RFP_Project Statement_26287.pdf
PDF 170 KB Posted
- Solicitation number
- RFP 171 260000002211 3
- Issued by
- Oakland County, Michigan
About this file
This is a Project Statement and Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) on behalf of the Michigan Department of Corrections (MDOC) for professional engineering services related to HVAC controls upgrades at Muskegon Correctional Facility located at 2400 South Sheridan Drive, Muskegon, Michigan. The project scope includes Phase 100 Study, Phase 300 Schematic Design, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection services for the complete facility assessment and Powerhouse-specific upgrades. The existing pneumatic HVAC controls, which are over 35 years old and obsolete, require replacement with current Direct Digital Controls (DDCs) integrated with the facility's Building Management System. Key project requirements include standardizing controls throughout the facility, connecting to the new MDOC BMS for monitoring, integrating with variable frequency drives for energy efficiency, performing testing and air balancing, and coordinating all work to minimize operational disruption. A mandatory walk-through inspection is scheduled for June 22, 2026, at 1:00 PM at the facility's Administration Building Lobby, with required vendor LEIN submissions due five business days prior. The proposal due date is July 9, 2026, at 2:00 PM Eastern, with RFP questions accepted until July 1, 2026. The desired schedule includes PSC selection within two months, Phase 100 assessment completion by September 2026, design and bid document preparation through March 2027, and construction of Powerhouse controls from August 2027 through March 2028.
Proposals must be submitted electronically through SIGMA VSS with a combined technical and cost proposal not exceeding 25 megabytes. Firms should include all required reimbursable expenses, including $5,000 in LARA plan-review fees and all testing costs associated with the requested services. The PSC must provide construction cost estimates at 50 percent and 90 percent completion of each design phase and conduct bi-weekly progress calls with the Project Director. All design meetings should be conducted electronically to the greatest extent possible, with field work coordinated in advance with MDOC to comply with facility policies. The contract will be structured under the DTMB Contract for Professional Services billing rate structure, with the total cost for all phases submitted as the final bid amount. The project is classified under NIGP codes 90607, 90644, 92507, 92531, 92533, and 92567. Project Director Heather DeKorte (517-243-7248) and Client Agency Contact Ben Verway (517-388-2171) are available for inquiries, with questions directed to dekorteh@michigan.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Billable Rate 26287.pdf | ||
| RFP_ADDENDUM 1_26287.pdf | ||
| RFP_Attachments_26287.pdf | ||
| LEIN Request 26287.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 04/26) HJD 2026-0604, post 0611
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division 3111 West St. Joseph Street
Lansing, Michigan 48909
FILE NUMBER
472/26287.HJD
PROPOSAL DUE DATE
July 9, 2026 @ 2:00 PM Eastern
CLIENT AGENCY
Department of Corrections
PROJECT NAME AND LOCATION
Muskegon Correctional Facility – HVAC Controls Upgrade PROJECT ADDRESS (if applicable) 2400 South Sheridan Dr., Muskegon, MI 49442
CLIENT AGENCY CONTACT
Ben Verway, Physical Plant Division
TELEPHONE NUMBER
517-388-2171
DTMB - DCD PROJECT DIRECTOR
Heather DeKorte, Project Director
TELEPHONE NUMBER
517-243-7248
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Muskegon Correctional Facility, 2400 South Sheridan Dr., Muskegon, MI 49442 Administration Building Lobby, Phone 231-773-3201 Monday, June 22, 2026, at 1:00 PM.
MANDATORY (Check box if Walk-Through is Mandatory)
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
PROJECT DESCRIPTION/SERVICES REQUESTED:
On behalf of the Michigan Department of Corrections (MDOC), the Department of Technology, Management, and Budget (DTMB) is requesting professional engineering services for the design, bidding, and construction administration for upgrades to the existing HVAC controls throughout the Muskegon Correctional Facility. This request is to provide Phase 100 Study, 300 Schematic Design, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection services.
The existing HVAC pneumatic controls throughout the facility are over 35 years old. The controls have exceeded their service life. The controls are outdated and replacement parts are hard to find. The controls do not integrate with facility’s Building Management System. It is hard to manage the heat in the Housing Units. The goal of this project is to upgrade to current controls technology to improve the facility’s ability to manage and monitor the existing HVAC systems.
The PSC shall provide a detailed assessment of existing controls, plan a phased installation to avoid operational disruption, and integrate modern DDC and BMS with energy-efficient components. PSC shall provide a Phase 100 Study for all buildings within the Facility. PSC shall provide Phases 300 through 700 services for HVAC control upgrades in the Powerhouse only. Future Phase 300 through 700 services may mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov include control upgrades of other buildings within the Facility if budget allows but should not be included in the PSC proposal.
The PSC must consider the following items:
• Replace outdated controls, including pneumatic or obsolete controls.
• Standardize controls throughout the facility.
• Install Direct Digital Controls (DDCs).
• Connect HVAC controls to new MDOC facility Building Management System (BMS) for monitoring.
• Add new controls to existing Variable Frequency Drives (VFDs) on pumps and fans for energy efficiency.
• Integrate with energy recovery system for condensate, ensuring proper purge CFM and fan performance.
• Clean coils to maintain air quality.
• Ensure upgraded controls maintain proper ventilation.
• Asbestos abatement may be required for upgrades.
• Modify sprinkler, lighting, and utility systems as needed.
• Testing and Air Balancing of systems after controls upgrades.
• Ideally the new BMS system will be non-proprietary and compatible with State of MI software requirements.
• Some air handler controls in Education Building and Health Care have already been upgraded and will need to tie into a new Building Management System (BMS).
In addition to the requirements described in the DTMB Contract for Professional Services: Billing Rate – Not to Exceed sample contract, please accommodate the following:
1) Clearly document the number of meetings proposed and indicate which meetings will need to be on-site.
Design meetings shall be held via electronic format to the greatest extent possible.
2) Attend a bi-weekly progress phone call with the Project Director.
3) Provide construction estimates for owner review at the 50% and 90% of each phase. Review the construction budget at every design review meeting.
4) Coordinate all field work, construction phasing and scheduling with MDOC in advance to minimize disruption to their operation of the project site. Conduct field work in a manner that complies with MDOC policies currently in effect or which may come into effect.
5) Develop contract documents to include alternates for the improvement work to use all available funding.
6) Include as reimbursables in this proposal all testing required as part of the services requested.
7) Include LARA plan-review fees of $5000 as a reimbursable expense.
8) Agency will provide available drawings to the selected PSC. The PSC shall field verify all existing conditions.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS.
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
• Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 25mb.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4 mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
90607, 90644, 92507, 92531, 92533, 92567
DESIRED SCHEDULE OF WORK
RFP Process to award PSC Architect/Engineer 2 months (June -July ‘26) PSC conduct Phase 100 Assessment 2 months (August – Sept ’26) PSC design and Prepare Bid Documents 6 months (Oct ‘26-Mar ‘27) Bidding process and SAB Award/Permitting 3 months (April-June ‘27) Award Bid Package - Powerhouse Controls 1 month (July ’27) Construction – Powerhouse Controls 9 months (Aug ‘27-Mar ‘28)
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Heather DeKorte at dekorteh@michigan.gov address no later than 2:00 p.m., Eastern on July 1, 2026.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)
Attachment(s) are combined into a single PDF.
1) MCF Aerial site image with buildings identified
2) MCF Building List
3) MCF Image of Available Drawings
4) MDOC Special Working Conditions mailto:dekorteh@michigan.gov