RFP EQPMBA-26-0363 Price Quote Breakdown.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Ballistic Mitigation
- Solicitation number
- EQPMBA-26-0363
- Issued by
- Not on record
About this file
This is a Price Quote Breakdown template for RFP EQPMBA-26-0363, a design-build solicitation for ballistic mitigation work at the Quentin N. Burdick Courthouse Annex in Fargo, North Dakota. The template is structured to capture pricing across 33 construction divisions aligned with the Construction Specifications Institute (CSI) MasterFormat, including general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electrical safety and security, earthwork, exterior improvements, and utilities.
The pricing format requires contractors to input cost for each applicable division, followed by labor rates and hours for project management and project superintendent positions. The template then incorporates calculations for general conditions markup, overhead markup, and profit markup, with all markups applied as percentage rates to their respective subtotals. The completed price quote must be reconciled with the SF1442 federal contracting form submission. The solicitation is set aside for small businesses and represents a full and open after exclusion of sources contract. Contractors are explicitly cautioned that failure to price all applicable divisions does not relieve them of the obligation to perform all work described in the solicitation and any amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Price Quote Breakdown
| Division # | Division Title | Amount |
| Division 1 | General Requirements | |
| Division 2 | Existing Conditions | |
| Division 3 | Concrete | |
| Division 4 | Masonry | |
| Division 5 | Metals | |
| Division 6 | Wood, Plastic, and composite | |
| Division 7 | Thermal and Moisture Protection | |
| Division 8 | Openings | |
| Division 9 | Finishes | |
| Division 10 | Specialties | |
| Division 11 | Equipment | |
| Division 12 | Furnishings | |
| Division 13 | Special construction | |
| Division 14 | Conveying Equipment | |
| Division 21 | Fire Supression | |
| Division 22 | Plumbing | |
| Division 23 | HVAC | |
| Division 25 | Integrated Automation | |
| Division 26 | Electrical | |
| Division 27 | Communications | |
| Division 28 | Electrical safety and security | |
| Division 31 | Earthwork | |
| Division 32 | Exterior Improvements | |
| Division 33 | Utilities | |
| Other | Other | |
| Subtotal |
| Hourly Rate | Hours* | Total (Rate x Hours) | |
| Project Manager | |||
| Project superintendent |
| Subtotal (Lines 29+32+33) | |||
| % Rate | Rate x Subtotal | Subtotal with GCs | |
| General Conditions | |||
| % Rate | Rate x Previous Subtotal | Subotal with OH | |
| Overhead | |||
| % Rate | Rate x Previous Subtotal | Subtotal with Profit | |
| Profit |
Subtotal
Bond (if requested)
| GRAND TOTAL |
| All divisions may not apply. The Grand Total is your proposed price and the amount shall match the amount on the SF1442 form. Failure to list prices in the appropriate category does not relieve the contractor of the requirement to perform all work as described in the solicitation and any amendments. |