About this file

This is a Bid Schedule for a federal contract opportunity (24-006) at Tewaukon National Wildlife Refuge in Cayuga, North Dakota. The project involves replacing the drinking water system at the refuge, with work to be completed in accordance with attached specifications and drawings.

The scope of work includes seven line items under General Conditions: (1) Mobilization/Demobilization, Bonding, Overhead, and Profit as a lump sum (LS); (2) 1-1/2" Water Main installation using majority directional drill methods for approximately 1,512 linear feet, priced as a job bid (JB); (3) 2" Water Main for approximately 74 linear feet (JB); (4) 1" Water Service Line for approximately 550 linear feet (JB); (5) Installation of seven Curb Stops (JB); (6) Installation of one Yard Hydrant (JB); (7) Demolition of three Yard Hydrants (JB); and (8) Demolition of nine Curb Stops (JB). Bidders must furnish all labor, materials, and equipment necessary to complete the work. The bid schedule provides columns for Unit Cost and Total Cost calculations, with a final line for Total All Divisions pricing.

View the file

Other files for this federal contract opportunity

Other files attached to ND-TEWAUKON NWR-REPLACE WATER DISTRIBUTION SYSTEM, newest first.
File Type Posted
24-006_Specifications_Tewaukon_Water_System_Replacement.pdf PDF
24-006_Drawings_Tewaukon_Water_System_Replacement.pdf PDF
Projected_Submittal_List.pdf PDF
Sol_140FC126R0005.pdf PDF
A04_-_Scope_of_Work_Tewaukon_24-006_Water_System_Replacement.pdf PDF
Wage_Determination_GDN_ND20260036_01-30-2026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

24-006

TEWAUKON NATIONAL WILDLIFE REFUGE

CAYUGA, NORTH DAKOTA

A. GENERAL CONDITIONS:

Unit Total

QTY Unit Cost Cost

1 1 LS

1 1 JB

2 1 JB

3 1 JB

4 Curb Stops (7EA) 1 JB

5 Yard Hydrant (1EA) 1 JB

6 Demo Yard Hydrant (3EA) 1 JB

7 Demo Curb Stops (9EA) 1 JB

Total All Divisions

1" Water Service Line (550LF est.)

2" Water Main (74LF est.)

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached descriptions/specifications and drawings.

Project Description: Replace drinking water system at Tewaukon NWR.

Mobilization/Demobilization, Bonding, Overhead, & Profit

1-1/2" Water Main (majority directional drill) (1512LF est.)