RFP 27-1004 - Exhibits A - S.pdf

PDF 11 MB Posted

Attached to
RFP 27-1004, RIC Common-Use Passenger Lounge
Solicitation number
RFP-132009
Issued by
Roanoke City, Virginia

About this file

This document consists of exhibits and supporting materials for RFP 27-1004 related to Richmond International Airport's concessions and terminal expansion project. The exhibits include location maps, security screening configurations, revenue analysis, passenger demographics and activity data, air service networks, regional market information, and architectural floor plans for Concourse A expansion. The project involves the development of multiple concession spaces across three packages, including food and beverage venues, retail shops, and premium passenger amenities, with proposed concepts ranging from Wolfgang Puck and Hardywood Craft Brewery to Virginia Marketplace and international dining options. A consolidated TSA security checkpoint is planned, moving concessions from pre-security to post-security locations. The project execution timeline, detailed in Exhibit R, spans from July 2026 through August 2029, encompassing procurement of design and construction management at risk (CMAR) services, design phases, and phased construction across two checkpoint phases with concurrent concessions and shell space buildout.

The concessions program identifies approximately $26.7 million in fiscal year 2026 gross revenue, with 45.3 percent attributed to food and beverage and 54.7 percent to retail operations. The airport serves nearly five million annual passengers and is positioned within a region experiencing above-average growth. Multiple spaces totaling approximately 50,000 square feet are designated for existing, new, and proposed concession concepts, with additional spaces (B, C, D) reserved for future growth and sponsored passenger amenities. The project includes a central dining hall and common-use lounge, with detailed architectural plans showing holdrooms, corridors, mechanical systems, and accessibility features throughout the expanded concourse.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONNECTING OUR REGION.

GROWING OPPORTUNITIES.

EXHIBIT A – COMMON-USE

PASSENGER LOUNGE LOCATION MAP

Premium Passenger Amenity Opportunity in Concourse A

EXHIBIT B – EXISTING TSA

SECURITY SCREENING CONFIGURATION

2 TSA Screening Checkpoints and a Large Portion of the Concessions Program Located Pre-Security

EXHIBIT C – FUTURE CONSOLIDATED

SECURITY SCREENING CONFIGURATION

Consolidated TSA Screening Checkpoint Conceptual Layout Moving All Concessions Post-Security

$11,131,458.00 $11,587,630.00 $12,088,683.00 $11,881,390.00 $13,454,327.00 $13,330,997.00

GROWING OPPORTUNITIES.

EXHIBIT D – GROSS REVENUE ANALYSIS

Gross Revenue

EXHIBIT E – PASSENGER ACTIVITY

BY AIRLINE AND CONCOURSE

Delivering World Class Customer Experience and Operational Excellence

EXHIBIT F – PASSENGER SNAPSHOT

Demographics – Q1 2026

EXHIBIT G – PASSENGER GROWTH TRENDS

(NEARLY FIVE MILLION ANNUAL PASSENGERS)

RIC Passengers (Millions Enplaned Plus Deplaned)

EXHIBIT H – AIRPORT GROWTH AND MARKET POSITION

CUN

SJU

ATL

BOS

CLT

ORD

DFW

DEN

IAH

MIA

BNA

EWR

PHL

DTW

FLL

IAD

MDW

MSY

CHS

JAX

SFO

LAS

PVD

PHX

MSP

LAX

RSW

BWI

SRQ

ISP

SFB

MCO

PBI

JFK

LGA

PIE

TPA

HVN

BDL

CONNECTING OUR REGION.

EXHIBIT I – NONSTOP AIR SERVICE NETWORK

EXHIBIT J – REGIONAL POPULATION

GROWTH INDICATORS

Counties Surrounding Richmond are Experiencing Above-Average Growth, Outpacing Other Large Virginia Metro Areas

EXHIBIT K – RICHMOND REGIONAL

TOURISM MARKET OVERVIEW

Tourism Investment Drives Visitors, Fuels Our Economy, and Increases Passenger Traffic at Richmond International Airport

EXHIBIT L – HIGHER EDUCATION MARKET OVERVIEW

EXHIBIT N – MAJOR REGIONAL

INVESTMENT ANNOUNCEMENT

FY26 GROSS REVENUE BY LOCATION

(Note: Revenue Not Audited by 3rd Party)

$26.7M $12.1M(45.3%) $14.6M(54.7%)

Exhibit O

RICHMOND INTERNATIONAL AIRPORT

Concessions Map (Existing, New, & Proposed)

1 2

12 13

18 19 A

B D C

FUTURE PROGRAM OVERVIEW

PROPELLING REGIONAL PROSPERITY BY DELIVERING WORLD-CLASS CUSTOMER EXPERIENCE AND OPERATIONAL EXCELLENCE.

Spaces B, C and D have been reserved for future concession growth while providing opportunities for sponsored passenger amenities in the interim.

Full Map Key on next Common Exhibit T

Additional Spaces:

A Common Use Lounge B Sponsorship / Activation Opportunity C Commission Sponsorship / Activation Opportunity D Sponsorship / Activation Opportunity

20 Central Dining Hall / Commission Operated

Exhibit P

FUTURE PROGRAM OVERVIEW

Spaces B, C and D have been reserved for future concession growth while providing opportunities for sponsored passenger amenities in the interim.

RICHMOND INTERNATIONAL AIRPORT

Concessions Map (Existing, New, & Proposed)

PROPELLING REGIONAL PROSPERITY BY DELIVERING WORLD-CLASS CUSTOMER EXPERIENCE AND OPERATIONAL EXCELLENCE.

Space # Concept Approx. SF Status Existing Concept 1 Wolfgang Puck, Bar + Bites 2820 New (Coming Soon) 2 Homegrown 918 New (Coming Soon) 3 Beet Box 1217 New (Coming Soon) 4 1A Craft Brewery w/Mexican, Tex Mex or BBQ 2200 Proposed Concept Pk1 - 1A Cross Grains - Con A 5 Hudson - March 2030 1437 Current Retail 6 2A Neighborhood Café 356 Proposed Concept Pk2 - 2A Ironclad - Con A 7 2B Virginia Marketplace 1620 Proposed Concept Pk2 -2B 8 2C Virginia Travel Essentials 1240 Proposed Concept Pk2 - 2C 9 1B Premium Burger House 1600 Proposed Concept Pk1 - 1B

10 1C Signature Wine & Chef's Table 2925 Proposed Concept Pk1 - 1C 11 1D National Coffee House 2000 Proposed Concept Pk1 - 1D 12 1E Premium Chicken Eatery 1600 Proposed Concept Pk1 - 1E 13 2D International Marketplace 1620 Proposed Concept Pk2 - 2D 14 2E International Travel Essentials 1240 Proposed Concept Pk2 - 2E 15 3A National Brand Partnership 1620 Proposed Concept Pk3 - 3A Samuel Adams & Chee Burger - Con B 16 Hudson - March 2030 1227 Current Retail 17 2F Express Café 845 Proposed Concept Pk2 - 2F 18 Hardywood Craft Brewery 3396 New (Coming Soon) Club Level Grill - Con B 19 Hudson, Tech On the GO 1223 Current Retail

A 3300

Reserved for Future Concessions Development Excluded from Current Concessions Program. Future development based on passenger enplanement levels.

Common Use Lounge

B Sponsorship / Activation Opportunity 1880 C Commission Sponsorship / Activation Opportunity 4800 D Sponsorship / Activation Opportunity 1880 E Central Dining Hall / Commission Operated 7500

UP

UP

UPUP

UP

F D

F D

UP

UP

UP

UP

UP

UP

UP

UP

UPUPUPUPUPUPUPUPUPUP

UPUPUPUP

18171615141312111098765432

A

B

C

D

R 55' - 0" xA xB xC xD xE xF xG xH xI xJ xK x1 x2 x3 x4 x5 x6

P A

R T

A P

A R

T B

/4

23' - 11 1/2" 109' - 7 3/4" 7' - 11" 4' - 10 3/8"

108' - 9 1/4"

STAIR 4

A13SA13S

ELEV. 3

A6EA6E

STAIR 1

A14SA14S

UNFINISHED FUTURE

TENANT BUILD OUT

A2720A2720

CORRIDOR

A2650A2650

CORRIDOR

A2633A2633

STAIR 3

A11SA11S

STAIR 2

A10SA10S

ELEV. 1

A4EA4E

WOMEN'S RESTROOM

A2654A2654

MEN'S RESTROOM

A2652A2652

JANITOR CLOSET

A2653A2653

FAMILY RESTROOM

A2651A2651

MOTHER'S ROOM

A2655A2655

P A

R T

A P

A R

T B

A14

A16

A12 A10

A11

A13

A15

EXISTING

A5

MECH.

A2631A2631

24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 32' - 0" 22' - 0" 14' - 0" 28' - 0"

PLAN

NORTH

UNFINISHED FUTURE

TENANT BUILD OUT

A2620A2620

EXISTING

A8

CORRIDOR

A2691A2691

CORRIDOR

A2671A2671

STAIR 5

A12SA12S

CORRIDOR

A2681A2681

ELEV. 4

A5EA5E

ELEC.

A2634A2634

ELEV. 2

A3EA3E

CORRIDOR

A2632A2632

HOLDROOM A16

A2710A2710

CORRIDOR

A2601A2601

EXIST. STAIR #2

EX. 101EX. 101

HOLDROOM A13

A2680A2680

HOLDROOM A11

A2660A2660

HOLDROOM A14

A2690A2690

HOLDROOM A12

A2670A2670

HOLDROOM A10

A2600A2600

HOLDROOM A15

A2700A2700

E

JW

-0

E

JF

-0

E

JW

-0

EJF-01

EJW-01

VERTICAL

EEJ-02

VERTICAL

EEJ-02

46' - 0" 50' - 0" 91' - 8" 50' - 0"

50' - 0" 44' - 0" 50' - 0"

26' - 4" 80' - 0"

3' - 0"

3' - 0"

5' - 10"

DN

D N

15' - 0"

8' - 0"

1'

0"

1'

0"

6"

6"

2 1' - 4 1/2"

/2

18171615141312111098765432

A

B

C

D

A312

A312

A312 xA xB xC xD xE xF xG xH xI xJ xK x1 x2 x3 x4 x5 x6

A310

A311

A311

A310

A14

A16

A12 A10

EXISTING

A8

A11

A13

A15

EXISTING

A5

P A

R T

A P

A R

T B

P A

R T

A P

A R

T B

CORRIDOR

A2650A2650

UNFINISHED FUTURE

TENANT BUILD OUT

A2720A2720

STAIR 2

A10SA10S

STAIR 4

A13SA13S

ELEV. 3

A6EA6E

STAIR 3

A11SA11S

WOMEN'S RESTROOM

A2654A2654

MEN'S RESTROOM

A2652A2652

JANITOR CLOSET

A2653A2653

FAMILY RESTROOM

A2651A2651

MOTHER'S ROOM

A2655A2655

STAIR 1

A14SA14S

ELEV. 1

A4EA4E

STAIR 5

A12SA12S

MECH.

A2631A2631

ELEC.

A2634A2634

CORRIDOR

A2633A2633

ELEV. 2

A3EA3E

UNFINISHED FUTURE

TENANT BUILD OUT

A2620A2620

HOLDROOM A16

A2710A2710

HOLDROOM A16

A2710A2710

ELEV. 4

A5EA5E

PLAN

NORTH

HOLDROOM A10

A2600A2600

HOLDROOM A15

A2700A2700

HOLDROOM A13

A2680A2680

HOLDROOM A11

A2660A2660

HOLDROOM A12

A2670A2670

HOLDROOM A14

A2690A2690

CORRIDOR

A2632A2632

CORRIDOR

A2671A2671

CORRIDOR

A2691A2691

CORRIDOR

A2681A2681

CORRIDOR

A2601A2601

CHASE

A2659A2659

CHASE

A2656A2656

CHASE

A2657A2657

CHASE

A2658A2658

E

JW

-0

E

JF

-0

E

JW

-0

EJF-01

EJW-01

VERTICAL

EEJ-02

VERTICAL

EEJ-02

F E

C F

E C

FEC

FEC

F E

C

F E

C

F E

C

A3203' - 0"

3' - 0"

22' - 0"

RFI-155.3

RFI-155.2

6' - 11 3/8" 5' - 5 1/8"

11' - 7 1/2" 12' - 4 1/2"

A650

DN

D N

60' - 3 5/16" 22' - 0" 47' - 0"

COMPLY WITH ALL REQUIREMENTS INCLUDED IN THE “GENERAL

NOTES FOR NEW CONSTRUCTION FLOOR PLANS" ON SHEET

A001.

GATE IDENTIFICATION NUMBERS

KEY PAD

SEE "KEYNOTES" LEGEND ON THIS SHEET.

DOOR DESIGNATION (SEE SHEET A901, AND PROJECT

MANUAL FOR DOOR, FRAME AND HARDWARE SCHEDULE)

EXTERIOR WINDOW DESIGNATION (SEE SHEET A901

FOR EXTERIOR WINDOW SCHEDULE)

WALL DESIGNATION (SEE SHEET G011 FOR TYPES OF WALLS/

PARTITIONS/ BARRIERS)

KP

00 000.00

AXXEXISTING TYPE A - 1 HOUR FIRE BARRIERS TO REMAIN

EXISTING TYPE N - NON-RATED PARTITION TO REMAIN

TYPE A - 1 HOUR FIRE BARRIERS

TYPE N - NON-RATED PARTITION

SEE PROJECT INFORMATION SHEET G011 FOR

COMPONENTS OF WALLS/ PARTITIONS/ BARRIERS

ACCESSIBLE ACC

1i

A00

ACCESS PANEL

CARD READER

ELECTRIC WATER COOLER

ELECTRICAL PANEL

EXPANSION JOINT

FIRE EXTINGUISHER

FIRE HOSE CABINET

FIRE HOSE CABINET WITH FIRE EXTINGUISHER

AP

CR

EWC

EP

EXJ

FE

FHC

FHC W/ FE

D ra w n B y

C h e c k e d B y

A p p ro v e d B y

DATE:

PROJECT:

G S & P R

G R E S H A M S M I T H A N D P A R T N E R S

Design Services For The Built

Environment

LINE IS 3 INCHES WHEN PRINTED FULL SIZE

FULL SHEET SIZE = 30"X42"

www.greshamsmith.com

10 South 6th Street Suite 100

Richmond, VA 23219

These Record Documents have been prepared based on information provided by others.

Gresham Smith has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by the contractor, owner or others. Those relying on this Record Document are advised to obtain independent verification of its accuracy.

RECORD DRAWINGS

/1

/2

:5 :5

P

M B

IM

/4 .0

R

IC

C o n co u rs e E x p a n si o n R

/4

A R C H

.r v t

LEVEL 2 - NEW

CONSTRUCTION PLAN &

DIMENSION PLAN

A202 41477.06

AUGUST 27, 2021

A u th o r

C h e ck e r

A p p ro v e r

C o n co u rs e A

E x te n si o n

R ic h m o n d I n te rn a ti o n a l A ir p o rt

R ic h a rd

E B y rd

T e rm in a l D r

R ic h m o n d V A

IF

B

-2

0' 48'32'16'8' 1/16" = 1'-0"

LEVEL 2 - DIMENSION PLAN

0' 48'32'16'8' 1/16" = 1'-0"

LEVEL 2 - NEW CONSTRUCTION PLAN

KEY PLAN

CONCOURSE A

FLOOR PLAN LEGEND

PLAN

NORTH

Revision

No. Date Description

09/10/18 ISSUE FOR

CONSTRUCTION

1 04/12/19 ASI #05

2 5/27/20 PR #11

3 8/27/21 RECORD

DRAWING

EXHIBIT R

ID Task Name Duration Start Finish 0 Consolidated Checkpoint Project - Execution Plan 796 days 7/30/2026 8/16/2029 1 Procurement - Design Consultant 95 days 7/30/2026 11/1/2026 2 Consultant RFP 33 days 7/30/2026 8/31/2026 3 Consultant Selection 11 days 9/1/2026 9/11/2026 4 Board Approval 1 day 10/27/2026 10/27/2026 5 Design Contract Execution 5 days 10/28/2026 11/1/2026 6 Procurement - CMAR (Contractor) 173 days 8/28/2026 2/16/2027 7 CMAR RFQ 31 days 8/28/2026 9/27/2026 8 CMAR Shortlisting 14 days 9/28/2026 10/11/2026 9 CMAR RFP 30 days 10/12/2026 11/10/2026 10 CMAR Selection 21 days 11/11/2026 12/1/2026 11 Board Approval 1 day 1/26/2027 1/26/2027 12 CMAR Contract Execution 21 days 1/27/2027 2/16/2027 13 Design Schedule 390 days 11/2/2026 11/26/2027 14 Enabling Projects Design 90 days 11/2/2026 1/30/2027 15 Checkpoint Design 300 days 1/31/2027 11/26/2027 16 Construction Schedule 900 days 3/1/2027 8/16/2029 17 Enabling Projects Construction 120 days 3/1/2027 6/28/2027 18 Phase 1 Checkpoint 480 days 6/29/2027 10/20/2028 19 Checkpoint Construction (Shell + 7 Lanes) 390 days 6/29/2027 7/22/2028 20 Old Checkpoint A Demo 90 days 7/23/2028 10/20/2028 21 Atrium Concessions 120 days 7/1/2027 10/28/2027 22 2nd Floor Shell Space 120 days 7/1/2027 10/28/2027 23 1st Floor Shell Space 120 days 7/1/2027 10/28/2027 24 Phase 2 Checkpoint 390 days 7/23/2028 8/16/2029 25 Checkpoint Construction (7 Lanes) 270 days 7/23/2028 4/18/2029 26 Old Checkpoint B Demo 90 days 4/19/2029 7/17/2029 27 Mezzanine Finishes 180 days 7/23/2028 1/18/2029 28 1st Floor Finishes 120 days 4/19/2029 8/16/2029

Consultant RFP Consultant Selection

10/27 Design Contract Execution

CMAR RFQ

CMAR Shortlisting

CMAR RFP

CMAR Selection

1/26 CMAR Contract Execution

Enabling Projects Design Checkpoint Design

Enabling Projects Construction

Checkpoint Construction (Shell + 7 Lanes) Old Checkpoint A Demo

2nd Floor Shell Space 1st Floor Shell Space

Checkpoint Construction (7 Lanes) Old Checkpoint B Demo

Mezzanine Finishes 1st Floor Finishes

Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Project: Consolidated Checkpo Date: 10/8/2026

This Timeline is the current proposed execution plan and is subject to change.

Exhibit SU

File details come from the government source that posted it. Updated .