Text R

ELECTRICAL DEMOLITION NOTES

DEMOLITION KEYED NOTES

AREA 'H'AREA 'F'

AREA 'H'

AREA 'G'

G149

BOYS TOILETS

G142

STORAGE

H101

CLASSROOM

H102

ELECTRICAL

H100

CORRIDOR

H113

VESTIBULE

H115

VESTIBULE

H114

STAIRS

H112

STORAGE

H116

MEN'S TOILETS

H117

WOMEN'S TOILETS

H111

CORRIDOR

H109

TOILETS

H108

TOILETS

H107

DRESSING ROOM

H110

DRESSING ROOM

H106

OFFICE

H105

OFFICE

H103

OFFICE

H104

CLASSROOM

H121

CORRIDOR

H120

CORRIDOR

H123

CORRIDOR

H125

CORRIDOR

H122

SCENE SHOP

H124

SCENE SHOP

STORAGE

H126

STAGE

H118

LOBBY

H119

RAMP

H129

RAMPH128

PASSAGE

H141

STAIRS

H142

LOBBY H143

VESTIBULE

H136

TICKETS

H138

BOX

OFFICE

H139

MECHANICAL

H137

INNER

LOBBY

H130

AUDITORIUM

H135

STAIRS

H134

RAMP

H133

PASSAGE

H132

PASSAGE

H131

CHAIR

LIFT

H127

PASSAGE

H140

ELEVATOR

NOT TO SCALE

KEY PLAN

ELECTRICAL DEMO FLOOR PLAN - AREA 'H' B

A C

D F

E G

H

ED22.11H

ELECTRICAL DEMO FLOOR

PLAN - AREA 'H'

HMN / LTD

SET

STERLING HEIGHTS

HIGH SCHOOL

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

SES

Strategic Energy Solutions

Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com

4000 W. Eleven Mile Road Berkley, MI 48072

SES Project #22 0758 05

262123

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

10/02/2026

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

BIDS 10-02-26

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

Years

75Celebrating

ADDENDUM 1 10-28-26

AutoCAD SHX Text

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND THE EXTENT OF DEMOLITION WORK. 2. EXAMINE THE DRAWINGS OF OTHER TRADES, BE FAMILIAR WITH THE DEMOLITION EXAMINE THE DRAWINGS OF OTHER TRADES, BE FAMILIAR WITH THE DEMOLITION REQUIRED BY OTHER TRADES. 3. PERFORM ALL INCIDENTAL ELECTRICAL DEMOLITION AND/OR RELOCATION OF PERFORM ALL INCIDENTAL ELECTRICAL DEMOLITION AND/OR RELOCATION OF DEVICES AND EQUIPMENT REQUIRED TO FACILITATE THE DEMOLITION WORK OF OTHER TRADES. 4. COORDINATE WITH NEW WORK PLANS, ONE LINE, AND RISER DIAGRAMS FOR COORDINATE WITH NEW WORK PLANS, ONE LINE, AND RISER DIAGRAMS FOR EXTENT OF DEMOLITION WORK. 5. COORDINATE ANY SHUTDOWN OF EXISTING SERVICES AND EQUIPMENT REMAINING COORDINATE ANY SHUTDOWN OF EXISTING SERVICES AND EQUIPMENT REMAINING IN USE WITH OWNERS' REPRESENTATIVE. WHERE EXISTING BUILDING SERVICE IS REQUIRED TO BE SHUT DOWN, INCLUDE ALL ASSOCIATED OVERTIME COST TO PERFORM THIS WORK DURING EVENING AND WEEKENDS. INCLUDE ALL COSTS FOR PROVIDING TEMPORARY POWER. 6. REMOVE ALL CONDUIT AND WIRE BACK TO NEAREST UPSTREAM DEVICE REMOVE ALL CONDUIT AND WIRE BACK TO NEAREST UPSTREAM DEVICE REMAINING IN SERVICE. 7. WHERE DEMOLITION WORK AFFECTS ELECTRICAL SERVICE TO DOWNSTREAM WHERE DEMOLITION WORK AFFECTS ELECTRICAL SERVICE TO DOWNSTREAM DEVICES TO REMAIN; EXTEND CONDUIT AND WIRE AS REQUIRED TO MAINTAIN ELECTRICAL SERVICE. 8. PROVIDE BLANK COVER PLATES WHERE SWITCHES AND DEVICES ARE REMOVED PROVIDE BLANK COVER PLATES WHERE SWITCHES AND DEVICES ARE REMOVED AND WALL REMAINS INTACT. MARK ALL UNUSED CIRCUIT BREAKERS AS "SPARE". 9. CONTRACTOR TO TAG ALL CIRCUITS AT BOTH ENDS AFFECTED BY THIS SCOPE CONTRACTOR TO TAG ALL CIRCUITS AT BOTH ENDS AFFECTED BY THIS SCOPE OF WORK. 10. CONTRACTOR SHALL PROVIDE UPDATED, TYPED-IN DIRECTORIES FOR ALL CONTRACTOR SHALL PROVIDE UPDATED, TYPED-IN DIRECTORIES FOR ALL PANELS AFFECTED BY THIS SCOPE OF WORK. 11. CONTRACTOR SHALL VERIFY ALL UNDERGROUND AND IN-SLAB UTILITIES CONTRACTOR SHALL VERIFY ALL UNDERGROUND AND IN-SLAB UTILITIES LOCATIONS PRIOR TO SAW CUTTING OR PENETRATING ANY FLOOR SLABS. CONTRACTOR SHALL REPAIR ALL UTILITIES DAMAGED BY SAW CUTTING.

AutoCAD SHX Text

1. REMOVE EXISTING RECEPTACLE OUTLETS TO ACCOMMODATE NEW VIDEO REMOVE EXISTING RECEPTACLE OUTLETS TO ACCOMMODATE NEW VIDEO DISPLACE. REFER TO NEW WORK FOR MORE INFORMATION. 2. REMOVE EXISTING FLUORESCENT LIGHTING FIXTURES AND CONTROL. REFER TO REMOVE EXISTING FLUORESCENT LIGHTING FIXTURES AND CONTROL. REFER TO NEW WORK FOR MORE INFORMATION. 3. TEMPORARY REMOVE AND REINSTALL CEILING TILES, LIGHTING FIXTURES, TEMPORARY REMOVE AND REINSTALL CEILING TILES, LIGHTING FIXTURES, SENSORS, SPEAKERS AND SECURITY CAMERAS LOCATED IN THE CORRIDORS AS REQUIRED TO FACILITATE MECHANICAL/ELECTRICAL WORKS ABOVE CEILING. RESTORE THE SYSTEM TO ORIGINAL OPERATION. REPLACE TILES AND ELECTRICAL DEVICES IF DAMAGED DURING CONSTRUCTION.

AutoCAD SHX Text (E)A/C

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text

TC

AutoCAD SHX Text T

AutoCAD SHX Text

(E)PAC DIMMER RACK

AutoCAD SHX Text

(E)T2 XFMR (300KVA)

AutoCAD SHX Text

(E)MSB-5 480/277V-1200A

AutoCAD SHX Text T

AutoCAD SHX Text

(E)PAD MOUNTED TRANSFORMER

AutoCAD SHX Text

(E)RP-BA

AutoCAD SHX Text

(E)LP-HH

AutoCAD SHX Text

(E)DP-E

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

(E)LP-A (LP-C) FED STAGE WORK LIGHTS

AutoCAD SHX Text

(E)RP-R3

AutoCAD SHX Text

(E)RP-R2

AutoCAD SHX Text

(E)DP-A

AutoCAD SHX Text

(E)T-RP-BB

AutoCAD SHX Text

(E)NATIONAL TIME & SIGNAL 902

AutoCAD SHX Text T

AutoCAD SHX Text

(E)T3 (75KVA)

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text L5-20

AutoCAD SHX Text

FB

AutoCAD SHX Text

FB

AutoCAD SHX Text

FB

AutoCAD SHX Text

FB

AutoCAD SHX Text L5-20

AutoCAD SHX Text

ETC

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

ETC

AutoCAD SHX Text

RELOCATE METAL ENCLOSURE AND CONDUITS AS REQUIRED TO ACCOMMODATE NEW VIDEO WALL

AutoCAD SHX Text

(E)STAGE MANAGER RACK

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

C 2018 SES, INC.

AutoCAD SHX Text R

HVAC GENERAL NOTES

KEYED NOTES

AREA 'H'

AREA 'F'

AREA 'H'

AREA 'G'

H208

UPPER

AUDITORIUM

H207

UPPER STAGE

H206

CATWALK

H208

UPPER

AUDITORIUM

H207

UPPER STAGE

H206

CATWALK

NOT TO SCALE

KEY PLAN

MECHANICAL 2ND FLOOR PLAN - AREA 'H' B

A C

D F

E G

H

M22.12H

MECHANICAL 2ND FLOOR

PLAN - AREA 'H'

GK / RSO

RNR

STERLING HEIGHTS

HIGH SCHOOL

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

SES

Strategic Energy Solutions

Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com

4000 W. Eleven Mile Road Berkley, MI 48072

SES Project #22 0758 05

262123

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

10/02/2026

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

BIDS 10-02-26

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

Years

75Celebrating

ADDENDUM 1 10-28-26

AutoCAD SHX Text

1. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. PROVIDE HVAC SYSTEMS COMPLETE PER SPECIFICATION, SMACNA STANDARDS, AND PER APPLICABLE CODES INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL RADIUS OR MITERED ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR STRUCTURAL CONDITIONS OR OTHER CONDITIONS. 2. CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF ALL OTHER CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF ALL OTHER TRADES. ALL DUCTWORK IS TO BE ROUTED AS HIGH A POSSIBLE. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. VERIFY ALL CLEARANCES PRIOR TO THE FABRICATION OF ANY WORK. 3. DUCTWORK/PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL NOT DUCTWORK/PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT/PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT. DUCTWORK/PIPING SHALL NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE. 4. DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT RESTRICTS DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT RESTRICTS THE ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS. 5. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALL MECHANICAL SYSTEMS. 6. COORDINATE FLOOR, WALL, ROOF PENETRATIONS, LOUVER SIZES, PAD COORDINATE FLOOR, WALL, ROOF PENETRATIONS, LOUVER SIZES, PAD LOCATIONS ETC. WITH ARCHITECTURAL TRADES. SEAL ALL PIPING AND DUCT PENETRATIONS. 7. BRANCH DUCTWORK TO GRILLES, REGISTERS AND DIFFUSERS SHALL BE THE BRANCH DUCTWORK TO GRILLES, REGISTERS AND DIFFUSERS SHALL BE THE SAME SIZE AS THE GRILLE, REGISTER OR DIFFUSER NECK SIZE WHERE NO DUCT SIZE IS INDICATED ON PLAN. 8. PAINT ALL VISIBLE INTERIOR SURFACES OF EXHAUST/RETURN GRILLES, PAINT ALL VISIBLE INTERIOR SURFACES OF EXHAUST/RETURN GRILLES, REGISTERS AND VISIBLE ASSOCIATED DUCTWORK FLAT BLACK. 9. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED. 10. ROOF MOUNTED EQUIPMENT REQUIRING SERVICE SHALL BE LOCATED A MINIMUM ROOF MOUNTED EQUIPMENT REQUIRING SERVICE SHALL BE LOCATED A MINIMUM OF 10 FEET FROM ROOF EDGES. WHERE EQUIPMENT CAN'T BE LOCATED AWAY FROM ROOF EDGE AND GUARD RAILS ARE NOT PROVIDED, PROVIDE PERMANENT FALL ARREST ANCHORAGE CONNECTION DEVICE THAT COMPLIES WITH ANSI/ASSE Z 359.1.

AutoCAD SHX Text

1. CONNECT NEW RETURN DUCTWORK TO EXISTING. MAKE TRANSITION AS CONNECT NEW RETURN DUCTWORK TO EXISTING. MAKE TRANSITION AS REQUIRED. FIELD VERIFY EXACT LOCATION AND CONNECTION SIZE PRIOR TO START OF CONSTRUCTION. ALL NEW DUCTWORK TO HAVE A MINIMUM OF 1" INTERNALLY LINED, DIMENSIONS SHOWN ARE INTERIOR DIMENSIONS. 2. CONNECT NEW RETURN DUCTWORK TO EXISTING. MAKE TRANSITION AS CONNECT NEW RETURN DUCTWORK TO EXISTING. MAKE TRANSITION AS REQUIRED. FIELD VERIFY EXACT LOCATION AND CONNECTION SIZE PRIOR TO START OF CONSTRUCTION. ALL NEW DUCTWORK TO HAVE A MINIMUM OF 1" INTERNALLY LINED, DIMENSIONS SHOWN ARE INTERIOR DIMENSIONS. 3. 72x26 RETURN DUCTWORK. DUCTWORK TO BE ROUTED ALONG SIDE OF 72x26 RETURN DUCTWORK. DUCTWORK TO BE ROUTED ALONG SIDE OF EXISTING CATWALK AND NOT INTERFERE WITH ROOF ACCESS LADDER. COORDINATE EXACT LOCATION AND ROUTING WITH NEW SCREEN DISPLAY AND EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. 4. 28x28 SUPPLY DUCTWORK. ROUTE UP AND AS TIGHT AS POSSIBLE TO NEW 28x28 SUPPLY DUCTWORK. ROUTE UP AND AS TIGHT AS POSSIBLE TO NEW RETURN AIR DUCT. DUCTWORK IS NOT TO INTERFERE WITH NEW SCREEN DISPLAY AND ALL EXISTING THEATER EQUIPMENT. COORDINATE EXACT LOCATION AND ROUTING WITH NEW SCREEN DISPLAY AND EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. 5. SUPPLY DUCTWORK TO BE MOUNTED A MINIMUM OF 26'-0" TO BOTTOM OF SUPPLY DUCTWORK TO BE MOUNTED A MINIMUM OF 26'-0" TO BOTTOM OF DUCT WITH THE RETURN AIR DUCTWORK TO BE MOUNTED DIRECTLY ABOVE. BOTH SUPPLY AND RETURN DUCTWORK TO BE SUPPORTED OFF OF CMU BLOCK WALL. COORDINATE EXACT LOCATION PRIOR TO START OF CONSTRUCTION. 6. NEW SUPPLY AND RETURN AIR DUCTWORK TO HAVE A MINIMUM OF 1" NEW SUPPLY AND RETURN AIR DUCTWORK TO HAVE A MINIMUM OF 1" INTERNALLY LINED, DIMENSIONS SHOWN ARE INTERIOR DIMENSIONS. 7. RETURN AIR GRILLES TO BE MOUNTED ON TOP OF RETURN AIR DUCT. RETURN AIR GRILLES TO BE MOUNTED ON TOP OF RETURN AIR DUCT. 8. COORDINATE LOCATION OF HANDRAILS FOR EQUIPMENT WITHIN 10'-0" OF EDGE COORDINATE LOCATION OF HANDRAILS FOR EQUIPMENT WITHIN 10'-0" OF EDGE OF ROOF. HANDRAILS TO BE PROVIDED BY ARCHITECTURAL TRADES. 9. RE-WORK EXISTING WET SPRINKLER SYSTEM PIPING AND SPRINKLER HEADS RE-WORK EXISTING WET SPRINKLER SYSTEM PIPING AND SPRINKLER HEADS LAYOUT AS REQUIRED PER NEW ARCHITECTURAL FLOOR PLAN. 10. CLEAN EXISTING SUPPLY AIR DIFFUSER. RE-INSTALL SUPPLY AIR BRANCH CLEAN EXISTING SUPPLY AIR DIFFUSER. RE-INSTALL SUPPLY AIR BRANCH DUCTWORK AND SUPPLY AIR DIFFUSER IN NEW LAY-IN CEILING. ADJUST/EXTEND BRANCH DUCT AS REQUIRED. COORDINATE WITH ARCHITECTURAL TRADES FOR CEILING GRID LAYOUT.

AutoCAD SHX Text (E)28x28 SA

AutoCAD SHX Text (E)44x38 SA

AutoCAD SHX Text

(E) SASA

AutoCAD SHX Text (E)72x26 RA

AutoCAD SHX Text

(E)SG (TYP-3)

AutoCAD SHX Text

(E)SG (TYP-3)

AutoCAD SHX Text

TO (E)RTU-1 ON ROOF

AutoCAD SHX Text

TO (E)RTU-1 ON ROOF

AutoCAD SHX Text 72x26 RA UP

AutoCAD SHX Text 28x28 SA UP

AutoCAD SHX Text 28x28 SA BELOW

AutoCAD SHX Text 26x26 RA ABOVE

AutoCAD SHX Text 28x28 SA BELOW

AutoCAD SHX Text 26x26 RA ABOVE

AutoCAD SHX Text R-1 24x24

AutoCAD SHX Text R-1 24x24

AutoCAD SHX Text 28x28 SA DN

AutoCAD SHX Text 72x26 RA ABOVE

AutoCAD SHX Text

EF-1 (ON ROOF)

AutoCAD SHX Text 10x10

AutoCAD SHX Text E-1 28x8 500

AutoCAD SHX Text T

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

C 2018 SES, INC.

AutoCAD SHX Text R

MECHANICAL DEMOLITION NOTES

DEMOLITION KEYED NOTES

AREA 'H'

AREA 'F'

AREA 'H'

AREA 'G'

S

H208

UPPER

AUDITORIUM

H207

UPPER STAGE

H206

CATWALK

NOT TO SCALE

KEY PLAN

MECHANICAL DEMO 2ND FLOOR PLAN - AREA 'H' B

A C

D F

E G

H

MD22.12H

MECHANICAL DEMO 2ND

FLOOR PLAN - AREA 'H'

GK / RSO

RNR

STERLING HEIGHTS

HIGH SCHOOL

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

SES

Strategic Energy Solutions

Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com

4000 W. Eleven Mile Road Berkley, MI 48072

SES Project #22 0758 05

262123

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

10/02/2026

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

BIDS 10-02-26

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

Years

75Celebrating

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

SES

Strategic Energy Solutions

Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com

4000 W. Eleven Mile Road Berkley, MI 48072

SES Project #22 0758 05

262123

B O

N D

P R

O G

R

AM

W

AR

R

EN

C O

N

SO

LI

D

AT

ED

S C

H O

O

LS

10/02/2026

BI

D

P

AC

KA

G

E #1

- S

H H

S

- P

AC

VI

D

EO

W

AL

L

CD PAGE TURN 09-08-26

BIDS 10-02-26

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

Years

75Celebrating

ADDENDUM 1 10-28-26

AutoCAD SHX Text

1. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK. 2. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE SITE AND PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS, SYSTEMS, AND UTILITIES. NOTIFY ARCHITECT OF ANY INTERFERENCES OR DISCREPANCIES. 3. VERIFY DEPTH, SIZE, LOCATIONS AND CONDITION OF EXISTING UTILITIES IN THE VERIFY DEPTH, SIZE, LOCATIONS AND CONDITION OF EXISTING UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION PRIOR TO STARTING ANY WORK. 4. ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'S REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT BUILDING'S OPERATION. 5. ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING UNLESS ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND REQUIRES FIELD VERIFICATION. 6. ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED COMPLETE, ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED COMPLETE, WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTS. 7. ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE. WHERE ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE. WHERE DUCT OR PIPE INSULATION HAS BEEN DAMAGED DURING DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS REQUIRED TO MATCH EXISTING. 8. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT BEING THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING RELOCATED AND OWNER PROVIDED EQUIPMENT.

AutoCAD SHX Text

1. REMOVE EXISTING RETURN DUCTWORK BACK TO LOCATION INDICATED AND REMOVE EXISTING RETURN DUCTWORK BACK TO LOCATION INDICATED AND PREPARE EXISTING DUCTWORK FOR NEW CONNECTION. REFER TO NEW WORK PLANS. 2. REMOVE EXISTING RETURN DUCTWORK AND GRILLES COMPLETE AS INDICATED. REMOVE EXISTING RETURN DUCTWORK AND GRILLES COMPLETE AS INDICATED. 3. REMOVE EXISTING SUPPLY DUCTWORK BACK TO LOCATION INDICATED AND REMOVE EXISTING SUPPLY DUCTWORK BACK TO LOCATION INDICATED AND PREPARE EXISTING DUCTWORK FOR NEW CONNECTION. REFER TO NEW WORK PLANS. 4. CONTRACTOR TO HAVE ENGINEER APPROVED TESTING AND BALANCING COMPANY CONTRACTOR TO HAVE ENGINEER APPROVED TESTING AND BALANCING COMPANY PERFORM PRE-DEMOLITION AIRFLOW READINGS FOR ALL SUPPLY AND RETURN TO DETERMINE EXISTING AIRFLOW FROM AIR HANDLER. PROVIDE FINDINGS TO ENGINEER PRIOR TO DEMOLITION ACTIVITIES. 5. REMOVE AND SALVAGE EXISTING SUPPLY AIR DIFFUSER AND SUPPLY AIR REMOVE AND SALVAGE EXISTING SUPPLY AIR DIFFUSER AND SUPPLY AIR BRANCH DUCTWORK AS REQUIRED FOR REMOVAL OF EXISTING 72x26 RETURN AIR DUCTWORK.

AutoCAD SHX Text (E)28x28 SA

AutoCAD SHX Text (E)44x38 SA

AutoCAD SHX Text

(E) SASA

AutoCAD SHX Text (E)72x26 RA

AutoCAD SHX Text (E)26x26 RA ABOVE

AutoCAD SHX Text (E)28x28 SA BELOW

AutoCAD SHX Text (E)26x26 RA ABOVE

AutoCAD SHX Text (E)28x28 SA BELOW

AutoCAD SHX Text (E)28x28 SA OFFSET UP

AutoCAD SHX Text

(E)RG ON TOP OF DUCT (TYP-4)

AutoCAD SHX Text

(E)SG (TYP-3)

AutoCAD SHX Text (E)72x26 RA

AutoCAD SHX Text

(E)SG (TYP-3)

AutoCAD SHX Text

TO (E)RTU-1 ON ROOF

AutoCAD SHX Text

TO (E)RTU-1 ON ROOF

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

C 2018 SES, INC.

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

C 2018 SES, INC.

AutoCAD SHX Text R

write up_ADDENDUM NO 01
262123_A22.12H_Sterling_Heights_HS-42x30 Drawing
262123_A22.61_Sterling_Heights_HS-42x30 Drawing
E22.12H ELECTRICAL 2nd FLOOR PLAN - AREA 'H'
ED22.11H ELECTRICAL DEMO FLOOR PLAN - AREA 'H'
M22.12H MECHANICAL 2nd FLOOR PLAN - AREA 'H'
MD22.12H MECHANICAL DEMO 2nd FLOOR PLAN - AREA 'H'

File details come from the government source that posted it. Updated .