RFP Engineering_Berrien_CDBG_DR.pdf
PDF 229 KB Posted
- Attached to
- REQUEST FOR PROPOSALS OF ENGINEERING SERVICES
- Solicitation number
- PE-77258-NONST-2026-000000023
- Issued by
- Bartow County, Georgia
About this file
Summary: RFP for Engineering Services
This Request for Proposals is issued by Berrien County Board of Commissioners in Nashville, Georgia, for the selection of an engineering firm to provide pre- and post-award services for community and economic development projects. The engineering services requested include preliminary engineering reports, planning, design, cost estimating, bidding, contracting, construction oversight, quality control, and project closeout. Berrien County seeks to address critical public infrastructure improvements in communications towers, water systems, sewer systems, street paving, and drainage. The County is considering applications for funding through the Georgia Department of Community Affairs, including Community Development Block Grant (CDBG) Annual Competition, CDBG Disaster Recovery (CDBG-DR), Employee Incentive Program (EIP), Redevelopment Fund (RDF), and Immediate Threat and Danger (ITAD) programs. Proposals must be submitted to Brenda Ferrell, County Clerk/Administrator, at 201 North Davis Street, Nashville, GA 31639, no later than Tuesday, July 7, 2026, at 4:00 PM. The selected engineering firm may provide services for future community and economic development projects for a limited time period contingent upon grant funding. Contact Tonia Hendricks at the Southern Georgia RC, (912) 285-6097, to request the Statement of Qualifications Form and RFP scoring criteria.
Evaluation scoring uses a four-point scale: Poor (1 point), Fair (2 points), Good (3 points), and Excellent (4 points). Selection criteria include years in business, firm history and resource capability, community knowledge, firm officer information, legal qualifications and licenses, errors and omissions insurance, capability to produce required documentation, ability to meet a 30-day preliminary engineering report deadline, prior CDBG experience with references, and proposed timeframe for final plans and specifications. Firms must provide specific cost estimates for all engineering services from application through project closeout, including cost estimates, plans and specifications, surveying, bid documents, bid analysis, contractor performance management, inspections, change orders, and DCA reporting. Proposals must clearly state all costs, including whether fees apply to preliminary engineering reports. This contract opportunity is a Section 3 Covered Contract under the HUD Act of 1968, and Section 3 Business Concerns are encouraged to apply. The County commits to compliance with Title VI of the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990, and fair housing requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
BERRIEN COUNTY BOARD OF COMMISSIONERS
201 North Davis Street
Nashville, GA 31639
229-686-5421
REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES
Berrien County is requesting qualifications and proposals for selection of an Engineering Firm to provide pre- and post-award services for various community and economic development projects. Pre- and post-award services will include, but are not limited to, preparing preliminary engineering report, planning, design, cost estimating, bidding, contracting, construction oversight, quality control, and project closeout. Berrien County is in dire need of Public
Infrastructure Improvements, including, but not limited to, communication tower, water, sewer, street paving, and/or drainage, and is considering applying for federal and/or state funding for
Community Development Block Grant (CDBG) Annual Competition, Community Development
Block Grant Disaster Recovery (CDBG-DR), Employee Incentive Program (EIP), Redevelopment Fund (RDF), and/or Immediate Threat and Danger (ITAD) funds through the
Georgia Department of Community Affairs (DCA).
Selection of an Engineer for the project will be based on qualifications as they relate to community and economic development needs. All contracts are subject to Federal and State contract provisions prescribed by the Georgia DCA. Selection could allow your firm to provide pre- and post-award Engineering Services for future community and economic development projects for a limited time period based on the funding of the grant.
Firms interested in submitting proposals for this project are asked to contact Tonia Hendricks at the Southern Georgia RC, 1725 South Georgia Parkway, W., Waycross, GA 31503, (912) 285-
6097 to request the Statement of Qualifications Form, the Section 3 Forms (Only Submit with your Proposal if you are claiming Section 3 Status), and the RFP scoring criterion. Your firm will be asked to mail or hand deliver your reply to the following:
Berrien County
ATTN: Brenda Ferrell, County Clerk/Administrator
201 North Davis Street
Nashville, GA 31639
Office Number: 229-686-5421
Proposals mailed to or received at any location other than the above address will not be accepted.
Proposals must be received at the above address no later than Tuesday, July 7, 2026 at 4:00
PM. No proposals will be accepted after this time and date. Berrien County reserves the right to accept or reject any and all proposals and to waive informalities in the proposal process.
2 | P a g e
Berrien County is committed to Affirmatively Further Fair Housing. This project is covered under the requirements of Section 3 of the HUD Act of 1968. This contract opportunity is a
Section 3 Covered Contract. Section 3 Business Concerns are encouraged to apply. Berrien
County also abides by the following laws as they pertain to HUD Assisted Projects: Title VI of the Civil Rights Act of 1964; Section 109 of the Housing and Community Development Act of
1974, Title 1; Title VII of the Civil Rights Act of 1968 (Fair Housing Act); Section 104(b)(2) of the Housing and Community Development Act of 1974; Section 504 of the Rehabilitation Act of
1973 as amended; Title II of the Americans with Disabilities Act of 1990 (ADA); and the
Architectural Barriers Act of 1968. Berrien County is committed to providing all persons with equal access to its services, programs, activities, education and employment regardless of race, color, national origin, religion, sex, familial status, disability or age.
3 | P a g e
Berrien County Request for Proposals
Selections will be based on qualifications, timeframes, and monies, as they relate to the following. However, your firm is encouraged to request the Statement of Qualifications form and the RFP scoring criterion. Scoring of RFP’s will be as follows: Poor (1 point), Fair
(2 points), Good (3 points), and Excellent (4 points).
QUALIFICATIONS AND TIME FRAMES:
1. Years in Business in Present Form.
2. Firm’s History and Resource Capability to Perform Required Services.
3. Firm’s knowledge of the community.
4. Titles, Names, and Addresses of all Officers.
5. List categories in which firm is legally qualified to do business. Include Licenses and
Registrations where applicable.
6. Does your firm carry errors and omissions insurance?
7. Will your firm be able to provide necessary documentation for the application, including preliminary engineering reports, maps, and cost estimates as per CDBG, OneGeorgia, or other Department of Community Affairs program application requirements if your firm is selected as project engineer?
8. Can your firm meet the draft PER deadline of no later than 30 days after selection as project engineer?
9. Has your firm been involved in applying for funds through DCA’s Community
Development Block Grant (CDBG) program? If “YES”, give specific projects, including project name, location, owner, year, grant/total project amount, contact person(s), and nature of firm’s responsibility.
10. If your firm is selected for this project, and the grant is approved, what timeframe do you feel you will need to have final plans and specifications ready for approval by any and all applicable agencies? Please provide this information in months, such as 3 months after
Notice of Award of all grants, etc.
4 | P a g e
11. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.
12. List three (3) references for the Firm.
13. Are you a Section 3 Business Concern?
COST:
Please provide a specific cost estimate of what you will charge the County to provide
Engineering services for this project from start to final close-out, to include but not limited to the following:
• Cost estimates
• Preparation of Plans and Specs and Final Design
• Surveying, for application purposes and for final project, if funded
• Bid Documents
• Assistance in Bid Opening
• Perform Bid Analysis
• Management of Contractor Performance, Inspections, Preparation of Change Orders, and
Approval of Contractor’s Request for Payments
• Prepare and submit all required Reports and Documentation to DCA
1. If you are awarded the design, bid phase, and inspection for this project, what would your fee be?
2. Does your firm charge for the preliminary engineering report (PER)? If yes, what would the charge be?
Please be sure to state all costs in your proposal.
If you have any questions pertaining to this RFP, please call Tonia Hendricks at (912) 285-6097, or email trhendricks@sgrc.us.
cc: Berrien RFP File
SGRC Procurement File
File details come from the government source that posted it. Updated .