STATEMENT OF WORK: Water System Replacement

This Statement of Work outlines a water system replacement project at Tewaukon National Wildlife Refuge in North Dakota (Project 24-006), issued by the U.S. Fish and Wildlife Service Region 6 on November 27, 2023. The existing water system, over 60 years old, serves the main campus and multiple buildings. The contractor shall remove nine curb stops and three yard hydrants from the existing system, which will remain in place but be made unusable. New construction includes installation of 74 feet of 2-inch water main, 1,512 feet of 1-1/2-inch water main, 550 feet of 1-inch water service line, seven curb stops, and one yard hydrant. The new system will connect to existing infrastructure located directly outside the building foundation. Prospective bidders must conduct site inspections by contacting Station Manager Eric Wilson at (701) 724-5702 prior to proposal submission.

Prospective bidders must submit a Technical and Cost Proposal with detailed breakouts for all materials, equipment, and field work. Evaluation criteria include field work capabilities, price, ability to meet deadlines, and locality. The project completion deadline is 120 days after Notice to Proceed, with extensions considered for adverse field conditions. Weekly progress meetings are required during construction. An Initial Conference must be held within seven days of Notice to Proceed as directed by the Contracting Officer. All personnel listed in the Designated Officials section shall receive electronic copies of the construction schedule. Key contacts include Project Engineer Michael Wandersee (720-813-8224, michael_wandersee@fws.gov) and Station Manager Eric Wilson (701-724-5702, eric_wilson@fws.gov).

View the file

Other files for this federal contract opportunity

Other files attached to ND-TEWAUKON NWR-REPLACE WATER DISTRIBUTION SYSTEM, newest first.
File Type Posted
Sol_140FC126R0005.pdf PDF
Wage_Determination_GDN_ND20260036_01-30-2026.pdf PDF
24-006_Specifications_Tewaukon_Water_System_Replacement.pdf PDF
24-006_Drawings_Tewaukon_Water_System_Replacement.pdf PDF
RFP_Bid_Schedule.pdf PDF
Projected_Submittal_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REAL PROPERTY MEMO

US FISH AND WILDLIFE SERVICE REGION 6

Water System Replacement

Tewaukon National Wildlife Refuge, ND

24-006

November 27, 2023

I. PROJECT BACKGROUND

The Tewaukon NWR water system is over 60 years old and had resulted in a constant failing system. The system serves the main campus that includes multiple buildings. The water system connects to a third-party system, but the project only impacts

UWFWS property.

II. PROJECT SCOPE

The project will leave the existing system in place and be made unusable. The contractor will remove the 9 curb stops and 3 yard hydrants.

The new construction includes 74 feet of 2” water main, 1512 feet of 1-1/2” water main, 550 feet 1” water service line, 7 curb stops, and a yard hydrant.

The project will connect to the water system that is located directly outside of the building foundation.

III. CONFERENCES

The Initial Conference shall be held within seven (7) days of Notice to Proceed as directed by the Contracting Officer.

Weekly progress meetings shall be held during the construction phase.

IV. DELIVERABLES AND SCHEDULE

Water system replacement at Tewaukon National Wildlife Refuge will occur as outlined in the drawings and specifications.

Projects shall be completed within 120 days after the notice to proceed has been issued. Extensions of schedule will be considered for adverse field conditions. All personnel listed in the Designated Officials section shall receive an electronic copy of the construction schedule.

V. SUBMISSION OF PROPOSAL

Submit a Technical and Cost Proposal for all work required in the Drawings and Specifications. Provide breakouts for all materials, equipment and field work required.

The Prospective Bidders will be evaluated on field work capabilities, price, ability to meet deadlines, and locality.

Prospective bidders are urged to visit the site and become familiar with existing conditions and ascertain the conditions which affect the work. Failure of the successful bidder to visit the site prior to submitting a bid or proposal on this work will not relieve the successful bidder from completing the project at the bid price. Prospective bidders must make site inspection arrangements with the Station Manager at Tewaukon NWR, Phone (701) 724-5702.

VII. DESIGNATED OFFICIALS

A. U.S. Fish and Wildlife Service

Contracting Officer

Phone: TBD

E-Mail: TBD

B. Project Engineer

Michael Wandersee

Phone: 720-813-8224

E-Mail: michael_wandersee@fws.gov

C. Tewaukon NWR

Station Manager

Eric Wilson

Phone: 701-724-5702

E-Mail: eric_wilson@fws.gov

VIII. ATTACHMENTS

1. Drawings

2. Specifications

END OF STATEMENT OF WORK