RFP N00421-23-R-0004 - MSE.pdf
PDF 1 MB Posted
- Solicitation number
- N0042123R0004
About this file
This is a request for proposal for mission systems engineering services. The Naval Air Warfare Center - Aircraft Division at Webster Outlying Field is seeking to procure engineering support for ship and air integrated warfare programs. Services include C6ISR systems engineering, integration, and in-service engineering agent support. The contract will be a single-award IDIQ with a five-year ordering period and an estimated value award date of November 2023. The North American Industry Classification System code is 541330 for engineering services, and the product service code is AC13 for national defense research and development. The solicitation number is N00421-23-R-0004. Questions regarding the solicitation must be submitted by 2:00 PM Eastern Time on the 14th calendar day after issuance. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment portal.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 05:00 PM local time 12 Jun 2023
X
A X B X C X D
EX
X
G F 83 - 93
94 - 119 X H 120 - 127
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A7 1 127
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00421 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and https://piee.eb.mil conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 16
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
17 - 50 51 - 52
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
53 - 54 55 - 57
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 58 - 62 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 63 - 70 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
71 - 81
PART II - CONTRACT CLAUSES
NAWCAD PROCUREMENT GROUP
21983 BUNDY ROAD, BLDG 441
PATUXENT RIVER MD 20670
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
10 May 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0042123R0004
Section A - Solicitation/Contract Form
SECTION A
POINTS OF CONTACT
Cheri Swailes Contract Specialist Email: cheri.a.swailes.civ@us.navy.mil
Amy G. Davis Contracting Officer Email: amy.g.davis.civ@us.navy.mil
Rick Paskoski Procuring Contracting Officer Email: rick.a.paskoski.civ@us.navy.mil
COMPETITION
This acquisition is a full and open competition.
CONTRACT TYPE
The contract resulting from this solicitation will be a Single-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing Cost-Plus-Fixed-Fee (CPFF) CLINs for Labor (Term and Completion) and Cost Reimbursable (non-fee-bearing) CLINs for Other Direct Costs (ODCs) (Travel and Material).
NOT SEPARATELY PRICED CLINS
Not Separately Priced (NSP) CLINs will be on the Basic IDIQ Contract, whereas, at the Task Order Level, CLINs will be separately priced. At the IDIQ level, CLINs 0001, 0007, and 0013 will contain the overall ceiling for NSP CLINs 0002-0006, 0008-0012, and 0014-0018, respectively.
VERBIAGE & TERMINOLOGY
For clarification purposes, throughout this solicitation, CPFF Term, CPFF Level of Effort, and CPFF Non- Performance-Based are used interchangeably.
For clarification purposes, throughout this solicitation, CPFF Completion and CPFF Performance-Based are used interchangeably.
PRODUCT SERVICE CODE
The basic contract of this Single-Award IDIQ CPFF and Cost Reimbursable vehicle will have an associated Product Service Code (PSC) of AC13, National Defense R&D Services; Department of Defense – Military; Experimental Development.
SERVICE CONTRACT LABOR STANDARDS
This solicitation, and the resulting contract, will be subject to the Service Contract Act (SCA) of 1965, as amended, and to FAR clause 52.222-41 Service Contract Labor Standards (May 2014), contained in Section I of this solicitation.
ORDERING PERIOD
This Contract will have a five (5) year ordering period.
SECURITY CLEARANCE
The Offeror shall be responsible for employing personnel having at least the minimum level of security clearance identified in Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.2.2.1.
Section B - Supplies or Services and Prices
B-1 ESTIMATED RATES
I. Hourly Burdened Composite Labor Rates (excluding fee) and Streamlined Ordering Procedures for CPFF Labor Term and Completion CLINs and/or Orders
(a) Hourly Burdened Composite Labor Rates (provided within the tables in paragraphs (c) through (d) below) are applicable to CLINs 0001-0012:
(1) The rates below are the Hourly Burdened Composite Labor Rates for each labor category.
i. Hourly Burdened Composite Labor Rates shall include direct labor rates plus all applicable burdens, to include indirect rates, applicable escalation, subcontractor fee on subcontractor labor, and subcontractor pass-through costs.
ii. Hourly Burdened Composite Labor Rates shall not include prime fee on prime labor, prime fee on subcontractor labor, Other Direct Costs (ODCs) such as Travel and Material, and Cost of Money costs (if proposed).
iii. The Hourly Burdened Composite Labor Rate would be the sum of both the prime and all subcontractor labor costs, as described above, for that labor category, divided by the total number of labor hours for that labor category.
(2) The Hourly Burdened Composite Labor Rates in paragraphs (c) through (d) are estimates, and invoicing will be based on actual costs incurred.
(b) Task Orders (TOs) that include CPFF Labor Term and Completion CLINs will be issued under this Contract using the following streamlined ordering procedures:
(1) For each proposed order that includes CPFF Labor Term or Completion CLINs, the Contracting Officer will provide the Contractor a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the Hourly Burdened Composite Labor Rates provided in paragraphs (c) through (d) below, to calculate the total estimated cost for the proposed CLINs and/or TO.
i. The TO fixed fee is calculated using Section G Clause 5252.232-9510 PAYMENT OF FIXED FEE
(NAVAIR).
ii. Ceiling for ODCs will be priced in accordance with the Government estimate.
iii. TOs crossing multiple years will be estimated by the Government using the Hourly Burdened Composite Labor Rates for each year in proportion to the Period of Performance (PoP) of the TO.
(2) Within three (3) working days of receipt of the TO and IGCE, the contractor shall respond:
i. If the contractor agrees that it can perform the TO within the parameters of the IGCE, they will sign and return the DD 1155 to the Contracting Officer. If the requirement remains valid, a priced order will be issued to the Contractor; or
ii. If the Contractor does not agree with the TO and/or IGCE, the Contractor shall acknowledge its disagreement within three (3) working days. Additionally, a proposal shall be submitted to the Contracting Officer within five (5) working days of receipt of the TO and IGCE, addressing only the specific areas of difference in labor categories and/or hours in the IGCE. Once the differences are resolved between the Contracting Officer and the Contractor, and the requirement remains valid, a priced order will be issued to the Contractor.
(c) Hourly Burdened Composite Labor Rates for Government Site
TERM AND COMPLETION ON-SITE (St. Inigoes, MD)
Composite Fully Burdened Rates (Regardless of Clearance or if Key)
Contract Labor Category and Bureau of Labor Statistics Standard Occupational Classification (BLS SOC)
Year 1 Year 2 Year 3 Year 4 Year 5
02/15/2024- 02/14/2025*
02/15/2025- 02/14/2026*
02/15/2026- 02/14/2027*
02/15/2027- 02/14/2028*
02/15/2028- 02/14/2029*
Computer Hardware Engineer, Junior, 17-
Computer Hardware Engineer, Journeyman, 17-2061
Computer Hardware Engineer, Senior, 17-
Computer Network Architect, Junior, 15-
Computer Network Architect, Journeyman, 15-1241
Computer Network Architect, Senior, 15-
Computer Systems Analyst, Apprentice, 15-1211
Computer Systems Analyst, Junior, 15-
Computer Systems Analyst, Journeyman, Computer Systems Analyst, Senior, 15-
Electrical Engineer, Apprentice, 17-2071
Electrical Engineer, Junior, 17-2071
Electrical Engineer, Journeyman, 17-2071
Electrical Engineer, Senior, 17-2071
Engineer, All Other (Systems Engineer), Apprentice, 17-2199
Junior, 17-2199
Journeyman, 17-2199
Senior, 17-2199
General and Operations Manager (Program Manager), Senior, 11-1021
General and Operations Manager (Project
Logistician, Junior, 13-1081
Logistician, Journeyman, 13-1081
Logistician, Senior, 13-1081
Management Analyst (Configuration Management Analyst), Junior, 13-1111
Management Analyst), Journeyman, 13-
Management Analyst), Senior, 13-1111
Mechanical Engineer, Apprentice, 17-2141
Mechanical Engineer, Junior, 17-2141
Mechanical Engineer, Journeyman, 17-
Mechanical Engineer, Senior, 17-2141
Network and Computer Systems Administrator, Junior, 15-1244
Administrator, Journeyman, 15-1244
Administrator, Senior, 15-1244
Project Management Specialist, Junior, 13-
Project Management Specialist, Journeyman, 13-1082
Project Management Specialist, Senior, 13-1082
Contract Labor Category and Service Contract Act (SCA) Code
Cable Splicer (SCA), 49-9099
Computer Programmer II (SCA), 15-1251
Computer Programmer III (SCA), 15-1251
Drafter/CAD Operator I (SCA), 17-3012
Drafter/CAD Operator II (SCA), 17-3012
Drafter/CAD Operator III (SCA), 17-3012
Electronics Technician Maintenance II
(SCA), 17-3023
Electronics Technician Maintenance III
Engineering Technician I (SCA), 17-3029
Engineering Technician II (SCA), 17-3029
Engineering Technician III (SCA), 17-
Engineering Technician IV (SCA), 17-
General Clerk I (SCA), 43-9061
General Clerk II (SCA), 43-9061
General Clerk III (SCA), 43-9061
Shipping/Receiving Clerk (SCA), 43-5071
Technical Writer II (SCA), 27-3042
Telecommunications Mechanic I (SCA), 49-2022
Telecommunications Mechanic II (SCA), Truck Driver, Medium (SCA), 53-3033
Warehouse Specialist (SCA), 43-5071
* Dates to be adjusted at contract award
(d) Hourly Burdened Composite Labor Rates for Contractor Site
TERM AND COMPLETION OFF-SITE (Contractor Facility)
Composite Fully Burdened Rates (Regardless of Clearance or if Key)
Contract Labor Category and Bureau of Labor Statistics Standard Occupational Classification (BLS SOC)
Year 1 Year 2 Year 3 Year 4 Year 5
02/15/2024- 02/14/2025*
02/15/2025- 02/14/2026*
02/15/2026- 02/14/2027*
02/15/2027- 02/14/2028*
02/15/2028- 02/14/2029*
Computer Hardware Engineer, Junior, 17-
Computer Hardware Engineer, Journeyman, 17-2061
Computer Hardware Engineer, Senior, 17-
Computer Network Architects, Junior, 15-
Computer Network Architect, Journeyman, 15-1241
Computer Network Architect, Senior, 15-
Computer Systems Analyst, Apprentice, Computer Systems Analyst, Junior, 15-
Computer Systems Analyst, Journeyman, Computer Systems Analyst, Senior, 15-
Electrical Engineer, Apprentice, 17-2071
Electrical Engineer, Junior, 17-2071
Electrical Engineer, Journeyman, 17-2071
Electrical Engineer, Senior, 17-2071
Apprentice, 17-2199
Junior, 17-2199
Journeyman, 17-2199
Senior, 17-2199
General and Operations Manager (Program
General and Operations Manager (Project
Logistician, Junior, 13-1081
Logistician, Journeyman, 13-1081
Logistician, Senior, 13-1081
Management Analyst), Junior, 13-1111
Management Analyst), Journeyman, 13-
Management Analyst), Senior, 13-1111
Mechanical Engineer, Apprentice, 17-2141
Mechanical Engineer, Junior, 17-2141
Mechanical Engineer, Journeyman, 17-
Mechanical Engineer, Senior, 17-2141
Administrator, Junior, 15-1244
Administrator, Journeyman, 15-1244
Administrator, Senior, 15-1244
Project Management Specialist, Junior, 13-
Project Management Specialist, Journeyman, 13-1082
Project Management Specialist, Senior, 13-1082
Contract Labor Category and Service Contract Act (SCA) Code
Cable Splicer (SCA), 49-9099
Computer Programmer II (SCA), 15-1251
Computer Programmer III (SCA), 15-1251
Drafter/CAD Operator I (SCA), 17-3012
Drafter/CAD Operator II (SCA), 17-3012
Drafter/CAD Operator III (SCA), 17-3012
Electronics Technician Maintenance II
Electronics Technician Maintenance III
Engineering Technician I (SCA), 17-3029
Engineering Technician II (SCA), 17-3029
Engineering Technician III (SCA), 17-
Engineering Technician IV (SCA), 17-
General Clerk I (SCA), 43-9061
General Clerk II (SCA), 43-9061
General Clerk III (SCA), 43-9061
Shipping/Receiving Clerk (SCA), 43-5071
Technical Writer II (SCA), 27-3042
Telecommunications Mechanic I (SCA), Telecommunications Mechanic II (SCA), Truck Driver, Medium (SCA), 53-3033
Warehouse Specialist (SCA), 43-5071
* Dates to be adjusted at contract award
B-2 FEE
Non-Performance Based (Level of Effort (LOE)) - For non-performance based LOE tasks, the composite rates from B-1 will be used to develop the total estimated cost for the order. The fixed fee will be calculated based on fee per hour. The fee per hour is the total fee proposed for CLIN 0001 for all periods divided by the total number of CLIN 0001 LOE hours for all periods. The non-performance based fee per hour is $_[to be completed at contract award]______.
Performance Based (Completion) - For performance-based (completion) tasks, the composite rates from B-1 will be used to develop the total estimated cost. The fixed fee will be calculated based on the percentage of total fee proposed for CLIN 0007 for all periods divided by the total proposed cost of CLIN 0007 for all periods. The performance based (completion) fee percentage is _[to be completed at contract award]____%.
B-3 LABOR HOURS
CPFF Non-Performance Based/Term (CLINs 0001-0006) The Government estimate is 621,266 labor hours for the entire work effort for CPFF Non-Performance Based/Term tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.
CPFF Performance Based/Completion (CLINs 0007-0012) The Government estimate is 81,077 labor hours for the entire work effort for CPFF Performance Based/Completion tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.
The Government estimate (inclusive of CPFF Non-performance Based/Term and CPFF Performance Based/Completion) for the entire effort is 702,343 labor hours.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Labor in support of SOW/PWS - Term
CPFF
Services in accordance with Section C, Statement of Work (SOW) / Performance Work Statement (PWS), paragraphs 3.3.1, 3.3.2, and 3.3.3.
FOB: Destination
PSC CD: AC13
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 1 Lot Labor - Term - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0001.
0003 1 Lot Labor - Term - PROC
CPFF
Not Separately Priced (NSP) from CLIN 0001.
0004 1 Lot Labor - Term - O&M
CPFF
Not Separately Priced (NSP) from CLIN 0001.
0005 1 Lot Labor - Term - Non-DoD
CPFF
Not Separately Priced (NSP) from CLIN 0001.
0006 1 Lot Labor - Term - WCF
CPFF
Not Separately Priced (NSP) from CLIN 0001.
0007 1 Lot Labor in support of SOW/PWS - Completion
CPFF
Services in accordance with Section C, Statement of Work (SOW) / Performance Work Statement (PWS) excluding paragraphs 3.3.1 and 3.3.3.
0008 1 Lot Labor - Completion - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0007.
0009 1 Lot Labor - Completion - PROC
CPFF
Not Separately Priced (NSP) from CLIN 0007.
0010 1 Lot Labor - Completion - O&M
CPFF
Not Separately Priced (NSP) from CLIN 0007.
0011 1 Lot Labor - Completion - Non-DoD
CPFF
Not Separately Priced (NSP) from CLIN 0007.
0012 1 Lot Labor - Completion - WCF
CPFF
Not Separately Priced (NSP) from CLIN 0007.
0013 1 Lot ODC in support of CLINs 0001 & 0007
COST
Other Direct Costs (ODCs) in support of CLINs 0001 & 0007 in accordance with Statement of Work (SOW) / Performance Work Statement (PWS) paragraph 3.1.5., Other Direct Costs (ODCs) and Section C, CTXT.242-9520 Procedures and Approvals Required Prior to Incurring Direct Material Costs (APR 2022) and 5252.232-9509 Travel Approval and Reimbursement Procedures.
0014 1 Lot
ODC - RDT&E
COST
Other Direct Costs (ODCs). Cost in support of CLINs 0002 and 0008. Not Separately Priced (NSP) from CLIN 0013.
0015 1 Lot
ODC - PROC
COST
Other Direct Costs (ODCs). Cost in support of CLINs 0003 and 0009. Not Separately Priced (NSP) from CLIN 0013.
0016 1 Lot
ODC - O&M
COST
Other Direct Costs (ODCs). Cost in support of CLINs 0004 and 0010. Not Separately Priced (NSP) from CLIN 0013.
0017 1 Lot ODC - Non-DoD
COST
Other Direct Costs (ODCs). Cost in support of CLINs 0005 and 0011. Not Separately Priced (NSP) from CLIN 0013.
0018 1 Lot
ODC - WCF
COST
Other Direct Costs (ODCs). Cost in support of CLINs 0006 and 0012. Not Separately Priced (NSP) from CLIN 0013.
0019 1 Lot Technical Data
COST
Not Separately Priced (NSP) Technical Data in accordance with Statement of Work (SOW) / Performance Work Statement (PWS) in Section C in support of CLINs 0001 - 0012.
0020 1 Lot Contractor Acquired Property (CAP)
COST
Not Separately Priced (NSP) Contractor Acquired Property (CAP) in accordance with Statement of Work (SOW) / Performance Work Statement (PWS) in Section C in support of CLINs 0013 - 0018.
CLAUSES INCORPORATED BY FULL TEXT
5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR) (VARIATION) (MAR 2023)
(a) The level of effort estimated to be ordered during the term of this Contract is 621,266 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor is as follows:
CLIN Labor Hours 0001 621,266
(b) The estimated level of effort for each individual order will be established at the task order level.
(c) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(d) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause
52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort specified in paragraph above, at no increase in the fee of the order; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(e) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(f) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of Section C of this contract/order.
(End of Clause)
Section C - Descriptions and Specifications
SECTION C
Items 0001 through 0012 (Labor CLINs) – The Contractor shall provide services in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS). Contract services shall be performed in accordance with the SOW/PWS as detailed in the individual task orders. The task order SOW/PWS will detail tasks that fall within the scope of the basic contract.
Items 0013 through 0018 (ODC CLINs) (Travel and Material) – The Contractor shall provide Other Direct Costs (ODCs) in accordance with Section C, SOW/PWS paragraph 3.1.5; CTXT.242-9520 Procedures and Approvals Required Prior to Incurring Direct Materials Costs (APR 2022); and 5252.232-9509 Travel Approval and Reimbursement Procedures (NAVAIR)(OCT 2013).
Item 0019 (Technical Data CLIN) – The data to be furnished hereunder shall be in accordance with Exhibit A, Contract Data Requirements List (CDRLs), and Section C, SOW/PWS.
Item 0020 (Contractor Acquired Property (CAP) CLIN) – The item(s) to be furnished hereunder shall be marked in accordance with Section C, SOW/PWS and DFARS PGI 245.402.
STATEMENT OF WORK
STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS) FOR
SHIP & AIR INTEGRATED WARFARE DIVISION
MISSION SYSTEMS ENGINEERING
1.0 Scope.
As the organic Lead Systems Integrator (oLSI) for the Naval Air Warfare Center Aircraft Division (NAWCAD), Webster Outlying Field (WOLF) operates under a product-based business model whereby WOLF civilians lead and manage the efforts of combined Government-industry teams. Using this oLSI approach, the Government maintains ownership of intellectual property and data rights, enabling WOLF to rapidly adapt solutions to the dynamic needs of the warfighter.
The NAWCAD WOLF Ship & Air Integrated Warfare (SAIW) Division, operating under the oLSI model, provides mission systems engineering support to provide requirements definition, emerging technologies identification, rapid design engineering, drawing package support, development, customization, manufacturing, fabrication, integration, Test and Evaluation (T&E), installation, certification, maintenance, upgrade, logistics, software development and In- Service Engineering Agent (ISEA) activities of new and/or existing shipboard, surface, ground-based, and airborne mission systems. The Mission Systems Engineering (MSE) support is provided in response to tasking from the Department of Defense (DoD) and other U.S Government organizations.
This Statement of Work/Performance Work Statement (SOW/PWS) will provide Command, Control, Communications, Computers, Cyber, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C6ISR) systems engineering support, C6ISR integration support, and ISEA and logistics support to Mission Systems programs, systems, and technological areas within the SAIW project portfolio.
2.0 Applicable documents.
The following documents and document sources are provided for reference. The SAIW Division requirements to provide C6ISR interoperability among U.S military and U.S civilian efforts may dictate an adherence to a wide variety of specifications and standards. DoD systems shall adhere to the Joint Technical Architecture (JTA) 2.0 Standards. Non-DoD systems may be governed by numerous commercial, national, or international standards. The documents listed below are presented only as representative sources of the technological interface details that may be required during Contract performance. Likewise, the documentation listed is not all-inclusive but is representative of the type of information that may be necessary to perform the work. The document version applicable to tasking will be the most current published document at the time of Contract award.
2.1 DoD specifications.
2.1.1 DoD National Industrial Security Program Operating Manual (NISPOM) codifying 32 Code of Federal
Regulations Part 117, NISPOM Rule.
2.1.2 SECNAV M-5510.36B, Department of the Navy, Information Security Program, 12 Jul 2019.
2.1.3 DoDI 5200.48, Controlled Unclassified Information (CUI), dated 6 Mar 2020.
2.1.4 DoDD 5400.07, DoD Freedom of Information Act (FOIA) Program, 5 Apr 2019.
2.1.5 DoDI 5230.24, Distribution Statements on Technical Documents, Change 3, 15 Oct 2018.
2.1.6 SECNAV M-5510.30C, Department of the Navy, Personnel Security Program, 24 Jan 2020.
2.1.7 OPNAVINST 3440.17A, Navy Installation Emergency Management Program, 1 Aug 2014.
2.2 DoD standards.
2.2.1 MIL-STD-498, Software Development and Documentation, Version 01.00.00.
2.2.2 DoD-STD-2168, Military Handbook, Defense System Software Quality Program.
2.3 Other Government documents.
2.3.1 National Security Decision Directive 298, dated 22 January 1988 Public Law 100-235, Section 3(d)(4).
2.3.2 Federal Acquisition Regulation (FAR).
2.3.3 Bureau of Labor and Statistics (BLS) Standard Occupational Categories (SOC) available at www.bls.gov/soc.
2.3.4 NAVAIRINST 4355.19E, Systems Engineering Technical Review Process, 6 Feb 2015.NAVSEA
T9050-AA-DIR-010/AEGIS, Rev. G, Test Procedure Preparation Directive.
2.3.5 SAIW Division Operations Manual.
2.3.6 SAIW Division Project Realization Standard Operating Procedure (SOP).
2.4 Industry documents.
2.4.1 American Society for Testing and Materials (ASTM) manual A.
2.4.2 Capability Maturity Model Integration (CMMI) Model.
2.4.3 International Organization for Standardization (ISO) International Standard 9001:2015, Quality
Management Systems, Sept 2015.
3.0 Requirements.
3.1 General Requirements.
3.1.1 Compatibility. The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government Information Technology (IT) environment through the security classification of Secret as specified in the DD-254 (Attachment 01). The current operating environment required for this Contract includes:
Adobe Acrobat XI (Reader) Internet access Microsoft Office 365 Microsoft Office Professional Plus 2016 or greater Microsoft Project 2016 or greater Microsoft Windows 10
The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall ensure that all media are virus free when delivered. The Contractor shall be capable of internet and Local Area Network (LAN) communications with the SAIW Division. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with the SAIW Division during working hours whether at Contractor work site, on travel, or in telework environment.
3.1.2 Work location, facilities, and telework.
3.1.2.1 Work location. Approximately 34% of work will be performed at Government site and 66% of work will be performed at Contractor site. Government site includes NAWCAD WOLF, St. Inigoes, MD.
3.1.2.1.1 Government Site Requirements. Contractors performing on-site support will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network, including access to web servers and applicable databases or other applications necessary to carry out assigned tasks.
3.1.2.1.2 Contractor Site Requirements. The Contractor shall provide its own support facilities needed to perform the tasking of this Contract within 50 ground transportable miles of WOLF, St. Inigoes, MD, in order to satisfy the daily support and administrative operations of this Contract. The Government will not assume responsibility to retain the facility or take control of the title after the Contract is completed.
3.1.2.2 Meeting Support. In support of the tasking outlined in this SOW/PWS, the Contractor shall have the capability to host and conduct meetings at the classification levels up to Secret with the capacity to support a minimum of 10 persons and have Contractor-furnished telephone and Video Teleconference (VTC) capability as well as sufficient equipment to conduct meetings with presentations including compatible software as required in section 3.1.1. This support shall be provided at the Contractor support facilities, located within 50 ground transportable miles of WOLF, St. Inigoes, MD, as required in section 3.1.2.1.2.
3.1.2.3 Telework. The Contractor, upon notification to, and concurrence from, the Contracting Officer's
Representative (COR) that a position’s tasking is eligible for telework, may utilize alternate worksites/locations and telework to support continued performance of its contract In Accordance With (IAW) company policy. Contractor discretion is required when making alternate worksite and telework decisions based upon the nature of support being provided by the employees. In the event telework is utilized, the Contractor remains responsible for contract performance and compliance with any applicable cost accounting standards and contract cost principles/procedures.
3.1.2.4 Industrial Support Facilities. The Contractor shall provide sufficient industrial support for the receipt, storage, inventory, and shipment of equipment associated with assigned projects. Historically, the space required to meet SOW/PWS requirements has been no less than 7,500 feet. Additionally, the space shall be equipped with Heating, Ventilation and Air Conditioning (HVAC) systems capable of sustaining a controlled environment consistent with the storage, assembly, and operation of electronic equipment. The space shall be configured to meet requirements for receiving, material receipt inspection, storage awaiting build up, integration, and testing and storage of completed systems. The space shall be equipped to protect Government property and shall be located within 50 ground transportable driving miles of WOLF, St. Inigoes, MD. The Government will not have desk occupancy at the location and will not take possession of the facility at Contract termination.
3.1.3 Contract Status Reporting. The Contractor shall deliver the following documentation.
3.1.3.1 Monthly progress and financial status report. The Contractor shall deliver a progress and financial status report IAW the Contract Data Requirement List (CDRL). The report shall include work accomplished since submittal of the last report, including both monthly and cumulative work hour labor costs, expended by labor category and material and travel costs. (CDRL A001)
3.1.4 Work schedule to include Compressed Work Schedule (CWS), overtime, holidays, and installation closure.
3.1.4.1 Work Schedule. The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), from 0730 to 1600 each Monday through Friday (except on the legal holidays specified in paragraph 3.1.4.1.2). Some supported Government offices have flexibility to start as early as 0600 and end as late as 1800 Monday – Friday.
3.1.4.1.1 CWS. CWS is an alternative work schedule to the traditional five 8.5-hour workdays (which includes a
30-minute lunch break) worked per week. Under a CWS schedule, an employee completes the following schedule within a 2-week period of time: 8 weekdays are worked at 9.5 hours each (which includes a 30-minute lunch break), 1 weekday is alternately worked as 8.5 hours (which includes a 30-minute lunch break), and 1 weekday is not worked by the employee. The result is 80 hours worked every 2 weeks, with 44 work hours 1 week and 36 work hours the other.
The Contractor may allow its employees to work a CWS schedule provided the requirements of this
SOW/PWS are met. If the Contractor chooses to allow its employees to work a CWS schedule in support of this Contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this Contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage as required by the Government to the COR/Alternate Contracting Officer’s Representative (ACOR).
3.1.4.1.2 Holidays. The Government observes the Federal holidays identified on the Office of Personnel
Management (OPM) website: https://www.opm.gov.
3.1.4.1.3 Installation closure. When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility-related problem that prevents Federal personnel from working at the Government facility, Contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.
While generally Contractor personnel may not perform work on-site at a Government facility without oversight from Federal personnel, in very limited circumstances, work being performed by Contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by Contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer (KO) must concur with any determination that work being performed by Contractor personnel is mission essential.
3.1.4.1.4 Overtime. Overtime shall not exceed the amount specified in FAR clause 52.222-2, Payment for
Overtime Premiums.
3.1.5 Other Direct Costs (ODCs). (Research, Development, Test & Evaluation (RDT&E); Procurement
(PROC); Operations & Maintenance (O&M); Non-Department of Defense (Non-DoD); and Working Capital Fund (WCF).
3.1.5.1 Travel. Travel may include general and administrative expenses, but shall not include profit/fee.
Temporary travel to other locations in support of project tasking is required. If required, temporary travel locations include those listed in sections 3.1.5.1.1 and 3.1.5.1.2. This list is not all-inclusive as locations may change over the life of the Contract.
3.1.5.1.1 Continental United States (CONUS). CONUS locations may include travel to Bremerton, WA; Hood
River, OR; Jacksonville, FL; Mayport, FL; Norfolk, VA; Quantico, VA; San Diego, CA; St. Inigoes, MD; St Louis, MO; Tampa, FL; and Washington, D.C.
3.1.5.1.2 Outside the Continental United States (OCONUS). OCONUS locations may include travel to
Manama, Bahrain; Sasebo, Japan; and Yokosuka, Japan.
3.1.5.1.3 The Contractor shall complete their travel request(s) IAW NAVAIR Clause 5252.232-9509, Travel
Approval and Reimbursement Procedures. Upon completion of travel, the Contractor employee shall complete a trip/travel report. The COR shall approval all travel performed in support of this Contract prior to the commencement of the travel, and travel shall result in a trip report. (CDRL A002)
3.1.5.1.4 Synchronized Pre-Deployment & Operational Tracker (SPOT). The Contractor may travel to U.S.
Central Command locations. IAW Clauses 252.225-7040 and 5152.225-5908, SPOT enables the validation of Contractors Authorized to Accompany the Force (CAAF), their authorization and eligibility for access to specific DoD facilities, and their eligibility for specific Government Furnished Support (GFS). The Contractor shall initiate a Letter of Authorization (LOA) for each prospective traveler. The Contractor shall use the SPOT link (https://spot.dmdc.mil/privacy.aspx) to enter and maintain data with respect to traveling/deployed personnel and to generate LOAs.
3.1.5.1.5 LOA. The Contracting Officer (KO) will provide an LOA for official travel OCONUS, when applicable, supporting the Contract. The LOA will identify local authorizations, privileges, etc. as specified by DoD requirements. All defense contractor employees working under this Contract shall carry an LOA, when applicable, with them at all times while deployed OCONUS.
3.1.5.2 Material. Incidental material will be required in the performance of this Contact, and all incidental material purchases shall be IAW the Section H, CTXT.242-9520 Procedures and Approvals Required Prior to Incurring Direct Materials Costs (APR 2022). All materials not depleted during the performance of this Contract shall become Government property upon completion of this Contract. The Contractor shall transfer all materials not depleted to the COR by way of a Material Inspection and Receiving Report (DD Form 250) (CLIN 0020). Material costs may include general and administrative expenses but shall not include profit/fee. (CDRL A003)
3.1.6 Subcontractors. Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this Contract. All provisions of this SOW/PWS shall flow down to subcontractors providing support under this Contract.
3.1.7 Management of Contractor Personnel. The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual Contractor employees. The Contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.
3.1.8 Transition-Out Strategy.
The Contractor’s overall transition-out strategy shall be built around maintaining the mission of the
SAIW Division with minimal impact, not only in terms of timeliness of performance but also to ensure that critical data and knowledge transfer occurs. Prior to the termination or expiration of the Contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. The Contractor shall deliver a Transition-Out Plan, to include the minimum elements listed below IAW CDRL A004.
3.1.8.1 Work turnover. The Contractor shall provide a plan of action to effectively transfer tasked work that is in process at the expiration or termination of the Contract to the successor company and establish and maintain effective communication with the incoming Contractor or Government personnel for the period of transition via weekly status meetings.
3.1.8.2 Quality Assurance (QA). The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor company.
3.1.8.3 Risk mitigation strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.
3.1.8.4 Data/information transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data to the successor company.
3.1.9 Technical Direction Letters (TDLs). When necessary, technical direction or clarification concerning the details of specific tasks set forth in the Contract and the TOs will be given through issuance of written TDLs. TDLs will not, in any manner, alter the scope of the Contract or TO. For further direction, see NAVAIR Clause 5252.242-9502 Technical Direction (Variation) in Section H of the Contract. The Contractor shall prepare and deliver a COR Management Report for TDLs IAW CDRL A005.
3.1.10 Quality Management. The Contractor shall develop, implement, document, and maintain a quality management system to ensure conformance with contractual requirements and the specific quality and performance requirements to be issued under this Contract. The quality management system should meet the intent of the American National Standards Institute/American Society for Quality (ANSI/ASQ) ISO 9001:2015 and/or equivalent governing body. Regardless of the standards that are applied, the Contractor’s quality approach should be clearly defined and recognize the need to focus on customer satisfaction, defect prevention over inspection, management responsibility, and continuous improvement.
(CDRL A006)
3.1.10.1 Inspection System Plan (ISP). (CDRL A007)
3.1.10.2 The Contractor shall conduct a thorough review of the Contract quality requirements to identify the controls, processes, skills, fixtures, tools, and test equipment needed to ensure product quality.
3.1.10.2.1 The planning review shall also update inspection and testing techniques, instrumentation, and manufacturing methods and processes. (CDRL A008)
3.1.10.2.2 These written procedures and work instructions shall be made available to the employees required to perform the specific task.
3.1.10.3 OCI Mitigation Plan. The Contractor shall report OCI Mitigation Plan compliance and compliance status changes. (CDRL A030)
3.1.11 Government Furnished Property (GFP)/Government Furnished Information (GFI). Any GFI listed in this Contract will be provided to the Contractor within five (5) days after award. Additional GFI such as training and documentation requiring Contractor review, analysis, and updating will be provided throughout the Contract PoP. Disposition of GFI will be made at Contract completion. The Contractor shall have an approved Property Management System.
3.2 Security.
3.2.1 Citizenship Requirements. Only U.S. citizens may perform under this Contract, unless waived by the
Government. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include:
a) The individual's name, date and place of birth, position title, and current citizenship.
b) A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.
c) A statement of the unusual expertise possessed by the applicant.
d) A statement that access will be limited to a specific Government contract (specify contract number).
e) A statement that the Contractor has obtained an export license for the information required to perform the Contract.
3.2.2 Investigative Requirements.
Unclassified: All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV M-5510.30C. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the OPM. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor employee's Electronic Questionnaire for Investigations Processing (eQIP) and shall perform a preliminary screening of the Contractor employee's eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor employee access to Government facilities and information and may prohibit the Contractor employee from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor employee's eQIP. In such cases, the Contractor employee may not perform on the Contract.
The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of Controlled Unclassified Information (CUI) and to control distribution of CUI IAW National Industrial Security Program Operating Manual (NISPOM) codifying 32 Code of Federal Regulations Part 117, NISPOM Rule and SECNAV M-5510.36B, Department of the Navy, Information Security Program.
All Contractor facilities shall provide an appropriate means of storage for CUI and materials. All CUI shall be appropriately identified and marked IAW DoD Instruction 5200.48, Controlled Unclassified Information (CUI).
CUI, including legacy For Official Use Only (FOUO) information and Covered Defense Information (CDI) (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this Contract, shall be marked and safeguarded as specified in DoD Instruction 5200.48, Controlled Unclassified Information (CUI), available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF.
Any product containing CDI shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24, Distribution Statements on Technical Documents, and have this statement displayed per DoDI 5230.24, Enclosure 3.
All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s):
Distribution Statement (Insert Appropriate Letter and Authorization Title), (Insert Appropriate Reason Category) (dated – (Date of Distribution Authorization). Other requests shall be referred to: Commander, Naval Air Systems Command, Attn: COR, NAWCAD WOLF SAIW, 17134 Webster Field Road, Building 8225, Saint Inigoes, MD 20684-4015.
Classified: All Contractor personnel shall maintain security clearance eligibility commensurate with the level of classification of the work performed as annotated in the Contract's DD-254, Contract Security Classification Specification Form.
Contractor personnel shall require access to classified information in performance of this Contract up to and including Top Secret facility level, with a safeguarding level of Secret. The Contractor is responsible for ensuring that all personnel receive the requisite investigation and are favorably adjudicated IAW National Industrial Security Program Operating Manual (NISPOM) codifying 32 Code of Federal Regulation Part 117, NISPOM Rule. Contractor employees who fail to meet security clearance requirements may not access classified information or perform sensitive duties. In such cases, the Contractor employee may not perform on the Contract.
The Contractor shall comply with security requirements specified in DD-254, Attachment 01 of this Contract. Information or data that the Contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled IAW the appropriate designation (CUI;
legacy FOUO; CDI). Distribution is authorized to the Requiring Office's Organization and supported Activity only. Other requests for deliverables under this Contract shall be referred to the Technical Point of Contact (TPOC)/COR of this Contract for approval.
CUI, including legacy FOUO and CDI (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this Contract, shall be marked and safeguarded as specified in DoD Instruction 5200.48, Controlled Unclassified Information (CUI), available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF.
Any product containing CDI shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24, Distribution Statements on Technical Documents, and have this statement displayed per DoDI 5230.24, Enclosure 3.
3.2.2.1 All personnel shall have the appropriate DoD Security Clearance Level or Interim Clearance IAW the chart below. All other labor categories have no DoD Security Clearance requirement.
LABOR CATEGORY
LEVEL
DoD SECURITY
CLEARANCE
LEVEL (INTERIM
CLEARANCE
ACCEPTABLE)
FULL TIME
EQUIVALENTS
(FTEs)
REQUIRED DAYS
AFTER ISSUANCE
OF CONTRACT
Computer Hardware Engineers Junior Secret One Within 60 calendar days of award
Computer Hardware Engineers Journeyman Secret All Within 60 calendar days of award
Computer Hardware Engineers (Key)
Senior Top Secret One Within 120 calendar days of award
Computer Hardware Engineers (Non-Key)
Senior Secret All Within 60 calendar days of award
Computer Network Architects Junior Secret One Within 60 calendar days of award
Computer Network Architects Journeyman Secret All Within 60 calendar days of award
Computer Network Architects Senior Secret All Within 60 calendar days of award
Computer Systems Analysts Senior Secret All Within 60 calendar days of award
Computer Systems Analysts Journeyman Secret All Within 60 calendar days of award
Computer Systems Analysts (Key and Non-Key)
Senior Secret All Within 60 calendar days of award
Electrical Engineers Junior Secret One Within 60 calendar days of award
Electrical Engineers Journeyman Secret All Within 60 calendar days of award
Electrical Engineers (Key and Non-Key)
Senior Secret All Within 60 calendar days of award
Engineers, All Other (Systems Engineer)
Junior Secret One Within 60 calendar days of award
Engineers, All Other (Systems Engineer)
Journeyman Secret Two Within 60 calendar days of award
Engineers, All Other (Systems Engineer) (Key)
Senior Top Secret One Within 120 calendar days of award
Engineers, All Other (Systems Engineer) (Non-Key)
Senior Secret One Within 60 calendar days of award
General and Operations Managers (Program Manager) (Key)
Senior Top Secret One Within 120 calendar days of award
General and Operations Managers (Project Manager) (Key)
Senior Top Secret
One Within 60 calendar days of award
General and Operations Managers (Project Manager) (Non-Key)
Senior Secret All Within 60 calendar days of award
Logisticians Journeyman Secret All days of award
3.2.3 Common Access Card (CAC)/Public Key Infrastructure (PKI) and System Authorization Access
Request Navy (SAAR-N).
3.2.3.1 SAAR-N. All Contractor personnel requiring access to Government IT systems shall have an approved
SAAR-N Form…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .