Aloha SP Storm Water Management and Drainage Improvements PRD Project Statement.pdf
PDF 152 KB Posted
- Solicitation number
- RFP - 171 - 240000001245
- Issued by
- Presque Isle County, Allen Park City, Michigan
About this file
The document is a Project Statement from the Michigan Department of Natural Resources (DNR) Parks and Recreation Division (PRD) requesting assistance with water management and drainage improvements at Aloha State Park. The project scope includes providing hydrologic and hydraulic analysis, assessing the integrity of existing infrastructure, and developing a water management plan with alternative solutions. The successful consultant will be required to provide brief bi-weekly design progress updates. The project is anticipated to take place during the park's operating season from April 1 to October. The related state and local contract opportunity is for the Aloha SP Water Management & Drainage Improvements project, which is located in Presque Isle County and the City of Allen Park, Michigan.
The document outlines general requirements for the project, including a minimum of one in-person project team meeting and additional meetings via video conference at specific project milestones. All required testing to verify site conditions is to be identified and itemized in the consultant's technical and cost proposal. The project schedule is to be provided as part of the proposal submission, and biweekly progress updates will be required for the project team. The DNR Parks and Recreation Regional Field Planner is identified as the primary contact.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNR PARKS AND RECREATION DIVISION
Aloha State Park
Water Management and Drainage Improvements Project Statement
The DNR Parks and Recreation Division (PRD) is requesting assistance with the Aloha State Park Water Management and Drainage Improvements. It is anticipated that all design work associated with this project will occur in a coordinated fashion at the same time.
PROJECT BACKGOUND:
Aloha State Park located in the Village of Aloha, Aloha Township, Cheboygan County Michigan and is approximately 107 acres. The park campground consists of a 290-site modern campground with the facility sewer system and wastewater lagoon servicing three toilet shower buildings, 91 full hook-up sites and a campground sanitation station.
In the late 1950’s several drain tiles were constructed beneath the middle and north campground loops. This system allows water to pass from wetlands on the east side of the park, under the campground and into Lake Mullett. In recent months the north campground loop has been impacted by high ground water levels, causing water to bubble up out of the ground and to enter the underground electrical system. This has caused the closure of fifteen coveted lakeside campsites.
PROPOSED SCOPE OF WORK:
Interested bidders shall provide a complete PSC Proposal for all required Professional Services for groundwater and surface drainage improvements. Consulting services shall comply with the State of Michigan, Department of Management and Budget Contract for Professional Services and DMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. Proposals shall include Phase 100 – Study and Phase 300 – Schematic Design services to address groundwater and surface drainage concerns including advantages and disadvantages of options, option cost comparisons, and comparative life cycle considerations with a professional recommendation for DNR and DTMB consideration. The successful consultant shall provide brief bi-weekly design progress updates for the project team.
Professional services for Aloha State Park Storm Water Management and Drainage Improvements shall include but are not limited to:
• Provide hydrologic and hydraulic analysis of existing and post-project conditions.
• Gather all base data that shall ultimately be necessary for plans, submittals, and permit application considerations required for the Departments of Licensing and Regulatory Affairs (LARA), Environment, Great Lakes, and Energy (EGLE formerly DEQ) and United States Army Corps of Engineers (USACE), and governing agency approvals.
• Assess the integrity of the existing water management infrastructure and identify risks to other underground infrastructure such as electrical, water and sewer systems.
Page 2 Aloha State Park Water Management and Drainage Improvements
• Develop a water management plan outlining alternative solutions to water management practices, drainage, and shoreline improvements.
• Design and engineer preferred alternative(s) for water management, drainage, and shoreline improvements.
GENERAL REQUIREMENTS:
• A minimum of 1 face to face project team meetings with meetings likely to be project kick-off meeting and site analysis, additional meetings can be held via Teams or Zoom Phase 100, and Phase 300-50% and 90% completion intervals.
• For all meetings being held for document review, all required review information shall be submitted electronically and in hard copy formats ten (14) days prior to the meetings
• All testing required to verify the site conditions for the proper design is to be identified in the PSC Technical proposal, and the costs of testing are to be itemized in the PSC Cost proposal as reimbursements.
REFERENCE DOCUMENTS:
• U1_Utility Map, 1959
• 751-17144TAP_Sewer Upgrade As-built-Sheets 18-19, 2022
• R_Campground Topographic Survey, 2001
All existing park utility drawings will be made available to the successful bidder including sewer, water, and electric distribution drawings.
PROJECT SCHEDULE:
While the camping use season is from April 1-October it is anticipated that the consulting data collection and planning may take place in a coordinated and conscientious manner during this time frame as needed.
A proposed project schedule shown in weeks shall be provided as part of the proposal submission. Biweekly PSC progress updates will be required for the project team.
DNR Parks and Recreation Regional Field Planner is Ronda Osga (989) 619-6426.