RFP #8683: Western Hills Maintenance Buildings Roof Replacement

This Request for Proposal (RFP) from the City of Waterbury, Connecticut concerns the roof replacement for four maintenance buildings located at 582 Park Road, Waterbury. The project encompasses selective demolition, roofing system installation, and associated construction work across Buildings #1, #2, #3, and #4. Bidders must choose between two roofing options: Option #1 features 30-year architectural asphalt shingles with supporting materials, while Option #2 consists of a TPO membrane roofing system with polyisocyanurate insulation rated at R-30. The scope includes removal of existing roofing materials, installation of new gutters and downspouts, flashing repairs, and roof-mounted equipment relocation. Bids must be submitted in sealed format with separate pricing for six base bid items plus one roofing option. The project requires a Construction Progress Schedule using critical path methodology, monthly schedule updates, and weekly two-week look-ahead schedules. A pre-bid site visit is strongly recommended given the varying conditions across the four buildings and the requirement that contractors verify existing roof deck conditions prior to bidding.

Contractors must submit lump sum pricing for each bid item, with all costs including labor, materials, equipment, overhead, and profit. A Schedule of Values breaking down work into component tasks must be submitted within seven days of notice to proceed. The project is subject to Connecticut prevailing wage requirements with rates established by the Connecticut Department of Labor, and contractors must comply with the City's Good Jobs Ordinance (Chapter 34) regarding wage and employment standards. A 5% retainage will be held from partial payments, and a one-year general warranty period commences upon final acceptance. Bidders must provide proof of contractor qualifications, including experience with similar roofing projects and licensing as an approved installer for the selected roofing manufacturer. Insurance requirements include $1,000,000 general liability, $1,000,000 auto liability, statutory workers compensation, and $1,000,000 excess/umbrella coverage, with the City named as additional insured. Performance and payment bonds are required. All work must comply with the 2021 International Building Code and 2022 Connecticut State Building Code, with contractors responsible for obtaining all necessary permits and coordinating with utilities for service adjustments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Waterbury – Request for Proposal #8683

RFP #8683

RFP ATTACHMENT A

City Contract Compliance Documents

RFP ATTACHMENT B-1

Sample Contract

RFP ATTACHMENT B-2

General Conditions

RFP#8683

ATTACHMENT A-1.1

GENERAL CONDITIONS

INTRODUCTORY NOTE:

These General Conditions supplement the provisions and requirements of Contract and modify all Contract Documents which follow it numerically, as set forth in Section 1.2 of the Contract. The General Conditions may be amended, revised or supplemented by the Special Conditions, which are project specific. The Contractor’s attention is directed to the attached Special Conditions for any amendments, revisions or supplements to the General Conditions for this project. The terms used in these General Conditions which are defined in the Contract have the meanings assigned to them in said Contract.

This section applies equally and specifically to all contractors supplying labor and/or equipment and/or materials for this Project and all drawings, specifications and general provisions of the Contract apply to these General Conditions. Where items of the Contract are repeated, it is intended to call particular attention to or qualify them; it is not intended that any other parts of the Contract shall be assumed to be omitted if not repeated herein.

Unless expressly provided for otherwise in the Contract Documents, all costs associated with any work/services required or necessary under the General Conditions shall be considered as included in the Contract Amount (also referred to as Total Compensation). No separate or additional payment will be made for this work and/or services.

ARTICLE 1. PLANS AND SPECIFICATIONS AT THE SITE / AS-BUILTS

1.01 The Contractor shall maintain at the Project site two (2) copies of all Plans, Specifications, Addenda, approved Shop Drawings, Change Orders and other Modifications, Schedules and Instructions, in good order. One copy is to be marked to record all changes made during construction. These shall always be available to the Project Engineer and the City or their authorized representatives. At the conclusion of construction, the Contractor is to turn one (1) corrected set of all documents over to the Project Engineer.

ARTICLE 2. CONSTRUCTION PROGRESS SCHEDULE

2.01 Within seven (7) consecutive calendar days of the written Notice to Proceed, and prior to commencement of any work on site, the Contractor’s certified scheduler shall prepare and submit for the approval of the City three (3) copies of a complete Construction Progress Schedule which shall be comprised of a critical path method network. (At the same time, the Contractor shall submit the Schedule of Values, Sedimentation and Erosion Control Measures, Water Control Plan and Environmental Protection Plan, as outlined in the various Articles of these General Conditions). If the contractor does not have a certified scheduler in house then the contractor is responsible to hire a subconsultant to prepare all of the schedules and updates. The resume of the certified scheduler (primavera, P6, or equal) shall be provided for approval of the City.

2.02 The critical path of the Project must be identified on the Construction Progress Schedule which shall provide a workable plan for monitoring the progress of all the elements of the Project, establish and clearly display the critical elements of the Work, on which each part or division of the Work is expected to be started and completed, forecast completion of the elements of the Project, and match the Contract duration in time. The Construction Progress Schedule shall also indicate the logic of the work for the major elements and components of work under the Contract, such as the planned mobilization of plant and equipment, sequences of operations, procurement of materials and equipment, duration of activities, type of relationship, lag time (if any), and such other information as it is necessary to present a clear statement of the intended activities.

2.03 The Construction Progress Schedule shall, at a minimum, indicate the proposed scheduling of all major items of work and Project components. The schedule shall state the methods for doing each portion of the work and show the significant on-site construction activities with planned early/late start early/late completion dates and total float for each activity, including activities of the Contractor, subcontractors, fabricators, and suppliers to ensure adequate planning and communication. Activities shall include, the following items, as applicable: (a) milestone events; (b) seasonal weather limitations (c) the procurement and fabrication of materials, plant and equipment and any associated submittals; (d) the order in which the Contractor proposes to complete activities; (e) temporary structures or systems; (f) major construction or work zone traffic control stages; (g) activities assigned to Utilities, railroads and other parties; (h) activities assigned to the City and other State or municipal entities; (i) sampling and testing of materials; (j) settlement, surcharge or cure periods; (k) punch list work, (l) inspection activities assigned to the City, including final inspection and (m) all project closeout activities and requirements. The Contractor shall evaluate the sta tus of the Project at least monthly, comparing it to the original schedule, which shall be revised as required herein.

The Contractor shall notify the Project Engineer immediately of any circumstances that may affect the current schedule.

2.04 Upon approval of the initial Construction Progress Schedule by the Project Engineer, this schedule shall also be referred to as the "Baseline Construction Progress Schedule” or “Baseline Schedule.”

2.05 The Contractor shall perform the work of this Contract to satisfy the approved Construction Progress Schedule; however, the Project Engineer and City reserve the right to amend and alter the Construction Progress Schedule, as approved, at any time and in a manner which the Project Engineer deems to be in the best interests of the City. The latest version of the Construction Progress Schedule, as amended and approved by the Project Engineer, shall also be referred to as the "Current Construction Progress Schedule” or “Current Schedule.” The approval of the Construction Progress Schedule, or any revision thereof, shall in no way waive the requirements of the Contract nor shall it excuse the Contractor from any obligations under the Contract.

2.06 The Contractor shall be required to execute his work in accordance with the Construction Progress and in accordance with any additional requirements specified herein and/or revisions approved by the Project Engineer.

2.07 The Construction Progress Schedule shall forecast the times for doing each portion of the work. The Contractor shall arrange the work under this Contract to conform with the Construction Progress Schedule, as it may be revised by the Project Engineer from time to time, at no additional expense to the City.

2.08 Contractor shall provide, at a minimum, the following:

a. Monthly Updates: Each month, as of a calendar date mutually acceptable to the Contractor and to the Project Engineer, the Contractor shall deliver to the Engineer three (3) prints of all required schedule diagrams and tabulations. Until Final Completion of the work, Contractor shall continually evaluate the status of the Project, comparing it to the current Construction Progress Schedule, or approved revision thereof. The Contractor shall notify the Project Engineer immediately of any circumstances that may affect the Current Schedule, or any component thereof.

b. Biweekly Schedules: Each week, the Contractor shall be required to produce and submit to the Project Engineer a biweekly schedule showing all activities planned for the following two-week period. This short-term schedule may be handwritten; however, a two week “look ahead” filter from the Construction Progress Schedule is preferred. The biweekly schedule shall clearly indicate all work planned on a crew basis for the two-week period.

c. Recovery Schedules: If completion of any part of the work, delivery of equipment or materials, or submission of submittals or required documentation is behind the approved Const ruction Progress Schedule and will impact the end date of the work past the Contract completion dates (create negative float), the Contractor shall submit in writing, a revised Construction Project Schedule acceptable to the City for completing the work on or before the current Contract completion dates.

d. The revised Construction Project Schedule shall take some or all the following actions to demonstrate the manner in which an acceptable rate of progress will be regained, by the following methods:

i. Increase construction manpower in such quantities and crafts as shall substantially eliminate the backlog of work and meet the current Contract completion date.

ii. Increase the number of working hours per shift, the number of shifts per day, the number of workdays per week, or the amount of construction equipment, or any combination of the foregoing.

iii. Reschedule work items to achieve concurrent accomplishment of work activities.

e. Under no circumstances will the adding of equipment or construction forces, increasing the working hours, or employing any other method, manner, or procedure to return to the contractually required completion dates be a justification for additional compensation to the Contractor.

ARTICLE 3. ESTIMATED QUANTITIES

3.01 Any Estimated Quantities for the Project furnished by the City, including those provided on the Bid Form, are approximate only and are: a) for procurement related comparison purposes only, and b) given as a basis for the pricing and c) are not represented to be actual quantities for completion of the Work. Within the limits of available funds, the Contractor will be required to complete the Work at the unit prices provided in the Bid Form/or Price Proposal whether it involves quantities greater or lesser than the estimate. The Contractor will be compensated only for the actual quantity of authorized, and performed, and/or materials furnished.

ARTICLE 4. SCHEDULE OF VALUES; APPLICATION FOR PAYMENT

4.01 Within seven (7) consecutive calendar days after the Notice to Proceed, as a basis for estimating partial payments, the Contractor shall submit for the approval of the City a certified Schedule of Values, broken down into quantities and unit costs for the various parts of the work, divided as may be directed and aggregating the total sum of the Contract; and if required, he shall submit evidence supporting this schedule.

4.02 The Contractor's requisition for payment shall be submitted on forms supplied by the Contractor and approved by the City and shall be in such numbers of copies as may be designated by the City.

Sample forms are included in the Bid Documents. Alternate payment application forms may be utilized provided they are approved by the City, in writing, prior to submission by the Contractor.

4.03 If the Project is funded by multiple funding sources, the Contractor may be required to submit separate requisitions for payment to each source, on the forms provided by each source and in accord with all requirements of each individual funding source.

4.04 For Lump Sum projects, the requirements for the Schedule of Values are further defined as follows: a) the Schedule of Values shall delineate the various tasks that comprise the lump sum items. Each item in the Schedule of Values shall include its proper share of overhead and profit. This schedule, when accepted by the Project Engineer, shall only be used as a basis for Contractor’s periodic payment applications.

No payment will be made to Contractor until such Schedule has been submitted and accepted by Project Engineer, and b) the lump sum item shall be broken down sufficiently to provide a convenient and realistic means for determining the amount of work done during various stages of progress.

ARTICLE 5. PARTIAL PAYMENTS

5.01 The City will review the Contractor's monthly requisitions for Partial Payments to arrive at what is, in its opinion, a fair and just estimate of the materials suitably stored on the site and the amount of work performed on the Contract. At its discretion, the City may allow to be included in the monthly requisitions those materials stored off-site. In the event the City allows the Contractor to include in its requisitions payments for materials stored off the site, the Contractor shall also submit any additional bonds and/or insurance certificates relating to off-site stored material and follow such other procedures as may be required by the City.

5.02 In making such Partial Payments for the Project, retainage shall be held in the amount of 5% of the value of work completed to date. The Retainage does not include additional sums that the City may withhold due to the Contractors failure to comply with construction plans, specif ications etc. deemed provisions of this contract.

5.03 Where prices are not broken down sufficiently in the Schedule of Values to accurately determine the value of work completed, Project Engineer will estimate the value of work completed and will deduct some amount to arrive at a conservative value which will allow City to easily complete the Work with the unpaid balance. When the required detail in the Schedule of Values is not provided by Contractor, Contractor agrees to accept Project Engineer’s determinations.

5.04 The contractor shall supply notarized lien waivers with each notarized monthly application for payment for all subcontractors and suppliers documenting that the contractor is paying all subcontractors and suppliers monthly. For further information regarding compliance with lien waivers refer to article 23

ARTICLE 6. INSPECTION AND TESTS

6.01 All material and workmanship shall be subject to inspection, examination and testing by the City and/or Project Engineer (in addition to that required by the Specifications) all times during manufacture and/or construction and at all places where such manufacture and/or construction is carried on. Notice of the time of all tests to be made at the site shall be given to all interested parties.

6.02 Contractor must obtain the Engineer’s approval of any sources of materials to be incorporated into the Project before beginning to use them for the Project.

6.03 If, at any time before final acceptance of the Project, the City and/or Project Engineer considers it necessary or advisable to examine any portion of the Project already completed by removing or testing out the same, the Contractor shall upon request furnish promptly all necessary facilities, labor and materials. If such work is found to be defective in any material respect because of a fault of the Contractor or any of its subcontractors, or if any.

work shall have been covered over without the approval or consent of the City (whether it is found to be defective), the Contractor shall be liable for testing costs and all costs of correction, including labor, material, services of required consultants, additional supervision and administrative costs.

6.04 Unless expressly provided for otherwise, for Projects that include material testing to ensure compliance with the Technical Specifications, the Contractor shall be responsible for all testing as required in the relevant sections of the Technical Specifications.

6.05 Without additional charge, the Contractor shall promptly furnish all reasonable facilities, labor and materials necessary to make tests safe and convenient. Special, full size and performance tests shall be as described in the Specifications.

ARTICLE 7. UTILITIES

7.01 The accuracy and completeness of the utility information shown on the Plans and/or otherwise provided by the City is not guaranteed. The Contractor shall make its own investigation of the extent and location of utilities and of the possibility of relocation work by the utility companies and shall plan its operations accordingly. No claim for any delays, damage or extra work occasioned thereby will be allowed.

7.02 The Contractor shall allow others access to the Project for the purpose of placing, relocating or maintaining utilities, and he shall cooperate in every way in the performance of this Project.

7.03 The Contractor shall notify the utility owners well in advance of the time the Contractor proposes to perform any work which would endanger utility installations, and the Contractor shall cooperate with the utility owners in relocating and/or protecting such installations during construction operations.

7.04 No payment will be made to the Contractor for locating, protecting and making arrangements for relocating public utilities or for any delays caused thereby. The Contractor shall include all the costs of this Project in the other scheduled items of the Contract.

ARTICLE 8. SEDIMENTATION AND EROSION CONTROL

8.01 All watercourses shall be protected from sedimentation, both during and after construction. The Contractor shall control erosion and sedimentation problems in accordance with Connecticut Guidelines for Soil Erosion and Sediment Control prepared by the Connecticut Council on Soil and Water Conservation, dated 2002, as amended.

8.02 The Contractor shall submit the Sedimentation and Erosion Control Plan for the approval of the Project Engineer within seven (7) consecutive calendar days after the Notice to Proceed.

8.03 The Contractor shall be responsible for providing silt fences, staked haybales and other temporary erosion control measures which may be required to properly complete this Project. No extra compensation will be allowed, due to water or precipitation levels fluctuation.

ARTICLE 9. PROTECTION OF ENVIRONMENTAL RESOURCES

9.01 The environmental resources within the Project boundaries and those affected outside the limits of permanent work under this Contract shall be protected during the entire period of this Contract. The Contractor shall confine its activities to areas defined by the Plans and Specifications.

Environmental protection shall be as stated in the following subparagraphs:

a. Prior to the beginning of any construction, the Contractor shall identify all land resources to be preserved within the work area. The Contractor shall not remove, cut, deface, injure or destroy land resources including trees, shrubs, vines, grasses, topsoil and landforms without special written permission from the property owner. No ropes, cables or guys shall be fastened or attached to any trees for anchorage unless specifically authorized in writing by the Project Engineer. Where such special emergency use is permitted, the Contractor shall always provide effective protection for land and vegetation resources as defined in the following subparagraphs.

b. Prior to any construction, the Contractor shall mark the areas that are not required to accomplish all work to be performed under the Contract. Isolated areas within the general work area which are to be saved and protected shall also be marked or fenced. Monuments and markers shall be protected before construction operations commence. Where construction operations are to be conducted during darkness, the markers shall be visible. The Contractor shall convey to its personnel the purpose of marking and/or protection of all necessary objects.

c. Trees, shrubs, vines, grasses, landforms and other landscape features indicated and defined on the Plans to be preserved shall be clearly identified by marking, fencing or wrapping with boards, or any other approved techniques.

d. Earthwork brought to final grade shall be finished as indicated and specified. Side slopes and back slopes shall be protected as soon as practicable upon completion of rough grading. All earth work shall be planned and conducted to minimize the duration of exposure of unprotected soils. Except in instances where the constructed feature obscures borrow areas, quarries and waste material areas, these areas shall not initially be cleared in total. Clearing of such areas shall progress in reasonably sized increments as needed to use the areas developed as approved by the City and/or Project Engineer.

e. Runoff from the construction site shall be controlled by the construction of diversion ditches, benches and berms to retard and divert runoff to protected drainage courses, and any measures required by area wide plans approved under Paragraph 208 of the Clean Water Act, as amended.

f. The Contractor shall construct or install all temporary erosion control features as indicated in the submitted Sedimentation and Erosion Control Plans or directed by the City and/or Project Engineer. Temporary erosion control measures such as berms, dikes, drains, grass and mulching shall be maintained until construction of the Project is completed.

g. The Contractor's field offices, staging areas, stockpile storage and temporary buildings shall be placed in areas designated on the submitted Plan. A temporary move or relocation of the Contractor's facilities shall be made only on approval by the City and/or Project Engineer.

h. Borrow areas shall be managed to minimize erosion and to prevent sediment from entering nearby watercourses.

i. Spoil areas shall be managed and controlled to limit spoil areas and to prevent erosion of soil or sediment from entering nearby watercourses. Spoil areas shall be developed in accordance with the grading plan indicated on the Plans.

ARTICLE 10. ENVIRONMENTAL PROTECTION PLAN

10.01 Within seven (7) consecutive calendar days after the Notice to Proceed, and prior to commencement of any work on site, the Contractor shall submit an Environmental Protection Plan for the approval of the City in accordance with the provisions herein specified. The plan shall include but not be limited to the following:

a. A list of Federal, State and Local laws and regulations concerning environmental protection, pollution control and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws and regulations.

b. Methods for protection of features to be preserved within authorized work areas. The

Contractor shall prepare a listing of methods to protect resources needing protection, i.e., trees, shrubs, vines, grasses and groundcover, landscape features, air and water quality, fish and wildlife, soil, historical, archeological and cultural resources.

c. Procedures to be implemented by the Contractor to provide the required environmental protection and to comply with applicable laws and regulations. The Contractor shall set out the procedures to be followed to correct pollution of the environment due to accident, natural causes or failure to follow the procedures set out in accordance with the Environmental Protection Plan.

d. The location of the nearest suitable solid waste disposal area and a permit allowing the Contractor to use those facilities.

e. Drawing showing locations of any proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess' or spoil materials.

f. Environmental monitoring plans for the job site, including land, water, air and noise monitoring as necessary, and as required by the Project Engineer.

g. Environmental monitoring and management plans for the any endangered wildlife or plant species as determined by CT DEEP, City or Project Engineer.

h. Traffic control plan when necessary.

i. Methods of protecting surface and ground water during construction activities.

j. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. The plan should include measures for marking the limits of use areas.

ARTICLE 11. TEMPORARY UTILITIES

11.01 Unless expressly otherwise provided for in the Contract Documents the Contractor shall be responsible for determining and supplying at no cost to the City all temporary utilities of any nature whatsoever needed to complete the work. Unless otherwise provided for in the Bid Documents, all necessary temporary utilities shall be installed at the start of the Project.

ARTICLE 12. ABBREVIATIONS

12.01 Where one of the following abbreviations are used in the Contract Documents, it shall have the meaning set forth opposite each below:

AASHTO American Association of State Highway and Transportation Officials

ACI American Concrete Institute

AGA American Gas Association

AIEE American Institute of Electrical Project Engineers

AISC American Institute of Steel Construction

API American Petroleum Institute

ANSI American National Standards Institute

ASCE American Society of Civil Engineers

ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers

ASME American Society of Mechanical Engineers

ASTM American Society of Testing and Materials

AWG American (or Brown and Sharpe) Wire Gauge

AWWA American Water Works Association

CONNDOT Connecticut Department of Transportation

DEP Department of Environmental Protection

EDR Equivalent Direct Radiation

EPA Environmental Protection Agency

FWQA Federal Water Quality Administration

IBR Institute of Radiator and Boiler Manufacturers

MCB Master Car Builders

NBS National Bureau of Standards

NEC National Electrical Code (latest edition)

NEMA National Electrical Manufacturers Association

NEWWA New England Water Works Association

NFPA National Fire Protection Agency

NPT National Pipe Thread

SMACNA Sheet Metal and Air Conditioning Association

OS&Y Outside Screw and Yoke

STLWG United States Steel Wire, Washburn and Moen, American Steel And Wire Companies and Roebling Gauge

USS GAUGE United States Standard Gauge

WOG Water, Oil, Gas

WSP Water Steam Pressure

"Federal Specification" means a Federal specification issued by the Federal Supply Services Administration, Washington, D.C.

ARTICLE 13. SUBSURFACE EXPLORATION

13.01 Where applicable, boring logs, probes and related information contain data regarding subsurface conditions at the dates and location indicated. This information is shown for the convenience of the Contractor, but is not guaranteed to be correct or complete, and it is not warranted that it represents a true or approximately true picture of the actual subsurface conditions to be encountered. The boring log data is contained within the Appendices of the Technical Specifications.

ARTICLE 14. CONTRACT AND CONTRACT DOCUMENTS

14.01 The City shall interpret its own requirements. In case of any conflict or inconsistency between the provisions of this signed portion of the Contract and those of the Specifications, the provisions of the signed portion of the Contract shall govern.

14.02 The City’s record copy of the Contract Documents shall control and shall be effective and binding on the Contractor. If any provision in the Contract Documents conflict with any other provision therein, the priority of the documents shall be in accordance with Section 1.2 of the Contract.

ARTICLE 15. SHOP DRAWINGS, CATALOG CUTS AND SAMPLES

15.01 The Contractor shall promptly submit to the Project Engineer five copies of each submittal prepared in accordance with the approved schedule. After examination of such submittal by the Project Engineer and the return thereof, the Contractor shall make such corrections to the submittal as have been indicated and shall furnish the Project Engineer with five corrected copies. If requested by the Project Engineer, the Contractor must furnish additional copies. Regardless of corrections made on, or approvals given to, such submittal by the Project Engineer, the Contractor shall nevertheless be responsible for the accuracy of such submittal. The Contractor shall also be responsible for the submittal's conformity to the Submittal and Specifications unless the Contractor notifies the Project Engineer in writing of any deviations at the time of submission of the submittal. The submittals shall be submitted upon award of contract and shall be tied to the baseline schedule submittal and updated monthly.

15.02 Submittal of all fabricated work shall be submitted to the Project Engineer and no work shall be fabricated unless it is done at the Contractor's own risk until approval has been given by the Project Engineer and City.

15.03 The Contractor shall submit all submittals on dates sufficiently in advance of requirements to enable the Project Engineer and City to properly review them. This period shall include time to correct, resubmit and recheck, if necessary, and no claim for delay will be granted to the Contractor because of the Contractor's failure in this respect. The Project Engineer and City will be given a minimum of fourteen (14) consecutive calendar days for the initial review of each submitted submittal.

15.04 All submitted submittals must bear the approval stamp of the Contractor and reference conformance to the applicable provisions of the Specifications as evidence that the Contractor has checked the drawings. Any drawings submitted without this stamp of approval will not be considered and will be returned to the Contractor for resubmission. If the submittals show variations from the requirements of the Contract Documents because of standard shop practice or other reason, the Contractor shall make specific mention of such variation in the letter of submission to the Project Engineer. If the variation is acceptable to the Project Engineer and City, suitable action may be taken for proper adjustment. If not acceptable, the Contractor shall not be relieved from the responsibility for executing the work in accordance with the Contract Documents, although such submittals had been approved.

15.05 Where submittals are submitted by the Contractor that indicate a departure from the Contract Drawings which the Project Engineer deems to be a minor adjustment and in the City's interest and not involving a change in the Contract price or an extension in time, then the Project Engineer may approve the drawings. Such approval will contain, in substance the following:

The modification shown on the attached drawings is approved in the interest of the City to affect an improvement for the project and is ordered with the understanding that it does not involve any change in the Contract price or time. The modification is generally subject to all Contract stipulations and covenants, and it is without prejudice to all rights of the City under the Contract.

The approval of submittals will be general and shall not relieve the Contractor from the responsibility for adherence to the Contract nor of the responsibility for any errors that may exist.

15.06 The Contractor agrees to hold the Project Engineer and the City harmless and to defend them against damage or claims for damages arising out of injury to others or to property of third parties which result from errors on shop or working drawings, whether they have been approved by the Project Engineer and/or the City.

15.07 Working Drawings. When required by the Contract or when ordered to do so by the City Representative, the Contractor shall prepare and submit 4 copies of the working drawings to the City Representative for review. These drawings shall be submitted sufficiently (at least 15 consecutive calendar days) in advance of the proposed use, to allow for their review, and any necessary revisions, without delay of the Project. No work covered by these working drawings shall be done until the drawings have been submitted to the City Representative for review and the City Representative’s comments have been appropriately taken into account and implemented. The furnishing of the working drawings shall not serve to relieve the Contractor of any part of its responsibilities under the Contract.

ARTICLE 16. CONTRACTOR'S TITLE TO MATERIALS

16.01 No material, supplies or equipment for the work shall be purchased by the Contractor, or by any Subcontractor, subject to any chattel mortgage or under any conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. The Contractor warrants good title to all material, supplies and equipment installed or incorporated in the work. The Contractor further warrants that, upon completion of all work, he will deliver the premises, together with all improvements and appurtenances constructed thereon, to the City free of any claims, liens, charges or encumbrances. The Contractor further warrants that neither the Contractor nor any person, firm or corporation furnishing any material, labor or equipment for any work covered by this Contract shall have a right to lien upon the premises or any improvement or appurtenance thereon.

ARTICLE 17. "OR EQUAL" CLAUSES

17.01 Unless otherwise provided for in the Bid Documents, the Contract will be based on material and equipment described on the Bid Documents without consideration of possible substitute or “equal” items. However, after award of the Work, whenever a material or article required is specified or shown on the plans by using the name of a proprietary product or of a particular vendor or manufacturer, any materials or article which, in the sole discretion of the Project Engineer, is equal or superior to the specified item to material, may be considered an “equal.” Requests for substitutions must be supported by evidence such as technical data, test results, or other pertinent information that demonstrates that the substitute offered is equal to or better than the specification's requirements. Such items shall not be purchased or installed without the written approval of the Project Engineer. In all cases, only new materials shall be used for the work.

ARTICLE 18. REPRESENTATIONS OF THE CONTRACTOR

18.01 The Contractor represents and warrants:

(a) That he is financially solvent and that he is experienced and competent to perform the type of work or to furnish the plant, material or equipment to be performed or furnished by him; and

(b) That he is familiar with all Federal, State and municipal laws, ordinances, orders and regulations which may in any way affect the work of those employed therein, including but not limited to any special acts relating to the work or to the project of which it is a part; and

(c) That such permanent and temporary work required by the Contract Documents to be done can be satisfactorily constructed and be used for the purpose for which it is intended, and that such construction will not injure any person nor damage any property; and

(d) That he has carefully examined the drawings, specifications and addendum (or addenda) if any, and the site of the work, and that, from his own investigations, he has satisfied himself as to the nature, quality and quantity of surface and subsurface materials likely to be encountered; of the character of equipment required for the work; of other facilities needed for the performance of the work; of the general and local conditions and of all other materials which in any way may affect the work and its performance; and

(e) That he is aware of the hazards involved in the work and the danger to life and property both evident and inherent and that he will conduct the work in a careful and safe manner without injury to persons or property; and that he can provide the necessary equipment, labor and materials to complete the contract work within the specified contract duration.

ARTICLE 19. PROTECTION OF WORK AND PROPERTY (EMERGENCY)

19.01 The Contractor shall always safely guard and protect the City's property from injury or loss in connection with this contract. He shall always safely guard and protect his own work and that of adjacent property from damage. The Contractor shall replace or make good any such damage, loss or injury unless such is caused directly by errors contained in the Contract or by the City or its duly authorized representatives.

19.02 In case of an emergency that threatens the loss or injury of property and/or safety of life, the Contractor will be allowed to act in a diligent manner without previous instructions from the City.

He shall notify the City immediately thereafter.

19.03 Where the Contractor has not acted but has notified the City of an emergency threatening injury to persons or damage to the work or to any adjoining property, he shall act as instructed or as authorized by the City.

19.04 The amount of reimbursement claimed by the Contractor on account of any emergency action shall be determined in the manner provided elsewhere in the Contract Documents.

ARTICLE 20. WEATHER CONDITIONS

20.01 In the event of temporary suspension of the work, or during inclement weather, or whenever the City shall direct, the Contractor shall carefully protect his work and materials against damage or injury from the weather. The Contractor shall cause all his subcontractors to provide the same protection for their portion of the work. If, in the opinion of the City, any work or material was damaged or injured by reason of failure on the part of the Contractor, or any of his subcontractors, so to protect his work, or otherwise damaged by the negligence of the Contractor or any of his subcontractors or their agents or servants, or is otherwise defective, such materials shall be removed and replaced at the expense of the Contractor.

20.02 For projects involving asphalt paving, all work shall be temporarily suspended, upon direction of the City, when the Contractor can no longer properly pave exposed areas in accordance with the plans and specifications during inclement weather or during winter months.

ARTICLE 21. SUBLETTING

21.01 The Contractor is not to assign, transfer or sublet the Contract in whole or in part to any other person or persons without written permission from the City. The Contractor cannot abridge the terms of the Contract in any way without written permission of the City. The Contractor must keep the Contract in his name and control until all work is completed and finally accepted by the City. The Contractor shall likewise not assign any of the money payable under this Contract. Approval by the City of the subletting of any part of the work shall not, under any circumstances, relieve the Contractor or his Surety of any liabilities or obligations under the terms of the Contract Documents.

21.02 The Contractor shall be as fully responsible to the City for the acts and omissions of his subcontractors, and of the persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. Should any subcontractor violate any of the terms of these specifications, the City may, at its option, require the Contractor to end and terminate such subcontract.

21.03 The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the Contract and the General Conditions and other provisions of the Contract Documents. This language is to be applicable insofar as necessary to the work and is to give the Contractor the same power over as regards terminating any subcontract as the City may exercise over the Contractor under any provisions of the Contract Documents.

21.04 Nothing contained in this Contract shall create any contractual relation between the City and any subcontractor.

ARTICLE 22. SUBSTITUTE BOND

22.01 If, at any time, the Contractor's Surety or Sureties, or the carriers of other insurance herein specified to be written, become insolvent or, in a reasonable judgment of the City, become unsafe or unsound then, upon five days written notice from the City to the Contractor, the Contractor shall substitute such Performance and Labor and Material Bond or insurance with such other Surety or carrier in such form as shall be acceptable to the City. Any additional premium caused by such a substitution shall be paid for by the Contractor. No further payments will be deemed due nor will be made until the new Surety or Sureties have furnished such an acceptable bond to the City.

ARTICLE 23. RIGHT TO WITHHOLD PAYMENTS

23.01 The City may withhold from the Contractor so much of any approved payments due as may in the judgment of the City be necessary to:

a. Assure the payment of any lien, stop notice or claim, filed with the City for work, labor, or materials done, performed or delivered and used in the prosecution of the work herein provided for (whether in strictly legal form or otherwise)

b. Protect the City from loss due to defective work not remedied or through any improper or defective machinery, implements or appliances used by the Contractor or for failure of the Contractor to fully comply with any requirements of the Contract.

c. Protect the City from loss due to injury to persons or damage to the work or property of other contractors, subcontractors or others caused by the act' or neglect of the Contactor or any subcontractors.

23.02 The City shall have the right, as agent for the Contractor, to apply any amounts so withheld in such manner as the City may deem proper to satisfy such claims or to secure such protection. Such applications of such money shall be deemed payments to the account of the Contractor.

23.03 Notwithstanding the above, the Contractor, in conformance with Section 49-41a of the Connecticut General Statutes, as revised, shall, within 30 consecutive calendar days after any gi ven Contract payment to the Contractor by the City, pay any amounts due any subcontractor, whether for labor performed or materials furnished.

ARTICLE 24. PAYMENTS BY CONTRACTOR

24.01 The Contractor, in conformance with Section 49-41a of the Connecticut General Statutes, as revised, shall, within 30 consecutive calendar days after any given Contract payment to the Contractor by the City, pay any amounts due any subcontractor, whether for labor performed or materials.

ARTICLE 25. NOTICE OF WARNING

25.01 If the Contractor shall fail to make prompt payment to persons supplying labor or materials for the work; or refuse or fail to supply enough properly skilled workmen or proper materials; or refuse or fail to prosecute the work or any part thereof in accordance with the Contract Documents or with such diligence as will insure its completion within the period herein specified (or any duly authorized extension thereof); or fail to complete the work within said period; or refuse to regard laws ordinances, codes or instructions of the City then the City shall forward A Notice of Warning to the Contractor by registered mail at the address given in the Contract. In the event the Contractor fails to comply with said Notice of Warning within five (5) consecutive calendar days from receipt thereof, the City shall have the right to terminate the Contract.

ARTICLE 26. PROGRESS MEETINGS

26.01 Progress meetings will be held weekly at locations, dates and times selected by the City for the purpose of reviewing, scheduling and coordinating the Project’s progress as well as other matters.

ARTICLE 27. PERMITS

27.01 The Contractor shall keep himself fully informed of all existing and current Municipal, State or Federal ordinances, regulations or laws in any way limiting or controlling the operations or actions of those engaged in the work or affecting the materials supplied to or by them. The Contractor shall always observe and comply with all such valid and binding ordinances, laws or regulations. The Contractor shall protect and indemnify the City and its representatives against any claims arising from, or based upon, any violation of the same.

ARTICLE 28. RIGHT TO USE THE WORK

28.01 The City may enter upon the use of the whole or of any portion of the work, which may be in condition to use, at any time before its final acceptance of the Project. Such use shall not constitute, or be evidence of, acceptance by the City or by the Project Engineer of the whole or any part of the material furnished, or work performed under the Contract.

ARTICLE 29. PROVISIONS REQUIRED BY LAW

29.01 Every provision of law and clause required to be inserted in this Contract shall be deemed to be inserted herein and the Contract shall be read and enforced as though it were included herein. If, through mistake or otherwise, any such provision is not inserted, then, upon application of either party, the Contract shall forthwith be physically amended to make such insertion.

29.02 If this Contract contains any unlawful provisions not an essential part of the general structure of the Contract, and which shall not appear to have been a controlling or material inducement in the making thereof, the same shall be deemed stricken from the Contract without affecting the binding force of the remainder.

ARTICLE 30. WAIVER

30.01 Neither the inspection by the City or Project Engineer or by any of their employees;

nor any order, measurement or certificate by the Project Engineer; nor any order by the City for the payment of any money; nor any payment for or acceptance of the whole or any of the work by the Project Engineer for the City; nor any extension of time; nor any possession taken by the City or its employees shall operate as a waiver of any provision of this Contract or of any power herein reserved to the City; nor shall such action waive any right to damages herein provided. Nor shall any waiver of any breach of the Contract constitute a waiver of any other or subsequent breach. Any remedy provided in this Contract shall be construed as cumulative - i.e., in addition to each and every other remedy herein provided.

ARTICLE 31. USE OF PREMISES AND REMOVAL OF DEBRIS

31.01 The Contractor expressly undertakes at his/her own expense:

a. To take every precaution against injuries to persons or damage to property;

b. To store apparatus, materials, supplies and equipment in such orderly fashion at the site of the work as will not unduly interfere with the progress of the work or the work of any other contractor;

c. To place upon the work or any portion thereof only such loads as are consistent with the safety of that portion of the work;

d. To frequently clean up all refuse, rubbish, scrap materials and debris caused by the Contractor's operations to the end that at all times the site of the work shall present a neat, orderly and work manlike appearance;

e. To remove all surplus material; falsework; temporary structures including foundations thereof; plant of any description and debris of any nature resulting from the Contractor's operations before final payment is made;

f. To put the site in a neat orderly condition, to remove all clean-up materials, to remove such materials from the construction site, and to deposit them in a refuse disposal site at his/her expense; and

g. To affect all cutting, fitting or patching of work required to make the same conform to the Drawings and Specifications and, except with the consent of the City, not to cut or otherwise alter the work of any other contractor.

ARTICLE 32. RIGHT-OF-WAY AND SUSPENSION OF WORK

32.01 Land and rights-of-way for the purposes of this Contract will be furnished by the City to the extent shown on the Drawings. The City will use diligence in acquiring said land and rights-of-way as speedily as possible. However, it is possible that not all land and rights-of-way will be obtained as herein contemplated before construction commences. In such case the Contractor shall begin the work upon such land and rights of-way as the City may have previously acquired. No claim for damages whatsoever will be allowed by reasons of the delay in obtaining the remaining lands and/or rights-of-way. Should the City be prevented or enjoined from proceeding with the work, or from authorizing its prosecution, either before or after the commencement, by reason of litigation or by reason of its inability to procure any lands or rights-of-way for the said work, the Contractor shall not be entitled to withdraw from the Contract because of these occurrences. In the event of any of the above occurrences, the time for completion of the work may be extended in the manner provided elsewhere in the Contract Documents.

ARTICLE 33. CONSTRUCTION EQUIPMENT AND MACHINERY

33.01 The Contractor shall furnish and maintain, at its own cost and risk, all tools, all equipment, apparatus and appliances, hoists and/or cranes and power for same, scaffolding, runways, ladders, temporary supports and bracing and all other similar work or material necessary to insure speed, convenience and safety in the execution of its Contract. All such items shall be subject to approval of the City, upon the Project Engineer’s recommendation, as to general stability, type and location, but the responsibility for proper design, strength and safety shall remain with the Contractor.

All such items shall comply with OSHA regulations and all other applicable codes, statutes, rules and regulations.

33.02 The Contractor shall provide all drains, drainage, ditches and pumping apparatus (including power and attendance for same) that may be necessary to keep all excavations and sub-grade work free from water.

33.03 All machines, equipment, trucks and vehicles used in the prosecution of the work, or in connection therewith, shall always be in proper working condition. Only gasoline, electric or diesel engines shall be used for the power in operating equipment.

33.04 The Contractor shall be responsible for curtailing noise, smoke, fumes or other nuisances resulting from the operations. Contractor shall, upon written notification from the City or Project Engineer, make any repairs, replacements, adjustments or additions and furnish mufflers when necessary to fulfill requirements. No oil tanks for fueling equipment shall be stored less than one hundred (100) feet from any watercourse.

33.05 All costs involved in complying with the stipulations outlined shall be included in the various prices set in the proposal.

ARTICLE 34. CONTRACTOR’S GENERAL WARRANTY PERIOD

34.01 The One Year General Warranty Period shall commence on the date of the written notice of final acceptance of the Project by the City and during such time Contractor shall guarantee his work is free from faulty…