This document is an addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) for professional services related to water management and drainage improvements at Aloha State Park. The RFP seeks solutions to address historical water issues, including flooding and standing water, in the park's northern campground loop and other areas. The project involves conducting a comprehensive water flow study, assessing the existing drainage infrastructure, and providing recommendations to mitigate the water-related challenges. Topographic surveys, sewer upgrade plans, and geotechnical information are available to the awarded professional services contractor. The proposal due date is March 7, 2024, at 2:00 p.m. The contract will cover the Aloha State Park, located in Presque Isle County and the City of Allen Park, Michigan.
The RFP does not provide specific pricing terms or set-asides. There is no information on incumbents or the current environment. The funding requirements and sources are not explicitly stated. The addendum primarily focuses on responding to questions from potential proposers and providing clarification on the scope of work and available reference materials.
Text of this file
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 01
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
March 4, 2024
PROJECT NAME
Aloha State Park - Water Management and Drainage Improvements
FILE NUMBER
751/24131.GAG
PROJECT DIRECTOR
Gerald Gregorski
PROPOSAL DUE DATE:
March 7, 2024, at 2:00 p.m.
ADDENDUM ITEMS:
Submitted Questions with Response in BOLD:
1. Will the Topographic survey and Sewer Upgrade AB plans provided in the RFP be available in AutoCAD .DWG to the awarded PSC?
We are trying to determine if they are available, and they will be provided to the awarded firm I f so. For proposals, you should assume that they are not.
2. Does the site have any monitoring wells or historical groundwater level information?
See included reference drawings “E118_SewageDisposalSystem_08-24-1977.pdf”. As far as we can determine there is only one monitoring well left and that one is at the northeast corner of the sewage treatment plant fence. The others are believed to have been removed.
3. Does the site have any historical subsurface geotechnical/boring information?
See included reference drawings “E118_SewageDisposalSystem_08-24-1977.pdf” and “751-17154TAP_SewerUpgradeGeotechnical_04-14-2021.pdf”.
4. Is the Lagoon located to the E of the existing dump station part of the wastewater treatment system for the park? Is it a lined lagoon with either clay or geosynthetic liner?
See included reference drawings “L116_WastewaterTreatmentImprovements_01-26- 1994.pd”, Clay and PVC details.
5. Is the study intended to only cover the northern campground loop where the 15 sites are inaccessible due to high groundwater or a more expansive area beyond this area of concern for the campground/park?
The current area of greatest flooding concerns is between the contact station and boat basin, however the intent of the study is to provide information on how much water is http://www.buy4michigan.com/ flowing through our park as a part of the larger watershed area and recommendations on how to address the amount of water flowing through our site.
6. Are there any historical concerns that park staff notes of surface water/runoff drainage from the campground during periods of heavy precipitation?
See attached document “4-2-63 Project Daily Report Aloha Campground Development.pdf” that states concern of water issues at Aloha. We have historically had issues and during heavy periods of precipitation we have water laying for long periods of time throughout the campground. We have that stated on our reservation webpage because of past issues.
Campsites have been closed quite often because of heavy precipitation and water standing on the sites.
7. Is there a weather station at the park?
No, there is no weather station at Aloha.
8. When did the water seepage problems first occur?
There have been water issues at Aloha historically. The issues are getting worse as the years progress. After this last round of construction, the south section has been better, but this is when we discovered the water issues in the electrical system.
9. When were the underdrains installed?
It is assumed that these lines were installed in the spring of 1959 per included reference drawing “U1_UtilityMap_1-13-1959.pdf”. There are several generations of drainage being placed throughout the park dating from the 1960’s.
10. Have the underdrains ever been maintained/cleaned?
Yes, all drains have been maintained to the staff’s best ability.
11. Looking at the Rowe sanitary sewer plans from October 2022; can you provide the profile sheets for this plan set?
The full set of Rowe’s construction plans, which contain various detail sheets, will be available to the awarded firm. However, the file is too large to include in this posting.
12. From the Rowe sanitary sewer, can you provide the trench detail?
The full set of Rowe’s construction plans, which contain various detail sheets, will be available to the awarded firm. However, the file is too large to include in this posting.
13. Can you provide other utility profiles or depths such as electrical?
The full set of Rowe’s construction plans, which contain various detail sheets, will be available to the awarded firm. However, the file is too large to include in this posting.
14. Can you provide soil borings?
See included reference document “751-17154TAP_SewerUpgradeGeotechnical_04-14- 2021.pdf”
15. What shoreline improvements are you targeting?
We have no specific shoreline improvements planned.
Reference and Historical Documents Included:
L116_WastewaterTreatmentImprovements_01-26-1994.pd E118_SewageDisposalSystem_08-24-1977.pdf 751-17154TAP_SewerUpgradeGeotechnical_04-14-2021.pdf 751-17144TAP_Sewer Upgrade As-built-Sheets 18-19, 2022.pdf R_CampgroundTopographicSurvey_12-17-2001.pdf U1_UtilityMap_1-13-1959.pdf 10-2-72 ltr from Elmer to Corps of Engineers.pdf 4-2-63 Project Daily Report Aloha Campground Development.pdf Aloha Pic 1.pdf Aloha Pic 2.pdf Aloha Pic 3.pdf Aloha Pic 4.pdf Aloha Pic 5.pdf Aloha Pic 6.pdf
APPROVED BY:
PROJECT DIRECTOR DATE
3-4-2024
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .