This document is a Request for Proposal (RFP) issued by the State of Nevada Department of Administration Purchasing Division on behalf of the Conservation and Natural Resources, Division of State Parks. The RFP seeks proposals from qualified vendors to provide replacement of a boat dock at Spring Valley State Park, located in Lincoln County, Nevada. The scope of work includes the design, build, and delivery of approximately 100' long galvanized steel frame docks, including finger docks, a T-Head dock, an aluminum ADA gangway, and related components. The RFP provides a detailed technical specification for the dock system. Proposals are due by 2:00 PM Pacific Time on May 24, 2022, with a contract award estimated on or about June 1, 2022, subject to Board of Examiners approval. The resulting contract is expected to be for the completion of the design and installation of the boat dock.
The RFP outlines mandatory minimum requirements, including compliance with Nevada law and state indemnity, no boycott of Israel, and data encryption and stateside data storage requirements. Vendor background, staff resumes, subcontractor information, and financial information are also required for evaluation. The cost proposal will be evaluated based on a formula that considers the lowest cost submitted. The RFP also includes an inverse preference for vendors with a principal place of business outside of Nevada if that state applies an in-state preference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments for Signature~1.pdf | ||
| Federal Laws and Authorities.pdf | ||
| Spring Valley State Park Boat Dock.docx | DOCX document | |
| COST SCHEDULE.docx | DOCX document | |
| Proposed Staff Resume~1.docx | DOCX document | |
| Reference Questionnaire~1.docx | DOCX document | |
| Terms and Conditions for Goods.pdf | ||
| INSURANCE SCHEDULE~3.docx | DOCX document | |
| Terms and Conditions for Services~1.pdf | ||
| Quote Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NEVADA
DEPARTMENT OF ADMINISTRATION
Purchasing Division 515 East Musser Street, Suite 300 │ Carson City, NV 89701 Phone: 775-684-0170
Request for Proposal: RFP 70CNR-S1992 For
SPRING VALLEY BOAT DOCK REPLACEMENT
Release Date: 04/26/2022 Deadline for Submission and Opening Date and Time: 05/24/2022 @ 2:00 pm Refer to Proposal Timeline and Submission Requirements for complete RFP schedule and submission instructions
Single point of contact for the RFP:
Nancy Feser, Purchasing Officer II Email Address, nfeser@admin.nv.gov
(TTY for Deaf and Hard of Hearing, 800-326-6868 Ask the relay agent to dial, 1-775-515-5173/V.)
TABLE OF CONTENTS
| 1. | APPLICABLE REGULATIONS GOVERNING PROCUREMENT | 2 |
| 2. | PROJECT OVERVIEW | 2 |
| 3. | SCOPE OF WORK | 2 |
| 4. | PROJECT SPECIFIC TERMS AND CONDITIONS | 3 |
| 5. | GENERAL INFORMATION | 3 |
| 6. | ATTACHMENTS | 3 |
| 7. | PROPOSAL TIMELINE | 4 |
| 8. | PROPOSAL EVALUATION PROCESS | 4 |
| 9. | MANDATORY MINIMUM REQUIREMENTS | 5 |
| 10. | CRITICAL ITEMS | 6 |
| 11. | SUBMISSION CHECKLIST | 7 |
APPLICABLE REGULATIONS GOVERNING PROCUREMENT
All applicable Nevada Revised Statutes (NRS) and Nevada Administrative Code (NAC) documentation can be found at: www.leg.state.nv.us/law1.cfm.
Prospective vendors are advised to review Nevada’s ethical standards requirements, including but not limited to NRS 281A, NRS 333.800, and NAC 333.155.
PROJECT OVERVIEW
The State of Nevada Purchasing Division, on behalf of Conservation and Natural Resources, Division of State Parks is seeking proposals from qualified vendors to provide replacement of boat dock at Spring Valley as described in the scope of work and attachments.
The State intends to award one (1) contract in conjunction with this Request for Proposals (RFP), as determined in the best interests of the State. State Parks shall administer contract(s) resulting from this RFP. The resulting contract(s) are expected to be for a contract term to completion of design and install of boat dock, subject to Board of Examiners approval.
AGENCY BACKGROUND
Proposal for the design, build and delivery of an approximately 100’ long galvanized steel frame docks at the Spring Valley State Park, 7449 Eagle Valley Road, Pioche, NV 89043. The previous dock has been removed from the reservoir.
SCOPE OF WORK
Docks shall be engineered and built to include:
(12) 3’W x 15’L Finger Docks, w/ADA toe rails and handrails. Minimum 8’ between finger dock sections.
(1) 8’W x 60’L T-Head Dock w/ADA fishing rails and gate.
(1) 5’W x 24’ Aluminum ADA Gangway, and Docks shall be engineered and constructed to provide for future installation of electric and water utilities.
Galvanized Steel Truss Frames
12” deep galvanized steel dock frame – for strength and low maintenance.
Box truss frame design – to promote load transfer.
Main structural frame members shall be a minimum of 2.5” x 2.5” x 3/16” angle iron – for long term system performance.
Bolted connection in horizontal plane – added strength for vertical/wave movement.
Frame and all metal components hot dip galvanized after all drilling and fabrication to promote durability and long life.
Finger frames shall have opposing top diagonal angles for additional structural strength and lateral loading support (no underwater trusses); and Dock must be delivered in modular format in as large of sections that can be delivered on a flat-bed tractor and trailer. All dock and finger dock sections are to be completely assembled including decking, floats, side boards, bumpers, cleats, etc. Railing and gate for T-Head sections shall also be in modular format.
IPE Wood Decking
Ipe hardwood 5/4” x 6” deck boards – natural resistance to moisture & decay, and Attached to frame with 5/16” self-tapping screws on 2’ maximum span – level and firm footing
Polyethylene Floats
Shell: Roto-molded polyethylene, resistant to marine life and petroleum.
Core: Expanded polystyrene block is molded inside the shell.
Shell thickness shall be .1875 inches ARM STD +/-20%.
Firmly bolted to the frame with galvanized hardware, and 30 PSF Live load with 20” +/- Deadload Freeboard.
Bumpering / Fendering
Single row 5/4” x 6” IPE Wood sideboards on full perimeter, and Flat vinyl bumper (black) on full perimeter attached with stainless steel screws
Vessel Mooring Devices
10” Aluminum “S” Cleats bolted through frame for firm and durable vessel mooring
Winch and Cable Anchorage System
LM 16 Wintech winches with 16" wide drum - extra cable capacity or approved equal Two-speed gears - easily adjustable, minimum of two handles supplied w/dock Elevated winch stand and multi-directional fairlead - to reduces cable wear 5/8" galvanized cable and clamps - (200') of cable per winch (800’) total or approved equal.
Provide Concrete Anchors Details for NDSP to construct.
Provide loop brackets and/ other hardware for installation into concrete anchors.
ADA Compliant Aluminum Gangway
24-foot Marine grade aluminum decking installed on maximum 2’ span with stainless steel hardware.
Heavy Duty 5th Wheel Hinge connection with Transition Plate to new dock Roll-On to landside with 6” hard rubber wheels and transition plate or approved equal.
Provide cost to upgrade gangway from 24-foot to a 40-foot and a 50-foot, same construction.
Warranties
Minimum Two-Year Dock & Gangway Manufacturer’s Material and Workmanship Warranty. Minimum Fifteen-Year Manufacturer’s Flotation Warranty.
Dock & Gangway
Total design, build, and delivered price to include– Nevada Licensed Engineer Stamped Plans.
Provide preliminary engineering plans with Proposal.
PROJECT SPECIFIC TERMS AND CONDITIONS
Provide preliminary engineering drawings including details with Proposal. Selected vendor must provide Nevada Licensed Professional Engineer Stamp and signature on final plan set.
GENERAL INFORMATION
Project/delivery location should be considered remote. Identify required equipment for unloading at project location.
ATTACHMENTS
ATTACHMENTS INCORPORATED BY REFERENCE.
Terms and Conditions for Services Federal Laws and Authorities
ATTACHMENTS FOR REVIEW. To be read and not returned (unless redlining).
Contract Form Insurance Schedule
PROPOSAL ATTACHMENTS. To be completed and returned.
Cost Schedule Proposed Staff Resume Reference Questionnaire Attachments for Signature
Vendor Information Response Vendor Certifications Certification Regarding Lobbying Confidentiality and Certification of Indemnification
PROPOSAL TIMELINE
All questions regarding this RFP shall be submitted using the Bid Q&A feature in NevadaEPro by the deadline below.
The following represents the proposed timeline for this project.
All times stated are Pacific Time (PT).
These dates represent a tentative schedule of events.
The State reserves the right to modify these dates at any time.
| Deadline for Questions | No later than 5:00 pm on 05/03/2022 |
| Answers Posted | On or about 05/10/2022 |
| Deadline for References | No later than 5:00 pm on 05/23/2022 |
| Deadline Proposal Submission and Opening | No later than 2:00 pm on 05/24/2022 |
| Evaluation Period (estimated) | 05/24/2022 – 06/01/2022 |
| Selection of a Vendor (estimated) | On or about 06/01/2022 |
| BOE Approval (estimated) | 08/09/2022 |
| Contract start date (estimated) | 08/09/2022 |
PROPOSAL EVALUATION PROCESS
Proposal evaluation and scoring is conducted in accordance with NRS 333.335 and NAC 333.160-333.165.
Proposals shall be kept confidential until a contract is awarded.
In the event the RFP is withdrawn prior to award, proposals remain confidential.
The evaluation committee is an independent committee established to evaluate and score proposals submitted in response to the RFP.
Financial stability shall be scored on a pass/fail basis.
Proposals shall be consistently evaluated and scored based upon the following factors and relative weights.
| Demonstrated Competence | 30 |
| Experience in Performance of Comparable Engagements | 20 |
| Conformance with the Terms of this RFP | 10 |
| Expertise and Availability of Key Personnel | 10 |
| Cost Factor | 30 |
Cost proposals will be evaluated based on the following formula.
Cost Factor Weight x (Lowest Cost Submitted by a Vendor / Proposer Total Cost) = Cost Score
Following the evaluation and scoring process specified above, the State may require vendors to make a presentation of their proposal to the evaluation committee or other State staff, as applicable.
The State, at its option, may limit participation in vendor presentations to vendors above a natural break in the relative scores from technical and cost scores.
Following the presentations, the combined technical, cost, and presentation scores will become the final score for a proposal.
The State reserves the right to add additional criteria or presentations.
INVERSE PREFERENCE
The State applies an inverse preference to vendors that have a principal place of business in a state other than Nevada and that state applies an in-state preference not afforded to Nevada based vendors, pursuant to AB28 passed in the 81st session of the Nevada Legislature.
The amount of the inverse preference is correlated to the amount of preference applied in the other state.
Vendors who meet this criterion must indicated it on their submitted Quote in NevadaEPro.
This preference cannot be combined with any other preference, granted for the award of a contract using federal funds, or granted for the award of a contract procured on a multi-state basis.
MANDATORY MINIMUM REQUIREMENTS
Pursuant to NRS 333.311 a contact cannot be awarded to a proposal that does not comply with the requirements listed in this section.
NEVADA LAW AND STATE INDEMNITY. Pursuant to SB 445 of the 81st Session of the Nevada Legislature, any contract that is entered into may not: (1) Require the filing of any action or the arbitration of any dispute that arises from the contract to be instituted or heard in another state or nation; or (2) Require the State to indemnify another party against liability for damages.
NO BOYCOTT OF ISRAEL. Pursuant to NRS 333.338, the State of Nevada cannot enter a contract with a company unless that company agrees for the duration of the contract not to engage in a boycott of Israel. By submitting a proposal or bid, vendor agrees that if it is awarded a contract it will not engage in a boycott of Israel as defined in NRS 333.338(3)(a).
INDEMNIFICATION. Confirm vendor agrees to comply with required contract terms on Indemnification: "To the fullest extent permitted by law, Contractor shall indemnify, hold harmless and defend, not excluding the State’s right to participate, the State from and against all liability, claims, actions, damages, losses, and expenses, including, without limitation, reasonable attorneys’ fees and costs, arising out of any breach of the obligations of Contractor under this contract, or any alleged negligent or willful acts or omissions of Contractor, its officers, employees and agents. Contractor’s obligation to indemnify the State shall apply in all cases except for claims arising solely from the State’s own negligence or willful misconduct. Contractor waives any rights of subrogation against the State. Contractor’s duty to defend begins when the State requests defense of any claim arising from this Contract."
LIMITED LIABILITY. Confirm vendor agrees to comply with required contract terms on Limited Liability: "The State will not waive and intends to assert available NRS Chapter 41 liability limitations in all cases. Contract liability of both parties shall not be subject to punitive damages. Damages for any State breach shall never exceed the amount of funds appropriated for payment under this Contract, but not yet paid to Contractor, for the Fiscal Year budget in existence at the time of the breach. Contractor’s tort liability shall not be limited."
CONTRACT RESPONSIBILITY. Awarded vendor shall be the sole point of contract responsibility. The State shall look solely to the awarded vendor for the performance of all contractual obligations which may result from an award based on this RFP, and the awarded vendor shall not be relieved for the non-performance of any or all subcontractors.
DATA ENCRYPTION. Confirm vendor will comply with State IT requirement that data be encrypted in transit and in rest.
STATESIDE DATA. Confirm vendor will comply with State IT requirement that State data assets must be maintained stateside and data will not be held offshore.
NEVADA BUSINESS LICENSE. Pursuant to NRS 353.007, prior to contract execution awarded vendor must hold a State business license pursuant to NRS chapter 76 unless exempted by NRS 76.100(7)(b).
DISCLOSURE. Each vendor shall include in its proposal a complete disclosure of any alleged significant prior or ongoing contract failures, contract breaches, any civil or criminal litigation or investigations pending which involves the vendor or in which the vendor has been judged guilty or liable.
CRITICAL ITEMS
In addition to the Scope of Work and Attachments, the items listed in this section are critical to the success of the project. These items will be used in evaluating and scoring the proposal. Vendor proposal should address items in this section in enough detail to provide evaluators an accurate understanding of vendor capabilities. Proposals that fail to sufficiently respond to these items may be considered non-responsive.
CONTRACT FORM. The State strongly prefers vendors agree to the terms of the attached Contract Form as is. Ability to agree to contract terms is a high priority to the State. Vendors who cannot agree to the contract as is must include a redlined Word version of the attached Contract Form with their proposal response.
INSURANCE SCHEDULE
Confirm vendor will comply with attached Insurance Schedule. If not, please explain which areas are causing non-compliance and attach a red line if necessary.
Awarded vendor shall maintain, for the duration of the contract, insurance coverages as set forth in the fully executed contract.
Work on the contract shall not begin until after the awarded vendor has submitted acceptable evidence of the required insurance coverages.
Failure to maintain any required insurance coverage or acceptable alternative method of insurance shall be deemed a breach of contract.
VENDOR BACKGROUND
Company background/history and why vendor is qualified to provide the services described in this RFP.
Provide a brief description of the length of time vendor has been providing services described in this RFP to the public and/or private sector.
VENDOR STAFF RESUMES
A resume shall be included for each proposed key personnel, see Proposed Staff Resume.
A resume shall also be included for any proposed key subcontractor personnel.
SUBCONTRACTORS
Subcontractors are defined as a third party, not directly employed by the contractor, who shall provide services identified in this RFP. This does not include third parties who provide support or incidental services to the contractor.
Proposal should include a completed Vendor Information Response form for each subcontractor.
Vendor shall not allow any subcontractor to commence work until all insurance required of the subcontractor is provided to the vendor.
Vendor proposal shall identify specific requirements of the project for which each subcontractor shall perform services.
How the work of any subcontractor(s) shall be supervised How channels of communication shall be maintained How compliance with contracts terms and conditions will be assured Previous experience with subcontractor(s)
VENDOR FINANCIAL INFORMATION
The information requested in this section is designated as confidential business information by the Administrator pursuant to NRS 333.020(5)(b) and is not public information pursuant to NRS 333.333.
This information should be submitted as a separate attachment, flagged as confidential in NevadaEPro.
Proposing vendor shall provide the following financial information and documentation:
Dun and Bradstreet Number Federal Tax Identification Number The last two (2) full years and current year interim:
1. Profit and Loss Statements
2. Balance Statements
BUSINESS REFERENCES
The information requested in this section is designated as confidential business information by the Administrator pursuant to NRS 333.020(5)(b) and is not public information pursuant to NRS 333.333.
Vendors shall provide a minimum of three (3) business references from similar projects performed for private and/or public sector clients within the last five (5) years, see Reference Questionnaire.
The purpose of these references is to document relevant experience and aid in the evaluation process.
Business references should return Reference Questionnaire directly to Single Point of Contact via email.
Business references will not be accepted directly from proposing vendor.
The State will not disclose submitted references, but will confirm if a reference has been received.
The State reserves the right to contact references during evaluation.
SUBMISSION CHECKLIST
This section identifies documents that shall be submitted to be considered responsive. Vendors are encouraged to review all RFP requirements to ensure all requested information is included in their response.
Proposals must be submitted as a Quote through NevadaEPro, https://NevadaEPro.com.
Vendors are encouraged to submit a single file attachment per proposal section if possible.
Technical proposal information and Cost proposal information shall not be included in the same attachment.
Cost proposal attachment shall not be flagged as confidential in NevadaEPro.
Additional attachments may be included if necessary, but are discouraged and should be kept to a minimum.
TECHNICAL PROPOSAL
Title Page Table of Contents Response to Mandatory Minimum Requirements Response to Critical Items Response to Scope of Work Proposed Staff Resumes Other Informational Material
PROPRIETARY INFORMATION. If necessary. Attachment should be flagged confidential in NevadaEPro.
Title Page Table of Contents Trade Secret information, cross referenced to the technical proposal
COST PROPOSAL
VENDOR FINANCIAL INFORMATION. Attachment should be flagged confidential in NevadaEPro.
SIGNED ATTACHMENTS
Vendor Information Response Vendor Certifications Confidentiality and Certification of Indemnification Certification Regarding Lobbying
REFERENCE QUESTIONNAIRES. Not submitted directly by vendor.
Revised: December 2021 Page 1 of 6 RFP Template image1.jpg
File details come from the government source that posted it. Updated .