This is a solicitation package for a construction project to repair sludge processing at MCB Camp Lejeune, North Carolina (Solicitation No. N40085-24-R-2555, Project No. 22-0032). The solicitation is limited to three pre-selected MACC contractors: Mechworks Mechanical Contractors Inc., North State Mechanical Inc., and R&W Construction Company Inc.
The project has an estimated cost range of $1-5 million with a completion timeframe of 540 days after award. Proposals are due December 31, 2024 by 3:00 PM EST. Key requirements include bonds for proposals over $150K (bid, payment, and performance bonds required), compliance with Davis-Bacon Act wage determinations, and Buy American provisions for construction materials. The contract will be awarded based on lowest price. Liquidated damages are set at $880 per calendar day. A site visit will be scheduled via amendment, and RFIs must be submitted by December 16, 2024. One person may serve as Superintendent, Quality Control Manager, and Safety and Health Officer if qualified for all positions. Proposals must be submitted to mechmacc@navy.mil and tony.d.benson.civ@us.navy.mil.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0002 N40085-24-R-2555.pdf | ||
| Amendment 0001 N40085-24-R-2555.pdf | ||
| N4008522B0032 Specs.pdf | ||
| N4008522B0032 Dwgs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FC436 Repair Sludge Processing Solicitation No. N40085-24-R-2555 MCB Camp Lejeune, North Carolina Project No. 22-0032
11/26/2024
ROICC CAMP LEJEUNE
POC: Tony Benson tony.d.benson.civ@us.navy.mil
ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL
FOR THIS PROJECT:
N40085-20-D-0076 Mechworks Mechanical Contractors, Inc.
5441 HWY 70
Morehead City, NC 28557
(252) 504-3201 POC: Charlie Morgan estimating@mechworksinc.com
N40085-20-D-0077 North State Mechanical, Inc.
225 Ellis Blvd Jacksonville, NC 28540
(910) 355-9332 POC: Danielle Menture dmenture@northstatemechanical.com
N40085-20-D-0078 R&W Construction Company, Inc.
2646 Richlands Highway Jacksonville, NC 28540
(910) 455-1830 POC: Chris Bland chris@randwconstruction.com mailto:tony.d.benson.civ@us.navy.mil
GENERAL REQUIREMENTS
NAVFAC Solicitation No.: N40085-24-R-2555 Public Works Project No.: 22-0032
Title: FC436 Repair Sludge Processing
Contract Completion Date: 540 days after award
Estimated Cost Range: Between $1,000,000 and $5,000,000
Wage Determination: General Decision Number: NC20240010 01/05/2024
Liquidated Damages: $880 per Calendar Day
Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification.
Special Scheduling: None
Basis for Award: Lowest Price
Proposal Acceptance Period: 60 days from receipt of offers
Site Visit: A site visit will be scheduled via amendment.
Bond Requirements: Bid bonds are required based on the dollar values listed below. An electronic copy of your bid bond may be submitted with your proposal. Failure to submit a required bid bond by the deadline will result in your proposal being removed from consideration.
Utilize the bond formats at FAR 53.300. Payment and/or performance bond(s) will be requested at the time of award per the current process.
• No bonds are required for proposals less than $40K.
• Proposals valued at $40K and greater will require a payment bond only.
• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.
Proposal Due Date: December 31, 2024
3:00 PM EST
E-Mail Address for Proposals: mechmacc@navy.mil AND tony.d.benson.civ@us.navy.mil
Requests for Information (RFIs): RFIs must be submitted by the prime contractor to tony.d.benson.civ@us.navy.mil. The cut off for RFIs is December 16, 2024 by 2:00 PM EST in order to process all inquiries by the proposal due date.
The specifications and drawings are posted as attachments on https://sam.gov/.
“OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF
FUNDS ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS
SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR
PROPOSAL COSTS RESULTING FROM THIS SOLICITATION.”
General Decision Number: NC20240010 01/05/2024
Superseded General Decision Number: NC20230010
State: North Carolina
Construction Type: Building County: Onslow County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:
Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $17.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2024.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:
Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $12.90 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2024.
mailto:mechmacc@navy.mil
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024
IRON0848-003 07/01/2023
Rates Fringes
IRONWORKER................................................. $ 28.00 17.10
PLUM0421-006 7/01/2023
Rates Fringes
PIPEFITTER...................................................... $ 33.96 13.48
SUNC2018-010 08/08/2023
Rates Fringes
BRICKLAYER.................................................. $ 19.13 0.00
CARPENTER, Excludes Form Work.... $ 18.11 2.63
CEMENT MASON/CONCRETE FINISHER...$ 16.72 ** 0.00
ELECTRICIAN................................................. $ 22.15 5.93
FORM WORKER.............................................. $ 14.51 ** 1.88
LABORER: Common or General..................... $ 11.98 ** 0.81
LABORER: Mason Tender - Brick................... $ 13.17 ** 0.00
LABORER: Mason Tender - Cement/Concrete................................................ $ 15.26 ** 0.00
LABORER: Pipelayer....................................... $ 16.33 ** 3.11 http://www.dol.gov/whd/govcontracts
OPERATOR:
Backhoe/Excavator/Trackhoe............................ $ 21.00 2.89
OPERATOR: Bulldozer.................................... $ 17.54 2.63
OPERATOR: Forklift....................................... $ 16.75 ** 0.00
OPERATOR: Grader/Blade.............................. $ 22.68 3.27
OPERATOR: Roller.......................................... $ 15.31 ** 1.46
PAINTER........................................................... $ 15.55 ** 1.05
PLUMBER......................................................... $ 23.11 0.00
ROOFER............................................................ $ 18.26 4.38
SHEET METAL WORKER.............................. $ 19.67 13.27
TRUCK DRIVER: Dump Truck....................... $ 15.98 ** 2.93
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four-letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.
Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
52.225-10 Notice of Buy American Requirement-Construction Materials.
As prescribed in 25.1102(b)(1), insert the following provision:
Notice of Buy American Requirement-Construction Materials (May 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs
(c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
| As prescribed in 25.1102(b)(1), insert the following provision: |
| Notice of Buy American Requirement-Construction Materials (May 2014) |
| (a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Bu... |
| (b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission... |
| (c) Evaluation of offers. |
| (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost... |
| (2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that ... |
| (d) Alternate offers. |
| (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic constructi... |
| (2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offe... |
| (3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction m... |
| (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or |
| (ii) May be accepted if revised during negotiations. |
| (End of Provision) |