RFP #377904-RK Summary
This is a Request for Proposal (RFP) issued by Fermi Forward Discovery Group, LLC (FFDG), the managing contractor for Fermi National Accelerator Laboratory (Fermilab), a Department of Energy facility, for the fabrication, assembly, testing, and delivery of PIP-II SSR2 edge-welded bellows. The solicitation is unrestricted with no set-asides, classified under NAICS code 332919 (Other Metal Valve and Pipe Fittings Manufacturing) with a small business size standard of 500 employees. A small business subcontracting plan is required if the awardee exceeds 500 employees and the subcontract value exceeds $750,000. The proposal deadline is March 6, 2026 at 2:00 P.M. CST, with a question submission deadline of February 20, 2026. The price proposal must be firm-fixed-price, valid for 90 days from the final proposal due date, submitted in USD without economic price escalation provisions. Domestic offerors use FOB Destination Fermilab, Batavia, Illinois (including shipping costs); non-domestic offerors use DAP per Incoterms 2020 with duties paid by FNAL. Payment is issued upon delivery, inspection, and testing per the Statement of Work. FFDG reserves the right to consider milestone payments at its discretion and may require bank guarantees for such arrangements.
The proposal must be submitted in two separate, unbound parts: Part I (Technical Proposal) and Part II (Business Management & Price Proposal). Technical evaluation criteria include technical merit and quality, past experience with three relevant projects from the past five years, a management control plan demonstrating quality standards and dimensional conformance controls, and a detailed delivery schedule meeting specified lead times. Part II requires submission of the FFDG price form, Subcontractor Annual Representations & Certifications (SARC), and PUR-466 Proposal Certifications as separate files. Required exhibits include the SOW (ED0045548), drawing package, FFDG General Terms and Conditions, and the small business subcontracting plan template. This is a best-value trade-off source selection where non-cost factors are significantly more important than cost; award is intended without discussions to the most responsive and responsible offeror offering best value to FFDG.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
#377904-RK
SSR2 EDGE-WELDED BELLOWS
February 06, 2026
Table of Contents
1. INTRODUCTION
2. INVITATION TO SUBMIT PROPOSAL
3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND
SMALL BUSINESS SUBCONTRACTING PLAN
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION PERIOD ... 2
5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD
6. AMENDMENT OF SOLICITATION
7. PROPOSAL DUE DATE
8. LATE SUBMISSION
9. EXCEPTIONS AND DEVIATIONS
10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS
11. ORDER OF PRECEDENCE
12. SUBCONTRACT AWARD
13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
A. Part I – TECHNICAL PROPOSAL/EVALUATION CRITERIA B. Part II – BUSINESS MANAGEMENT & PRICE PROPOSAL
14. DESCRIPTION OF WORK
15. DELIVERY TERMS
16. RESTRICTION ON DISCLOSURE AND USE OF DATA
17. EXHIBITS
The following requirements must be adhered to for the Offeror’s submission of Proposals to Fermi Forward Discovery Group, LLC (FFDG) in support of this specific requirement.
1. INTRODUCTION
Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under the prime contract with the U.S.
Department of Energy (DOE), is seeking to subcontract for the fabrication, assembly, testing, and delivery of PIP-II SSR2 Edge-welded bellows, in accordance with the requirements set forth in this Request for Proposal (RFP), the Statement of Work (SOW), Drawings any and all specifications as identified herein.
2. INVITATION TO SUBMIT PROPOSAL
You are invited to submit a proposal for the items specified and with the provision contained herein, including the terms and conditions of a proposed firm-fixed price subcontract that will be entered into as a result of this solicitation.
3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE
AND SMALL BUSINESS SUBCONTRACTING PLAN
This acquisition is unrestrictive and contains no set-aside provisions. The North American Industry Classification System (NAICS) code for this solicitation is 332919 – Other Metal Valve and Pipe Fittings Manufacturing. The small business size standard for this NAICS code is 500 employees.
A small business subcontracting plan will be required should the awardee not meet the definition of a small business as described in the paragraph above, and the subcontract exceed $750,000.00. The Subcontracting Plan shall follow the Federal Acquisition Clause, 52.219-9, Small Business Subcontracting Plan (See Exhibit D. FL-55 - Small Business Subcontracting Plan). A draft plan must be submitted with your RFP response.
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION
PERIOD
The prospective offeror should examine and review the solicitation with care. Any prospective offeror who has questions or desires an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by 2:00 P.M. CST, February 20, 2026, and be submitted to the Procurement Specialist at the email address identified on the Request for Proposal Form and below. Oral explanations or instructions given before the award of a subcontract will not be binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation if that information is necessary for submitting proposals or if the lack of the information would be prejudicial to other prospective offerors.
Any and all changes to these specifications are valid only if they are included in a written addendum and shall become part of the subcontract.
All questions concerning this RFP should be submitted in via email to the Procurement Specialist identified below.
Procurement Specialist: Richard Konan Phone: (630) 840-2835 Email: rkonan@fnal.gov
Fermi Forward Discovery Group, LLC Procurement Department Kirk Road & Wilson Street Batavia, IL 60510-0500
5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD
All offerors are prohibited from making any contact (including sales calls) with officials or employees of FFDG (collectively “FFDG personnel”) with regard to the request for proposals, other than in the manner and to the persons designated herein, until after an award has been made. The Chief Procurement Officer or their designee reserves the right to disqualify any offeror found to have contacted FFDG personnel in any manner regarding the proposal request.
6. AMENDMENT OF SOLICITATION
FFDG may, by addenda/amendment, modify any provision or part of this RFP at any time before the award of any resultant subcontract. All terms and conditions that are not modified remain unchanged.
An offeror shall acknowledge receipt of any addenda/amendments to this RFP. Failure to acknowledge may result in the disqualification of an offeror’s proposal with no further consideration for an award. The acknowledgment shall be provided in one of the following ways:
• Immediately upon receipt of the amendment via an email sent to the FFDG Procurement
Specialist.
• Return of the Amendment with a signature on the acknowledgment signature line; or
• In the offeror’s proposal.
7. PROPOSAL DUE DATE
The offeror’s proposal shall be emailed to the Procurement Specialist no later than 2:00 P.M. CST, March 06, 2026. Partial or incomplete proposals [including required documents (e.g., project timeline, examples of prior work, references, submission of the Request for Proposal Form)] may be considered non-responsive and will not be considered for an award.
mailto:rkonan@fnal.gov
8. LATE SUBMISSION
Proposals received by FFDG after the Submittal Date and Time indicated may not be considered. The Respondent assumes the risk of the method of dispatch chosen.
9. EXCEPTIONS AND DEVIATIONS
Any exceptions to the General Terms and Conditions identified herein MUST be documented on a separate sheet on the Offeror’s Letterhead with your proposal submission. Exceptions to FFDG’s Terms and Conditions MUST be clearly and completely indicated on a company letterhead. FFDG is not required to accept any exceptions or deviations.
Any exceptions or additional terms noted on a Quote Form will not be considered and are hereby expressly rejected. Likewise, any references—whether through language or hyperlink—to additional terms and conditions are not accepted and are similarly rejected.
Offerors taking exceptions, deviations, or conditional assumptions to the Specifications provided herein must clearly identify and explain each exception/deviation, or conditional assumption taken with sufficient amplification and justification to permit evaluations. Such exceptions, deviations, or conditional assumptions will not themselves automatically cause a proposal to be deemed unacceptable to FFDG. However, a large number of exceptions or one or more significant exceptions not providing benefit to FFDG may result in the rejection of the offeror’s proposal as unacceptable.
NOTE TO OFFERORS: Please be advised that any exceptions to the specifications or to FFDG’s terms and conditions may cause your proposal to be disqualified.
10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS
The offeror may submit modifications to its proposal at any time before the solicitation closing date and time and may submit modifications in response to an amendment or to correct a mistake at any time before award.
Proposals may be withdrawn at any time before the submission deadline. Withdrawals are effective upon receipt of notice by the Procurement Specialist.
11. ORDER OF PRECEDENCE
Where there appear to be variances or conflicts, the following order of precedence shall prevail: FFDG’s drawings (if applicable), FFDG’s Statement/Scope of Work, and the RFP General Terms and Conditions.
12. SUBCONTRACT AWARD
Issuance of the RFP does not compel FFDG to make an award. FFDG reserves the right to accept or reject all proposals if it is determined to be in its best interest. A decision may be made without discussion; hence, an offeror’s proposal should be submitted initially on the most favorable terms. The proposed award is based on a continuing program requirement and the issuance of obligation authority from the Procurement Department of the Fermi National Accelerator Laboratory (FNAL). Any subsequent award issued by
FFDG shall be constituted in writing by authorized representatives of the Procurement Department of the FNAL.
No other representatives of FFDG are authorized to issue contracts or agreements or bind FFDG to any form of agreement or understanding. The authorized Procurement Department official of the FNAL is the only individual who can legally commit FFDG to the expenditure of funds in connection with this proposed procurement.
13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
This is a best-value trade-off source selection. This process permits tradeoffs between cost or price and non-cost factors. As a result, FFDG will accept an offer based on the totality of the proposal, not simply based on the lowest-priced proposal. Specifically, all evaluation factors other than cost or price, when combined, are significantly more important than cost or price. An award shall be made to the offeror who is deemed most responsive and responsible by FFDG, whose proposal conforms to the solicitation’s requirements and is judged to represent the best value to FFDG. FFDG intends to award without discussions.
FFDG shall be the sole determiner of what is of the best value to FFDG.
FFDG reserves the right to cancel this solicitation at any time without incurring any liability or damages associated with such cancellation.
Under no circumstances shall FFDG be responsible for any proposal preparation expenses, submission costs, or any other expenses, costs, or damages, of whatever nature, incurred as a result of an offeror’s participation in this RFP process. The Offeror understands and agrees that it submits its proposal at its own risk and expense and releases FFDG from any claim for damages or other liability arising out of the RFP and award process.
FFDG shall not be liable for any errors in the offeror’s proposal submission. Except during negotiations initiated by FFDG, no modifications to the proposal shall be accepted from the offeror after the Submittal Date. The offeror is responsible for a careful review of their entire proposal to ensure that all information, including pricing, is correct and complete.
Offerors are liable for all errors or omissions contained in their proposals.
FFDG reserves the right to award a subcontract only to responsive and responsible proposers. Responsive offers are proposals that meet all minimum requirements (e.g., submit all required documents and meet the minimum years requirement). Responsible proposers are defined as organizations that demonstrate the financial ability, resources, skills, capability, willingness, and business integrity necessary to perform on the subcontract. FFDG shall be the sole determiner of whether an offer or offeror is considered responsive and/or responsible.
The proposal shall be submitted in two (2) parts: Part I - Technical Proposal and Part II – Business/Management Proposal.
Under no circumstances shall Part I and Part II be bound together, which can result in disqualification.
The Technical Proposal shall not contain any reference to cost other than what is referenced in Current/Past Projects. Additionally, the offeror SHALL NOT BIND Exhibits into a single document.
Any information of a proprietary nature shall be CLEARLY MARKED and identified in the offeror’s submission.
Offerors shall provide a clear, complete, and well-organized response addressing each of the Evaluation Criteria below. The submission must include sufficient detail, supporting documentation, and explanation to allow FFDG to assess the Offeror’s technical capability and the extent to which the proposed approach meets the requirements of the Statement of Work (SOW). Additionally, Offerors may state any recommendations or areas of concern related to the Statement/Scope of Work requirements in their proposals.
A. Part I – TECHNICAL PROPOSAL/EVALUATION CRITERIA
To be considered responsive, an offeror must provide information for the following technical criteria, which enable FFDG to evaluate technical capability.
1. Technical Merit & Quality
The Technical Proposal must demonstrate the Offeror’s ability to fabricate, test, and deliver the assemblies in full compliance with the requirements of the SOW (Exhibit A) & Exhibit B. Offerors must address the following evaluation factors:
• Overall Quality of Proposal – Offerors are to submit a detailed technical proposal that demonstrates the ability of the Offeror to fully meet or exceed all mandatory fabrication specifications and technical requirements contained in the SOW (Exhibit A) and Drawings (Exhibit B).
• Technical Capabilities, Experience, and Infrastructure – Offerors shall provide documentation demonstrating the technical capability, qualified staffing, and manufacturing infrastructure required to fabricate, assemble, inspect, and test the SSR2 edge-welded bellows assemblies in compliance as identified herein. The proposal shall demonstrate the capability to meet the requirements for configuration control and dimensional conformance (Section 3.2), welding (Section 3.3), examination (Section 3.4), and dimensional inspection, including CMM measurements, for applicable components (Table 3) specified in the SOW (Exhibit A). Offerors shall disclose what part of the work, if any, will be subcontracted. Please include any additional documentation that will demonstrate the offeror’s capabilities, experience and infrastructure.
• Materials – Offerors shall provide material documentation demonstrating compliance with Section 3.1 – Materials and all applicable drawing requirements specified in the SOW (Exhibit A). Substitution of materials is prohibited unless approved by Fermilab Forward Discovery Group (FFDG) through a Manufacturer’s Drawings Exception Document
(MDED). The proposal shall include Certified Mill Test Reports (CMTRs) demonstrating material grade, composition, physical and magnetic properties where applicable, and full traceability through fabrication, inspection, and final delivery, including verification of subcontracted materials prior to the Shipping Readiness Review (SRR).
• Quality Assurance Plan – Offeror shall provide a detailed Quality
Assurance Plan with their submission. This plan shall include the methods to be used to verify material properties, find defects, flaws, test procedures and the criteria for rejecting parts.
All offerors must include a project timeline and delivery schedule with their submission.
2. Past Experience Offerors shall provide a list of previous experience with projects of a similar size, scope, and complexity. At a minimum, the offeror shall submit three (3) relevant examples from the past five (5) years.
Each reference shall include the following:
• Customer name;
• Project Name and Location;
• Project Description;
• Total Contract Amount;
• Contracted project schedule duration;
• Project Start and Completion Date. If a current project, please provide the
Percent (%) complete and the projected completion date
• Examples of relevant project documentation, as applicable
3. Management Control Plan Offerors shall provide written documentation demonstrating their ability to ensure the required quality standards as defined in the SOW (Exhibit A) throughout the entire execution of the project.
Please provide examples of documentation that was developed for similar projects within the last five (5) years (e.g., Quality Control Plan, Manufacturing Inspection Plan, Factory Acceptance Verification Matrix). This documentation should demonstrate the offeror’s ability to perform inspection and testing, which will be considered as part of the technical evaluation.
As part of the Management Control Plan, the Offeror shall specify how the dimensional conformance of formed parts will be controlled.
4. Delivery Schedule and Milestones
Offerors shall provide documentation (e.g., Gantt chart or similar) demonstrating a detailed schedule that meets the lead times as defined in the SOW (see Exhibit A, Section 2).
B. Part II – BUSINESS MANAGEMENT & PRICE PROPOSAL
The Business Management and Price proposal submitted shall include, at a minimum, the following documentation:
1. Price Proposal Please provide pricing for the assemblies in accordance with the specifications as defined in the SOW (Exhibit A) & Drawings (Exhibit B). THE OFFEROR
MUST SUBMIT THEIR PRICING USING THE FORM PROVIDED
HEREIN.
If a subcontract is awarded to the offeror, payment shall be issued upon delivery, inspection, testing (if applicable) as identified herein, and pursuant to the General Terms and Conditions, and the Statement of Work as identified herein.
The proposed pricing shall be a firm-fixed price for the requirements as identified herein, and the price proposal shall be valid for 90 days from the final proposal due date. An Offeror providing a price proposal with a validation period of less than the minimum acceptance period as identified herein may be rejected without further consideration for an award.
All pricing must be submitted in USD, and no allowances shall be made for currency conversion during the term of the subcontract.
Economic price escalation language will not be accepted or considered.
FFDG may consider a proposal nonresponsive if the prices proposed are materially unbalanced. A proposal is considered materially unbalanced when the price of one or more line items in a submission is significantly overstated or understated, even though the total price may be acceptable when reviewing using cost or price analysis techniques. This would include a reasonable doubt that the proposal will result in the lowest overall cost to FFDG, even though it may be the lowest evaluated proposal, or if it is so unbalanced as to be tantamount to allowing an advance payment.
When applicable, FFDG will reimburse the subcontractor for actual costs (e.g., freight, pre-pay and add) incurred. No allowance shall be made for overhead and profit; any invoice containing overhead, profit, surcharges, handling costs, etc., will be rejected.
1.1 Duties/Tariffs
FFDG recognizes that international shipments may be subject to additional charges related to duties and tariffs. Therefore, shipping terms shall be DAP with the Subcontractor responsible for all shipping and handling costs to Destination, Batavia, Illinois. FNAL will be responsible for payment of duties and will provide broker information to the Subcontractor following award and prior to shipment.
1.2 Milestone Payments
FFDG may, at its discretion, consider milestone payments as part of the award determination process. If an offeror proposes milestone payments, such requests must be clearly identified in the original pricing proposal and accompanied by detailed terms and justification. Milestone payments will be evaluated as part of the overall proposal review. Unless milestone payments are expressly approved in writing, payment shall be made upon delivery and acceptance.
FFDG reserves the right to accept or decline milestone payments based on what is determined to be in the best interest of FNAL. FNAL may reject any proposal that includes milestone payments if such terms are determined to introduce undue risk, administrative burden, or misalignment with project objectives.
PLEASE NOTE: FNAL may require a bank guarantee if milestone payments are approved.
2. Subcontractor Annual Representations & Certifications (SARC), Form SARC The SARC certification submitted by the successful Offeror will be incorporated into the subsequent subcontract. If an offering entity is a joint venture, association, consortia, or partnership, each member entity must submit an individual Representations and Certifications Form (Exhibit E). The Form SARC must be submitted as a separate file.
3. Proposal Certifications, Form PUR-466 The PUR-466 certification submitted by the successful Offeror will be incorporated into the subsequent subcontract. All sections are required to be completed and must be signed by a company official. The Form PUR-466 must be submitted as a separate file.
14. DESCRIPTION OF WORK
The selected subcontractor shall provide all labor, materials, tools, equipment, and supervision required to complete all fabrications and assemblies as defined as follows:
• Exhibit A: ED0045548 - SSR2 Edge Welded Bellows Procurement Specification
• Exhibit B: Drawing Package (Provided Upon Request)
The awarded offeror shall deliver the specified quantities of the fabricated assemblies in full compliance with the fabrication requirements outlined in the referenced specifications and drawings. All fabrication shall follow the approved quality assurance plan and will be subject to the acceptance criteria defined herein.
15. DELIVERY TERMS
The Offeror shall propose a schedule that meets the lead times as defined in the SOW (Exhibit A).
Delivery terms shall be FOB Destination Fermilab, Batavia, IL for domestic offerors, which shall include shipping/freight costs within their firm-fixed-price proposal submission.
Delivery terms shall be DAP Fermilab, Batavia IL per Incoterms 2020 for non-domestic vendors. Non-domestic offerors will be provided with FFDG’s Customs Clearance Broker Information upon subcontract award.
The Subcontractor shall handle and transport the assemblies to Fermilab site in strict adherence to the clauses in the SOW (Exhibit A).
The Offeror must include their shipping/freight costs on the Price Submission Sheet within their proposal.
16. RESTRICTION ON DISCLOSURE AND USE OF DATA
Offerors or quoters who include in their proposals or quotations data that they do not want to be disclosed to the public for any purpose or used by FFDG except for evaluation purposes, shall –
A. Mark the title page with the following legend:
“This proposal or quotation includes data that shall not be disclosed outside FFDG and shall not be duplicated, used, or disclosed – in whole or in part – for any purpose other than to evaluate this proposal or quotation. If, however, a subcontract is awarded to this Offeror or quoter as a result of – or in connection with – the submission of this data, FFDG shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting subcontract. This restriction does not limit FFDG’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets (insert numbers or other identification of sheets)”, and
B. Mark each sheet of data it wishes to restrict with the following legend “Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal or quotation.”
17. EXHIBITS
A. SOW ED0045548 - SSR2 Edge Welded Bellows Procurement Specification B. Drawings Package C. Price Form D. FFDG General Terms and Conditions For Supplies (08.2025) E. FL-55 – Small Business Subcontracting Plan F. Subcontractor Annual Representations & Certifications (SARC) G. PUR-466 Proposal Certifications
| 1. INTRODUCTION |
| 2. INVITATION TO SUBMIT PROPOSAL |
| 3. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SUBCONTRACTING PLAN |
| 4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS / QUESTION PERIOD |
| 5. CONTACT WITH FFDG PERSONNEL/BLACKOUT PERIOD |
| 6. AMENDMENT OF SOLICITATION |
| 7. PROPOSAL DUE DATE |
| 8. LATE SUBMISSION |
| 9. EXCEPTIONS AND DEVIATIONS |
| 10. OFFEROR’S MODIFICATION AND WITHDRAWAL OF PROPOSALS |
| 11. ORDER OF PRECEDENCE |
| 12. SUBCONTRACT AWARD |
| 13. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS |
| A. Part I – TECHNICAL PROPOSAL/EVALUATION CRITERIA |
| B. Part II – BUSINESS MANAGEMENT & PRICE PROPOSAL |
| 14. DESCRIPTION OF WORK |
| 15. DELIVERY TERMS |
| 16. RESTRICTION ON DISCLOSURE AND USE OF DATA |
| 17. EXHIBITS |