This solicitation requests proposals for combat systems repair and refurbishment services in support of the Mid-Atlantic Regional Maintenance Center. Offerors must have the capability to repair and refurbish various combat and C4I systems, including SLQ-32 antenna enclosures, decoy launching systems, harpoon launch support structures, torpedo tubes, UHF SATCOM antennas and associated equipment. The period of performance consists of a one year base period and four one-year options. Pricing will be on a firm-fixed-price basis for individual delivery orders covering specific repair requirements. Proposals were due by 10:00 AM local time on April 3, 2020, with the government intending to make award on this solicitation. The solicitation includes various contract clauses and standard items related to safety, environmental compliance, and technical requirements for the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004_SF30_N5005420R0001.pdf | ||
| Bidders_Questions_and_Answers_(007-008).pdf | ||
| Amendment_0003_SF30_N5005420R0001.pdf | ||
| Bidders_Questions_and_Answers_(005-006).pdf | ||
| Bidders_Questions_and_Answers_(002_004).pdf | ||
| Amendment_0002_SF30_N5005420R0001.pdf | ||
| Amendment_0001_SF30_N5005420R0001.pdf | ||
| Bidders_Questions_and_Answers_(001).pdf | ||
| J-3_LWT_042-037.pdf | ||
| J-2_CDRLs.pdf | ||
| J1-_Labor_and_Material_Price_Sheet.xlsx | XLSX spreadsheet | |
| J-5_SWT_077-001.pdf | ||
| J-7_Capacity_Evaluation_Form.xlsx | XLSX spreadsheet | |
| J-4_SWT_042-001.pdf | ||
| J-9_Past_Performance_Assessment_Questionnaire.docx | DOCX document | |
| J-10_Request_for_Specification_Clarification.docx | DOCX document | |
| J-11 SHIP ACCESS FORM.xlsx | XLSX spreadsheet | |
| J-6 -Small-Business-Participation-Plan-Table.xlsx | XLSX spreadsheet | |
| J-8_Past_Performance_Reference_List.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 03 Apr 2020
X
A
X B
X C X D
EX
X
G
F 92 - 101
102 - 115
X H 116 - 122 wendell.davis@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 122
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N50054 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
MARMC, LF-18 Quaterdeck conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
WENDELL D. DAVIS 757-400-0262
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 11
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
12 - 43
44 - 45
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
46 - 48
49 - 52 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 53 - 62 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 63 - 68 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
69 - 89
PART II - CO NTRACT CLAUSES
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 414,
9727 AVIONICS LOOP
NORFOLK VA 23511-2124
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
90 - 91
6. REQUISITION/PURCHASE NO.
N50054CS2020
5. DATE ISSUED
04 Mar 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N5005420R0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
CLIN
Number
1 Job
Base Year Effort
FFP
Firm-Fixed Price (FFP) Delivery Orders (DOs) for Base Year repair and refurbishment of Combat Systems. SEE NOTES indicated below in Section B.
FOB: Destination
PURCHASE REQUEST NUMBER: N50054CS2020
PSC CD: J998
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
CLIN
UNDEFINED
DATA
FFP
Data Per Items A001 and A002
Not Separatley Priced
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION Option I - Second Year Effort
FFP
Firm-Fixed Price (FFP) Delivery Orders (DOs) for Second Year repair and refurbishment of Combat Systems. SEE NOTES indicated below in Section B.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION DATA
Not Separatlely Priced
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION Option II - Third Year Effort
FFP
Firm-Fixed Price (FFP) Delivery Orders (DOs) for Third Year repair and refurbishment of Combat Systems. SEE NOTES indicated below in Section B.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
CLIN
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION Option III - Fourth Year Effort
FFP
Firm-Fixed Price (FFP) Delivery Orders (DOs) for Fourth Year repair and refurbishment of Combat Systems. SEE NOTES indicated below in Section B.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
CLIN
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION Option IV - Fifth Year Effort
FFP
Firm-Fixed Price (FFP) Delivery Orders (DOs) for Fifth Year repair and refurbishment of Combat Systems. SEE NOTES indicated below in Section B.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
CLIN
DATA
Data Items Per A001 and A002
Not Separately Priced
OPTION NOTE
NOTE A: CLINs 0101 through 0402 are option items to which the option clause 52.217-7 in SECTION I applies and which are to be supplied only if and to the extent said option is exercised.
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES (CEILING RATES)
1.0 The Contractor’s fully burdened ship repair labor rate will be used for negotiating Firm Fixed Price (FFP) delivery orders, growth work, and new work to be performed under this IDIQ-MAC for each delivery order.
The fully burdened ship repair labor rate shall be the ceiling rate of the contract. The contractor agrees that the number of man hours included in its price proposal for delivery order modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting
Fire Watch
Welding (inside)
Welding (outside)
Machinists
Burning
Brazing
Carpentry
Electrical Work
Electronic Work
Engineering
Design Support
Lagging
Ship-fitting
Painting
Sheet-metal Work
Pipefitting
Rigging
General Labor
Staging/Scaffolding
2.0 The fully burdened ship repair labor rate proposed by the contractor shall include those support functions
(whether charged directly or indirectly by the offeror’s accounting systems) which are herein defined as support for production functions. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man hours. Labor hours for the below support functions shall not be separately proposed. Examples of support functions include but are not limited to:
Testing
Quality Assurance
Execution Planning
Cleaning (except tank cleaning)
Supervision
Security
Surveying
Administration
Transportation
Purchasing Staff
Lofting
Other indirect support
Material handling & Warehousing
Safety/Environmental
3.0 The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, general and administrative expenses, and profit. The fully burdened ship repair labor rate represents the ceiling for the blended rate to be performed by the offeror, including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.
4.0 Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s ship repair labor rate and not separately priced.
5.0 Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material mark-up rates apply to physical materials but not to consumable materials. The mark-up will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6.0 Fully Burdened Ship Repair Labor and Material Rate Schedule, (transcribed from J-1, Labor and Material
Burden Price Rates Sheet):
Base Period
Fully Burdened Ship
Repair Labor Rate
Material Burden Rate
Option Period 1
Option Period 2
Option Period 3
Option Period 4
7.0 The Contracting Officer may negotiate the fixed ship repair labor rate and material burden rate (not to exceed the contract ceiling rate) with the offeror(s) in accordance with FAR 15.4 at the delivery order level.
NOTE C: GOVERNMENT RIGHT TO NOT EXERCISE FUTURE OPTIONS
Whether to exercise an option is solely within the Government’s discretion. However, part of the Government’s decision to exercise an option may be based on how well, in the Government’s determination, the Contractor has been performing the Delivery Orders awarded under the contract, as documented in past performance information including the Contractor’s Contract Performance Assessment Rating (CPAR) scores.
CLAUSES INCORPORATED BY FULL TEXT
B-231-H002 WORKSITE TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) The contractor shall not charge, and the Government shall not pay, as an allowable cost under this contract, any manhour costs (whether straight-time or overtime) for contractor personnel or subcontractor personnel traveling to or from worksites, including travel to worksites other than the contractor's facility for performance of contract work.
(b) Workers being paid under this contract, as prime contractor personnel or subcontractor personnel, will complete a full shift at the worksite, and no compensation will be paid for travel time before or after the shift.
(c) This requirement pertains only to payments for travel time before or after these workers' regular shifts
(commuting costs), and does not apply to legitimate travel costs incurred during normal working hours, provided that those costs are otherwise reasonable, allocable and allowable and approved in writing by the Government. This requirement does not apply to manufacturer's representatives or Original Equipment Manufacturer (OEM) representatives when specifically required by the Government work specifications.
(d) Additionally, the contractor shall not charge, and the Government shall not pay, any transportation costs under this contract associated with transporting contractor or subcontractor personnel between the contractor's facility (or subcontractor's facility), and any other worksite to perform ship repair, maintenance or modernization.
Transportation costs include, but are not limited to, bus fare, car fare, train fare, or boat fare, paid by the work force, or paid by the contractor on behalf of the work force.
(End of text)
Section C - Descriptions and Specifications
STATEMENT OF WORK
C.1. SCOPE OF WORK
C.1.1. The Contractor shall furnish the necessary management, labor, material, repair support, equipment and facilities to perform industrial fabrication, material procurement to accomplish repair and refurbishment of United
States Navy/FMS Surface Combat/C4I Systems listed below:
SLQ-32 Antenna Enclosures
MK-36 and MK-53 Decoy Launching System (DLS) CERTIFICATION REQUIRED
MK-141 MOD 1 Harpoon Launch Support Structure (LSS)
MK-32 Surface Vessel Torpedo Tube
OE-82 Series UHF SATCOM Antennas
AM-6534/SSR-1, AM-7317A/SSR Amplifiers, Radomes and ancillary equipment
C.1.2. A delivery order will normally consist of a single requirement. A number of the delivery orders will be issued for emergent requirements. The contractor may be required to respond to more than one requirement (simultaneous delivery orders for more than one vessel).
C.1.3. Required reports and documentation shall be compatible with Windows NT Server 4.0 as the standard
Network Operating System and MS Office 2010 Professional as the standard Office Software.
a. Definition of Repair Requirements - The contractor shall be required to identify repair requirements. These efforts, when required, will include, but are not limited to the following: inspect equipment and/or systems to determine repair options, repair alternatives, and make recommendations to the Contracting Officer’s Representative
(COR). In some cases, the Subject Matter Expert (SME) will confirm the repair options and requirements with the contractor prior to report being submitted. For conditions that impact the schedule, the contractor shall notify the government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror’s professional recommendation for resolution, which shall not exceed five (5) days as specified below. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR in accordance with the instructions below:
NOTIFICATION TO GOVERNMENT:
CFRs shall be submitted to the COR within five (5) working days of discovery of the condition.
At a minimum, the CFR will include the following:
(1) Identify contract, DO, ship, and hull number
(2) Serialized by CFR number
(3) Identification of the applicable Work Item number
(4) Date requirement was discovered
(5) Description of the work requirement
(6) Specific location of the work
(7) Recommendation for corrective action
(8) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance
Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.
(9) Identification of related changes, if any, to the internal milestones and production and contract completion dates.
GOVERNMENT REVIEW AND RESPONSE TO CFR
The COR shall review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to 5-day requirement). As appropriate, the Government and contractor will need to meet, conduct ship checks and/or discuss the recommendation for corrective action further to determine the full scope of work required prior to final approval of the CFR. The contractor's accuracy reflected in the CFRs submitted may be evaluated in CPARS.
b. Repair Implementations. The contractor shall provide necessary personnel to implement repairs/refurbishment, maintenance, renewal and evaluation on naval ships and shore-based activities on United States Navy/FMS Surface
Combat/C4I Systems. The contractor efforts shall include, but is not limited to, the following:
(1) Conduct ship visits to coordinate schedules for Combat/C4I Systems fleet technical support, inspections, repairs, equipment removal for repair, and refurbishment or replacement. Repair actions shall include the removal and reinstallation of all interferences.
(2) Correct deficiencies identified during ship visits and/or surveys when authorized by the individual delivery order.
(3) Provide journeymen level mechanics, technicians, and when required in the delivery order, the In-Service
Engineering Agent (ISEA) or Original Equipment Manufacturer (OEM) representatives to accomplish repairs.
Repair efforts on short notice may be required and may require work efforts to continue around the clock, including weekends and holidays, until completed.
(4) Provide subcontracting capabilities, administration, and management to accomplish repairs that may require highly specialized skills beyond the contractor’s internal workforce.
(5) Submit completion inspection report to COR, after all repair and/or replacement actions have been accomplished.
(6) Provide Quality Assurance Inspections and Certifications for all repair actions accomplished in accordance with this contract and standard industry practices.
(7) Repair and refurbishment work efforts shall be conducted at locations specified in each delivery order.
(8) During the ship visits, the contractor shall work closely with the SME to expeditiously fulfill planned or emergent work requirements and keep the Government fully informed in writing of the status of work on a weekly basis.
(9) Provide the necessary tools, rigs, and test equipment to perform repairs.
(10) Coordinate with SME and ship’s force when crane services are required.
(11) Provide written report of all work performed, delays of work and test documentation results to the COR after confirmation from the SME.
C.1.4. Except as otherwise provided in this contract, or delivery orders issued thereunder, the contractor shall provide all material, labor, repair support, equipment, supplies, power, accessories, facilities and such other things and services as necessary for accomplishing assigned requirements .
C. 1.5. The contractor shall perform the repairs ordered by the issuance of delivery orders from the Contracting
Officer. When ordered, the repairs shall be in accordance with the requirements outlined in this contract. Repairs shall be performed shipboard or at contractor facilities within a 50-mile radius of NOB, Norfolk, VA. Under normal conditions, work shall be accomplished at the contractor’s facilities. Additionally, performance of work may be required elsewhere including OCONUS. In the event work is required outside of the 50-mile radius of NOB, Norfolk, VA, travel and per diem shall be paid in accordance with Joint Travel Regulations (JTR).
C.2. PERSONNEL
C.2.1. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform delivery orders. The contractor, upon request of the Government representative, shall produce the qualifications of an individual to substantiate qualifications to perform the requirement. In addition, the contractor is responsible for employing and maintaining the personnel, organizational and administrative controls necessary to ensure that performance meets or exceeds all contract specification requirements hereunder and as set forth in each individual delivery order.
C..3. ORGANIZATION
C.3.1. The contractor shall have a management organization with the experience and comprehensive understanding to apply management techniques, methods and procedures required to efficiently complete the requirements of the solicitation.
C.4. REFERENCES
C.4.1. In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation:
C.4.1.1. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the Internet at https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/ and shall be invoked on all delivery orders:
FY-20 ITEM
NO.
TITLE UTILIZATION
CATEGORY
DATE
009-01 General Criteria I 01 OCT 2018
009-02 Environmental Compliance Report for
Material Usage
I 30 APR 2018
009-03 Toxic and Hazardous Substance;
control
I 08 APR 2019
009-04 Quality Management System; provide I 08 APR 2019
009-05 Temporary Access II 01 OCT 2018 https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
I 31 AUG 2018
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
I 24 July 2019
009-08 Shipboard Fire Protection and Fire
Prevention; accomplish
I 31 AUG 2018
009-09 Process Control Procedure (PCP);
provide and accomplish
II 01 OCT 2018
009-11 Insulation and Lagging; accomplish II 01 OCT 2017
009-12 Weld, Fabricate, and Inspect;
accomplish
II 01 OCT 2018
009-13 Meter, Gage, Switch, and
Thermometer; repair
II 08 ARP 2019
009-16 Electronic Equipment; repair II 01 OCT 2018
009-19 Provisioning Technical Documentation
(PTD); provide
I 01 OCT 2018
009-20 Government Property; control I 01 OCT 2017
009-21 Alteration Verification, Logistics and
Technical Data; provide
I 01 OCT 2018
009-23 Interference; remove and install I 01 OCT 2018
009-24 Authorization, Control, Isolation, Blanking, Tagging and Cleanliness;
accomplish
I 01 OCT 2018
009-25 Structural Boundary Test; accomplish II 01 OCT 2018
009-26 Deck Covering; accomplish II 01 OCT 2018
009-32 Cleaning and Painting Requirements II 08 APR 2019
009-36 Controller; repair II 31 AUG 2018
009-37 General Procedure for Woodwork;
accomplish
II 01 OCT 2018
009-39 Technical Manual Contract
Requirement (TMCR) for a New
Technical Manual for Commercial
Equipment/Component; accomplish
I 01 OCT 2018
009-40 Contractor Crane, Multi-Purpose
Machine and Material Handling
Equipment at a Naval Facility; provide
I 01 OCT 2018
009-45 Tapered Plug Valve; repair II 31 AUG 2018
009-46 Butterfly Valve, Synthetic and Metal
Seated; repair
II 31 AUG 2018
009-47 Gate Valve; repair II 31 AUG 2018
009-48 Pressure Seal Bonnet Valve Shop
Repair; accomplish
II 31 AUG 2018
009-49 Pressure Seal Bonnet Valve In-line
Repair; accomplish
II 31 AUG 2018
009-50 Horizontal Swing Check Valve; repair II 31 AUG 2018
009-52 Relief Valve; repair II 31 AUG 2018
009-53 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop
Repair; accomplish
II 31 AUG 2018
009-54 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve In-line
Repair; accomplish
II 31 AUG 2018
009-55 Regulating/Reducing Valve; repair II 31 AUG 2018
009-61 Shipboard Use of Fluorocarbons;
control
I 18 JUL 2014
009-63 Lubricating Oil and Hydraulic Fluid;
analyze
II 30 APR 2018
009-65 Polychlorinated Biphenyls (PCBs);
control
II 26 MAR 2018
009-67 Integrated Total Ship Testing; manage I 30 APR 2018
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention, and
Housekeeping for Unmanned Vessel;
accomplish
I 01 OCT 2018
009-71 Piping System; test II 31 AUG 2018
009-72 Physical Security at a Private
Contractor Facility; accomplish
I 31 AUG 2018
009-73 Shipboard Electrical/Electronic
Cable Procedure; accomplish
I 01 OCT 2018
009-74 Occupational, Safety and Health Plan;
accomplish
I 01 OCT 2018
009-75 Circuit Breaker; repair II 31 AUG 2018
009-78 Passive Countermeasures System
(PCMS) Material; repair
II 01 OCT 2018
009-79 Government Owned Material (GOM)
Status for Multi-Ship Multi-Option availabilities; report
II 01 OCT 2018
009-80 Ship Facilities; maintain I 18 NOV 2016
009-81 Compartment Closeout; accomplish I 31 AUG 2018
009-82 Installation of Equal Component
Vice Specified Component; report
I 26 MAR 2018
009-83 Wire Rope Assembly; fabricate II 26 MAR 2018
009-84 Threaded Fastener Requirements;
accomplish
I 01 OCT 2018
009-85 Government Sponsored Planning
Yard/Configuration Data Manager
(CDM) On-Site Representative
Facility; provide
II 19 JUL 2007
009-86 Recovery and Turn-In of Ozone
Depleting Substance (ODS);
accomplish
II 01 OCT 2017
009-87 Chemical Disinfection Procedure;
accomplish
II 01 OCT 2017
009-93 Emergency Planning and Community
Right-to-Know Act (EPCRA) and
I 06 MAR 2018
Pollution Prevention Act (PPA)
Information; provide
009-95 Mechanically Attached Fitting (MAFs);
install
II 01 OCT 2017
009-96 Ball Valve; repair II 31 AUG 2018
009-100 Ship's Stability; maintain I 06 MAR 2018
009-103 Weight and Moment Change Data;
provide
II 30 APR 2018
009-105 Thermal Sprayed Coating for
Machinery Component Repair;
accomplish
II 01 OCT 2018
009-106 Work Authorization Form Coordinator
(WAFCOR); provide
I 01 OCT 2017
009-117 Combat Systems Light-Off Support;
provide
I 31 AUG 2018
009-118 CG Deck Loading; accomplish I 18 JUL 2014
009-120 Fact Finding and Critique of
Unplanned Event; manage
I 06 MAR 2018
009-121 Ship Assessment/Inspection;
accomplish
II 18 NOV 2016
009-122 Temporary Padeye; install and remove I 01 OCT 2018
009-123 Fiber Optic Component; remove, relocate, repair, and install
II 01 OCT 2018
The following LOCAL WORK TEMPLATE (LWT) will be provided as an attachment and will be invoked on individual delivery orders as required:
042-037 General Requirements for Work Within Naval Station Norfolk; accomplish (Attachment J-3)
The following STANDARD WORK TEMPLATES (SWTs) shall be invoked on individual delivery orders as required:
042-001 Accountability of Man-hour and Material Reservation; accomplish (Attachment J-4)
077-001 Hazardous Waste Produced on Naval Vessels; control (Attachment J-5)
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals, specifications, and other references. NSIs take precedence over LWTs and SWTs. Other tiered drawings shall be followed when referenced.
C.5. POST-AWARD SUBMISSION
After receipt of a Delivery Order Award and prior to starting work onboard the vessel, the contractor shall submit a
Visit Authorization Letter (VAL) in accordance with SECNAV M-5510.30 (Dept. of the Navy, Personnel Security
Program), and/or DOD 5220.22M (National Industrial Security Program Operating Manual), to the Commanding
Officer of the ship via the Mid-Atlantic Regional Maintenance Center (MARMC) Security Officer.
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked.
C.6. MINIMUM CAPABILITIES AND FACILITY REQUIREMENTS
a. IAW Procedure for Certification of Waterfront Activity Refurbishment of MK-5 Mod 4 Ready Service Lockers
(NCS-Q32-WXMO-2012-055), all contractors and subcontractors shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center (MARMC) certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for Mid-Atlantic Regional
Maintenance Center (MARMC) Code 292. Refurbishment shall be accomplished IAW MK-5 Mod 4 Ready Service
Locker Technical Repair Standard and all changes SW393-AC-TRS-010. The Contractor shall provide required facilities, services and materials to overhaul SRBOC Ready Service Lockers.
b. IAW procedure for certification of waterfront activity refurbishment of MK-137 Mods 7 and 10 Nulka Launchers
NSC-Q32-WXM-2012-056, all contractors and subcontractors shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center (MARMC) certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for MARMC Code 292.
Refurbishment shall be accomplished IAW Intermediate Maintenance Activity Refurbishment Procedures for MK-
137 Mods 7 and 10 Nulka Decoy Launchers NSC-Q32-WXM-2012-043 and all changes. The Contractor shall provide required facilities, services and materials for refurbishment of MK-137 Mod 10 Nulka Launchers.
c. IAW Procedure for Certification of Waterfront Activity Refurbishment of MK-137 Mods 1,2 and 4 SRBOC
Launchers (NSC-Q32-WXM-2012-054), all contractors and subcontractors shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center MARMC certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for MARMC Code 292.
Refurbishment shall be accomplished IAW Intermediate Maintenance Activity Refurbishment Procedures for MK-
137 Mods 1, 2, and 4 Decoy Launchers and all changes NSC-Q32-WXM-2012-048.
d. Facilities. The successful offeror shall have sufficient facilities in appropriate locations to fully support the work intended by this contract. The offeror’s facilities shall be located within a 50-mile radius of NOB, Norfolk, VA.
C.7. GENERAL REQUIREMENTS
The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments.
Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.
C.7.1. The Contractor Shall:
a. Exercise own judgment and expertise to assure the successful completion of all requirements placed hereunder.
b. Designate in writing those persons authorized to accept/reject verbal orders.
c. As applicable, coordinate schedules in the work affected areas with the ship’s force representative, MARMC
Maintenance Team (MT), the Subject Matter Expert (SME) as defined in the Delivery Order, and the Contracting
Officer’s Representative (COR) during the performance period of the delivery order. The contractor shall obtain a copy of the ship's operation drills, etc. (prior to start of work) from the ships force, thus avoiding unnecessary delays. The work effort on delivery orders shall be coordinated on a daily basis with the ships force representative to allow for changing situations aboard ships to minimize delays and disruptions.
d. Forward all requests for changes in delivery schedules, funding requirements and scope of work in writing to the COR. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the COR prior to 85% of delivery availability being exceeded.
e. Not respond to new performance requirements until a delivery order or a modification has been signed or written authorization has been given by the Contracting Officer.
f. Not respond to any requests requiring deviations in technical performance as specified in the delivery order without obtaining a signed modification or prior approval of the Contracting Officer.
g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.
h. Comply with NSI 009-24 and ships or shipyard directives in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves. All work performed shall utilize Work Authorization
Form (WAF) in conjunction with NSI 009-24. The web site for the WAF is: http://www.submepp.navy.mil/.
i. Provide protection during contamination-producing operations and maintain cleanliness in accordance with
NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of performance. This shall be required on all delivery orders performed on this contract whether at a
Government facility or at a privately owned facility.
j. Request on a case-by-case basis to use ship's services that are available. A request for use of ship's services shall be made to the ship force representative or Port Engineer. Written permission shall be obtained from the CO of the ship before actual use of any ship services. A request for ship's services may be turned down whether or not the requested service is available. Denial of a request for use of ship's services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship's services, ship's services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury or damage to the ship's equipment.
k. Accomplish the requirements of NSI 009-40 for the use of contractor cranes at naval facilities. For work at other than naval facilities, contact the facility manager to determine the requirements and restrictions for crane operations prior to mobilization on-load, final determination of production sequencing and production zone layout, and demobilization off-load. Crane placement restrictions may affect production sequencing and zoning.
l. Ensure that persons assigned to render repairs hereunder are at all times under the direction and control of the contractor and are not employees of the Government.
m. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of the contractor’s personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.
n. Contact the MARMC Duty Officer at (757) 400-0000 when problems are encountered after normal working hours.
o. Submit a written weekly report detailing the daily events and the progress made during the course of each day to the on-site SME and COR, as required. Time and location for submission of the weekly report shall be agreed upon at the beginning of each delivery order and prior to the start of the work.
p. Be responsible for tag out of systems to be repaired and the removal of all interferences.
The contractor shall coordinate with the on-site SME to verify that systems have been properly tagged-out and secured prior to any production effort. The contractor shall reinstall and perform necessary test(s) to all removed interferences/equipment upon completion of all installations specified herein. NSI 009-23 shall apply.
q. Accomplish the requirements of NSI 009-29 where hangers and pipe are removed, disturbed, or new hangers are being installed.
r. Accomplish preservation of the new and disturbed normally painted surfaces in accordance with NSI 009-32, “Cleaning and Painting Requirements; accomplish.”
s. As required by 40 Code of Federal Regulations Part 63, report in accordance with NSIs 009-01 and 009-02 and
009-93 and LWT 042-37. The contractor, when awarded work within another contractor’s facility, is required to contact the facility owner’s environmental staff to determine requirements and report accordingly using federal requirements as standard.
t. Provide the necessary tools and test equipment to perform the repairs/maintenance actions.
u. Develop and implement test and quality assurance techniques in the performance of maintenance actions. The contractor shall conduct operational tests and provide written, legible copies of all test results to the COR.
v. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-95 when using any mechanically attached fittings.
w. Ensure personnel are familiar with the requirements of NSIs 009-08 and 009-93 and LWT 042-39 when working within a privately owned ship repair facility.
x. Prior to the delivery order start date, the contractor’s On-Site Supervisor shall meet with the SME and the COR to review the plans, drawings and schedules. The contractor shall immediately submit an itemized estimate for performing in accordance with the delivery order statement of work.
y. Accomplish the requirements of NSI 009-12 when any welding or brazing services are required.
z. The contractor shall provide and maintain a quality assurance program acceptable to the
Government. The contractor shall perform or have performed, the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the contract and conform to the drawings, specifications, and contract requirements listed herein. The contractor’s quality program shall be in accordance with that set forth in Standard Item 009-04. The Government shall have the right to deem work or material furnished by the contractor to be incomplete and not in accordance with the requirements of the contract by reason of the contractor’s failure to: (1) provide a written quality assurance program that has been accepted by MARMC prior to the start of productive work (2) comply with the requirements of the quality assurance system.
NOTE: THE QUALITY ASSURANCE PROGRAM SHALL BE SUBMITTED TO THE COR AND/OR MT
PM WITH A COPY TO MARMC QA NOT LATER THAN 10 CALENDAR DAYS AFTER AWARD OF
CONTRACT. CONTRACTORS WILL NOT BE ISSUED DELIVERY ORDERS WITHOUT AN
APPROVED QUALITY ASSURANCE PROGRAM.
C.7.2. Environmental and Safety Requirements.
The contractor shall:
a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001. Removal, disturbance or disposal of
ACM shall be accomplished IAW the requirements of NSI 009-10.
b. Accomplish confined space entry, certification, fire prevention and housekeeping requirements of NSI 009-07, 009-35 and 009-70. The contractor shall maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the requirement in the work areas specified on each delivery order.
c. Consider all waste to be removed from a ship under repair to be potentially hazardous waste. This includes liquids generated as a result of hydro blasting operations and includes wastes not identified under SWT
077-01. The contractor shall review and evaluate all solid waste to determine if that waste is hazardous IAW 40
CFR 262.11.
d. Prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier, and/or the vessel, including solid waste that is “Pending Analysis.” Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:
- Contractor Name
- Contractor POC: (name, cell phone number, phone number)
- Vessel
- MARMC Contract Number
- MARMC Delivery Order Number
- COR Point of Contact (name, cell phone number, phone number)
- Ship’s QTR Deck/OOD phone number
- Description of waste
- Analysis Pending/Sample date (if applicable)
- MARMC Maintenance Team Project Manager (name, cell phone number, phone number) if applicable
- MARMC Port Engineer (name, cell phone number, phone number) if applicable
e. For operations at Naval Station Norfolk, Joint Expeditionary Base Little Creek-Fort Story, and all private contractor shipyards in the Commonwealth of Virginia, all solid waste determined to be hazardous waste shall be turned over to the ship/vessel from which the waste was produced for processing and disposal through NAVFAC
MIDLANT (formerly PWC) hazardous waste operations. For operations at Naval Facilities or private contractor’s facilities outside the Commonwealth of Virginia, the contractor shall comply with all state and local regulations and local work items applicable in those areas.
f. Dispose of the waste in accordance with federal, state, and local regulations in the event that a solid waste is determined to be non-hazardous.
g. Provide a clean/empty vessel or tank truck for off-loading and transport grit blast or paint waste generated from the accomplish of the requirements of the delivery order. The contractor shall coordinate the vessel or tank truck placement with the Ships Authorized Representative (SAR). The contractor shall be responsible for all plumbing and piping as required. The contractor shall accomplish continuous clean-up of all debris and fluids incidental to installation or removal of piping system components during performance of work in individual delivery orders.
h. Submit to the COR, upon completion of each delivery order, one legible copy, in hard copy or electronic media, a report of the types and amounts of wastewater generated as a result of accomplishment of the delivery order. The report shall include description of wastewater, volume of wastewater, name/address of transporter, and the name/address of the disposal facility. If work is performed in a private contractor’s facility, the contractor shall submit this report to the COR and to the facility’s environmental manager.
C.7.3 SECURITY REQUIREMENTS - Contractor personnel shall comply with all current badging and security procedures required gaining access to any Government site (e.g. DBIDS). Access to Naval Installations sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. It is the contractor’s responsibility to check for and obtain changes and updated information at each installation on a continual basis.
Further information can be found at:
https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system.html and at MARMC website:
http://www.navsea.navy.mil/MARMC/default.aspx
C.8.MODIFICATION NEGOTIATIONS
8.1 Once the Government receives the contractor’s proposal, it will evaluate and negotiate it in accordance with applicable Agency regulations and policies. If necessary, the Government may issue unilateral modifications to accomplish required work using the pre-priced labor and material rates as specified in individual DOs.
8.2 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER - Except as specified in the paragraph below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, this said authority remains solely the
Contracting Officer’s. In the event the contractor effects any change at the direction of any person other than the
Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price and/or schedule to cover any increase in charges incurred as a result thereof.
If the contractor believes it has been directed to perform work outside the scope of the contract, it must notify the
Contracting Officer immediately.
9.0. BASIC CONTRACT DELIVERABLES & REQUIREMENTS
Contractors receiving IDIQ-MAC awards shall submit the following to the RMC Code 400 administrative contracting officer (ACO) within 30 days of award; with revisions submitted as directed by the RMC ACO or contract data requirement list (CDRL) requirements.
9.1 QUALITY ASSURANCE MANAGEMENT SYSTEM (in accordance with NAVSEA Standard Item 009-04)
9.2 SAFETY PLAN (in accordance with NAVSEA Standard Item 009-74)
9.3 HEAVY WEATHER PLAN (in accordance with NAVSEA Standard Item 009-69)
9.4 SECURITY PLAN (in accordance with NAVSEA Standard Item 009-72)
9.5 FIRE PREVENTION PLAN (in accordance with NAVSEA Standard Item 009-07)
9.6 24-HOUR POINT OF CONTACT
Within five (5) days of contract award, confirm the person responsible to respond to Government calls within two
(2) hours, 365 days of the year for emergencies. If an IDIQ- MAC holder’s 24-hour point of contact changes at any time during contract performance, the RMC Code 400 ACO shall be notified, in writing, within 24 hours of the personnel change with a copy to Code 300 Project Manager.
http://www.navsea.navy.mil/MARMC/default.aspx
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the
Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National
Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item
Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring
Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
C-211-H004 HEAVY WEATHER PLAN (NAVSEA) (OCT 2018)
(a) In order to ensure that Naval vessel(s), material and Government property are protected during destructive weather such as gales, storms, hurricanes, high winds, heavy snow, ice and high water, the Contractor is required to have a written Heavy Weather Plan (HWP) which assigns responsibilities and prescribes actions to be taken on the approach of and during heavy weather conditions as delineated in NAVSEA Standard Item (SI) 009-69 dated 18 November 2016. A copy of Standard Item (SI) 009-69 can be obtained from via the internet by going to:
http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI/ and selecting the NAVSEA Standard
Items (NSI) tab then select the applicable FY standard item link and then select SI 009-69. In accordance with SI 009-
69, the Contractor shall furnish to the cognizant Regional Maintenance Center (RMC), a copy of such HWP, and shall make such changes in the plan as the RMC considers necessary and reasonable to protect and care for vessel(s), material and Government property.
(b) In the event the RMC directs the Contractor to implement the HWP pursuant to SI 009-69 the Contractor may submit to the Contracting Officer a request for reimbursement for costs resulting from such actions together with any documentation that the Contracting Officer may reasonably require. The Government shall reimburse the Contractor for all reasonable, allowable and allocable costs resulting from the Contractor's implementation of the HWP based on such
Government direction.
C-211-H005 PLANT PROTECTION (NAVSEA) (OCT 2018)
(a) In accordance with NAVSEA STANDARD ITEM (SI) 009-72, (FORCE PROTECTION CONDITIONS) the
Contractor shall develop, maintain, and implement, as necessary, a Plant Protection Plan (Bravo) which prescribes the actions and procedures and assigns responsibilities for actions to be taken to provide adequate protection of the ship(s) and the materials and equipment to be installed therein.