This Request for Proposal (RFP) is issued by the Georgia World Congress Center Authority (GWCC Authority) seeking qualified firms to provide installation services for a Distributed Antenna System (DAS). The solicitation is open to firms specializing in DV/AV systems installation. The Authority reserves the right to reject any or all submittals, waive technicalities and irregularities, or cancel the procurement at any time. Specific details regarding response deadlines, project timelines, site visits, bidders' conferences, contract term, and renewal options are not provided in the available documentation.
A communication restriction is in effect throughout the procurement process from advertisement until final award. Interested firms are prohibited from communicating with Authority staff, GWCC officials, or their consultants regarding the solicitation or scope of work, except for submitting written questions as instructed in the RFP or pursuant to existing work agreements. Finalists and apparent awardees are restricted from issuing public statements or press releases regarding their selection status. Violation of these communication restrictions may result in rejection of the offending respondent's submittal. Pricing terms, set-asides, funding amounts, and other financial details are not specified in the provided documentation.
Text of this file
1 | P a g e August 18, 2022
Distributed Antenna System (DAS)
2 | P a g e August 18, 2022
GWCC Hotel and Conference Center
Request for Proposal for Distributed Antenna System (DAS)
GWCCA081922EC
Drew Company Atlanta, LLC is pleased to issue this Request for Proposal for the Signia by Hilton
Atlanta Hotel, located at the Georgia World Congress Center campus in Atlanta, Georgia (the
“Hotel”) on behalf of the Georgia World Congress Center Authority (the “GWCCA”). Drew
Company Atlanta, LLC is the developer for the Hotel. GWCCA is the owner.
Project Description
The Hotel is a new 976 key convention hotel in Atlanta which will be connected to the existing Georgia World Congress Center (the “GWCC”). This new Hotel will strengthen the
GWCC and Atlanta’s position as a national premier destination for sports, entertainment, and convention markets. The project’s front door and vehicular entrance is from Northside Drive, with an equally prominent pedestrian entrance off of Andrew Young International Boulevard.
The new Hotel is connected to the existing GWCC Building C to the North and the existing
GWCC B-C Connector to the East. The project has excellent visibility to both the new
Mercedes Benz Stadium and Home Depot Back Yard to the South and will be a beacon on the GWCC campus with visibility for miles around metro-Atlanta.
In addition to the 976 guestrooms and associated pool, fitness, and clubroom amenities, the project includes approximately 75,000 square feet of new meeting space organized into three zones: a social ballroom, a grand ballroom, and a conference center. These conference spaces can be used independently from or in conjunction with the existing GWCC convention space. The program also includes a three-meal restaurant, signature restaurant, multiple bars, and several outdoor spaces to support the hotel and surrounding campus activities. With its prominent connection to the new Mercedes Benz Stadium and close proximity to newly renovated State Farm arena, the Hotel amenities serve not only hotel guests but also visitors to the broader sports and entertainment campus on which the
GWCC Hotel sits.
3 | P a g e August 18, 2022
Scope of Services
The scope services being solicited within this RFP includes the full turnkey installation of a
Distributed Antenna System (DAS) as outlined below:
• GWCCA is seeking a contractor to provide design, construction, installation, implementation, operation, maintenance and service for a state-of-the art centralized neutral host distributed antenna system (“DAS”) at no cost to the GWCCA that is capable of providing enhanced commercial cellular wireless mobile services and radio coverage throughout the Hotel facility, located at 159 Northside Drive Atlanta, Georgia 30313, serving the Hotel staff, guests, tenants, licensee, exhibitors, attendees, contractors, and any member of the public authorized to use the proposed facilities. Contractor shall bear all costs associated with the design, installation and long-term management of the DAS. This RFP is for DAS only – WiFi, CBRS and
ERRCs will be under separate agreements with others.
• Contractor shall provide all DAS equipment and supporting infrastructure, including monitoring and management components, mechanical and structural hardware, and all construction elements (labor, materials, equipment, goods and services necessary) to support the neutral host DAS, which will provide robust and enhanced cellular mobile service throughout the Signia by Hilton Hotel, including administrative offices and loading docks. The DAS will also support current providers and known technologies at all times, independent of the wireless frequencies and format used.
• The drawings and specifications provided attached hereto as Exhibit A and
Exhibit B are meant to provide a general basis of design, only.
• The DAS must have active (powered) elements, which shall amplify radio signals to ensure consistent wireless services to all authorized carriers at the appropriate power levels, including the ability to adjust and control power levels to a carrier without disturbing services provided by other carriers.
• The DAS shall provide a centralized management system that provides a system wide view of the in-building deployment. An extensive plan review and approval process shall be implemented prior to any purchase of goods and installation of the DAS.
4 | P a g e August 18, 2022
• Contractor shall provide a long-term operation and management solution, including providing maintenance of the solution, monitoring, outage reconciliation and break-fix services, oversight and compliance of equipment obsolescence and upgrade development paths in the future.
• Contractor shall also comply at all times with all electrical code requirements at the federal, state, and local levels.
• Include project coordination which incorporates complete submittal package, shop drawings, project brochure package, dimensioned rough-in drawings, O&M
Manuals and warranties.
• Procurement and Warehousing of Equipment based on project schedule.
• Installation of all equipment which includes delivery, staging, inventorying, uncrating, assembling, setting, leveling and final fastening.
• Removal of all uncrating material, rubbish and trash must be included in this scope.
• Insurance to be provided per the attached Exhibit E requirements.
• The GWCCA intends to enter into an agreement with the Contractor to market the hotel to wireless/cellular carriers to improve cellular coverage at the Hotel.
Initial term of nine (9) years (initial term cannot exceed 9 years).
Renewal terms – Respondent to propose renewal terms.
Due Diligence period – Respondent to propose Due Diligence period. This period allows
Contractor to market the property to the wireless carriers, perform necessary testing, and obtain any required permits for the proposed installation. The Substantial Completion Date is December 18, 2023 and should be considered the on-air date for the system. In other words, the system should be operational with multiple carriers on or before December 18, 2023.
• If Contractor has received expressions of interest or letters of intent from any carriers include those with this response.
• Please indicate the minimum amount of carriers that would be required by the Contractor to move forward with design, construction and operation of the DAS.
• Recurring compensation as part of this arrangement, Contractor will compensate the GWCC
Hotel based on the scope of the solution.
• Commencement of the term of the DAS contract shall begin when the first Carrier commences operation on the DAS.
• During the Due Diligence, Contract and Renewal periods, Contractor will have the right to market, install and operate indoor networks that serve commercial wireless service providers.
• Contractor will be provided Head-end space on level B2 of the Hotel to accommodate
5 | P a g e August 18, 2022
Contractor’s DAS head-end equipment and the equipment the wireless service providers would need to join the DAS. Approximate size of the space is 368 SF as shown on the drawing attached as Exhibit F. The equipment room will be improved/constructed at Contractor’s sole cost and expense.
• Contractor will manage all carrier marketing, leasing and integration onto the DAS system, as well as manage future carrier modifications or upgrades, at absolutely no cost to the GWCC
Hotel or GWCC.
• Contractor will be responsible for technology evolution and network upgrades including but limited to the rollout of 5G. Network upgrades or modifications required to support future wireless service provider needs would be completed at no cost to the GWCC Hotel or GWCC and supported by the carriers’ deployment needs; Contractor will cover associated costs under our agreements with the wireless carriers.
• Contractor shall bear responsibility and overhead costs associated with network operations.
• Network reliability supported by Contractor NOC (Network Operations Center) for off-site monitoring by the Contractor with redundant backup, monitoring the DAS 24/7/365 with 99.9% availability. This monitoring is done at no cost to GWCCA.
• Contractor will maintain the DAS Network for the entire contract term at its sole cost and expense. Contractor shall contract with the wireless carriers for performance criteria and resolution management protocols.
• Contractor shall leverage their relationships with the wireless carriers to secure funding for the entire DAS network.
MWBE Participation
GWCCA strongly endorses and encourages the participation of Minority and Women Owned
Business Enterprise (M/WBE) firms in the design and construction on this Project which will be owned by GWCCA. Respondents should take into account the public ownership structure and traditional M/WBE target goals of Atlanta, Georgia. All non-M/WBE certified companies that submit proposals for this Project are encouraged to include M/WBE firms as second tier sub-consultants for appropriate opportunities within the scope of services for which they are qualified.
Proposal Requirements
Proposal Format - Please prepare your written RFP responses to address the following topics in
6 | P a g e August 18, 2022 this sequence:
1. Firm Information
• Firm’s Legal Name
• Date Founded
• Head Office Address, phone, fax, primary contact person, title and e-mail address
• Federal Tax ID number and D&B number, if applicable
• Firm Size
• W/MBE Status
• Client References
• Statement of Firm’s Current Workload (current projects under construction)
• Statement of Firm’s projects successfully completed
2. Scope of Services Proposed
• Scope of Services to be provided within your proposal
3. Confirmation of Ability to Meet Project Requirements
• Acceptance of Compliance with Project Drawings
• Acceptance of Compliance with Project Specifications
• Ability to Complete Work within Construction Milestone Schedule
• Exclusions or qualifications that might pertain to your proposal to complete or otherwise perform the Work
• Compensation Schedule
• M/WBE Participation
• Please detail lead times for all equipment
Additional RFP Information
7 | P a g e August 18, 2022
RFP Due Date - Please submit one (1) electronic copy to Drew Company Atlanta, LLC no later than
Friday, September 2, 2022 at 5:00 PM ET. Proposals received after that time will not be considered.
Drew Company Atlanta, LLC
55 Allen Plaza, Suite 845 55 Ivan Allen Jr. Boulevard, Atlanta, Georgia 30308
Attn: Richard Currier Email: Richard.currier@drewcompany.com
Additional RFP information is included in the following Exhibits:
Exhibit A – Issued for Construction Drawings
Exhibit B – Issued for Construction Specification Book
Exhibit C – Construction Schedule
Exhibit D – Schedule Milestone Dates
Exhibit E – Insurance
Exhibit F – Head End Room
Questions - Should you have any questions regarding this RFP request, please forward to
Richard Currier with written detail defining your specific question(s). To ensure a timely response, questions regarding the RFP must be submitted by Friday, August 26, 2022 at 5:00
PM (ET).
Negotiation and Award. Based on proposals received in response to this RFP, it is the intent of GWCCA to select the most responsive Respondent for contract negotiations as soon as possible to enable the operation of the DAS on or before the Substantial Completion Date of
December 18, 2023. This RFP does not in any way limit the right of GWCCA to solicit contracts for similar or identical services, in GWCCA sole and absolute discretion. The selection of any proposal shall not imply acceptance by GWCCA of all terms of the proposal, which may be subject to further negotiation and approvals before the GWCCA, may be legally bound thereby. The final contract will be between GWCCA and Respondent. If a satisfactory contract cannot be negotiated in a reasonable time, GWCCA, in their sole discretion, may terminate negotiations and begin negotiations with another Respondent.
8 | P a g e August 18, 2022
We know these efforts take time and energy to prepare. Thank you for your consideration.
End of RFP
9 | P a g e August 18, 2022
Exhibit A – Issued for Construction Drawings
Exhibit B – Issued for Construction Specification Book
Exhibit C – Construction Schedule
See following Dropbox link for Exhibits A, B and C:
https://www.dropbox.com/sh/tlywtpaosyvs21w/AAAAenc502azNkO2VuTbA9Sna?dl=0 https://www.dropbox.com/sh/tlywtpaosyvs21w/AAAAenc502azNkO2VuTbA9Sna?dl=0
Exhibit D - Schedule Milestone Dates
Exhibit E
INSURANCE REQUIREMENTS
Contractor Insurance Requirements –
I. Prior to the commencement of any work, contractor will to deliver to Drew Company Atlanta, LLC original certificates of insurance evidencing the insurance coverage required below. On all policies except Worker’s Compensation, “Geo. L. Smith II Georgia World Congress Center Authority c/o Drew Company Atlanta, LLC., a Foreign Limited Liability Company;.” shall be named as Additional Insured.
II. Minimum required coverage and limits:
(a) Worker's compensation insurance with statutory benefits and limits which fully comply with all state and federal requirements;
(b) Employer's liability insurance with limits of not less than $200,000.00;
(c) Automobile liability insurance including owned, non-owned, leased and hired car coverage, naming Landlord as an additional insured, providing primary (and not contributing) coverage, and containing cross-liability and severability of interest clauses; limits of contract for the performance of the work is $150,000 or less, coverage will be in an amount of not less than $1,000,000.00 combined contract is over $150,000, coverage will be in an amount of not less than $1,000,000.00 combined single limit per occurrence;
(d) Employer’s Liability - $1,000,000 (per bodily injury/disease and aggregate).
(e) Comprehensive general liability insurance including personal injury, owner's and contractor's protective liability, explosion, collapse and underground damage liability endorsement (commonly called X, C and U hazard), products, completed operations, blanket contractual and broad form property damage coverage, providing primary (and not contributing) coverage, and containing cross-liability and severability of interest clauses;
limits of liability will be as follows: if the total amount of contractor's contract for the performance of the work is $150,000 or less, coverage will be in an amount of not less than $2,000,000.00 combined single limit per occurrence; if the total amount of contractor's contract is over $150,000, coverage will be in an amount of not less than $5,000,000.00 combined single limit per occurrence; and
(f) Umbrella and Excess Liability. These policies shall provide excess liability limits of $5,000,000 in the form of an umbrella or excess liability policy. (limits of liability required herein may be satisfied with a combination of general liability, umbrella and/or excess policies of insurance where applicable, provided that such policies comply with all of the provisions hereof including, without limitation, with respect to scope of coverage and naming of the Insured Parties as additional insureds).
(g) Professional Liability Insurance. This insurance shall provide coverage for bodily injury, property damage and/or financial loss on a claims made basis with limits of $1,000,000 each claim and annual aggregate and shall be maintained at least 5 years following completion of the project (If applicable, for projects with Design Build components).
All of the above insurance policies must be placed with insurance companies reasonably acceptable to Owner and must be endorsed to require 30 days' written notice to Owner prior to any cancellation or material changes in coverage. Contractor shall also obtain certificates or evidence of similar insurance from each of contractor's subcontractors before their work commences and deliver such certificates or evidence to owner. Each subcontractor must be covered by insurance of the same character and in the same amount as specified for contractor above, except that (i) a subcontractor's comprehensive general liability insurance will have combined single limits not less than $2,000,000.00 per occurrence, if the total amount of contractor's contract for the performance of the work is $150,000 or less, and not less than $5,000,000.00 per occurrence, if the total amount of contractor's contract is over $150,000; (ii) so long as contractor's builders risk policy covers all of the work, no subcontractor will be required to maintain builders risk contractor and Landlord may agree to lesser limits in writing because of the nature of the particular subcontract work.
III. Certificate Holder and additional information:
A. The Certificate Holder shall be identified as follows:
Geo. L. Smith II Georgia World Congress Center Authority, an instrumentality of the State of Georgia and a public corporation 285 Andrew Young International Blvd., NW Atlanta, Georgia 30313-1591 Attention: Design and Construction
B. Additional Named Insured:
Owner, together with (ii) Drew Company Atlanta, LLC, (iii) the Project lenders, (iv) Hilton Worldwide, Inc. and its owners, subsidiaries and affiliates, and (v) Atlanta Falcons Stadium Company, LLC, Atlanta Falcons Football Club, LLC, Atlanta United Football Club, LLC, AMB Sports & Entertainment, LLC and each of their affiliated companies (collectively, the “Falcons Parties”), together with the respective, directors, officers, members, trustees, employees, agents and representatives, successors and assigns of each of the aforementioned (collectively the “Owner Additional Insured Parties”), C. Description of Operations/Locations/Vehicles/Special Items:
“All operations performed for Geo. L. Smith II Georgia World Congress Center Authority c/o Drew Company Atlanta, LLC., a Foreign Limited Liability Company; Certificate Holder is included as General Liability Additional Insured; Waiver of Subrogation.”
D. Cancellation or Notice of Non-Renewal
Thirty (30) day cancellation notice provision required.
Exhibit F - Head End Room
PGPH
MA
TC
H
LI
NE
SE
E
/ A 2.0
B2 E
(109 SINGLE & TANDEM SPACES LEVEL B2)
3'-0"
SERVICE
ELEVATOR
LOBBY
B2010
DAS HEAD
END
B2031
PLUMBING
EQUIPMENT
ROOM
B2015
CHILLER
CENTRAL
PLANT
B2005
BOILER
CENTRAL
PLANT
B2017 FIRE PUMP
ROOM
B2018
EMERGENCY
GENERATOR
B2016
WASTE
B2020
LINEN HOLD
B2003
STAIR 2
B2S2
MECH. LOUVER
EXISTING BUILDING C
EXISTING GOLD DECK
EXISTING LOADING
DOCK DRIVE
EXISTING BUILDING B
SERVICE
ELEVATORS
B2SE4
SERVICE
ELEVATORS
B2SE6
F
PA
D BP N M J
4.3
3.8
3.6
3.3
2.9
F.8
P7
P8
P5
P3
P2
P4
P6
P1
PBPCPDPEPFPG
C
P9
RECEIVING /
SECURITY
B2023
SOILED
LINEN &
SORT
B2030
EXISTING ORANGE DECK
LOADING
DOCK
B2022
SERVICE
CORRIDOR
B2008
STAIR 14
B2S14
MACHINE
ROOM
B2004 b b
(3) LOADING DOCK
BERTHS
REFER TO CIVIL FOR
GRADING
EL. 981'-8"
RAMP DN
EL. 980'-2"
VERIFY EXISTING GRADE
EL. 977'-8" (LOW PT.)
NEW VALET PARKING
(109 SINGLE & TANDEM SPACES AT LEVEL B2)
TANDEM PARKING
TANDEM
PARKING
TYP.
EXISTING LOADING
DOCK DRIVE
ENTRY/EXIT TO
PARKING GARAGE
b b RAMP DN
MECHANICAL
B2014
DOCK
RESTROOM
B2025
ELECTRICAL
VAULT
B2013
ELECTRICAL
SWITCHGEAR
B2009
SERVICE
CORRIDOR
B2006
RECEIVING
& STORAGE
B2024
2.95
P0.1
EMERGENCY
ELECTRICAL
B2011
RA
MP
D N
EL. 979'-8"
EL. 979'-8"
EL. 979'-8"
EL. 981'-8"
EL. 978'-0"
EL. 979'-8"
MECH. LOUVER
FOOD
HOLDING
B2027
GENERAL
STORAGE
B2029
RECYCLING
B2019CLEAN
LINEN
B2026
TANDEM
PARKING
UNDERGROUND GREASE
TRAP LOCATIONS, REFER TO
PLUMBING DRAWINGS
MA
TC
H
LI
NE
SE
E
/ A 2.0
B2 W
EL. 979'-8"
PA.5
GENERAL
STORAGE
B2012
CAN WASH
B2021
RAMP DN
IDF
B2032
________________08 A9.18
A9.19
A9.18
________________06 A7.16b
EXIT
PASSAGEWAY
B2007
SERVICE VEHICLE
PARKING
TYP
TYP
EAST
DV2.0B2E
CONSTRUCTION PLAN LEVEL B2 -
SEGMENT EAST
- DV SYSTEMS
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
Tel 404.507.1000 Fax 404.507.1001
999 Peachtree St., NE Suite 1400 Atlanta, GA 30309 United States
13.2749.000
GWCC HOTEL
ANDREW YOUNG INTERNATIONAL BLVD
ATLANTA, GA 30313
NTI JOB NO. 18-7581
Member
Comm
I N T E R N A T I O N A L
320 SOUTH PERRY STREET, LAWRENCEVILLE, GA. 30046
1275 SHILOH ROAD, SUITE 3020 KENNESAW, GA. 30144
TEL (404) 876-6033 FAX (404) 876-6034
www.nticonsultants.com
THIS DRAWING IS AN INSTRUMENT OF SERVICE AND, AS
SUCH, IS THE PROPERTY OF NETWORK TECHNOLOGIES, INC.
(NTI). IT IS TO BE USED ONLY FOR THE PROJECT AND SITE
SPECIFICALLY IDENTIFIED HEREIN. NO PART OF THIS
DOCUMENT SHALL BE REPRODUCED OR TRANSMITTED IN
ANY FORM OR BY ANY MEANS, ELECTRONIC OR
MECHANICAL, FOR ANY PURPOSES WITHOUT THE EXPRESS
WRITTEN PERMISSION OF NETWORK TECHNOLOGIES, INC.
04.12.2019 BOND VALIDATION PRICING PACKAGE
NTI JOB NO. 18-7581
US
ER
: D
MC
KI
NN
EY
P
LO
TT
ED
: 2 /18
/20
1:4
7 P M
N
:\2
8\1 8-
G W
CC
\D
V\
DV
2.0 B2
.dw g
LA
YO
UT
: D V2
.0B 2E
GWCCA / DREW
08.30.2019 DESIGN DEVELOPMENT PACKAGE
12.02.2019 GMP PACKAGE
12.02.2019 PERMIT PACKAGE ONE
12.18.2019 ADDENDUM 1
03.03.2020 PERMIT PACKAGE ONE - FOR CONSTRUCTION
05.04.2020 PERMIT PACKAGE THREE
02.19.2021 ISSUED FOR CONSTRUCTION
SCALE : 3/32" = 1'-0"
LEVEL B2 - SEGMENT EAST - DV SYSTEMS
IDF
J6A2 a
LAN CLOSET INSTALLATION NOTESKEYED NOTES
SCALE : 1/4" = 1'-0"
GENERAL NOTES
SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
DV9.00 DV9.00
SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
SCALE : 1/4" = 1'-0"
DV9.00 DV9.00 DV9.00
SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
SCALE : 1/4" = 1'-0"
DV9.00 DV9.00 DV9.00
SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
SCALE : 1/4" = 1'-0"
DV9.00 DV9.00 DV9.00
DATA RACK FRONT ELEVATION
SCALE : 1/4" = 1'-0"
DV9.00
IDF ROOM B2032 (LEVEL B2)
IDF ROOM 2020 (LEVEL 2)
DAS ROOM B2031 (LEVEL B2) 4
SCALE : 1/4" = 1'-0"
DV9.00
IDF ROOM 1076 (LEVEL 1)
IDF ROOM 2011 (LEVEL 2)IDF ROOM 2033 (LEVEL 2)CHASE ROOM 1003 (LEVEL 1)
IDF ROOM 3013 (LEVELS 3)
IDF ROOM (LEVEL 6 - 28) (TOWER)CHASE ROOM (LEVELS 6-28) (TOWER)
DAS HEAD
END
B2031
B2031
SCALE : 1/4" = 1'-0"
CHASE ROOM LEVELS (LEVEL 29 - 38) (TOWER)
IDF
B2032
B2
CHASE BACKBOARD ELEVATION RACK FRONT ELEVATION22
SCALE : 1/4" = 1'-0"SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
SCALE : 1/4" = 1'-0"
DV9.00 DV9.00 DV9.00
21 MATV BACKBOARD ELEVATION CROSS CONNECT DETAIL - MDF + IDF ROOMS (TYP.)
INCOMING PHONE
RISER CABLES
RISER BLOCKS IN MAIN
EQUIPMENT ROOM/MDF TO BE
WALL MOUNTED 110 BLOCKS
(RACK MOUNT 110 BLOCKS IN IDF
ROOMS ONLY!)
WALL MOUNTED 110
BLOCKS PROVIDED AND
INSTALLED BY CABLING
CONTRACTOR. MOUNT
BESIDE RISER 110 BLOCKS.
PROVIDE SUFFICIENT
QUANTITY TO CROSS
CONNECT ALL RISER
CABLES.
CABLING CONTRACTOR IS
RESPONSIBLE FOR ALL CROSS
CONNECTS TO PROVIDE CONTINUITY
FROM THE WALL PLATE/OUTLET TO
THE RISER BLOCKS IN THE MDF/MAIN
EQUIPMENT ROOM. TESTING/TONING
OF ALL TELEPHONE CABLE DROPS
FROM WALL JACK TO RISER BLOCKS
IS REQUIRED TO BE COMPLETED 2
WEEKS PRIOR TO PBX VENDOR
INSTALL. COORDINATE SCHEDULE
REQUIREMENTS WITH WLS PROJECT
MANAGER.
RJ-45 TO 110 CROSS CONNECT PATCH
CORD (PROVIDED AND INSTALLED BY
CABLING CONTRACTOR) TO CROSS
CONNECT 1 PAIR PER GUESTROOM OR
SUITE (TYPICAL) FOR SINGLE LINE
ANALOG PHONE. PURCHASE
PRE-MANUFACTURED SEIMON BRAND
OR EQUIVALENT OR ASSEMBLE IN FIELD
USING CAT-5E OR BETTER CROSS
CONNECT WIRE AND SOLID
CONDUCTOR RJ-45 PLUGS. PROVIDE
ADD ALTERNATE FOR HYBRID PATCH
CORDS.
CATEGORY 3 PHONE RISER
CABLE TO MDF (SEE RISER
DIAGRAM FOR PAIR COUNT)
WALL OR FLOOR
MOUNTED RACK IN
TYPICAL IDF ROOM
INCOMING 4 PAIR
CAT-6 PHONE CABLES
RACK MOUNTED CAT-6
PATCH PANEL FOR
TELEPHONE DROPS
FROM GUESTROOM OR
ADMIN PUBLIC AREAS
RACK MOUNTED 110
BLOCKS FOR
TERMINATION OF
CAT-3 RISER CABLE
CROSS CONNECTIVITY
BY PBX SYSTEM VENDOR
SCALE : 1/4" = 1'-0"
DV9.00
SCALE : 1/4" = 1'-0"
IDF ROOM (LEVEL 29 - 38) (TOWER) NOT IN USE
MDF ROOM 1039 (LEVEL 1)
COMPUTER
ROOM/MDF
D6B
A6A
11' - 8 3/4" 4' - 11"
IDF ROOM 1148 (LEVEL 1)
IDF ROOM 1087 (LEVEL 1)
IDF
JANITOR
CLOSET
A6A
IDF
4' - 0" 8' - 7 3/4"
IDF ROOM 2039 (LEVEL 2) IDF ROOM 2003, 3003, 4003 (LEVELS 2, 3, 4) IDF ROOM 4009 (LEVEL 4) IDF ROOM 5003 (LEVEL 5)
STORAGE
IDF
IDF
20202020
IDF
IDF
DV9.00
ENLARGED EQUIPMENT ROOMS -
STRUCTURED CABLING SYSTEM /
SECURITY
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
Tel 404.507.1000 Fax 404.507.1001
999 Peachtree St., NE Suite 1400 Atlanta, GA 30309 United States
13.2749.000
GWCC HOTEL
ANDREW YOUNG INTERNATIONAL BLVD
ATLANTA, GA 30313
NTI JOB NO. 18-7581
Member
Comm
I N T E R N A T I O N A L
320 SOUTH PERRY STREET, LAWRENCEVILLE, GA. 30046
1275 SHILOH ROAD, SUITE 3020 KENNESAW, GA. 30144
TEL (404) 876-6033 FAX (404) 876-6034
www.nticonsultants.com
THIS DRAWING IS AN INSTRUMENT OF SERVICE AND, AS
SUCH, IS THE PROPERTY OF NETWORK TECHNOLOGIES, INC.
(NTI). IT IS TO BE USED ONLY FOR THE PROJECT AND SITE
SPECIFICALLY IDENTIFIED HEREIN. NO PART OF THIS
DOCUMENT SHALL BE REPRODUCED OR TRANSMITTED IN
ANY FORM OR BY ANY MEANS, ELECTRONIC OR
MECHANICAL, FOR ANY PURPOSES WITHOUT THE EXPRESS
WRITTEN PERMISSION OF NETWORK TECHNOLOGIES, INC.
04.12.2019 BOND VALIDATION PRICING PACKAGE
NTI JOB NO. 18-7581
US
ER
: D
MC
KI
NN
EY
P
LO
TT
ED
: 2 /18
/20
1:5
0 P M
N
:\2
8\1 8-
G W
CC
\D
V\
DV
0.d wg
L
AY
OU
T:
D V9
.00
GWCCA / DREW
08.30.2019 DESIGN DEVELOPMENT PACKAGE
12.02.2019 GMP PACKAGE
12.02.2019 PERMIT PACKAGE ONE
12.18.2019 ADDENDUM 1
03.03.2020 PERMIT PACKAGE ONE - FOR CONSTRUCTION
05.04.2020 PERMIT PACKAGE THREE
02.19.2021 ISSUED FOR CONSTRUCTION
368 sf
115 SF
| DAS Exhibits.pdf |
| Blank Page |
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Questions | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .