This is a Request for Proposals (RFP #33101-26013FAS5) issued by the State of Tennessee, Department of Education, for a School Choice Program Management System to support three educational choice programs: the Education Savings Account (ESA), Individualized Education Account (IEA), and Education Freedom Scholarship (EFS). The State seeks a comprehensive, secure, web-based electronic system capable of managing interactive applications, fiscal management, and payment processing for up to 700 schools, 70,000 students, and approximately 100 state staff members, with expansion capacity to 100,000 users. The system must include an Application System, Account Holder Management System, Fiscal Management and Payment System, Support and Training System, and Reporting System. The RFP was issued on October 30, 2025, with a Pre-response Conference scheduled for November 6, 2025, at 10:30 a.m. via Microsoft Teams. The written questions and comments deadline is November 14, 2025, at 2:00 p.m., and the response deadline is December 19, 2025, at 2:00 p.m. The State will complete technical evaluations by January 9, 2026, open and score cost proposals on January 12, 2026, and issue a Notice of Intent to Award on January 15, 2026. The contract term is sixty-four months (fiscal years 2026-2031), with system implementation required by May 1, 2026.
The estimated contractor compensation is $9,750,000.00 for the full contract term, with cost proposals including line items for requirements gathering, development, testing, pilot and training, rollout phases, annual system hosting and subscription/license fees, system maintenance, technical support, and change orders. Pricing must be submitted on the exact Cost Proposal form provided, with all costs incorporated for the total contract period. No specific set-asides for disadvantaged enterprises are mentioned. Respondents must be registered with the Tennessee Department of Revenue for sales and use tax collection and must hold all necessary business and professional licenses. The system must be web-based with no software downloads required, ADA compliant, accessible from major web browsers on tablets, mobile devices, and computers, and support multiple languages. Technical requirements include cloud-based hosting with 99.95% uptime, SOC 2 Type 2 compliance, FIPS 140-2 or 140-3 data encryption standards, nightly backups, and data integration capabilities with the State's Tennessee Education Data System (TEDS) and Ed-Fi data model standards. The system must be housed exclusively in the continental United States with data access limited to US-based resources. The evaluation will award up to 10 points for general qualifications and experience, up to 60 points for technical qualifications and approach, and up to 30 points for cost proposals, with contract award based on the best combination of attributes rather than the lowest cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09-18-25 RFP
STATE OF TENNESSEE
DEPARTMENT OF EDUCATION
REQUEST FOR PROPOSALS
FOR
SCHOOL CHOICE PROGRAM MANAGEMENT SYSTEM
(FY2026-FY2031)
RFP # 33101-26013FAS5
RELEASE 2
RFP CONTENTS
SECTIONS:
1. INTRODUCTION
2. RFP SCHEDULE OF EVENTS
3. RESPONSE REQUIREMENTS
4. GENERAL CONTRACTING INFORMATION & REQUIREMENTS
5. EVALUATION & CONTRACT AWARD
ATTACHMENTS:
6.1. Response Statement of Certifications & Assurances
6.2. Technical Response & Evaluation Guide
6.3. Cost Proposal & Scoring Guide
6.4. Reference Questionnaire
6.5. Score Summary Matrix
6.6. Pro Forma Contract
1. INTRODUCTION
The State of Tennessee, Department of Education, hereinafter referred to as “the State,” issues this Request for Proposals (RFP) to define minimum contract requirements; solicit responses; detail response requirements; and, outline the State’s process for evaluating responses and selecting a contractor to provide the needed goods or services.
Through this RFP, the State seeks to procure necessary goods or services at the most favorable, competitive prices and to give ALL qualified respondents, including those that are owned by minorities, women, service-disabled veterans, persons with disabilities and small business enterprises, an opportunity to do business with the state as contractors, subcontractors or suppliers.
1.1. Statement of Procurement Purpose
The State is seeking to procure a Tennessee School Choice Program Management System (“System”), a secure, electronic System for interactive applications, fiscal management, and payments that includes but is not limited to the following capabilities: acceptance and denial of applications, enrollment confirmation with schools, pre-approval of funds, disbursement of funds, and monitoring of funds. This System will be utilized by families, schools, and State staff to process applications and shall provide a fiscal management and payment system for the Education Savings Account (ESA) program, the Individualized Education Account (IEA) program, and the Education Freedom Scholarship (EFS) program (collectively, the “School Choice Programs”).
In 2019, the Tennessee General Assembly passed the Tennessee Education Savings Account Pilot
Program, codified at Tenn. Code Ann. § 49-6-2601 et seq., and the State Board of Education (SBE) subsequently approved SBE Rule 0520-01-16 for spending of ESA funds. Pursuant to Tenn. Code Ann. §§ 49-6-2603, 2607 the State is required to oversee the implementation of the school and parent application approvals and monitor the expenditure of funds for the ESA program.
The IEA program is a school choice initiative established for eligible K-12 students with qualifying disabilities. This IEA program supports Tennessee families by providing funds for approved education expenses tailored to meet each student's unique learning needs. These funds can be used for various purposes such as scholarships to attend certain non-public schools, participation in umbrella home school programs, or participation in independent home-schooling. To qualify for the IEA program, students must meet specific eligibility criteria established and guided by state law (Tenn. Code Ann. § 49-10-1401 et seq.; SBE Rule 0520-01-11).
In 2025, the Tennessee General Assembly passed the Education Freedom Scholarship Act, codified in Tenn. Code Ann. § 49-6-3501 et seq. Pursuant to Tenn. Code Ann. § 49-6- 3504, the State is required to oversee the implementation of the school and parent application approvals and monitor the expenditure of funds for the EFS program.
The comprehensive System shall include all parts of the School Choice Programs, including allowing application information to stay with the student records to effectively organize and report data, tracking the use of funds by schools and parents, and empowering the State to report and monitor funds for compliance. The System will also allow a comprehensive review of programs, help schools and parents, reduce the risk of non-compliance, and improve the outcome of students in the School Choice Programs.
The System will be user-friendly, flexible, and fully customizable, with the ability to respond to changing mandates and satisfy reporting obligations for the School Choice Programs. It must also be entirely web-based, requiring no application-specific software to be downloaded by users and being accessible from any major web browser (e.g., Chrome, Firefox, Internet Explorer, etc.) from a tablet, mobile, or computer (including Mac or PC) to ensure users have readily available access to the System. The System must also include multiple languages and have password-protected account access for families and password-protected account access for State staff to access all data. The System must also allow for uploads and a customizable application process.
The System will be utilized by up to 700 schools, up to 70,000 students, and approximately 100 State staff with the ability to expand to accommodate more users in response to legislative changes.
For the purposes of this RFP, the definitions in the Pro Forma Contract shall apply.
The estimated contractor’s compensation is $9,750,000.00 for the Contract Term of sixty-four (64) months. The awarded contractor’s compensation will be based on the awarded contractor’s cost proposal. The overall maximum liability will also include pass-through funding for all three (3) programs in accordance with sections A.20. and A.21. of the Pro Forma Contract.
The Contractor shall complete implementation of the System, including completion of all key project phases and associated deliverables by May 1, 2026, unless otherwise agreed to by the State.
1.2. Scope of Service, Contract Period, & Required Terms and Conditions
The RFP Attachment 6.6., Pro Forma Contract details the State’s requirements:
Scope of Services and Deliverables (Section A);
Contract Period (Section B);
Payment Terms (Section C);
Standard Terms and Conditions (Section D); and, Special Terms and Conditions (Section E).
The pro forma contract substantially represents the contract document that the successful Respondent must sign.
1.3. Nondiscrimination
No person shall be excluded from participation in, be denied benefits of, or be otherwise subjected to discrimination in the performance of a Contract pursuant to this RFP or in the employment practices of the Contractor on the grounds of handicap or disability, age, race, creed, color, religion, sex, national origin, or any other classification protected by federal, Tennessee state constitutional, or statutory law. The Contractor pursuant to this RFP shall, upon request, show proof of such nondiscrimination and shall post in conspicuous places, available to all employees and applicants, notices of nondiscrimination.
1.4. RFP Communications
1.4.1. The State has assigned the following RFP identification number that must be referenced in all communications regarding this RFP:
1.4.2. Unauthorized contact about this RFP with employees or officials of the State of Tennessee except as detailed below may result in disqualification from consideration under this procurement process.
1.4.2.1. Prospective Respondents must direct communications concerning this RFP to the following person designated as the Solicitation Coordinator:
Genell Jordan | Sourcing Specialist
Central Procurement Office Tennessee Tower, 3rd Floor 312 Rosa L. Parks Ave.
Nashville, TN 37243
(615) 532-7202 Genell.Jordan@tn.gov
1.4.2.2. Notwithstanding the foregoing, Prospective Respondents may alternatively contact:
the following individual designated by the State to coordinate compliance with the nondiscrimination requirements of the State of Tennessee, Title VI of the Civil Rights Act of 1964, the Americans with Disabilities Act of 1990, and associated federal regulations:
Helen Crowley Central Procurement Office Department of General Services WRS 312 Rosa L. Parks Avenue Tennessee Tower, 3rd Floor Nashville, TN 37243-1102
(615) 741-3836 Helen.Crowley@tn.gov
1.4.3. Only the State’s official, written responses and communications with Respondents are binding with regard to this RFP. Oral communications between a State official and one or more Respondents are unofficial and non-binding.
1.4.4. Potential Respondents must ensure that the State receives all written questions and comments, including questions and requests for clarification, no later than the Written Questions & Comments Deadline detailed in the RFP Section 2, Schedule of Events.
1.4.5. Respondents must assume the risk of the method of dispatching any communication or response to the State. The State assumes no responsibility for delays or delivery failures resulting from the Respondent’s method of dispatch. Actual or digital “postmarking” of a communication or response to the State by a specified deadline is not a substitute for the State’s actual receipt of a communication or response. It is encouraged for Respondents to submit bids digitally.
1.4.6. The State will convey all official responses and communications related to this RFP to the prospective Respondents from whom the State has received a Notice of Intent to Respond (refer to RFP Section 1.8).
1.4.7. The State reserves the right to determine, at its sole discretion, the method of conveying official, written responses and communications related to this RFP. Such written communications may be transmitted by mail, hand-delivery, facsimile, electronic mail, Internet posting, or any other means deemed reasonable by the State. For internet posting, please refer to the following website: https://www.tn.gov/generalservices/procurement/central-procurement-office--cpo- /supplier-information/request-for-proposals--rfp--opportunities1.html.
1.4.8. The State reserves the right to determine, at its sole discretion, the appropriateness and adequacy of responses to written comments, questions, and requests related to this RFP. The State’s official, written responses will constitute an amendment of this RFP.
1.4.9. Any data or factual information provided by the State (in this RFP, an RFP amendment or any other communication relating to this RFP) is for informational purposes only. The State will make reasonable efforts to ensure the accuracy of such data or information, however it is the Respondent’s obligation to independently verify any data or information provided by the State.
The State expressly disclaims the accuracy or adequacy of any information or data that it provides to prospective Respondents.
1.5. Assistance to Respondents With a Handicap or Disability
Prospective Respondents with a handicap or disability may receive accommodation relating to the communication of this RFP and participating in the RFP process. Prospective Respondents may contact the Solicitation Coordinator to request such reasonable accommodation no later than the Disability Accommodation Request Deadline detailed in the RFP Section 2, Schedule of Events.
1.6. Respondent Required Review & Waiver of Objections
1.6.1. Each prospective Respondent must carefully review this RFP, including but not limited to, attachments, the RFP Attachment 6.6., Pro Forma Contract, and any amendments, for questions, comments, defects, objections, or any other matter requiring clarification or correction (collectively called “questions and comments”).
1.6.2. Any prospective Respondent having questions and comments concerning this RFP must provide them in writing to the State no later than the Written Questions & Comments Deadline detailed in the RFP Section 2, Schedule of Events.
1.6.3. Protests based on any objection to the RFP shall be considered waived and invalid if the objection has not been brought to the attention of the State, in writing, by the Written Questions & Comments Deadline.
1.7. Pre-Response Conference
A Pre-response Conference will be held at the time and date detailed in the RFP Section 2, Schedule of Events. Pre-response Conference attendance is not mandatory, and prospective Respondents may be limited to a maximum number of attendees depending upon overall attendance and space limitations.
The conference will be held at:
Microsoft Teams Need help?
Join the meeting now Meeting ID: 249 763 916 209 3 Passcode: s5rG9iT9 Dial in by phone +1 629-209-4396,,948959170# United States, Triune Find a local number Phone conference ID: 948 959 170# Join on a video conferencing device Tenant key: stateoftn@m.webex.com Video ID: 117 099 709 1 More info
The purpose of the conference is to discuss the RFP scope of goods or services. The State will entertain questions, however prospective Respondents must understand that the State’s oral response to any question at the Pre-response Conference shall be unofficial and non-binding. Prospective Respondents must submit all questions, comments, or other concerns regarding the RFP in writing prior to the Written Questions & Comments Deadline date detailed in the RFP Section 2, Schedule of Events. The State will send the official response to these questions and comments to prospective Respondents from whom the State has received a Notice of Intent to respond as indicated in RFP Section 1.8 and on the date detailed in the RFP Section 2, Schedule of Events.
1.8. Notice of Intent to Respond
Before the Notice of Intent to Respond Deadline detailed in the RFP Section 2, Schedule of Events, prospective Respondents should submit to the Solicitation Coordinator a Notice of Intent to Respond (in the form of a simple e-mail or other written communication). Such notice should include the following information:
the business or individual’s name (as appropriate);
a contact person’s name and title; and the contact person’s mailing address, telephone number, facsimile number, and e-mail address.
A Notice of Intent to Respond creates no obligation and is not a prerequisite for submitting a response, however, it is necessary to ensure receipt of any RFP amendments or other notices and communications relating to this RFP.
1.9. Response Deadline
A Respondent must ensure that the State receives a response no later than the Response Deadline time and date detailed in the RFP Section 2, Schedule of Events. The State will not accept late responses, and a Respondent’s failure to submit a response before the deadline will result in disqualification of the response. It is the responsibility of the Respondent to ascertain any additional security requirements with respect to packaging and delivery to the State of Tennessee. Respondents should be mindful of any potential delays due to security screening procedures, weather, or other filing delays whether foreseeable or unforeseeable.
2. RFP SCHEDULE OF EVENTS
2.1. The following RFP Schedule of Events represents the State’s best estimate for this RFP.
EVENT
TIME
(Central Time
Zone)
DATE
1. RFP Issued October 30, 2025
2. Disability Accommodation Request Deadline 2:00 p.m. November 5, 2025
3. Pre-response Conference 10:30 a.m. November 6, 2025
4. Notice of Intent to Respond Deadline 2:00 p.m. November 7, 2025
5. Written “Questions & Comments” Deadline 2:00 p.m. November 14, 2025
6. State Response to Written “Questions & Comments”
December 12, 2025
7. Response Deadline 2:00 p.m. December 19, 2025
8. State Completion of Technical Response Evaluations
January 9, 2026
9. State Opening & Scoring of Cost Proposals 8:00 a.m. January 12, 2026
10. Negotiations (Optional) January 13 -14, 2026
11. State Notice of Intent to Award Released and RFP Files Opened for Public Inspection
2:00 p.m. January 15, 2026
12. End of Protest Period January 23, 2026
13. State sends contract to Contractor for signature January 27, 2026
14. Contractor Signature Deadline 2:00 p.m. January 29, 2026
2.2. The State reserves the right, at its sole discretion, to adjust the RFP Schedule of Events as it deems necessary. Any adjustment of the Schedule of Events shall constitute an RFP amendment, and the State will communicate such to prospective Respondents from whom the State has received a Notice of Intent to Respond (refer to Section 1.8).
3. RESPONSE REQUIREMENTS
3.1. Response Form
A response to this RFP must consist of two parts, a Technical Response and a Cost Proposal.
3.1.1. Technical Response. RFP Attachment 6.2., Technical Response & Evaluation Guide provides the specific requirements for submitting a response. This guide includes mandatory requirement items, general qualifications and experience items, and technical qualifications, experience, and approach items all of which must be addressed with a written response and, in some instances, additional documentation.
NOTICE: A technical response must not include any pricing or cost information.
If any pricing or cost information amounts of any type (even pricing relating to other projects) is included in any part of the technical response, the state may deem the response to be non-responsive and reject it.
3.1.1.1. A Respondent should duplicate and use the RFP Attachment 6.2., Technical Response
& Evaluation Guide to organize, reference, and draft the Technical Response by duplicating the attachment, adding appropriate page numbers as required, and using the guide as a table of contents covering the Technical Response.
3.1.1.2. A response should be economically prepared, with emphasis on completeness and clarity. A response, as well as any reference material presented, must be written in English and must be written on standard 8 ½” x 11” pages (although oversize exhibits are permissible) and use a 12 point font for text. All response pages must be numbered.
3.1.1.3. All information and documentation included in a Technical Response should correspond to or address a specific requirement detailed in the RFP Attachment 6.2., Technical Response & Evaluation Guide. All information must be incorporated into a response to a specific requirement and clearly referenced. Any information not meeting these criteria will be deemed extraneous and will not contribute to evaluations.
3.1.1.4. The State may determine a response to be non-responsive and reject it if:
a. the Respondent fails to organize and properly reference the Technical Response as required by this RFP and the RFP Attachment 6.2., Technical Response & Evaluation Guide; or
b. the Technical Response document does not appropriately respond to, address, or meet all of the requirements and response items detailed in the RFP Attachment 6.2., Technical Response & Evaluation Guide.
3.1.2. Cost Proposal. A Cost Proposal must be recorded on an exact duplicate of the RFP Attachment
6.3., Cost Proposal & Scoring Guide.
NOTICE: If a Respondent fails to submit a cost proposal exactly as required, the State may deem the response to be non-responsive and reject it.
3.1.2.1. A Respondent must only record the proposed cost exactly as required by the RFP
Attachment 6.3., Cost Proposal & Scoring Guide and must NOT record any other rates, amounts, or information.
3.1.2.2. The proposed cost shall incorporate ALL costs for services under the contract for the total contract period, including any renewals or extensions.
3.1.2.3. A Respondent must sign and date the Cost Proposal.
3.1.2.4. A Respondent must submit the Cost Proposal to the State on a separate e-mail, CD, or
USB flash drive from the Technical Response (as detailed in RFP Sections 3.2.3., et.
seq).
3.2. Response Delivery
3.2.1. A Respondent must ensure that both the Technical Response and Cost Proposal files meet all form and content requirements, including all required signatures, as detailed within this RFP.
3.2.2. A Respondent must submit their response as specified in one of the two formats below.
3.2.2.1. Digital Media Submission
3.2.2.1.1. Technical Response
The Technical Response document should be in the form of one (1) digital document in “PDF” format properly recorded on its own otherwise blank, standard USB flash drive and should be clearly identified as the:
“RFP # 33101-26013FAS5 TECHNICAL RESPONSE ORIGINAL”
and ONE (1) digital copies of the Technical Response each in the form of one (1) digital document in “PDF” format properly recorded on its own otherwise blank, standard USB flash drive clearly labeled:
“RFP # 33101-26013FAS5 TECHNICAL RESPONSE COPY”
The customer references should be delivered by each reference in accordance with RFP Attachment 6.4. Reference Questionnaire.
3.2.2.1.2. Cost Proposal:
The Cost Proposal should be in the form of one (1) digital document in “PDF” or “XLS” format properly recorded on a separate, otherwise blank, USB flash drive clearly labeled:
“RFP # 33101-26013FAS5 COST PROPOSAL”
An electronic or facsimile signature, as applicable, on the Cost Proposal is acceptable.
3.2.2.2. E-mail Submission
3.2.2.2.1. Technical Response
The Technical Response document should be in the form of one (1) digital document in “PDF” format or other easily accessible digital format attached to an e-mail to the Solicitation Coordinator. Both the subject and file name should be clearly identified as follows:
“RFP # 33101-26013FAS5 TECHNICAL RESPONSE”
The customer references should be delivered by each reference in accordance with RFP Attachment 6.4. Reference Questionnaire.
3.2.2.2.2. Cost Proposal:
The Cost Proposal should be in the form of one (1) digital document in “PDF” or “XLS” format or other easily accessible digital format attached to an e-mail to the Solicitation Coordinator. Both the subject and file name should be clearly identified as follows:
“RFP # 33101-26013FAS5 COST PROPOSAL”
An electronic or facsimile signature, as applicable, on the Cost Proposal is acceptable.
3.2.3. For e-mail submissions, the Technical Response and Cost Proposal documents must be dispatched to the Solicitation Coordinator in separate e-mail messages. For digital media submissions, a Respondent must separate, seal, package, and label the documents and copies for delivery as follows:
3.2.3.1. The Technical Response and copies must be placed in a sealed package that is clearly labeled:
“DO NOT OPEN… RFP # 33101-26013FAS5 TECHNICAL RESPONSE FROM
[RESPONDENT LEGAL ENTITY NAME]”
3.2.3.2. The Cost Proposal must be placed in a separate, sealed package that is clearly labeled:
“DO NOT OPEN… RFP # 33101-26013FAS5 COST PROPOSAL FROM
[RESPONDENT LEGAL ENTITY NAME]”
3.2.3.3. The separately, sealed Technical Response and Cost Proposal components may be enclosed in a larger package for mailing or delivery, provided that the outermost package is clearly labeled:
“RFP # 33101-26013FAS5 SEALED TECHNICAL RESPONSE & SEALED COST
PROPOSAL FROM [RESPONDENT LEGAL ENTITY NAME]”
3.2.3.4. Any Respondent wishing to submit a Response in a format other than digital may do so by contacting the Solicitation Coordinator.
3.2.4. A Respondent must ensure that the State receives a response no later than the Response Deadline time and date detailed in the RFP Section 2, Schedule of Events at the following address:
Genell Jordan | Sourcing Specialist
Central Procurement Office Tennessee Tower, 3rd Floor 312 Rosa L. Parks Ave.
Nashville, TN 37243
(615) 532-7202 Genell.Jordan@tn.gov
3.3. Response & Respondent Prohibitions
3.3.1. A response must not include alternate contract terms and conditions. If a response contains such terms and conditions, the State, at its sole discretion, may determine the response to be a non-responsive counteroffer and reject it.
3.3.2. A response must not restrict the rights of the State or otherwise qualify either the offer to deliver goods or provide services as required by this RFP or the Cost Proposal. If a response restricts the rights of the State or otherwise qualifies either the offer to deliver goods or provide services as required by this RFP or the Cost Proposal, the State, at its sole discretion, may determine the response to be a non-responsive counteroffer and reject it.
3.3.3. A response must not propose alternative goods or services (i.e., offer services different from those requested and required by this RFP) unless expressly requested in this RFP. The State may consider a response of alternative goods or services to be non-responsive and reject it.
3.3.4. A Cost Proposal must be prepared and arrived at independently and must not involve any collusion between Respondents. The State will reject any Cost Proposal that involves collusion, consultation, communication, or agreement between Respondents. Regardless of the time of detection, the State will consider any such actions to be grounds for response rejection or contract termination.
3.3.5. A Respondent must not provide, for consideration in this RFP process or subsequent contract negotiations, any information that the Respondent knew or should have known was materially incorrect. If the State determines that a Respondent has provided such incorrect information, the State will deem the Response non-responsive and reject it.
3.3.6. A Respondent must not submit more than one Technical Response and one Cost Proposal in response to this RFP, except as expressly requested by the State in this RFP. If a Respondent submits more than one Technical Response or more than one Cost Proposal, the State will deem all of the responses non-responsive and reject them.
3.3.7. A Respondent must not submit a response as a prime contractor while also permitting one or more other Respondents to offer the Respondent as a subcontractor in their own responses.
Such may result in the disqualification of all Respondents knowingly involved. This restriction does not, however, prohibit different Respondents from offering the same subcontractor as a part of their responses (provided that the subcontractor does not also submit a response as a prime contractor).
3.3.8. The State shall not consider a response from an individual who is, or within the past six (6) months has been, a State employee. For purposes of this RFP:
3.3.8.1. An individual shall be deemed a State employee until such time as all compensation for salary, termination pay, and annual leave has been paid;
3.3.8.2. A contract with or a response from a company, corporation, or any other contracting entity in which a controlling interest is held by any State employee shall be considered to be a contract with or proposal from the employee; and
3.3.8.3. A contract with or a response from a company, corporation, or any other contracting entity that employs an individual who is, or within the past six (6) months has been, a State employee shall not be considered a contract with or a proposal from the employee and shall not constitute a prohibited conflict of interest.
3.3.9. This RFP is also subject to Tenn. Code Ann. § 12-4-101—105.
3.4. Response Errors & Revisions
A Respondent is responsible for any and all response errors or omissions. A Respondent will not be allowed to alter or revise response documents after the Response Deadline time and date detailed in the RFP Section 2, Schedule of Events unless such is formally requested, in writing, by the State.
3.5. Response Withdrawal
A Respondent may withdraw a submitted response at any time before the Response Deadline time and date detailed in the RFP Section 2, Schedule of Events by submitting a written request signed by an authorized Respondent representative. After withdrawing a response, a Respondent may submit another response at any time before the Response Deadline. After the Response Deadline, a Respondent may only withdraw all or a portion of a response where the enforcement of the response would impose an unconscionable hardship on the Respondent.
3.6. Additional Services
If a response offers goods or services in addition to those required by and described in this RFP, the State, at its sole discretion, may add such services to the contract awarded as a result of this RFP.
Notwithstanding the foregoing, a Respondent must not propose any additional cost amounts or rates for additional goods or services. Regardless of any additional services offered in a response, the Respondent’s Cost Proposal must only record the proposed cost as required in this RFP and must not record any other rates, amounts, or information.
NOTICE: If a Respondent fails to submit a Cost Proposal exactly as required, the State may deem the response non-responsive and reject it.
3.7. Response Preparation Costs
The State will not pay any costs associated with the preparation, submittal, or presentation of any response.
4. GENERAL CONTRACTING INFORMATION & REQUIREMENTS
4.1. RFP Amendment
The State at its sole discretion may amend this RFP, in writing, at any time prior to contract award.
However, prior to any such amendment, the State will consider whether it would negatively impact the ability of potential Respondents to meet the response deadline and revise the RFP Schedule of Events if deemed appropriate. If an RFP amendment is issued, the State will convey it to potential Respondents who submitted a Notice of Intent to Respond (refer to RFP Section 1.8). A response must address the final RFP (including its attachments) as amended.
4.2. RFP Cancellation
The State reserves the right, at its sole discretion, to cancel the RFP or to cancel and reissue this RFP in accordance with applicable laws and regulations.
4.3. State Right of Rejection
4.3.1. Subject to applicable laws and regulations, the State reserves the right to reject, at its sole discretion, any and all responses.
4.3.2. The State may deem as non-responsive and reject any response that does not comply with all terms, conditions, and performance requirements of this RFP. Notwithstanding the foregoing, the State reserves the right to waive, at its sole discretion, minor variances from full compliance with this RFP. If the State waives variances in a response, such waiver shall not modify the RFP requirements or excuse the Respondent from full compliance, and the State may hold any resulting Contractor to strict compliance with this RFP.
4.4. Assignment & Subcontracting
4.4.1. The Contractor may not subcontract, transfer, or assign any portion of the Contract awarded as a result of this RFP without prior approval of the State. The State reserves the right to refuse approval, at its sole discretion, of any subcontract, transfer, or assignment.
4.4.2. If a Respondent intends to use subcontractors, the response to this RFP must specifically identify the scope and portions of the work each subcontractor will perform (refer to RFP Attachment 6.2., Section B, General Qualifications & Experience Item B.14.).
4.4.3. Subcontractors identified within a response to this RFP will be deemed as approved by the State unless the State expressly disapproves one or more of the proposed subcontractors prior to signing the Contract.
4.4.4. After contract award, a Contractor may only substitute an approved subcontractor at the discretion of the State and with the State’s prior, written approval.
4.4.5. Notwithstanding any State approval relating to subcontracts, the Respondent who is awarded a contract pursuant to this RFP will be the prime contractor and will be responsible for all work under the Contract.
4.5. Right to Refuse Personnel or Subcontractors
The State reserves the right to refuse, at its sole discretion and notwithstanding any prior approval, any personnel of the prime contractor or a subcontractor providing goods or services in the performance of a contract resulting from this RFP. The State will document in writing the reason(s) for any rejection of personnel.
4.6. Insurance
The State will require the awarded Contractor to provide a Certificate of Insurance issued by an insurance company licensed or authorized to provide insurance in the State of Tennessee. Each Certificate of Insurance shall indicate current insurance coverages meeting minimum requirements as may be specified by this RFP. A failure to provide a current, Certificate of Insurance will be considered a material breach and grounds for contract termination.
4.7. Professional Licensure and Department of Revenue Registration
4.7.1. All persons, agencies, firms, or other entities that provide legal or financial opinions, which a Respondent provides for consideration and evaluation by the State as a part of a response to this RFP, shall be properly licensed to render such opinions.
4.7.2. Before the Contract resulting from this RFP is signed, the apparent successful Respondent (and
Respondent employees and subcontractors, as applicable) must hold all necessary or appropriate business or professional licenses to provide the goods or services as required by the contract. The State may require any Respondent to submit evidence of proper licensure.
4.7.3. Before the Contract resulting from this RFP is signed, the apparent successful Respondent must be registered with the Tennessee Department of Revenue for the collection of Tennessee sales and use tax. The State shall not award a contract unless the Respondent provides proof of such registration or provides documentation from the Department of Revenue that the Contractor is exempt from this registration requirement. The foregoing is a mandatory requirement of an award of a contract pursuant to this solicitation. To register, please visit the Department of Revenue’s Tennessee Taxpayer Access Point (TNTAP) website for Online Registration and the Vendor Contract Questionnaire. These resources are available at the following:
https://tntap.tn.gov/eservices/_/#1
4.8. Disclosure of Response Contents
4.8.1. All materials submitted to the State in response to this RFP shall become the property of the State of Tennessee. Respondents are cautioned not to provide any materials in response to this RFP that are trade secrets, as defined under Tenn. Code Ann. § 47-25-1702 and any other applicable law. By submitting a response to this RFP, the respondent acknowledges and agrees that the State shall have no liability whatsoever for disclosure of a trade secret under the Uniform Trade Secrets Act, as provided at Tenn. Code Ann. § 47-25-1701-1709, or under any other applicable law. Selection or rejection of a response does not affect this right. By submitting a response, a Respondent acknowledges and accepts that the full response contents and associated documents will become open to public inspection in accordance with the laws of the State of Tennessee.
4.8.2. The State will hold all response information, including both technical and cost information, in confidence during the evaluation process.
4.8.3. Upon completion of response evaluations, indicated by public release of a Notice of Intent to
Award, the responses and associated materials will be open for review by the public in accordance with Tenn. Code Ann. § 10-7-504(a)(7).
4.9. Contract Approval and Contract Payments
4.9.1. After contract award, the Contractor who is awarded the contract must submit appropriate documentation with the Department of Finance and Administration, Division of Accounts.
4.9.2. This RFP and its contractor selection processes do not obligate the State and do not create rights, interests, or claims of entitlement in either the Respondent with the apparent best-evaluated response or any other Respondent. State obligations pursuant to a contract award shall commence only after the Contract is signed by the State agency head and the Contractor and after the Contract is approved by all other state officials as required by applicable laws and regulations.
4.9.3. No payment will be obligated or made until the relevant Contract is approved as required by applicable statutes and rules of the State of Tennessee.
4.9.3.1. The State shall not be liable for payment of any type associated with the Contract resulting from this RFP (or any amendment thereof) or responsible for any goods delivered or services rendered by the Contractor, even goods delivered or services rendered in good faith and even if the Contractor is orally directed to proceed with the delivery of goods or the rendering of services, if it occurs before the Contract Effective Date or after the Contract Term.
4.9.3.2. All payments relating to this procurement will be made in accordance with the Payment
Terms and Conditions of the Contract resulting from this RFP (refer to RFP Attachment 6.6., Pro Forma Contract, Section C).
4.9.3.3. If any provision of the Contract provides direct funding or reimbursement for the competitive purchase of goods or services as a component of contract performance or otherwise provides for the reimbursement of specified, actual costs, the State will employ all reasonable means and will require all such documentation that it deems necessary to ensure that such purchases were competitive and costs were reasonable, necessary, and actual. The Contractor shall provide reasonable assistance and access related to such review. Further, the State shall not remit, as funding or reimbursement pursuant to such provisions, any amounts that it determines do not represent reasonable, necessary, and actual costs.
4.10. Contractor Performance
The Contractor who is awarded a contract will be responsible for the delivery of all acceptable goods or the satisfactory completion of all services set out in this RFP (including attachments) as may be amended. All goods or services are subject to inspection and evaluation by the State. The State will employ all reasonable means to ensure that goods delivered or services rendered are in compliance with the Contract, and the Contractor must cooperate with such efforts.
4.11. Contract Amendment
After Contract award, the State may request the Contractor to deliver additional goods or perform additional services within the general scope of the Contract and this RFP, but beyond the specified Scope, and for which the Contractor may be compensated. In such instances, the State will provide the Contractor a written description of the additional goods or services. The Contractor must respond to the State with a time schedule for delivering the additional goods or accomplishing the additional services based on the compensable units included in the Contractor’s response to this RFP. If the State and the Contractor reach an agreement regarding the goods or services and associated compensation, such agreement must be effected by means of a contract amendment. Further, any such amendment requiring additional goods or services must be signed by both the State agency head and the Contractor and must be approved by other state officials as required by applicable statutes, rules, policies and procedures of the State of Tennessee. The Contractor must not provide additional goods or render additional services until the State has issued a written contract amendment with all required approvals.
4.12. Severability
If any provision of this RFP is declared by a court to be illegal or in conflict with any law, said decision will not affect the validity of the remaining RFP terms and provisions, and the rights and obligations of the State and Respondents will be construed and enforced as if the RFP did not contain the particular provision held to be invalid.
4.13. Next Ranked Respondent
The State reserves the right to initiate negotiations with the next ranked Respondent should the State cease doing business with any Respondent selected via this RFP process.
5. EVALUATION & CONTRACT AWARD
5.1. Evaluation Categories & Maximum Points
The State will consider qualifications, experience, technical approach, and cost in the evaluation of responses and award points in each of the categories detailed below (up to the maximum evaluation points indicated) to each response deemed by the State to be responsive.
EVALUATION CATEGORY MAXIMUM POINTS POSSIBLE
General Qualifications & Experience (refer to RFP Attachment 6.2., Section B)
Technical Qualifications, Experience & Approach (refer to RFP Attachment 6.2., Section C)
Cost Proposal (refer to RFP Attachment 6.3.)
5.2. Evaluation Process
The evaluation process is designed to award the contract resulting from this RFP not necessarily to the Respondent offering the lowest cost, but rather to the Respondent deemed by the State to be responsive and responsible who offers the best combination of attributes based upon the evaluation criteria.
(“Responsive Respondent” is defined as a Respondent that has submitted a response that conforms in all material respects to the RFP. “Responsible Respondent” is defined as a Respondent that has the capacity in all respects to perform fully the contract requirements, and the integrity and reliability which will assure good faith performance.)
5.2.1. Technical Response Evaluation. The Solicitation Coordinator and the Proposal Evaluation
Team (consisting of three (3) or more State employees) will use the RFP Attachment 6.2., Technical Response & Evaluation Guide to manage the Technical Response Evaluation and maintain evaluation records.
5.2.1.1. The State reserves the right, at its sole discretion, to request Respondent clarification of a Technical Response or to conduct clarification discussions with any or all Respondents. Any such clarification or discussion will be limited to specific sections of the response identified by the State. The subject Respondent must put any resulting clarification in writing as may be required and in accordance with any deadline imposed by the State.
5.2.1.2. The Solicitation Coordinator will review each Technical Response to determine compliance with RFP Attachment 6.2., Technical Response & Evaluation Guide, Section A— Mandatory Requirements. If the Solicitation Coordinator determines that a response failed to meet one or more of the mandatory requirements, the Solicitation Coordinator will review the response and determine whether:
a. the response adequately meets RFP requirements for further evaluation;
b. the State will request clarifications or corrections for consideration prior to further evaluation; or,
c. the State will determine the response to be non-responsive to the RFP and reject it.
5.2.1.3. Proposal Evaluation Team members will independently evaluate each Technical
Response (that is responsive to the RFP) against the evaluation criteria in this RFP, and will score each in accordance with the RFP Attachment 6.2., Technical Response & Evaluation Guide.
5.2.1.4. For each response evaluated, the Solicitation Coordinator will calculate the average of the Proposal Evaluation Team member scores for RFP Attachment 6.2., Technical Response & Evaluation Guide, and record each average as the response score for the respective Technical Response section.
5.2.1.5. Before Cost Proposals are opened, the Proposal Evaluation Team and the Solicitation
Coordinator will review the Technical Response Evaluation record and any other available information pertinent to whether or not each Respondent is responsive and responsible. If the Proposal Evaluation Team or the Solicitation Coordinator identifies any Respondent that does not meet the responsive and responsible thresholds such that the team or the Solicitation Coordinator would not recommend the Respondent for Cost Proposal Evaluation and potential contract award, the team members or the Solicitation Coordinator will fully document the determination.
5.2.2. Cost Proposal Evaluation. The Solicitation Coordinator will open for evaluation the Cost
Proposal of each Respondent deemed by the State to be responsive and responsible and calculate and record each Cost Proposal score in accordance with the RFP Attachment 6.3., Cost Proposal & Scoring Guide.
5.2.3. Total Response Score. The Solicitation Coordinator will calculate the sum of the Technical
Response section scores and the Cost Proposal score and record the resulting number as the total score for the subject Response (refer to RFP Attachment 6.5., Score Summary Matrix).
5.3. Contract Award Process
5.3.1 The Solicitation Coordinator will review the Proposal Evaluation Team determinations and scores for consideration along with any other relevant information that might be available and pertinent to contract award.
5.3.2. The Solicitation Coordinator will determine the apparent best-evaluated Response using the scoring provided by the Proposal Evaluation Team. To effect a contract award to a Respondent other than the one receiving the highest evaluation process score, the Solicitation Coordinator must provide written justification and obtain the written approval of the Chief Procurement Officer and the Comptroller of the Treasury.
5.3.3. The State will issue a Notice of Intent to Award identifying the apparent best-evaluated response and make the RFP files available for public inspection at the time and date specified in the RFP Section 2, Schedule of Events.
NOTICE: The Notice of Intent to Award shall not create rights, interests, or claims of entitlement in either the apparent best-evaluated Respondent or any other Respondent.
5.3.4. The Respondent identified as offering the apparent best-evaluated response must sign a contract drawn by the State pursuant to this RFP. The Contract shall be substantially the same as the RFP Attachment 6.6., Pro Forma Contract. The Respondent must sign the contract by the Contractor Signature Deadline detailed in the RFP Section 2, Schedule of Events. If the Respondent fails to provide the signed Contract by this deadline, the State may determine that the Respondent is non-responsive to this RFP and reject the response.
5.3.5. Notwithstanding the foregoing, the State may, at its sole discretion, entertain limited terms and conditions or pricing negotiations prior to Contract signing and, as a result, revise the pro forma contract terms and conditions or performance requirements in the State’s best interests, PROVIDED THAT such revision of terms and conditions or performance requirements shall NOT materially affect the basis of response evaluations or negatively impact the competitive nature of the RFP and contractor selection process.
5.3.6. If the State determines that a response is non-responsive and rejects it after opening Cost
Proposals, the Solicitation Coordinator will re-calculate scores for each remaining responsive Cost Proposal to determine (or re-determine) the apparent best-evaluated response.
RFP ATTACHMENT 6.1.
RFP # 33101-26013FAS5 STATEMENT OF CERTIFICATIONS AND ASSURANCES
The Respondent must sign and complete the Statement of Certifications and Assurances below as required, and it must be included in the Technical Response (as required by RFP Attachment 6.2., Technical Response & Evaluation Guide, Section A, Item A.1.).
The Respondent does, hereby, expressly affirm, declare, confirm, certify, and assure ALL of the following:
1. The Respondent will comply with all of the provisions and requirements of the RFP.
2. The Respondent will provide all services as defined in the Scope of the RFP Attachment 6.6., Pro Forma Contract for the total Contract Term.
3. The Respondent, except as otherwise provided in this RFP, accepts and agrees to all terms and conditions set out in the RFP Attachment 6.6., Pro Forma Contract.
4. The Respondent acknowledges and agrees that a contract resulting from the RFP shall incorporate, by reference, all proposal responses as a part of the Contract.
5. The Respondent will comply with:
(a) the laws of the State of Tennessee;
(b) Title VI of the federal Civil Rights Act of 1964;
(c) Title IX of the federal Education Amendments Act of 1972;
(d) the Equal Employment Opportunity Act and the regulations issued there under by the federal government; and,
(e) the Americans with Disabilities Act of 1990 and the regulations issued there under by the federal government.
6. To the knowledge of the undersigned, the information detailed within the response submitted to this RFP is accurate.
7. The response submitted to this RFP was independently prepared, without collusion, under penalty of perjury.
8. No amount shall be paid directly or indirectly to an employee or official of the State of Tennessee as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Respondent in connection with this RFP or any resulting contract.
9. Both the Technical Response and the Cost Proposal submitted in response to this RFP shall remain valid for at least 120 days subsequent to the date of the Cost Proposal opening and thereafter in accordance with any contract pursuant to the RFP.
10. The Respondent affirms the following statement, as required by the Iran Divestment Act Tenn. Code Ann. § 12-12- 111: “By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to §12-12-106.” For reference purposes, the list is currently available online at: https://www.tn.gov/generalservices/procurement/central-procurement-office--cpo- /library-/public-information-library.html.
By signing this Statement of Certifications and Assurances, below, the signatory also certifies legal authority to bind the proposing entity to the provisions of this RFP and any contract awarded pursuant to it. If the signatory is not the Respondent (if an individual) or the Respondent’s company President or Chief Executive Officer, this document must attach evidence showing the individual’s authority to bind the Respondent.
DO NOT SIGN THIS DOCUMENT IF YOU ARE NOT LEGALLY AUTHORIZED TO BIND THE RESPONDENT
SIGNATURE:
PRINTED NAME & TITLE:
DATE:
RESPONDENT LEGAL ENTITY
NAME:
RFP ATTACHMENT 6.2. — Section A
TECHNICAL RESPONSE & EVALUATION GUIDE
SECTION A: MANDATORY REQUIREMENTS. The Respondent must address all items detailed below and provide, in sequence, the information and documentation as required (referenced with the associated item references). The Respondent must also detail the response page number for each item in the appropriate space below.
The Solicitation Coordinator will review the response to determine if the Mandatory Requirement Items are addressed as required and mark each with pass or fail. For each item that is not addressed as required, the Solicitation Coordinator must review the response and attach a written determination. In addition to the Mandatory Requirement Items, the Solicitation Coordinator will review each response for compliance with all RFP requirements.
Response Page #
(Resp…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .