RFP_9186_Backflow_Testing_and_RepairsDRAFT.pdf

PDF 3 MB Posted

Attached to
Backflow Testing
Solicitation number
PR9186
Issued by
Florida

About this file

RFP 9186 - Backflow Testing and Repair

This Request for Proposal (RFP) from the Orlando Utilities Commission (OUC) in Orlando, Florida, solicits qualified companies to provide annual testing and repair services for residential and commercial backflow prevention devices (BFPD). OUC maintains approximately 46,000 residential and 18,000 commercial backflow devices across its water distribution system. The RFP encompasses testing of device sizes ranging from 5/8" to 2" for residential applications and 5/8" to 12" for commercial applications, including double check valve assemblies (DCVA), reduced pressure zone (RPZ) devices, and pressure vacuum breaker (PVB) assemblies. Testing and repair services must comply with American Water Works Association (AWWA) Manual of Water Supply Practices M-14, Fifth Edition (Copyright 2024). All work requires technicians holding State of Florida Department of Environment Level III distribution operator licenses and active backflow testing and repair certifications. Residential work follows systematic area routing with weekly completion requirements, while commercial work operates on a quarterly schedule with 45-day advance customer notification. The submission deadline is June 30, 2026 at 2:00 PM EST, with a questions/comments due date of June 12, 2026 and an addendum due date of June 18, 2026. No pre-response conference is currently scheduled. The contract term is three years with two one-year renewal options, for a potential maximum contract period of five years. Bid bonds and payment/performance bonds are not required.

Pricing must remain firm throughout the contract period and all renewal extensions, with bidders providing unit pricing in an Excel worksheet for residential and commercial testing services across multiple device sizes and types. The supplier must include all labor, travel time, materials, equipment rental, consumables, tools, overhead, and profit in submitted unit prices. Suppliers are responsible for all miscellaneous materials, equipment, permits, traffic control devices, site restoration, and daily cleanup, with costs incorporated into unit pricing. Monthly invoicing accompanies detailed work completion summaries and exception reports. Commercial work orders not completed within the quarterly schedule are paid at 50% of unit pricing upon completion. The RFP requires three references with contact information for completed projects of similar scope and size, submission of subcontractor information with qualifications and project history, a complete list of certifications for all testing personnel, and proof of Fire Protection Contractor Class II certification if applicable. Bidders must maintain comprehensive general liability insurance with limits of $2,000,000 per occurrence and provide certificates of insurance prior to commencing work.

View the file

Other files

File Type Posted
PR_9186_Letter_of_Intent_to_Award.pdf PDF
ADDENDA_ACKNOWLEDGEMENT.pdf PDF
Addenda_No.1_9186_Backflow_Testing_and_Repairs.pdf PDF
Compliance_forms.pdf PDF
Copy_of_2027_Price_Sheet.xlsx XLSX spreadsheet
Supplier_Information.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 9186

For

Backflow Testing and Repair

Issue Date: May 29, 2026

Pre-response Conference: None Scheduled At This Time

Pre-response Conference Date:

Questions/Comments Due Date: June 12, 2026

Addendum Due Date: June 18, 2026

Proposal Due Date: June 30, 2026 by 2:00 PM EST

Bid Bond: Not Required Payment & Performance Bond: Not Required

Direct all inquiries to Buyer of Record:

Cindy Luttfring, CPPB, NIGP-CPP

407-325-6311 cluttfring@ouc.com

Orlando Utilities Commission RFP 9186 – Backflow Testing and Repair

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

Orlando Utilities Commission Orlando, Florida

RFP 9186 for Backflow Testing and Repair

Table of Contents 1 Introduction

1.1 Scope of Work Summary

1.2 Pre-Response Conference

1.3 Term of Contract

1.4 Minimum Bidder Qualifications

1.5 Price and Costs

1.6 Terms and Conditions

1.7 Contract Sample

1.8 Proposal Evaluation Criteria

2 Bidder Requirements and Qualifications

2.1 Detailed Scope, Requirements, & Drawings

2.2 Bidder Information & Required Bidder Qualifications

2.2.1 Bidder Information

2.2.2 Required Bidder Qualifications

3 Instructions to Bidders

3.1 Legal and Public Record Statement

3.2 Confidentiality Notice to Bidders

3.2.1 Exemptions

3.3 Acknowledgement

3.3.1 Statement of No Bid

3.4 General Information

3.4.1 Common Terms

3.4.2 Submittal

3.4.2.1 Alternate Proposals

3.4.3 Signatures

3.4.4 Withdrawal

3.5 Electronic Submittal of the Proposal

3.6 Compliance Forms

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

3.6.1 Public Entity Crimes

3.6.2 Dispute Disclosure

3.7 RESERVED

3.8 Proposal Preparation Costs

3.9 Exceptions

3.10 Clarifications

3.11 Local Conditions

3.12 Opening

3.13 Solicitation Selection Schedule

3.14 Proposal Acceptance and Rejection

3.15 Proposal Evaluation Criteria

3.16 Cancelation

3.17 Freight (If Applicable)

3.18 Bid Bond (If Applicable)

3.19 Payment and Performance Bond (If Applicable)

3.20 Contract Execution

3.21 Award

3.22 Taxes, Permits, and Licenses

3.23 Error and Omissions

3.24 Proposal Submittal Format

3.24.1 OUC Policies and Procedures for Bidders

3.25 Signatures

4 Proposal Submittal Format & Checklist

5 Attachments

SCM-RFP-T-01 – Request for Proposal Template v5.0– 5/22/25

Re qu es t f or P ro po sa l (

RF

P)

Orlando Utilities Commission Orlando, Florida

RFP 9186 for Backflow Testing and Repair

Direct all inquiries to the Buyer of Record: Cindy Luttfring, CPPB, NIGP-CPP

407-325-6311 cluttfring@ouc.com

Proposal Opening Location:

Orlando Utilities Commission Reliable Plaza 100 West Anderson Street Orlando, Florida 32801

1. Instructions are located in the Instruction to Bidders section of this document; or, may be provided during a Pre-Conference Meeting.

2. Electronic proposal submittals, described in the Electronic Submittal of the Proposal section of this document, will be accepted. Email or other means will not be accepted.

3. VendorLink help can be accessed by calling 407-222-1885, or by emailing support@evendorlink.com.

mailto:support@evendorlink.com

1 INTRODUCTION

The Orlando Utilities Commission (OUC) is an electric and water municipal utility serving Orlando, Florida and portions of surrounding Orange County. OUC also has an Inter-local agreement with the City of St.

Cloud, Florida for the management of its electric utility. Currently, OUC serves more than 380,000 customers. To obtain general information about OUC, access www.ouc.com.

1.1 SCOPE OF WORK SUMMARY

The purpose of this Request for Proposal (RFP) is to solicit proposals from qualified companies seeking to provide testing of residential and commercial back flow prevention devices (BFPD). OUC has approximately 46,000 residential and 18,000 commercial backflow devices connected in our water distribution system. Currently OUC is administering an annual testing program to both residential and elective commercial customers.

Refer to Section 2.1, Detailed Scope, Requirements, & Drawings for more information.

1.2 PRE-RESPONSE CONFERENCE (NOT APPLICABLE)

To comply with security requirements, email names of attendees and company affiliations to the Buyer of Record at least 48 hours in advance of the meeting. Please bring government issued photo identification the day of the Pre-Response Conference.

If applicable, refer to Attachment C: Invitation to Pre-Response Conference

1.3 TERM OF CONTRACT

The term of the Contract will be for 3 years with 2 (1) year options to renew

1.4 MINIMUM BIDDER QUALIFICATIONS

Refer to Attachment C

1.5 PRICE AND COSTS

Prices documented in the submitted Proposal must remain firm throughout the contract period (including additional extensions, if applicable). Refer to Attachment B: Price Schedule.

1.6 TERMS AND CONDITIONS REFER TO ATTACHMENT D

Refer to Attachment D

1.8 Contract Sample

Click here to view an OUC contract sample.

1.7 PROPOSAL EVALUATION CRITERIA

Refer to the Instructions to Bidders section of this document.

http://www.ouc.com/ http://www.ouc.com/docs/procurement/proc_contract_agreement.pdf?sfvrsn=2

2 BIDDER REQUIREMENTS AND QUALIFICATIONS

2.1 DETAILED SCOPE, REQUIREMENTS, & DRAWINGS

Refer to Attachment A

Bidder Information & Required Bidder Qualifications

2.1.1 Bidder Information

On company letterhead Bidder to provide a response cover page with the following information:

1. Firm Name

2. Name of Parent Company if applicable

3. Complete Business Address

4. State of Incorporation

5. Number of years in business

6. Name(s) and contact information of key personnel

7. Dun & Bradstreet number

8. Licenses obtained to conduct business with OUC

2.1.2 Required Bidder Qualifications

Refer to Section 1.4 Minimum Bidder Qualifications for more information.

1. List the number of projects (with similar scope and size) that the bidding organization has completed and are in progress.

2. Provide at least three (3) references with contact information related to completed projects with the similar scope and size project.

a. If deemed pertinent, OUC will request to do site visits to customers provided as references by selected Bidder or Bidder’s affiliates.

3. Provide a complete list of all the subcontractors that may be part of the project, with the following information:

a. Company name

b. Contact information

c. Number of years in business

d. Proof of the necessary licenses for the job (if applicable)

e. List of project that they had participated with similar scope and size to this RFP

4. Should bidder be awarded the work in this RFP, please provide information on any Economic Development Opportunities that Bidder may bring, such as the creation of new jobs or purchasing or leasing of new building space, which could benefit the local Orlando Area or the State of Florida.

3 INSTRUCTIONS TO BIDDERS

3.1 LEGAL AND PUBLIC RECORD STATEMENT

As required by Florida’s Public Records Law, information provided to OUC in the course of business will be made available for public inspection and copying unless a specific statutory exemption applies.

3.2 CONFIDENTIALITY NOTICE TO BIDDERS

By submitting a proposal to OUC, each Bidder acknowledges and understands that OUC is a public agency subject to Chapter 119 Florida Statutes (“Public Records Law”). Any Proposal document the Bidder submits will become a public record when OUC provides notice of an intended decision or 30 days after opening the bids, proposals, or final replies, whichever is earlier. Trade Secrets, certain background financial information, and other items, may constitute exemptions to disclosure under the Public Records law.

3.2.1 Exemptions

If during the Proposal or Negotiation Phase a Bidder wishes to claim an exemption on any portion of its Proposal to OUC, the Bidder must identify the specific statutory exemption and do the following:

1. Submit a redacted version. Redact (black out) only those portions of the Proposal put forward for exemption.

2. Submit an un-redacted version of the same documents marked, “Confidential –Trade Secret/ Proprietary Information”. Both versions are to be submitted at the same time.

3.3 ACKNOWLEDGEMENT

1. From the issue date of this solicitation packet until a selection decision is made, no unauthorized contact related to this solicitation will be allowed between a Bidder, their employees or subcontractors and any OUC commissioner, officer, director, or staff, with the exception of the Buyer of Record. Any unauthorized contact will disqualify the Bidder from further consideration

2. The selected Bidder agrees to obtain, prior to award, Worker's Compensation, General Liability, Automotive, and other insurance requirements in accordance to the requirements in the terms and conditions specified in section 1.7.

3. All policies shall be subject to approval by OUC, and issued by companies authorized by the State of Florida’s Department of Insurance to conduct business in the State of Florida.

4. The selected Bidder agrees that it and its subcontractors have a Drug-Free Workplace Program that complies with Florida Statute §§ 287.087 and 440.101 et. seq., the Omnibus Employee Testing Act of 1991, 49 Code of Federal Regulation § 391 and 40 (operation of commercial motor vehicles).

a. In addition, all subcontractors must implement a controlled substance and alcohol testing policy for safety sensitive positions as defined by the Commission’s Alcohol and Controlled Substance Testing Policy for Safety Sensitive Positions.

5. The selected Bidder’s employees and its subcontractors’ employees are further prohibited from being under the influence or impairment of alcohol on OUC property or work sites or at any time or place while conducting business with or on behalf of OUC.

6. The selected Bidder shall submit only one proposal/bid in response to this solicitation packet, and shall have no financial interest in other entities submitting proposals/bid responses for the same solicitation packet.

7. Neither the selected Bidder, nor its affiliates, nor anyone associated with them shall have any potential conflict of interest due to any other clients, contracts, business relationships or property interests for this solicitation packet’s scope of work.

8. The selected Bidder shall disclose to OUC the name(s) of any OUC employee, contractor, or OUC Board Member who has a direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction. A direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction exists if the OUC employee, contractor, or Board Member:

a. Presently, or in the preceding twelve (12) months, has an ownership interest in the selected Bidder’s organization (other than as owner of less than 1% of the stock of a publicly traded corporation).

b. Works for, is a partner, officer, director, trustee, or consultant to the selected Bidder.

c. Has received grant, travel, honoraria, or other similar support from the selected Bidder

d. Has a right to receive royalties from the selected Bidder.

9. No member of the selected Bidder’s ownership, management, or staff shall have a vested interest in any aspect of OUC, nor any business or other relationship with any of OUC’s employees, officers, directors, or Board Members that creates a conflict of interest or the appearance of a conflict of interest.

10. No member of the selected Bidder’s ownership or management is presently applying for an employee position or actively seeking an appointment within OUC.

11. The selected Bidder, or authorized signatory, shall provide written notice to OUC in the event that a conflict of interest is identified at any time.

3.3.1 Statement of No Bid

The OUC Procurement Department is committed to continuously improving its processes to receive maximum participation from the industry/market. OUC is requesting that organizations, who do not wish to bid on this RFP, send the Buyer of Record an email briefly explaining their “no bid” decision. This response will help to improve the solicitation process and any future communications.

3.4 GENERAL INFORMATION

Bidders shall prepare Proposals in accordance with the requirements of these Instructions to Bidders. Not preparing a Proposal, in accordance with such instructions, implies that the Bidder does not intend to comply with all of the proposed contract conditions. Such proposals will be considered irregular and may be rejected.

OUC will receive Proposals through the VendorLink system for goods, equipment, materials, and related services set forth in the included specifications and documents.

http://www.myvendorlink.com/

3.4.1 Common Terms

OUC and Bidders (the parties) agree that the following phrases each shall have the meaning provided here and may be used interchangeably:

1. “Bidder(s)”, “Supplier(s)”, and “Proposer(s)” shall mean the organization, party, person, firm, company, corporation, partnership, joint venture, or other type of entity responding to this solicitation.

2. “Solicitation” shall mean , “Request for Proposal(s)”, “RFP”, “Request for Quote”, “RFQ”, “Invitation to Bid”, “ITB”, “Solicitation Package” or, “Solicitation Packet”, to which the Bidder is responding.

3. “Bid(s)”, “Proposal(s)”, or “Quote(s)” shall mean the documents formally submitted to OUC by each of the Bidders responding to this solicitation packet.

3.4.2 Submittal

Bidders shall submit Proposals in accordance with the instructions and schedule included in the solicitation containing these specifications and documents. Refer to Section 4: Proposal Submittal Format & Checklist and submit Proposal with all applicable content.

3.4.2.1 Alternate Proposals

If the Bidder submits an alternate proposal, they shall identify clearly the proposal as an “Alternate Proposal”. OUC may consider alternate proposals a blanket exception to the solicitation and reject the Proposal.

3.4.3 Signatures

An authorized representative of each Bidder shall:

1. Sign or e-sign the Proposal, give their full name and title, and provide the Bidder’s business name and address.

2. Enter the organization’s exact legal name on the Proposal.

3. Sign or e-sign compliance forms, if applicable.

3.4.4 Withdrawal

Bidders may withdraw, alter, and resubmit their Proposals through VendorLink at any time prior to the Proposal due date and time. Proposals may not be withdrawn, altered, or resubmitted after the Proposal due date and time. OUC may request clarifications and additional information after proposal submission.

3.5 ELECTRONIC SUBMITTAL OF THE PROPOSAL

To ensure correct Proposal formatting, Bidders shall:

1. Submit Proposals electronically through VendorLink.

2. Upload files only in MS Word (.doc or .docx), Excel (.xls or .xlsx), and PowerPoint (.ppt or .pptx); Adobe Portable Document Format (.pdf); Compressed File (ZIP) formats.

3. Enable printing on files submitted.

4. Clearly identify the RFP Number, Name, Submission Date, and Bidder Name on the Response Cover Page on Bidder’s letterhead.

5. Separate and identify each part of the submission (i.e. document type, form type, content type) with a divider/separation page.

6. Contact VendorLink technical support at support@evendorlink.com, if technical difficulties arise during proposal submission.

7. Follow all instructions outlined in this RFP and provide all requested information.

OUC may ask the selected Bidder to supply one hard copy set with original, written signatures and original compliance forms, prior to the contract execution. Do not submit following both methods unless otherwise instructed.

3.6 COMPLIANCE FORMS REFER TO ATTACHMENT E

3.6.1 Public Entity Crimes

Each Bidder shall submit copies of an executed and notarized Sworn Statement under Section

287.133 (3)(a) and 287.135, Florida Statutes, on Public Entity Crimes and Scrutinized Companies.

3.6.2 Dispute Disclosure

Each Bidder shall submit copies of an executed

3.7 RESERVED

3.8 PROPOSAL PREPARATION COSTS

OUC shall provide, without charge, one set of the specifications and documents to prospective Bidders for preparation of proposals. Addenda documents will be issued only to prospective Bidders registered in VendorLink.

This solicitation does not commit OUC to pay any costs incurred in the preparation and submission of the Proposal or to pay any other costs incurred prior to award.

3.9 EXCEPTIONS REFER TO ATTACHMENT E

OUC is seeking proposals that meet all technical and commercial requirements as outlined in this solicitation. If a Bidder takes exception to any solicitation requirement or condition, the exception must be specifically stated on the Exception Form provided within the solicitation document. OUC shall consider only those exceptions written on the form at the time the Proposal is submitted. The Bidder acknowledges that any exception taken to the solicitation criteria (including submitting an alternate proposal) may result in OUC determining the Proposal to be nonresponsive.

3.10 CLARIFICATIONS

If a prospective Bidder has doubt as to the true meaning of any part of the solicitation, they may submit a written request for clarification through email to the Buyer of Record; verbal requests will not be accepted. The Bidder must reference the Solicitation Package page number and section heading on any clarification requests

Failure of the Bidder to request information or make inquiries will not relieve them of any responsibility to perform under the terms of any contract awarded for the work in accordance with subsequent clarifications.

OUC shall issue an addendum to all Bidders, via VendorLink, once an inquiry is clarified and/or answered. Verbal responses will not be provided and are not binding on OUC.

mailto:support@evendorlink.com http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.myvendorlink.com/ http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2

3.11 LOCAL CONDITIONS

Each Bidder shall have thorough knowledge of conditions, factors, and scope of work, which would affect the execution and completion of the requested work. If required, site visits will be held the day of the Pre-Response Conference unless otherwise arranged.

Bidders shall investigate properly and consider all such factors in the preparation of every Proposal submitted. OUC shall not permit claims for financial adjustment based on the lack of prior information or its effect on the cost of the work.

3.12 OPENING

OUC shall open Proposals on the RFP Due Date at 2:00 p.m. EST at 100 West Anderson Street, Orlando, Florida. If required, at a public opening, OUC shall read only the Bidder name and if they have provided all the required information. OUC shall not share any other information at this time, with the exception of solicitations for construction or repairs on public works projects in which the price is submitted. Proposals not meeting the requirements may be rejected.

All questions concerning this solicitation must reference the document page number, and section heading. OUC shall answer questions and post them to VendorLink as an addenda to the solicitation.

3.13 SOLICITATION SELECTION SCHEDULE

OUC shall adhere to the stated schedule during the solicitation process, unless a change notice is issued to the Bidders via a written addendum. OUC reserves the right to postpone the date and time announced for the opening of proposals at any time.

OUC expects Proposals to address all of the information requested in the solicitation and subsequent clarifications, and to reflect the capabilities of the Bidder.

Bidders shall submit any supplemental information, and list any variations on the Exceptions form, in accordance with Section 4, Proposal Submittal Format & Checklist.

3.14 PROPOSAL ACCEPTANCE AND REJECTION

OUC reserves the right to accept the Proposal which, in its judgment, is the most responsive and responsible Proposal and to reject any and all proposals; as well as waive irregularities and formalities in any proposal that is submitted.

Without limiting the generality of the foregoing, OUC may reject any proposals which are incomplete or irregular; Proposals which omit any one or more items for which the solicitation requires, any Proposals which omit unit prices if unit prices are required, any Proposals from Bidders who have previously failed to satisfactorily complete contractual obligations.

1. The following shall cause an automatic rejection of the proposal:

a. Proposals delivered/submitted after the 2:00 p.m. due date

b. Failure to submit a Bid Bond (if required)

c. Failure to attend a mandatory Pre-Response Conference and/or any mandatory presentation (if required)

d. Failure to submit a signed Payment and Performance Bond Compliance Form when (a) a Payment and Performance Bond is required or (b) alternate payment and performance security permissible under Section 255.05, Florida Statutes is required http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2

2. The following items may cause a rejection of the proposal:

a. Failure to submit copies of any of the signed & notarized (where required) forms:

i. Statement on Public Entity Crimes form

ii. Dispute Disclosure

3.15 PROPOSAL EVALUATION CRITERIA

OUC shall evaluate the Proposals based on the information provided by each of the Bidders. OUC’s review may include, but may not be limited to the following categories:

1. Qualifications and Experience, including past performance for OUC

2. Responsiveness to Requirements

3. Safety and Quality Programs

4. Financial Soundness of Organization

5. Price

OUC reserves the right to negotiate with Bidders who submitted responsive and responsible Proposals in the best interest of the OUC Commission. This negotiation process may occur prior to OUC Commission approval. Each Bidder acknowledges that OUC shall evaluate all Proposals and may initiate clarification discussions or seek additional information from all or some of the Bidders to fully understand any unclear elements of their proposals. Following clarification, OUC may initiate negotiations with the Bidder considered to be the most responsive and responsible. If no agreement is reached with the highest ranked Bidder, OUC may reject all Proposals or continue negotiations with each subsequently ranked Bidder until an acceptable deal is reached. A final contract award may be contingent upon OUC Commission and legal approval.

OUC reserves the right to consider historic information and facts, whether gained from the Bidder’s Proposal, question and answer conferences, references, and/or other sources during the evaluation process. OUC may conduct such investigations to assist with the evaluation of any Proposal. The investigation also serves to establish the Bidders’, subcontractors’, and other related entities’ responsibility, qualifications, and financial ability to fulfill the Proposal requirements to the Commission’s satisfaction, within the prescribed time.

The Bidder solely is responsible to submit information related to the evaluation categories. OUC is under no obligation to solicit such information. Failure of the Bidder to submit information may cause an adverse impact on the Proposal’s evaluation.

3.16 CANCELATION

Prior to the final execution of a Contract or full Notice to Proceed, OUC reserves the right to rescind said award without prior notice to Bidders. In addition, OUC may reject all Proposals, reissue the solicitation packet, or re-award the contract.

3.17 FREIGHT (IF APPLICABLE)

The selected Bidder shall coordinate with OUC’s freight contractor for shipping unless OUC determines that the selected Bidder can obtain freight/shipping rates or methods that are more advantageous to OUC. The selected Bidder shall submit an alternate shipping proposal based on delivery to OUC’s Free On Board (FOB) carrier at the designated OUC facility or location. The alternate proposal must include the:

http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2

1. Carrier name

2. Insurance coverage

3. Firm price freight quote

The Bidder must include any alternate proposal in the bid response to this solicitation. OUC may accept or reject the proposed alternate shipping arrangement.

OUC’s freight/shipping supplier and contact information is:

Nexterus

1-888-867-5952 (Monday – Friday, 8:00 a.m. – 7:00 p.m. EST) dcs@nexterus.com

3.18 BID BOND (NOT APPLICABLE)

Bidder may be required to submit a certified check or cashier’s check drawn on an acceptable bank, or an acceptable Bidder’s bond executed by the Bidder and a surety company authorized to do business in the State of Florida. The value of the bid bond shall be five percent (5%) of the proposal price schedule. When submitting a Proposal through VendorLink, the Bidder shall provide a copy of the check and express mail the original check to the delivery location provided on the first page of the Solicitation Packet Form.

The bid bond guarantee shall be made payable without condition to OUC. The amount of the check or bond may be retained by and forfeited to OUC as liquidated damages if the Proposal results in a contract award and the Bidder fails to honor the accepted terms.

OUC shall return the selected Bidder’s bid bond when that Bidder executes the contract and files a satisfactory payment and/or performance bond, if required. OUC may retain the bid bond of the second highest ranked Bidder for a period not to exceed thirty (30) days, pending the execution of the contract by the selected Bidder. OUC shall return the bid bond of each unsuccessful Bidder upon request, after the contract is awarded or when the Proposal is rejected.

3.19 PAYMENT AND PERFORMANCE BOND (NOT APPLICABLE)

The selected Bidder may be required to furnish a Payment and Performance Bond to OUC per Florida Statutes; Section 255.05 equal to 100 percent of the contract price. The cost of such bonds shall be stated as a separate line item in the Proposal.

A surety company, authorized to do business in the State of Florida and acceptable to OUC, shall sign the bond. The Performance Bond and Payment Bond shall be dated with the actual execution date. With these bonds, the responsible party shall file certified copies of the power of attorney of such attorney-in-fact signing the bond on behalf of the surety, and such certificates shall be certified to show that such power of attorney was in effect to and including the date of the actual execution of the bonds. Any bonds submitted by a surety or its agent shall be conclusively presumed to have been authorized by and binding upon the surety company irrespective of the date shown on the power of attorney.

If bonds are required, they shall remain in full force and effect until satisfactory completion of any specified performance guarantee tests, or satisfactory completion of all other contractual requirements, whichever shall occur last. Upon recording of the performance and payment bond (if applicable) Bidder shall provide OUC three (3) copies.

OUC shall furnish a copy of the selected Bidder’s bond to any lienor demanding that bond under the provisions of Florida Statute 713.23.

3.20 CONTRACT EXECUTION

The selected Bidder shall execute the necessary contractual forms, and return the executed forms within ten (10) business days of receipt of forms for execution.

3.21 AWARD

OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items or any combination of such items; or to make no contract award.

OUC shall be the sole judge of its own best interests, the proposals, and the resulting contract. An award may be made to the most responsive and responsible organization whose proposal is determined to be the most advantageous to OUC. The Commission’s decision shall be final and OUC’s rights include the ability to:

1. Reject any or all proposals or parts thereof

2. Issue subsequent solicitations

3. Cancel the entire solicitation

4. Remedy technical errors on the solicitation

5. Negotiate with any, all or none of the Bidders

6. Award a contract to one or more Bidders or none at all

7. Accept other than the lowest price

8. Waive informalities and irregularities in proposals

3.22 TAXES, PERMITS, AND LICENSES

The Bidder's attention is directed to the General Terms and Conditions and the Florida Statutes regarding taxes, permits, and licenses. It shall be the Bidder's responsibility to determine the applicable taxes, permits, and licenses. If the Bidder has doubt as to whether or not a tax, permit, or license is applicable, they shall state in their proposal whether this item has been included in their proposal price and the amount of the applicable tax, permit, or license in question.

3.23 ERROR AND OMISSIONS

Bidders or their authorized representatives are expected to be fully informed as to the conditions, requirements and specifications before submitting proposals; failure to do so will be at the Bidder’s own risk. Neither law nor regulations make allowance for errors either of omission or commission on the part of Bidders. In case of error of extension of prices in the proposal, the unit price shall govern.

3.24 PROPOSAL SUBMITTAL FORMAT

Bidders shall complete all required forms, and include them in the proposal submittal package with any other required information. Refer to Section 4, Proposal Submittal Format & Checklist for more information.

3.24.1 OUC Policies and Procedures for Bidders

The Bidder shall read and comply with OUC’s policies and procedures before submitting this Proposal:

1. Contractor Security Policy

2. Bid Protest Guidance

3. Generic Contractor Orientation

4. Drug and Alcohol-Free Workplace and Testing Policy

5. OUC Travel and Expense Guidelines

6. All policies – OUC Procurement Services Department website

These policies and any supplemental policies provided at contractor orientation are hereby fully incorporated into this contract by reference and to the extent applicable to the supplier in the performance of their work. Supplier and its subcontractors, suppliers, agents, and employees shall fully comply with all such policies as amended from time to time.

3.25 SIGNATURES

By submitting this proposal with the authorized electronic signature, the Bidder hereby declares that, in all respects for and in good faith, without collusion or fraud:

1. Only the individuals or organizations interested in this proposal/bid response as principal or principals are named in this Proposal.

2. No other individuals or organizations than mentioned in this Proposal have any interest in this Proposal/Bid Response or in the subsequent contract.

3. This Proposal/Bid Response is made without connection with any other person, company, or parties likewise submitting a Proposal/Bid Response.

Bidders shall prepare Proposals in accordance with the Instructions to Bidder’s document. Failure to submit the necessary forms may cause a rejection of the proposal. The Bidder hereby agrees to provide the services and/or items specified in the solicitation packet at the prices quoted pursuant to the requirements of this document.

https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_sec_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_bid_protest.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_orientation_stanton.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_proc_alc_cont_subs_testing_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_supplier_business_expense_guidelines.pdf https://www.ouc.com/doing-business-with-ouc/

SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19

4 PROPOSAL SUBMITTAL FORMAT & CHECKLIST

A checkmark (✓) on the items below indicates these are applicable items and the terms and conditions stated in earlier sections are applicable. Bidders shall complete all the forms checked (✓) below, and include them in the proposal submittal package in order with any other information.

Provide a written signature on all original forms and, when required, a notary stamp. Scan & upload these forms with the Proposal.

Technical Response File (checked if applicable)

Tab 1 – Cover Page

Proposal Cover Page on Bidders Letterhead

Bidder Information as listed in Section 2.2.1

Tab 2 – Bidder Background and Qualifications

References and Qualifications as listed in Section 2.2

Tab 3 – Response to Requirements

Response to all Requirements as listed in Section 2 and any applicable Attachments

Tab 4 – Compliance Forms

Submit at time of proposal

Exceptions

Sworn Statement on Public Entity Crimes and Scrutinized Companies Under Florida Statutes, Section 287.133 (3) (a) and 287.135

Dispute Disclosure

☐ Bid Bond as described in Section 3.18 (Not Applicable)

Addenda (If Applicable)

Provided at time of award

Copy of Company’s Business License

Copy of Insurance Certificate

W-9 Form

☐ Payment & Performance Bond as described in Section 3.18 (Not Applicable) http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_addenda_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_w9_form.pdf?sfvrsn=2

SCM-RFP-T-01 – Request for Proposal Template v5.0 - 5/22/25

5 ATTACHMENTS

Attachment A: Detailed Scope of Work & Requirements

Attachment B: Price Schedule

Attachment C: Supplier Information Form

Attachment D: Terms and Conditions

Attachment E: Compliance Forms

DETAILED SCOPE OF WORK & REQUIREMENTS

Please see below

SPECIFICATIONS

Purpose

The purpose of this Request for Proposal (RFP) is to solicit proposals from qualified companies seeking to provide testing of residential and commercial backflow prevention devices (BFPD). OUC has approximately 46,000 residential and 18,000 commercial backflow devices connected in our water distribution system. Currently OUC is administering an annual testing program to both residential and elective commercial customers. The primary focus of the requested services will be for annual testing of residential BFPD and select commercial BFPD.

Section 1 - Outlines the scope of work for Residential Customers

Section 2 - Outlines the scope of work for Commercial Customers

Section 3 - Applies to all work performed in the scope of the contract

Section 1

1.1 Residential Work Order Assignment

The nature of work assignment will be a systematic area routing across the OUC water distribution service territory. The Supplier shall be capable of working with an electronic work order management system as means of receiving and completing assigned work.

This shall include integrated electronic work order management and mapping software applications. Supplier shall also be capable of communication by means of e-mail. The Supplier shall have a designated supervisor as a one-point contact for OUC, along with designated contingency contact. The use of secondary message centers will not be accepted as means of communication. In general, all work will need to be completed from 8:00 am to 5:00 pm Monday through Friday. All commercial BFD shall follow the notification procedures outlined in section 2.0. Supplier must schedule and receive approval by the OUC project coordinator prior to beginning any work outside the normal working hours. Supplier must be willing to work weekend and holiday hours if deemed necessary by OUC personnel.

On a yearly basis OUC will issue a group of BFPD work orders to be completed within the designated12 month period. The supplier shall provide a consistent weekly completion of BFPD testing over the designated period. OUC will not issue additional work orders until successful completion or returned to utility (RTU) of pending issued work orders.

1.2 Residential Testing Responsibilities of Supplier

The Supplier shall be responsible for scheduling and procurement of all necessary material, equipment and incidentals to perform and complete assigned projects.

a. Supplier shall provide labor, appropriate tools, miscellaneous material (see section 4.20), supervision, administration and technical support to install all related Water Distribution facilities, including but not limited to the following: PVC pipe, fittings, spigot (PVC), and any appurtenances associated with the construction of the water distribution facilities. Supplier shall be capable of testing, repairing backflow devices ranging from 5/8” to 2” in size. See Exhibit A for a typical residential backflow installation detail.

b. Supplier shall perform repairs on items as needed upon OUC’s request.

c. The Supplier shall be responsible for scheduling and procurement of all necessary material, equipment and incidentals to perform and complete assigned service orders.

d. The Supplier shall provide the use of competent and qualified, certified personnel who holds an active backflow test and repair certification.

e. The Supplier must employ sufficient full-time employees to provide the services described herein.

f. All work shall be performed by a technician who holds a State of Florida

Department of Environment level III distribution operator license in accordance with County, City, and State guidelines and in compliance of OSHA and OUC safe work practices. Work shall be in accordance with the manufacturer requirements and OUC drawings and specifications.

1.3 Residential Backflow Testing and Repair

The Supplier shall include in the proposal, descriptive information, explaining in detail the method used to accomplish the required testing and repairs. The approved testing procedure shall be in conformance with procedures outlined in the American Water Works Association Recommended Practice for Backflow Prevention and Cross- Connection Control, Manual of Water Supply Practices M-14 Fifth Edition, Copyright 2024.

a. The Supplier shall provide to OUC, a copy of current certification for each tester and the annual calibration documentation for each piece of testing equipment used.

b. The Supplier shall notify OUC of any illegal cross connections, incorrect installations or any other potential hazards to the water system within 24 hours.

c. The Supplier shall tag all devices after testing. Tags are to be securely fastened to each backflow device and indicate the test date (month/year).

d. Supplier shall notify the customer prior to performing a test. In cases where notification is unsuccessful, the Supplier shall check the water meter to see if water is being used. If not, the test can be conducted. At the conclusion of the test, the Supplier will make certain that the water meter is not clocking prior to leaving the location.

e. The Supplier shall leave a door hanger at each location where a successful test is performed while the customer is NOT present. Door hangers with contact information will be provided by OUC.

f. When opening the atmosphere to facilitate a backflow repair, the Supplier shall make every reasonable attempt to locate and open a flushing point, such as a hose spigot, prior to turning on water service so that any air and/or debris can be evacuated from the customers house line.

g. The Supplier shall be compensated only for backflow device test performed.

h. The Supplier will not be compensated for unsuccessful attempts to locate or gain access to a backflow device. Responsibility to locate the device will rest solely on the Supplier.

i. The Supplier will be responsible for restoring landscape/site to its original condition. All the costs related to the care and protection of the work area shall be included with the unit price provided in the pricing section.

j. The Supplier, without charge, shall clean the working areas each day of all trash and waste materials and shall maintain the site in a neat and orderly condition throughout the work period.

Section 2

2.0 Commercial Work Order Assignment and Process

The nature of work assignment for commercial backflow testing will be divided into a quarterly schedule. OUC will issue of customer contact information 45 days prior to the three-month work schedule. The customer has 45 days to respond. If no response is received OUC will schedule testing and dispatch work to the selected Vendors to perform the test. In the event of failure, Vendors have the authority to offer their services for repairs to the customer. The customer has the right to refuse service and get bids for repairs as they own and maintain their devices. See Exhibit C for an example of the Commercial Backflow Testing Notification Letter.

Work assignment will be a systematic area routing across the OUC water distribution service territory. The Supplier shall be capable of working with an electronic work order management system as means of receiving and completing assigned work. This shall include integrated electronic work order management and mapping software applications.

Supplier shall also be capable communication by means of e-mail. The Supplier shall have a designated supervisor as a one-point contact for OUC, along with designated contingency contact. The use of secondary message centers will not be accepted as means of communication. In general, all work will need to be completed from 8:00 am to 5:00 pm Monday through Friday. All commercial BFD shall follow the notification procedures outlined in section 2.0 Supplier must schedule and receive approval by the OUC project coordinator prior to beginning any work outside the normal working hours.

See Exhibit D for example of work completion summary

Supplier must be willing to work weekend and holiday hours if deemed necessary by OUC personnel.

On a quarterly basis OUC will issue a group of BFPD work orders to be completed within the designated 3 month period. The supplier shall provide a consistent weekly completion of BFPD testing over the designated period. OUC will not issue additional work orders until successful completion or returned to utility (RTU) of pending issued work orders. In addition work orders not completed within the quarterly schedule, upon completion will be paid at a rate of 50% of the unit pricing.

2.1 Electronic Work Order Management

The Supplier shall be capable of working with an electronic work order management system as means of receiving and completing assigned work. This shall include integrated electronic work order management and mapping software applications. Supplier shall also be capable communication by means of e-mail. The Supplier shall have a designated supervisor as a one-point contact for OUC, along with designated contingency contact.

The use of secondary message centers will not be accepted as means of communication.

In general, all work will need to be completed from 8:00 am to 5:00 pm Monday through Friday.

All commercial BFD shall follow the notification procedures outlined in section 2.0 Supplier must schedule and receive approval by the OUC project coordinator prior to beginning any work outside the normal working hours. Supplier must be willing to work weekend and holiday hours if deemed necessary by OUC personnel.

2.2 Commercial Testing Responsibilities of Supplier

a. The Supplier shall be responsible for scheduling and procurement of all necessary material, equipment and incidentals to perform and complete assigned projects.

b. Supplier shall provide labor, appropriate tools, miscellaneous material (see section 4.20), supervision, administration and technical support to install all related Water Distribution facilities, including but not limited to the following:

PVC pipe, fittings, spigot (PVC), and any appurtenances associated with the construction of the water distribution facilities. Supplier shall be capable of testing, repairing backflow devices ranging from 5/8” to12” in size.

c. Supplier shall be capable to perform repairs on items as needed upon OUC’s request.

d. The Supplier shall be responsible for scheduling and procurement of all necessary material, equipment and incidentals to perform and complete assigned service orders.

e. The Supplier shall provide the use of competent and qualified, certified personnel who holds an active backflow test and repair certification.

f. The Supplier must employ sufficient full-time employees to provide the services described herein.

g. All work shall be performed by a technician who holds a State of Florida

Department of Environment level lll distribution operator license in accordance with County, City, and State guidelines and in compliance of OSHA and OUC safe work practices. Work shall be in accordance with AWWA practices, manufacturer requirements and OUC drawings and specifications.

2.3 Commercial Backflow Testing and Repair

The Supplier shall include in the proposal, descriptive information, explaining in detail the method used to accomplish the required testing and repairs. The approved testing procedure shall be in conformance with procedures outlined in the American Water Works Association Recommended Practice for Backflow Prevention and Cross- Connection Control, Manual of Water Supply Practices M-14 Fifth Edition, Copyright 2024.

a. The Supplier shall provide to OUC, a copy of current certification for each tester and the annual calibration documentation for each piece of testing equipment used.

b. The Supplier shall notify OUC of any illegal cross connections, incorrect installations or any other potential hazards to the water system within 24 hours.

c. The Supplier shall tag all devices after testing. Tags are to be securely fastened to each backflow device and indicate the test date (month/year).

d. Supplier shall notify the customer prior to performing a test. In cases where notification is unsuccessful, the Supplier shall check the water meter to see if water is being used. If not, the test can be conducted. At the conclusion of the test, the Supplier will make certain that the water meter is not clocking prior to leaving the location.

e. The Supplier shall leave a door hanger at each location where a successful test is performed while the customer is NOT present. Door hangers with contact information will be provided by OUC.

f. When opening the atmosphere to facilitate a backflow repair, the Supplier shall make every reasonable attempt to locate and open a flushing point, such as a hose spigot, prior to turning on water service so that any air and/or debris can be evacuated from the customers house line.

g. The Supplier shall be compensated only for backflow device test performed.

There will be no compensation for unsuccessful attempts to locate or gain access to a backflow device. Responsibility to locate the device will rest solely on the Supplier.

h. The Supplier will be responsible for restoring landscape/site to its original condition. All the costs related to the care and protection of the work area shall be included with the unit price provided in the pricing section.

i. The Supplier, without charge, shall clean the working areas each day of all trash and waste materials and shall maintain the site in a neat and orderly condition throughout the work period.

Section 3

3.0 Quality Control

The supplier shall conduct a quality control program to review work performed and insure project workmanship and testing adheres outlined standards and satisfaction of OUC, as determined by the OUC Inspector or designated representative. At a minimum quality assurance verification audits shall observe 1% of all backflow-prevention assembly field tests, with an additional 1% inspected and re-tested. Submitted field test results shall be reviewed by supplier supervision to determine if unsatisfactory results failing performance criteria, repair or replacement was needed, the backflow properly installed for the correct application. The supplier shall have a designated quality control supervisor to report monthly to OUC with a quality assurance report outlining adherence to testing procedures, work order management reporting accuracy and return to utility (RTU) summary report.

The RTU summary report shall include root cause for unsuccessful completion of backflow testing and make suggestions to resolve observed field conditions.

Equipment and labor quality and project workmanship will be to the satisfaction of OUC, as determined by the OUC Inspector or designated representative. A monitoring program shall be followed by the supplier to insure all field test equipment accuracy is within acceptable tolerances meeting certifications by an independent laboratory. Any infractions received by supplier upon inspection by governing agencies shall be immediately provided to OUC, along with corrective measures taken by the Supplier.

3.1 Supplier Certification and Training

All cross-connection technicians shall be certified in the state of Florida to perform testing of back-flow prevention assemblies. This should include successful completion of certification exam, periodic re-certification though written and hands-on exam and procedures by the supplier for suspending or revoking certification for improper testing of assemblies.

The supplier shall insure all back-flow technicians are certified by means of AWWA benchmark training will at a minimum total 32 hours for each technician.

Vendors performing tests and repairs on Fire Line Backflow Devices will need to hold a Level 2 Fire Certification by means of Nice-T or other certifying authority.

3.2 Equipment

All equipment supplied by the Supplier must meet all federal state and local requirements.

The Supplier may substitute materials with prior OUC approval. OUC reserves the right to reject any substitutions submitted and to review the operational condition of such equipment.

Equipment shall be in good operational condition

3.3 Materials

OUC shall provide to the Supplier backflow devices, washers, and meter boxes with lids and all applicable brass parts. All other materials shall be provided by the Supplier, and their cost should be included with the unit price provided in the pricing section. All materials supplied by the Supplier must meet OUC specifications. The Supplier may substitute materials with prior OUC approval. OUC reserves the right to reject any substitutions submitted.

3.4 Traffic Control

The Supplier will be responsible for all traffic control devices such…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .