This document is a solicitation for landslide repair construction projects in Puerto Rico. The Department of Transportation Federal Highway Administration is seeking proposals from certified Small Business Concerns for Project PR ER DOT PRMNT RPR(13), which involves repairing damage caused by Hurricanes Irma and Maria on five roads located in the municipalities of Aibonito, Caguas, Guayama, Gurabo, and Patillas. The work includes embankment reconstruction, reinforced soil slope systems construction, drainage systems installation, retaining walls, pavement work, guardrails, signage, and temporary traffic control. The project will be split into multiple schedules with a total expected cost between $5-10 million. Proposals are due as specified in the solicitation to be issued on June 22, 2022. Offerors must submit qualifications related to their experience with landslide repair construction and register in the System for Award Management database. This will be a lowest price technically acceptable solicitation conducted as a two-step RFP process evaluating technical and price proposals.

View the file

Other files

File Type Posted
Amendment 0004 - PR ER DOT PRMNT RPR(13).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(13).pdf PDF
Amendment 0002 - PE ER DOT PRMNT RPR(13).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(13).pdf PDF
Report_Asbestos_AC-820579_HWY-312.pdf PDF
VETS-4212 Form.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Categorical Exclusion Form (NEPA) HWY-310.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Report_Lead_AC-838579_HWY-308.pdf PDF
Report_Lead_AC-820579_HWY-156.pdf PDF
Report_GEO_AC-820579_HWY-312.pdf PDF
Categorical Exclusion Form (NEPA) HWY-308.pdf PDF
Report_GEO_AC-838579_HWY-308.pdf PDF
USFWS Conservation Measures.pdf PDF
PRHTAs Project Specific Special Provisions.pdf PDF
Report_No Presence Cert_Asbesto and Lead Paint_AC-838579_HWY-308.pdf PDF
Report_Asbestos_AC-841579_HWY-410.pdf PDF
Categorical Exclusion Form (NEPA) HWY-312.pdf PDF
Report_Asbestos_AC-820579_HWY-156.pdf PDF
Report_Lead_AC-820579_HWY-312.pdf PDF
Report_Lead_AC-841579_HWY-410.pdf PDF
Categorical Exclusion Form (NEPA) HWY-156.pdf PDF
Report_Lead_AC-820579_HWY-424.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Report_GEO_AC-820579_HWY-156.pdf PDF
Report_GEO_AC-820579_HWY-310.pdf PDF
Report_GEO_AC-841579_HWY-410.pdf PDF
Report_Asbestos_AC-820579_HWY-424.pdf PDF
Report_Asbestos_AC-820579_HWY-310.pdf PDF
Categorical Exclusion Form (NEPA) HWY-410.pdf PDF
Report_Asbestos_AC-838579_HWY-308.pdf PDF
Report_GEO_AC-820579_HWY-424.pdf PDF
Report_Lead_AC-820579_HWY-310.pdf PDF
Plans_AC-841579 - PR ER DOT PRMNT RPR(13).pdf PDF
Plans_AC-820579 - PR ER DOR PRMNT RPR(13).pdf PDF
Categorical Exclusion Form (NEPA) HWY-424.pdf PDF
Plans_AC-838579 - PR ER DOT PRMNT RPR(13).pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Report_No Presence Cert_Asbesto and Lead Paint_AC-841579_HWY-410.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.

CONTRACTOR:

ADDRESS:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PR ER DOT PRMNT RPR(l3)

Puerto Rico Highway and Transportation Authority

Landslide Repairs in Aibonito, Caguas, Guayama, Gurabo, and Patillas.

REQUEST FOR PROPOSAL

RFPNo. 693C73- 22-R-000021

This Contract Cites

PRHT A's Standard Specifications for Road and Bridge Construction

STATE Puerto Rico

COUNTY Municipalities: Aibonito, Caguas, Guayama, Gurabo, and Patillas

AGENCY Puerto Rico Highway and Transportation Authority

TYPE OF IMPROVEMENT

The project consists of repairing landslides and washouts caused by Hurricanes Inna and Maria on PR-722 km

5.7; PR-14 km 54.3-54.4; PR-179 km 13.25; PR-181 km 8.7; PR-796 km 4.4; and PR-181 km 46.4 in the municipalities of Aibonito, Caguas, Guayama, Gurabo, and Patillas, Puerto Rico.

Project Length Totals

0.43 0.00

For Parking Areas, Lane Miles is calculated as SQFT/1 lft (nominal) lane

Parking Roadway / Parking Area / Other Mileposts/ SQFT Linear Route Lane

Schedule Area Feet Miles Miles

A □ AC-841579: To 580 0.11 0.00

ER-HWY-410 (PR-722: KM 5.7)

A □ AC-820579: To 470 0.09 0.00

ER-HWY-156 (PR-14: KM 54.3-54.4)

B □ AC- 838579: To 384 0,07 0.00

ER-HWY-308 (PR-179: KM 13.25)

B □ AC-820579: To 249 0.05 0.00

ER-HWY-310 (PR-181: KM 8.7)

C □ AC-820579: To 189 0.04 0.00

ER-HWY-424 (PR-796: KM 4.4)

C □ AC-820579: To 364 0,07 0.00

ER-HWY-312 (PR-181: 46.4)

TABLE OF CONTENTS

Page

Notice to Offerors 1 through 2

Checklist for Offer Submission 1 through 2

*SF-1442 Solicitation, Offer, and Award 1 through 6

Proposal Schedule Instructions 1 through 6

*Proposal Schedule B-1 through B-11

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 7

Representations and Certifications (SAMs online) D-1 through D-3

Instructions to Offerors E-1

*Socioeconomic Program Requirements F-1 through F-4

Minimum Wage Schedule F-5 through F-10

*General Contract Requirements G-1 through G-9

Construction Contract Requirements H-1 through H-5

Special Contract Requirements J-1 through J-320

Section K K-1 through K-3

Permits Obtained for this Project (18) 1 through 123

SPECIFICATIONS On The Secure Large File Transfer

Plans_AC-820579 - PR ER DOT PRMNT RPR(13) 1 through 76

Plans_AC-838579 - PR ER DOT PRMNT RPR(13) 1 through 44

Plans_AC-841579 - PR ER DOT PRMNT RPR(13) 1 through 44

Categorical Exclusion Form (NEPA) HWY-156 1 though 97

Categorical Exclusion Form (NEPA) HWY-308 1 through 174

Categorical Exclusion Form (NEPA) HWY-310 1 through 155

Categorical Exclusion Form (NEPA) HWY-312 1 through 88

Categorical Exclusion Form (NEPA) HWY-410 1 through 313

Categorical Exclusion Form (NEPA) HWY-424 1 through 157

TABLE OF CONTENTS

DTOP's Manual de Senales de Transito (MST) 1 through 174

PRHTA's Material Testing Schedule 1 through 70

PRHTA's Standard Drawings 1 through 400

PRHTA's Standard Specifications 1 through 1158

Report_Asbestos (6) See Documents/Sam.gov

Report_GEO (6) See Documents/Sam.gov

Report_Lead (6) See Documents/Sam.gov

Report_No Presence Cert_Asbesto & Lead Paint (2) See Documents/Sam.gov

USFWS Conservation Measures 1 through 23

*Offeror’s Qualifications Form 1 through 7

* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE PROPOSAL SUBMITTAL

PACKAGE

NOTICE TO OFFERORS

CONTRACT FORMAT:

Offerors should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-pages in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet website at https://www.acquisition.gov/. Offerors are encouraged to review the documents thoroughly before submitting a proposal.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the Offeror to verify that this proposal is complete as listed in the Table of Contents. The Offeror is responsible for submitting all required forms and documents with the offer.

Offerors should use the Checklist for Offer Submission included in this booklet to check that their proposals are complete.

CONSTRUCTION CONTRACTS:

Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDSs) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in Section G of this booklet. Failure to submit MSDSs may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDSs within two weeks after bid opening.

INTERNET BASED DATA BASES - REQUIRED INPUT:

According to FAR Subpart 4.1102 contractors are required to be registered in the System for Award Management (SAM) at the time an offer is submitted. Access the following web site to register: https://www.sam.gov/.

According to FAR Subpart 4.1201 contractors are required to complete electronic annual representations and certifications in SAM accessed via https://www.sam.gov/ as a part of required registration.

According to FAR Subpart 22.1302 (b) federal contractors and sub-contractors MUST complete the required annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.

PAYMENT:

Offerors are advised to review the Special Contract Requirements (SCRs), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in SAM must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as https://www.sam.gov/ https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm

NOTICE TO OFFERORS - (CONT'D.)

necessary) their EFT information in the SAM database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the SCR, “Specification 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING PROPOSAL DOCUMENTS:

Request For Proposal (RFP) documents will not be mailed. All solicitation documents are available for direct download from the Contract Opportunities website: https://sam.gov/. Contractors are encouraged to register on the website (for this specific project) in order to receive automatic notifications when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@dot.gov.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON

THOSE CHANGES.

PLEASE NOTE ELECTRONIC PROPOSALS WILL BE ACCEPTED VIA

EMAIL ONLY AT EFLHD.CONTRACTS@DOT.GOV. Proposals sent to any other email address besides EFLHD.Contracts@DOT.GOV will not be accepted. Proposals will not be accepted via facsmile.

https://sam.gov/ mailto:eflhd.contracts@dot.gov mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV

CHECKLIST FOR OFFER SUBMISSION

The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the Offeror. Failure to submit a complete proposal may be cause to reject your proposal.

PLEASE NOTE ELECTRONIC PROPOSALS WILL BE ACCEPTED VIA

EMAIL ONLY AT EFLHD.CONTRACTS@DOT.GOV. Proposals sent to any other email address besides EFLHD.Contracts@DOT.GOV will not be accepted. Proposals will not be accepted via facsimile. Hand-delivered proposals are not recommended.

1. Proposal Envelope (If the Offeror elects not to send the proposal electronically via email to EFLHD.Contracts@dot.gov):

a. Addressed as shown in Block 7 of SF-1442

b. In the lower left corner, indicate the following: Solicitation No., Project Name & Number, and mail to Suite E2-3-300, ATTENTION: ACQUISITIONS. If proposals are hand-delivered, bring them to the main entrance of Quantum Park, and ask for the Federal Highway Administration (EFLHD) Receptionist to be contacted and an EFLHD representative will come to collect the proposal. HAND-DELIVERED PROPOSALS ARE NOT RECOMMENDED.

2. Standard Form 1442: Solicitation, Offer and Award

a. Block 14: Name and Address of Offeror.

b. Block 15: Telephone Number of Offeror.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Proposal is signed and dated.

3. Proposal Schedule - (Pages B-1 through B-11)

a. Unit proposal price and proposal amount provided for each pay item in numbers.

b. Corrections initialed.

4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of Offeror.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of proposal total).

g. Proposal identification.

h. Signature of Offeror

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

PROPOSALS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV mailto:EFLHD.Contracts@dot.gov

CHECKLIST FOR OFFER SUBMISSION

5. Power of Attorney.

a. Dated on or before execution date of bond

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

PROPOSALS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED

6. Offeror's Qualifications form (provided separately as part of the proposal Documents Package). Form completed, signed and submitted with proposal

7. System for Award Management (SAM): The contractor is currently registered in the System For Award Management (SAM) database at https://www.sam.gov/ at the time the offer is submitted. If the contractor elects to not have its active SAM registration viewable by the public, then the contractor must submit a copy with the proposal.

8. Online Representations and Certifications Application: The contractor's Representations and Certifications have been input online via the electronic database at https://www.sam.gov/.

9. VETS – 4212 Reporting: The contractor has completed the annual reporting requirement online at http://www.dol.gov/vets/vets4212.htm.

The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A PROPOSAL

PACKAGE IS SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR

UPDATE YOUR DATA PRIOR TO OFFER SUBMISSION MAY CAUSE THE

PROPOSAL TO BE REJECTED.

https://www.sam.gov/ https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT PR ER DOT PRMNT RPR(13)

Landslide Repairs in Aibonito, Caguas, Guayama, Gurabo, and Patillas.

REQUEST FOR PROPOSALS

693C73-22-R-000021

Project Description: The project consists of repairing damage caused by Hurricanes Irma and Maria on PR- 14, Km 54.3-54.4; PR-722, Km 5.7; PR-796, Km 4.4; PR-179, Km 13.25; and PR- 181, Kms 8.7 and 46.4. The work includes embankment reconstruction, reinforced soil slope systems construction, drainage systems installation, concrete retaining wall, sheet pile wall, soldier pile retaining wall, milling and overlay, pavement reconstruction, pavement markings, removal and replacement of guardrails, signage, temporary traffic control, and other miscellaneous work. The project is located in the Municipalities of Aibonito, Caguas, Guayama, Gurabo, and Patillas, Puerto Rico.

The project will be split into multiple work schedules, with the cost of the entire project expected to fall within the price range of between $5,000,000 and $10,000,000.

Scope of Work: The detailed scope of work to be undertaken by the successful Offeror under the contract for this project is outlined in the Request for Proposal (RFP) solicitation documents.

These include the Plans, Special Contract Requirements (J Pages), and supplemental Government Furnished Information.

Procurement Overview of the Project: In accordance with Federal Acquisition Regulation (FAR) Part 15, the Eastern Federal Lands Highway Division (EFLHD) is conducting a Lowest Price Technically Acceptable Source Selection Process for this project. Under this Notice, the EFLHD (also referred to as “the Government”) is soliciting all eligible Contractor firms/teams (Offerors) to participate in a two-step RFP process. The two steps will include the submittal of two proposal packages; a Technical Proposal and a Price Proposal. A description of these proposals and their requirements can be found in the RFP’s Proposal Instructions (B Pages).

During step one, a selection evaluation board will review and evaluate the technical proposals submitted by all interested, responsive Offerors. The selection committee will select qualified Offerors based on the pass/fail (acceptable/unacceptable) evaluation criteria as stated in the RFP’s Proposal Instructions - Evaluation of Proposal Documents (B Pages). Offerors should submit technical proposals that are acceptable without additional explanation or information.

The Government may make a final determination regarding a technical proposal’s acceptability solely on the basis of the technical proposal as submitted. The Government may proceed with the second step (lowest price evaluation) without requesting further information from any Offeror; however, the Government may request additional information from any Offeror with a technical proposal considered reasonable and close to acceptable, and may discuss any technical proposal with any Offeror. Only one technical proposal may be submitted by each Offeror. The step one technical proposal shall not include any prices or pricing information.

During step two, only technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. The price proposals corresponding to the acceptable technical proposals will be opened and ranked according to price and the contract will be awarded to the lowest responsive, responsible Offeror as stated in the RFP’s Proposal Instructions - Basis of Award (B Pages). Only one price proposal may be submitted by each Offeror and the price proposal must be based upon the Offeror’s own technical proposal.

Contract award is anticipated to be no earlier than July 2022, with Notice to Proceed anticipated to be issued after the receipt of valid Performance and Payment Bonds (see Block 12a of the SF- 1412 and FAR Clause 52.228-15), but no earlier than August 2022.

It is not the intent of EFLHD to receive project specific design or engineering recommendations as part of the step one technical proposal other than what is necessary to support the technical proposal. Offerors should limit their technical proposal to the information required by this Notice, and other information that may be relevant to the qualifications and experience of the Offeror. No reimbursement will be made for any expenses associated with the preparation of a step one technical proposal or a step two price proposal.

Obligation to Keep Team Intact: In connection with the services covered by this procurement process, any in-house personnel, subcontractors, and outside associates will be limited to the individuals or firms that are specifically identified during the step one technical proposal. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, or outside associates.

Supplemental Work: Offerors are expected to provide qualified and experienced staff to develop appropriate pre-construction or construction protocols as designated by Federal, state, and local regulations/guidelines, including but not limited to the following:

• Work Plan.

• Accident Prevention Plan.

• Health and Safety Plan.

• Environmental Management Plan.

• Waste Management Plan.

• Recycling Plan.

Submittals: Each Offeror must provide the required number of Technical and Price Proposals as described below to EFLHD in separate, sealed envelopes/boxes or pdf attachments (if submitted electronically via email) clearly addressed and identified for “Project No: PR ER DOT PRMNT RPR(13) - Solicitation No. 693C73-22-R-000021.”

Hard Copy (Paper) Submissions:

Submit one (1) bound paper copy, one (1) unbound copy, and one (1) CD-ROM copy of the Technical Proposal. Submit the Technical Proposal copies separately from the Price Proposal in a sealed envelope/box and clearly labeled as the “Technical Proposal.”

Submit two (2) unbound paper copies and one (1) CD-ROM copy of the Price Proposal. Submit the Price Proposal copies separately from the Technical Proposal in a sealed envelope and clearly labeled as the “Price Proposal.”

Submit all proposal documents by the due date specified in Block 13 of the SF-1442 to the following address:

Federal Highway Administration Eastern Federal Lands Highway Division Quantum Park 22001 Loudoun County Parkway Suite E2-3-300 Ashburn, VA 20147 Attn: Mr. C. Shawn Long

Electronic Copy (Email) Submissions:

Submit one (1) Technical Proposal and one (1) Price Proposal electronically via one (1) email containing two (2) pdf attachments. One pdf attachment shall be the Technical Proposal and the second pdf attachment shall be the Price Proposal. Electronic proposals will be accepted only via email sent to EFLHD.CONTRACTS@DOT.GOV. Proposals submitted to any other email address will not be accepted. Please be sure to indicate the solicitation number, project number, and ATTN: C. Shawn Long on the subject line of your email.

It is the Offeror’s sole responsibility to see that its proposal is received. Proposal documents received after the time due will be rejected and returned without consideration or further evaluation.

Other Information: Questions concerning this solicitation may be directed to Mr. Long via e-mail to: EFLHD.Contracts@dot.gov. Please be sure to put the solicitation number and project title in the subject line of your email.

Questions can be submitted at any time, but questions submitted within 10 days of the proposal due date may not be answered or answered in time for the bidder to properly incorporate the responses into their bids.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

693C73

ATTN:ACQUISITIONS

ASHBURN VA 20147

See Block 7

YULIYA KENT

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

EFLHD.Contracts@dot.gov

See Block 14 x 06/22/2022

693C7322R000021

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Request for Proposals is for the Landslide repairs in Aibonito, Caguas, Guayama, Gurabo, and Patillas, Project No.PR ER DOT PRMNT RPR (13), located in the municipalities of Aibonito, Caguas, Guayama, Gurabo, and Patillas, Puerto Rico in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

PRHTA's Standard Specifications for Road and Bridge Construction, pages 1 through

1158.

Bid Schedule, Section B - pages B-1 through B-11.

Special Contract Requirements, Section J - pages J-1 through J-320.

Plans_AC-820579 - PR ER DOT PRMNT RPR(13), Sheets 1 through 76.

Plans_AC-838579 - PR ER DOT PRMNT RPR(13), Sheets 1 through 44.

Plans_AC-841579 - PR ER DOT PRMNT RPR(13), Sheets 1 through 44.

Categorical Exclusion Form (NEPA) HWY-156, pages 1 through 97.

Categorical Exclusion Form (NEPA) HWY-308, pages 1 through 174.

Categorical Exclusion Form (NEPA) HWY-310, pages 1 through 155.

Categorical Exclusion Form (NEPA) HWY-312, pages 1 through 88.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 670 calendar days and complete it within ________________ ________________ calendar days after receiving

Continuation Sheet, Block 11

07/21/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>

$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������

�%(��
�)��
�������
���
����� �������������������
���

�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�

0��#������ ��2�

������������
H������

������� �)4��

3�2���%����

�����"��� � ��������
�������������
��" ��������������
�������������"���

����������3 4��� '5 '6 �--����7��

3�2���%���

�����������������������
H������

������� )4������ �$���� �� �4������

���� 2 of 6������������������������

����2�� #��0 ��2�����

�)��������� )�&4'��������������� ������������ &4'���������������

�"������&��*���G��'����, Block 26

Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Branch Quantum Park 22001 Loudoun County Parkway Suite E2-2-200 Ashburn, VA 20147

Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL

9-AMC-AMZ-EFLINVOICES@FAA.GOV

Oklahoma City, OK 73125

EFLHD-CO

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693C7322R000021

Categorical Exclusion Form (NEPA) HWY-410, pages 1 through 313.

Categorical Exclusion Form (NEPA) HWY-424, pages 1 through 157.

DTOP's Manual de Senales de Transito (MST), pages 1 through 174.

PRHTA's Material Testing Schedule, pages 1 through 70.

PRHTA's Standard Drawings, pages 1 through 400.

PRHTA's Standard Specifications, pages 1 through 1158.

Report_Asbestos (6), See Documents/Sam.gov.

Report_GEO (6), See Documents/Sam.gov.

Report_Lead (6), See Documents/Sam.gov.

Report_No Presence Cert_Asbesto & Lead Paint (2), See Documents/Sam.gov.

USFWS Conservation Measures, 1 through 23.

Permits (18), pages 1 through 123.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONTINUATION OF SF 1442

Block 2:

This project is RESTRICTED - Proposals will be accepted from all eligible Small Business concerns.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

Electronic proposals will be accepted via email sent to EFLHD.Contracts@dot.gov. Please be sure to indicate the solicitation number, project number, and ATTN: Yuliya Kent on the subject line of your email. Please note you must include a scanned copy of your official bid bond along with your proposal documents if you submit your proposal electronically.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. DTOP's Manual de Senales de Transito (MST)

3. Categorical Exclusion Form (NEPA) (6)

4. Pre-Consultation_Tree-Inventory (6)

5. PRHTA's Material Testing Schedule

6. PRHTA's Project Specific Special Provisions

7. PRHTA's Standard Drawings

8. PRHTA's Standard Specifications

9. Report_Asbestos (6)

10. Report_GEO (6)

11. Report_Lead (6)

12. Report_No Presence Cert_Asbesto & Lead Paint (2)

13. USFWS Conservation Measures

14. Permits

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective offerors. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address EFLHD.Contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project number with all requests and questions.

Block 11:

Maximum Time Allowed for the Contract if all Schedules are Awarded at the same Time:

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 670 calendar days.

Maximum Time Allowed for Each Schedule of Work if Awarded Separately:

If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 590 calendar days.

If the Government awards the contract as Schedules A + C, the performance period to complete all contract work will be 620 calendar days.

If the Government awards the contract as Schedule A only, the performance period to complete all contract work will be 575 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period of the contract will be extended 50 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.

If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period of the contract will be extended 90 calendar days and the performance of

Schedule C work is to be simultaneous with the performance of the executed contract.

See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above.

Work restrictions can be found in SCR Sections 108 and 156.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Offerors are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-

15) may result in the start of construction activities to be no earlier than August 2022. See Subsection 108.01 of the SCRs for additional details.

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the price proposal or $3 million, whichever is less, is required with this proposal. If the offeror fails to provide the required bid guarantee, such failure may require rejection of the offer. Reference FAR Provision 52.228-1, Bid Guarantee. Please note you must include a scanned copy of your official bid bond along with your proposal documents if you submit your proposal electronically.

Block 17:

Amounts should be completed as follows:

Schedule A - $

Schedule B (Government Option 1) - $ Schedule C (Government Option 2) - $

Other:

The estimated price is expected to fall within the price range of $5,000,000 to $10,000,000.

Responsibility of offerors shall be evaluated in accordance with the information provided on the Offeror's Qualifications Form, which can be downloaded from the Contract Opportunities website located at http://SAM.gov. PRHTA’s Standard Specifications for Road and Bridge Construction Manual is provided in the solicitation package and can be downloaded from the Secure Large File Transfer website.

Electronic proposals must contain the required signatures (electronic or by hand).

Basis for Award:

The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals for technical acceptability.

After all of the technical proposals have been evaluated, the Offerors that were found technically acceptable will be ranked according to price and the contract will be awarded to the responsive, responsible Offeror with the lowest Evaluation Total Price of Project, which is defined as:

Schedule A (Base Contract) - $ Schedule B (Government Option 1) - $

Schedule C (Government Option 2) - $

The Government will award the project as a Base Contract (Schedules A) with the option to award Schedule B (Government Option 1) and Schedule C (Government Option 2); see FAR Clause 52.217-5.

Evaluation of Award:

Award will be made to an offeror whose technical submittal and price proposal contain the combination of the technical qualifications (past performance of same type of projects) and price that offers the best value to the Government. Past performance will be evaluated by pass/fail. In determining which proposal offers the greatest value to the Government, price will be given greater weight. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability for technical qualifications rests with the offeror.

Please Note:

This solicitation is a Request for Proposal (RFP). Therefore, there will not be a public bid opening and proposals are not available for review.

http://sam.gov/

PROPOSAL INSTRUCTIONS

PROJECT: PR ER DOT PRMNT RPR(13)

OFFERORS PLEASE NOTE: Before preparing the proposal, carefully read the Instructions to Offerors. While preparing the proposal, comply with the following:

Hard Copy (Paper) Submissions:

Submit all required proposal information to EFLHD in sealed envelopes/boxes clearly addressed and identified for “Project No. PR ER DOT PRMNT RPR(13) - Solicitation No. 693C73-22-R- 000021.” Submit all proposals so that they will arrive at the address shown in Block 7 of the SF- 1442 on the due date specified in Block 13 of the SF-1442. Send proposals directly to the attention of Acquisitions.

Submit one (1) bound paper copy, one (1) unbound copy, and one (1) CD-ROM copy of the Technical Proposal. Submit the Technical Proposal copies separately from the Price Proposal in a sealed envelope/box and clearly labeled as the “Technical Proposal.”

Submit two (2) unbound paper copies and one (1) CD-ROM copy of the Price Proposal. Submit the Price Proposal copies separately from the Technical Proposal in a sealed envelope and clearly labeled as the “Price Proposal.”

Electronic Copy (Email) Submissions:

Submit one (1) Technical Proposal and one (1) Price Proposal electronically via one (1) email containing two (2) pdf attachments. One pdf attachment shall be the Technical Proposal and the second pdf attachment shall be the Price Proposal. Electronic proposals will be accepted only via email sent to EFLHD.CONTRACTS@DOT.GOV. Proposals submitted to any other email address will not be accepted. Please be sure to indicate the solicitation number, project number, and ATTN: C. Shawn Long on the subject line of your email.

It is the Offeror’s sole responsibility to see that its proposal is received. Proposals received after the time due will be rejected without consideration or further evaluation. In addition, it is the Offeror’s responsibility to ensure all requirements of both the Technical Proposal and Price Proposal are included in their respective envelopes/boxes.

EVALUATION OF PROPOSAL DOCUMENTS

STEP 1 - TECHNICAL ACCEPTABILITY - Experience and Past Performance Performing Landslide Repairs and Proposed Project Team.

1.A. TECHNICAL ACCEPTABILITY EVALUATION DESCRIPTION

Competing Technical Proposals will be evaluated against the solicitation requirements; they are not compared with each other. Each of the technical evaluation factors described below will be rated on a pass/fail (acceptable/unacceptable) basis and must receive a passing score for an Offeror's proposal to receive further consideration. Failure to receive a passing score for any single technical evaluation factor will result in rejection of an Offeror's proposal notwithstanding passing scores for the other technical evaluation factors. Proposals which satisfy the technical requirements of the solicitation, in light of the evaluation criteria, will be determined technically acceptable.

Offerors will be evaluated on past performance and experience to manage landslide repair at multiple sites simultaneously in environmentally and culturally sensitive locations including the construction of earth retaining structures (including sheet pile walls, reinforced concrete walls, soldier pile retaining walls, and mechanically stabilized earth slopes), implementing temporary traffic control measures per MUTCD, performing pavement reconstruction and paving, implementing erosion and sediment control, and constructing culverts and other storm drain system installations and repairs.

1.B. TECHNICAL PROPOSAL EVALUATION FACTORS

Submit the following qualifications and information, and label as the Technical Proposal. The Technical proposal should address each of the factors in the same order as listed below.

(a) Relevant experience and past performance

The Offeror must have a minimum of five (5) years of experience performing landslide repair and roadway reconstruction work, as shown in Section 1.A above, that was similar in scope, cost, and difficulty to the work required by the contract resulting from this RFP.

(1) Provide a statement indicating the Offeror’s experience and technical competence performing work in environmentally and culturally sensitive locations, including implementing erosion control plans and related construction permitting activities.

(2) Provide a statement indicating experience with implementing and maintaining temporary traffic control and detours in state owned roadways or roadways where maintaining traffic access at all times was paramount.

(3) List any relevant experience delivering projects for Eastern Federal Lands Highway Division (EFLHD) and the Puerto Rico Highway and Transportation Authority

(PRHTA).

(4) Provide a list of three (3) to five (5) projects, successfully performed within the past five (5) calendar years (completed or currently more than 80% completed) showing the relevant experience.

(a) Provide customer/owner point of contact, phone number, and email address for each relevant project.

(b) Include Offeror’s project management staff including Project Manager and/or Superintendent.

(c) Discuss the similarities in project scope, cost, and constructability of the Offeror’s sample projects with the proposed project.

(d) Present the contract performance details for the sample projects. As a minimum, include information regarding original award and final project cost and schedule.

Discuss reasons for project delays and/or cost overruns.

(e) Present information requested for the sample projects in the following format:

Maximum of five (5) pages (8-1/2” x 11” sheet) using Times New Roman 12-point font. Keep the discussion for any one sample project within one (1) page (8-1/2” x 11” sheet).

(b) Proposed Project Team

(1) Provide an organizational chart of the Offeror’s key personnel selected to deliver this project. At a minimum, include the Project Manager, Construction Superintendent, Traffic Safety Supervisor, and the Construction QA/QC Manager.

(2) Provide resumes and a table summarizing each key personnel’s specific experience.

Each proposed key personnel shall have a minimum of three (3) years’ experience within the past five (5) years performing technically the same or similar work and have any required certifications. Limit the resumes to one (1) page (8-1/2” x 11” sheet) for each key personnel. Limit the table summarizing each key personnel’s specific experience to one (1) page (11” x 17” sheet).

(3) Provide a table listing any subcontractors whom the Offeror proposes to contract with for delivering the project. If none of the work will be subcontracted, indicate so.

Discuss the subcontractor’s experience in performing similar work to the one they will be performing for this project. Limit your table to one (1) page (11” x 17” sheet).

STEP 2 - LOWEST PRICE - Cost to Perform the Proposed Work

2.A. LOWEST PRICE EVALUATION DESCRIPTION

Only Price Proposals from Offerors that passed the technical acceptability phase will be opened and evaluated. Any hard copy Price Proposals from Offerors that did not pass the technical acceptability phase will be returned unopened. All acceptable Price Proposals will be reviewed and evaluated for completeness and reasonableness.

2.B. COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, Offerors must submit prices for each pay item.

Review Subsection 109.05 of the SCR (Special Contract Requirements) regarding scope of payment for direct and indirect payment work.

Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Price Proposal Summary page (B-11). Fill in the Evaluation Total Price of Project in the space provided on the Price Proposal Summary page (B-11).

The completed Bid Schedule, pages B-1 through B-11, is considered the Offeror's Price Proposal.

The amount in Block 17 of the SF 1442 should be completed as follows:

Schedule A - $ .

Schedule B - $ .

Schedule C - $ .

2.C. SCHEDULES OF WORK

The Bid Schedule is comprised of the following separate schedules and options of work:

Schedule A (Base Contract) - Pages B-1 thru B-4 Schedule B (Government Option 1) - Pages B-5 thru B-8 Schedule C (Government Option 2) - Pages B-9 thru B-10

The Government will award the project as a Base Contract (Schedule A) with the option to award Schedule B (Government Option 1) and Schedule C (Government Option 2); see FAR Clause 52.217-5.

The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds or permits required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract) and permitting issues for the individual schedules are resolved by that time, the Government may award Schedule B (Government Option 1) and Schedule C (Government Option 2) at that time. If additional funding is required and/or permitting issues have not been resolved for the award of Schedule B (Government Option 1) and Schedule C (Government Option 2), and funding is received and permitting issues are resolved after the award of Schedule A (Base Contract), the Government has the right to exercise Schedule B (Government Option 1) and Schedule C (Government Option 2), at the unit prices bid no later than 180 calendar days from the Notice to Proceed for Schedule A (Base Contract).

2.D. COMPLETION OF WORK

The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion for the various contract award scenarios. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 670 calendar days.

If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 590 calendar days.

If the Government awards the contract as Schedules A + C, the performance period to complete all contract work will be 620 calendar days.

If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 575 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.

If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period of the contract will be extended 50 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.

If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period of the contract will be extended 90 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.

In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the Special Contract Requirements (SCR). Specific work limitations may be (but are not limited to):

National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc.); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc.). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the SCR).

Offerors are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-

15) may result in the start of construction activities to be no earlier than August 2022. See Subsection 108.01 of the SCRs for additional details.

2.E. PRICE PROPOSAL SUBMITTAL

As stated above, the completed Bid Schedule, pages B-1 through B-11, is considered the

Offeror’s Price Proposal. Submit the Price Proposal separately from the Technical Proposal in accordance with the directions provided on page one (1) of the Proposal Instructions.

BASIS FOR AWARD

The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals for technical acceptability.

After all of the technical proposals have been evaluated, the Offerors that were found technically acceptable will be ranked according to price and the contract will be awarded to the responsive, responsible Offeror with the lowest Evaluation Total Price of Project, which is defined as:

Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total.

B I D S C H E D U L E Schedule A

Project No: PR ER DOT PRMNT RPR(13)

Item No. Quantity Unit Unit Price Amount

15000-1000 Line 0020 ALL LPSM $

15100-1000 Line 0040 ALL LPSM $

15102-0000 Line 0060 1 CTSM $

15401-0000 Line 0080 ALL LPSM $

15401-1000 Line 0100 ALL LPSM $

15501-0000 Line 0120 ALL LPSM $

20100-0000 Line 0140 1.60 Cuerda $ $

20100-3000 Line 0160 17 Each $ $

20100-4000 Line 0180 3 Each $ $

20200-1000 Line 0200 ALL LPSM $

20300-1000 Line 0220 3,110 m3 $ $

20300-4000 Line 0240 820 m3 $ $

20300-5000 Line 0260 45 m3 $ $

20500-1000 Line 0280 180 m3 $ $

21000-1000 Line 0300 400 M $ $

21000-2000 Line 0320 10 Each $ $

30100-1000 Line 0340 2,155 m3 $ $

30400-1000 Line 0360 145 m3 $ $

30500-1000 Line 0380 3 m2 $ $

Construction Survey and Staking

Mobilization

Reimbursement for Municipal Tax Payments

Contractor Testing

Contractor Testing (Biological Species Monitoring)

Construction Schedule

Lean Concrete Base

Borrow Class B

Trench Excavation, Unclassified

Silt Fence

Clearing and Grubbing

Cutting and Removing Trees, Small (13" to 24" Diameter)

Cutting and Removing Trees, Large (25" to 46" Diameter)

Removal of Structures and Obstructions

Unclassified Excavation

Borrow Class A

Straw Bales

Subbase Course

Aggregate Base Course

Submitted by: __________________________

Name: PR-722, HWY-410; PR-14, HWY-156 Schedule Total: _________________________

B-1

100,000.00

4,000.0010.00

150.0015.00

Project No: PR ER DOT PRMNT RPR(13)

Item No. Quantity Unit Unit Price Amount

Name: PR-722, HWY-410; PR-14, HWY-156

40300-1000 Line 0400 1,860 m2 $ $

42100-1000 Line 0420 255 TON $ $

42100-2000 Line 0440 330 TON $ $

60200-1000 Line 0460 164,365 lb $ $

60300-2000 Line 0480 30 M $ $

60402-8000 Line 0500 2 Each $ $

60600-1000 Line 0520 145 M $ $

60600-4000 Line 0540 25 M $ $

60600-8000 Line 0560 4 Each $ $

60700-2000 Line 0580 185 M $ $

60900-2000 Line 0600 235 M $ $

61000-1000 Line 0620 75 M $ $

61101-1000 Line 0640 21 mo $ $

61310-1000 Line 0660 1 Each $ $

61310-2000 Line 0680 1 Each $ $

61310-3000 Line 0700 1 Each $ $

61310-4000 Line 0720 1 Each $ $

61310-5000 Line 0740 4 Each $ $

61310-6000 Line 0760 4 Each $ $

Concrete Barrier

Field Office

Traffic Sign Assembly, Code 1

Cold Milling Bituminous Concrete Pavement

HPM Bituminous Pavement Mix Type S (75)(12)

Inlet, Type I (Modified)

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

Th…