RFP_EXHIBIT A - DD-1423 -CDRLS_A001 - A008_21RLM01.pdf

PDF 275 KB Posted

Attached to
RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT FOR SPECIALIZED AEROSPACE SYSTEMS Federal contract opportunity
Solicitation number
N00173-21-R-LM01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

This Contract Data Requirements List (CDRL) outlines eight required data items for a research and development contract. The contractor must submit monthly financial status reports, on-site labor reports, scientific/technical reports, presentation materials, technical data packages, test and evaluation plans, specifications and management documents, and software/code. The reports are to support tasks in areas like mission design, analysis, hardware development, modeling, testing and logistics. Distribution is restricted to U.S. government agencies and contractors for administrative or operational use. Delivery dates and formats are specified for each data item.

The federal solicitation seeks proposals for research, development and engineering support for specialized aerospace systems over five years. Tasks may involve concept design, feasibility analysis, systems engineering, data analysis, modeling, testing and logistics. The single IDIQ contract will be awarded using best value tradeoff, and all task orders will be cost-plus-fixed-fee. The 100% small business set-aside is for North American Industry Classification System code 541715 with a size standard of 1,000 employees. Proposals are due within 20 days, and the anticipated award date was not provided.

View the file

Other files for this federal contract opportunity

Other files attached to RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT FOR SPECIALIZED AEROSPACE SYSTEMS, newest first.
File Type Posted
QA_01_21RLM01_.docx DOCX document
AMEND 0002_RFP_Attachment 01 - Personnel Qualifications_21RLM01.docx DOCX document
RFP_CONFORMED VERSION THROUGH AMEND-0002_21RLM01.docx.pdf PDF
QA_02_21RLM01_.docx DOCX document
AMEND 0002.pdf PDF
RFP_N0017321RLM01_FINAL.pdf PDF
N0017321RLM01_Amendment 01.pdf PDF
RFP_Attachment 05 - Pre-Award Survey_SF 1408_21RLM01.pdf PDF
RFP_Attachment 04 - CPSS_21RLM01.xlsx XLSX spreadsheet
RFP_Attachment 02 - Reqs. for On-Site Ktrs._21RLM01.docx DOCX document
RFP_N0017321RLM01_FINAL.pdf PDF
RFP_Attachment 03 - DD254-SER 056-18_21RLM01.pdf PDF
RFP_Attachment 01 - Personnel Qualifications_21RLM01.docx DOCX document
RFP_Attachment 06 - Past Performance Quest._21RLM01.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Monthly Financial Status Report (MFSR)

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-80331

5. CONTRACT REFERENCE

SOW Section 4.2.1

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-FNCL-80331 in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall provide a MFSR by the 15th day after the first full month of performance and every 15th days of the month thereafter.

b) The MFSR shall show the number of hours and the fully burdened labor (Including fee) for each employee and/or subcontractor. Details for the current period and total accrued cost shall be given. Expenses (e.g., travel, materials and training - fully burdened) shall be separately reported. If an employee and/or subcontractor worked on more than one task (as defined by the COR) the accounting for each task must be shown separately.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to

NRL.

Blocks 10-13: Reports shall be delivered on a monthly basis. The first report shall be delivered no later than forty-five (45) days after award. All subsequent reports shall be delivered no later than fifteen (15) days after the period being reported.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract On-Site Labor Report

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81991

5. CONTRACT REFERENCE

SOW Section 4.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MGMT-81991 in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall provide Contract On-Site Labor Report by the 15th day after the first full month of performance and every 15th days of the month thereafter.

b) The report shall include as a minimum the following data: Reporting Period, Contract Number (and Order Number, if applicable), Contract Value, Current Funding, Amount Expended in current period, Total expended to date. Date submitted and Labor (including subcontractors) showing employee name and the number of hours worked on-site at NRL. If an employee and/or subcontractor worked on more than one task (as defined by the COR), then the accounting for each task must be shown separately. The report shall include details of all authorized material procurements.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered on a monthly basis. The first report shall be delivered no later than forty-five (45) days after award. All subsequent reports shall be delivered no later than fifteen (15) days after the period being reported.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 4.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall provide the scientific and technical communities with a description of the precise nature and results accomplished.

b) Detailed analyses and design updates shall be provided. Each deliverable may include a description of the analysis or demonstration performed and the results obtained; detailed design descriptions with drawings, schematics and revised parts list; updates on major technical issues, disposition of previous concerns; description of hardware and software development; specifications; schedule and cost estimates and test plans and procedures.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Presentation and Briefing Material

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 4.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall deliver all presentation and material used in support of scientific, technical and oral reports and/or presentations.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Technical Data Package

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 3.1.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall provide CoDR, PDR/CDR and other technical review design packages supporting major milestone program review activities. Each deliverable shall include the detailed design description, individual program plan, compliance statements and identification of risks. The technical data package shall include drawings, schematics, parts lists, analyses, simulations and test data to demonstrate the integrity of the proposed component, system or subsystem. The project plan shall describe the analyses, simulations, hardware and software development, and testing required to bring the design through performance verifications and flight readiness.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

1 0 NRL Code 8200

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Integration, Test and Evaluation Plans and Procedures

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 4.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall submit these plans and procedures as required by the Technical Direction Memorandum and following the guidelines of MIL-STD-1540 & MIL-HBK-343 or Equivalent.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Specifications, ICDs and Management Plans

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 4.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

The monthly report may be delivered in the Contractor's format provided that it is readable using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall provide Developmental Specifications, Interface Control Documents and Management Plans as required by Technical Direction Memorandum (TDM) and following the guidelines of MIL-STD-961 and MIL-HBK-2222 or equivalent government specification.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 8 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

0003, 1003

B. EXHIBIT

A

C. CATEGORY:

TDP ✘ TM ______ OTHER:

D. SYSTEM/ITEM

Research and Development

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Software, Algorithms, Programs, Instructions and Source Code

3. SUBTITLE

Monthly Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

SOW Section 3.1.2

6. REQUIRING OFFICE

NRL Code 8200

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

As Required

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final Reg Repro

16. REMARKS

e The monthly report may be delivered in the Contractor's format provided that it is readabl using Microsoft Office 2010 products (or better) or Adobe Acrobat Reader.

The contractor shall address all relevant topic areas included in DI-MISC-80711A in each report but all submitted reports shall include the following at a minimum:

a) The Contractor shall include all computer programs/software, upgrades, algorithms, object, source and executable codes, draft and final user documentation developed under this contract.

Delivery shall be made as required by the COR.

Block 9: Distribution Statement Required will read as follows:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (ADMINISTRATIVE OR OPERATIONAL USE) (date of determination). Other requests for this document shall be referred to NRL.

Blocks 10-13: Reports shall be delivered as required.

NRL Code 1320 0 1 0 NRL Code 8200 0 1 0

15. TOTAL 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 8 Pages