This is a Project Statement RFP issued by the Michigan Department of Technology, Management and Budget (DTMB), Design and Construction Division, on behalf of the Department of Natural Resources Parks & Recreation Division, for professional design and construction services at Mitchell State Park in Cadillac, Michigan. The project involves removing and replacing existing day-use structures, related infrastructure, parking areas, drives, and walkways at the Mitchell State Park Day Use Area. Requested services include site surveying, Phase 400 Preliminary Design, Phase 500 Final Design Services, Phase 600 Construction Administration, and Phase 700 Construction Field Services. Proposals must include preliminary and final design layouts for buildings, drives, parking, and walkways that ensure efficient and safe vehicle and pedestrian circulation, along with detailed cost estimates for demolition and construction. All designs must comply with State and Federal Barrier Free Standards, EGLE permit requirements, State and Federal Environmental permits, and Michigan construction codes. A mandatory walk-through inspection is scheduled for Wednesday, August 30, 2023, at 10:00 a.m. at the project site. Proposals are due September 21, 2023, at 2:00 p.m. Eastern time through the SIGMA VSS online submission system, with RFP questions accepted until September 18, 2023, at 12:00 p.m. The desired project schedule encompasses design from October 2023 through March 2024, bidding in April 2024, and construction from September 2024 through May 2025.
Proposals must be submitted as a single combined technical and cost proposal attachment not exceeding 6 MB, with the total cost for all phases entered as the bid amount. Pricing terms and set-asides are not specified in this project statement document. The project is funded through ARPA (American Rescue Plan Act) resources and is assigned file number 751/23309.GAG. Contact for the client agency is Annamarie Bauer at 231.468.8616, and the DTMB-DCD Project Director is Gerald Gregorski at 231.557.9043. All work must be coordinated with the Construction Manager and comply with applicable federal, state, and local regulations administered by agencies including EPA, OSHA, DOT, DHHS, EGLE, DNR, and MIOSHA. The applicable NIGP codes are 90607, 90610, 90638, 90644, 90646, 90656, 90672, 92507, 92517, 92531, 92533, 92567, and 92586.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 10/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
751/23309.GAG
PROPOSAL DUE DATE
September 21, 2023, at 2:00 p.m., EASTERN
CLIENT AGENCY
Department of Natural Resources / Parks & Recreation Division
PROJECT NAME AND LOCATION
Mitchell State Park - Day Use Improvements
PROJECT ADDRESS (if applicable) William Mitchell State Park, 6093 East M-115 Cadillac MI
CLIENT AGENCY CONTACT
Annamarie Bauer
TELEPHONE NUMBER
231.468.8616
DTMB - DCD PROJECT DIRECTOR
Gerald Gregorski
TELEPHONE NUMBER
231.557.9043
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Wednesday, August 30, 2023, at 10:00am Mitchell State Park – Day Use Area, 6093 East M-115 Cadillac MI
MANDATORY (Check box if Mandatory)
PROJECT DESCRIPTION/SERVICES REQUESTED
Provide all required Professional Services to remove and replace the existing day use structures, related infrastructure, parking areas, drives and walkways at the Mitchell State Park Day Use Area. Scope of work to include all necessary site surveying, Phase 400 Preliminary Design and Phase 500 Final Design Services, Phase 600 Construction Administration and Phase 700 Construction Field Services.
Proposals shall provide for preliminary and final design layout of buildings, drives, parking and walkways for efficient, safe vehicle and pedestrian circulation throughout the site. Detailed cost estimates for the required demolition and construction shall be included. All design alternatives shall be based on and take into consideration State and Federal Barrier Free Standards, EGLE permit requirements, State and Federal Environmental permits and requirements and State of Michigan License and Regulatory Affairs construction codes and permitting. All work must be coordinated and integrated with the Construction Manager. See attached “Mitchell State Park Day Use Improvements ARPA Project Statement 230821”.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.
• Firms should only submit one (1) attachment (being less than 6 MB) for proposal submission. The attachment is to be the technical and cost proposal combined.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov mailto:sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
90607, 90610, 90638, 90644, 90646, 90656, 90672, 92507, 92517, 92531, 92533, 92567, 92586, DESIRED SCHEDULE OF WORK
Design: Oct. 2023 through March 2024, Bidding: April 2024, Construction: Sept. 2024 through May 2025
ACCEPTING RFP QUESTIONS UNTIL: Monday, September 18, 2023, at 12:00pm Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Gerald Gregorski at gregorskig@michigan.gov address no later than 12:00 p.m., Eastern on September 18, 2023.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DHHS, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s)
Construction Grades Electrical and Telephone Lift Station and Tile Field Baseline Plan Public Access Site Mitchell State Park Site Map mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:gregorskig@michigan.gov