This document consists of exhibits and supporting materials for RFP 27-1004 related to Richmond International Airport's concessions and terminal expansion project. The exhibits include location maps, security screening configurations, revenue analysis, passenger demographics and activity data, air service networks, regional market information, and architectural floor plans for Concourse A expansion. The project involves the development of multiple concession spaces across three packages, including food and beverage venues, retail shops, and premium passenger amenities, with proposed concepts ranging from Wolfgang Puck and Hardywood Craft Brewery to Virginia Marketplace and international dining options. A consolidated TSA security checkpoint is planned, moving concessions from pre-security to post-security locations. The project execution timeline, detailed in Exhibit R, spans from July 2026 through August 2029, encompassing procurement of design and construction management at risk (CMAR) services, design phases, and phased construction across two checkpoint phases with concurrent concessions and shell space buildout.
The concessions program identifies approximately $26.7 million in fiscal year 2026 gross revenue, with 45.3 percent attributed to food and beverage and 54.7 percent to retail operations. The airport serves nearly five million annual passengers and is positioned within a region experiencing above-average growth. Multiple spaces totaling approximately 50,000 square feet are designated for existing, new, and proposed concession concepts, with additional spaces (B, C, D) reserved for future growth and sponsored passenger amenities. The project includes a central dining hall and common-use lounge, with detailed architectural plans showing holdrooms, corridors, mechanical systems, and accessibility features throughout the expanded concourse.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONNECTING OUR REGION.
GROWING OPPORTUNITIES.
EXHIBIT A – COMMON-USE
PASSENGER LOUNGE LOCATION MAP
Premium Passenger Amenity Opportunity in Concourse A
EXHIBIT B – EXISTING TSA
SECURITY SCREENING CONFIGURATION
2 TSA Screening Checkpoints and a Large Portion of the Concessions Program Located Pre-Security
EXHIBIT C – FUTURE CONSOLIDATED
SECURITY SCREENING CONFIGURATION
Consolidated TSA Screening Checkpoint Conceptual Layout Moving All Concessions Post-Security
$11,131,458.00 $11,587,630.00 $12,088,683.00 $11,881,390.00 $13,454,327.00 $13,330,997.00
GROWING OPPORTUNITIES.
EXHIBIT D – GROSS REVENUE ANALYSIS
Gross Revenue
EXHIBIT E – PASSENGER ACTIVITY
BY AIRLINE AND CONCOURSE
Delivering World Class Customer Experience and Operational Excellence
EXHIBIT F – PASSENGER SNAPSHOT
Demographics – Q1 2026
EXHIBIT G – PASSENGER GROWTH TRENDS
(NEARLY FIVE MILLION ANNUAL PASSENGERS)
RIC Passengers (Millions Enplaned Plus Deplaned)
EXHIBIT H – AIRPORT GROWTH AND MARKET POSITION
CUN
SJU
ATL
BOS
CLT
ORD
DFW
DEN
IAH
MIA
BNA
EWR
PHL
DTW
FLL
IAD
MDW
MSY
CHS
JAX
SFO
LAS
PVD
PHX
MSP
LAX
RSW
BWI
SRQ
ISP
SFB
MCO
PBI
JFK
LGA
PIE
TPA
HVN
BDL
CONNECTING OUR REGION.
EXHIBIT I – NONSTOP AIR SERVICE NETWORK
EXHIBIT J – REGIONAL POPULATION
GROWTH INDICATORS
Counties Surrounding Richmond are Experiencing Above-Average Growth, Outpacing Other Large Virginia Metro Areas
EXHIBIT K – RICHMOND REGIONAL
TOURISM MARKET OVERVIEW
Tourism Investment Drives Visitors, Fuels Our Economy, and Increases Passenger Traffic at Richmond International Airport
EXHIBIT L – HIGHER EDUCATION MARKET OVERVIEW
EXHIBIT N – MAJOR REGIONAL
INVESTMENT ANNOUNCEMENT
FY26 GROSS REVENUE BY LOCATION
(Note: Revenue Not Audited by 3rd Party)
$26.7M $12.1M(45.3%) $14.6M(54.7%)
Exhibit O
RICHMOND INTERNATIONAL AIRPORT
Concessions Map (Existing, New, & Proposed)
1 2
12 13
18 19 A
B D C
FUTURE PROGRAM OVERVIEW
PROPELLING REGIONAL PROSPERITY BY DELIVERING WORLD-CLASS CUSTOMER EXPERIENCE AND OPERATIONAL EXCELLENCE.
Spaces B, C and D have been reserved for future concession growth while providing opportunities for sponsored passenger amenities in the interim.
Full Map Key on next Common Exhibit T
Additional Spaces:
A Common Use Lounge B Sponsorship / Activation Opportunity C Commission Sponsorship / Activation Opportunity D Sponsorship / Activation Opportunity
20 Central Dining Hall / Commission Operated
Exhibit P
FUTURE PROGRAM OVERVIEW
Spaces B, C and D have been reserved for future concession growth while providing opportunities for sponsored passenger amenities in the interim.
RICHMOND INTERNATIONAL AIRPORT
Concessions Map (Existing, New, & Proposed)
PROPELLING REGIONAL PROSPERITY BY DELIVERING WORLD-CLASS CUSTOMER EXPERIENCE AND OPERATIONAL EXCELLENCE.
Space # Concept Approx. SF Status Existing Concept 1 Wolfgang Puck, Bar + Bites 2820 New (Coming Soon) 2 Homegrown 918 New (Coming Soon) 3 Beet Box 1217 New (Coming Soon) 4 1A Craft Brewery w/Mexican, Tex Mex or BBQ 2200 Proposed Concept Pk1 - 1A Cross Grains - Con A 5 Hudson - March 2030 1437 Current Retail 6 2A Neighborhood Café 356 Proposed Concept Pk2 - 2A Ironclad - Con A 7 2B Virginia Marketplace 1620 Proposed Concept Pk2 -2B 8 2C Virginia Travel Essentials 1240 Proposed Concept Pk2 - 2C 9 1B Premium Burger House 1600 Proposed Concept Pk1 - 1B
10 1C Signature Wine & Chef's Table 2925 Proposed Concept Pk1 - 1C 11 1D National Coffee House 2000 Proposed Concept Pk1 - 1D 12 1E Premium Chicken Eatery 1600 Proposed Concept Pk1 - 1E 13 2D International Marketplace 1620 Proposed Concept Pk2 - 2D 14 2E International Travel Essentials 1240 Proposed Concept Pk2 - 2E 15 3A National Brand Partnership 1620 Proposed Concept Pk3 - 3A Samuel Adams & Chee Burger - Con B 16 Hudson - March 2030 1227 Current Retail 17 2F Express Café 845 Proposed Concept Pk2 - 2F 18 Hardywood Craft Brewery 3396 New (Coming Soon) Club Level Grill - Con B 19 Hudson, Tech On the GO 1223 Current Retail
A 3300
Reserved for Future Concessions Development Excluded from Current Concessions Program. Future development based on passenger enplanement levels.
Common Use Lounge
B Sponsorship / Activation Opportunity 1880 C Commission Sponsorship / Activation Opportunity 4800 D Sponsorship / Activation Opportunity 1880 E Central Dining Hall / Commission Operated 7500
UP
UP
UPUP
UP
F D
F D
UP
UP
UP
UP
UP
UP
UP
UP
UPUPUPUPUPUPUPUPUPUP
UPUPUPUP
18171615141312111098765432
A
B
C
D
R 55' - 0" xA xB xC xD xE xF xG xH xI xJ xK x1 x2 x3 x4 x5 x6
P A
R T
A P
A R
T B
/4
23' - 11 1/2" 109' - 7 3/4" 7' - 11" 4' - 10 3/8"
108' - 9 1/4"
STAIR 4
A13SA13S
ELEV. 3
A6EA6E
STAIR 1
A14SA14S
UNFINISHED FUTURE
TENANT BUILD OUT
A2720A2720
CORRIDOR
A2650A2650
CORRIDOR
A2633A2633
STAIR 3
A11SA11S
STAIR 2
A10SA10S
ELEV. 1
A4EA4E
WOMEN'S RESTROOM
A2654A2654
MEN'S RESTROOM
A2652A2652
JANITOR CLOSET
A2653A2653
FAMILY RESTROOM
A2651A2651
MOTHER'S ROOM
A2655A2655
P A
R T
A P
A R
T B
A14
A16
A12 A10
A11
A13
A15
EXISTING
A5
MECH.
A2631A2631
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 32' - 0" 22' - 0" 14' - 0" 28' - 0"
PLAN
NORTH
UNFINISHED FUTURE
TENANT BUILD OUT
A2620A2620
EXISTING
A8
CORRIDOR
A2691A2691
CORRIDOR
A2671A2671
STAIR 5
A12SA12S
CORRIDOR
A2681A2681
ELEV. 4
A5EA5E
ELEC.
A2634A2634
ELEV. 2
A3EA3E
CORRIDOR
A2632A2632
HOLDROOM A16
A2710A2710
CORRIDOR
A2601A2601
EXIST. STAIR #2
EX. 101EX. 101
HOLDROOM A13
A2680A2680
HOLDROOM A11
A2660A2660
HOLDROOM A14
A2690A2690
HOLDROOM A12
A2670A2670
HOLDROOM A10
A2600A2600
HOLDROOM A15
A2700A2700
E
JW
-0
E
JF
-0
E
JW
-0
EJF-01
EJW-01
VERTICAL
EEJ-02
VERTICAL
EEJ-02
46' - 0" 50' - 0" 91' - 8" 50' - 0"
50' - 0" 44' - 0" 50' - 0"
26' - 4" 80' - 0"
3' - 0"
3' - 0"
5' - 10"
DN
D N
15' - 0"
8' - 0"
1'
0"
1'
0"
6"
6"
2 1' - 4 1/2"
/2
18171615141312111098765432
A
B
C
D
A312
A312
A312 xA xB xC xD xE xF xG xH xI xJ xK x1 x2 x3 x4 x5 x6
A310
A311
A311
A310
A14
A16
A12 A10
EXISTING
A8
A11
A13
A15
EXISTING
A5
P A
R T
A P
A R
T B
P A
R T
A P
A R
T B
CORRIDOR
A2650A2650
UNFINISHED FUTURE
TENANT BUILD OUT
A2720A2720
STAIR 2
A10SA10S
STAIR 4
A13SA13S
ELEV. 3
A6EA6E
STAIR 3
A11SA11S
WOMEN'S RESTROOM
A2654A2654
MEN'S RESTROOM
A2652A2652
JANITOR CLOSET
A2653A2653
FAMILY RESTROOM
A2651A2651
MOTHER'S ROOM
A2655A2655
STAIR 1
A14SA14S
ELEV. 1
A4EA4E
STAIR 5
A12SA12S
MECH.
A2631A2631
ELEC.
A2634A2634
CORRIDOR
A2633A2633
ELEV. 2
A3EA3E
UNFINISHED FUTURE
TENANT BUILD OUT
A2620A2620
HOLDROOM A16
A2710A2710
HOLDROOM A16
A2710A2710
ELEV. 4
A5EA5E
PLAN
NORTH
HOLDROOM A10
A2600A2600
HOLDROOM A15
A2700A2700
HOLDROOM A13
A2680A2680
HOLDROOM A11
A2660A2660
HOLDROOM A12
A2670A2670
HOLDROOM A14
A2690A2690
CORRIDOR
A2632A2632
CORRIDOR
A2671A2671
CORRIDOR
A2691A2691
CORRIDOR
A2681A2681
CORRIDOR
A2601A2601
CHASE
A2659A2659
CHASE
A2656A2656
CHASE
A2657A2657
CHASE
A2658A2658
E
JW
-0
E
JF
-0
E
JW
-0
EJF-01
EJW-01
VERTICAL
EEJ-02
VERTICAL
EEJ-02
F E
C F
E C
FEC
FEC
F E
C
F E
C
F E
C
A3203' - 0"
3' - 0"
22' - 0"
RFI-155.3
RFI-155.2
6' - 11 3/8" 5' - 5 1/8"
11' - 7 1/2" 12' - 4 1/2"
A650
DN
D N
60' - 3 5/16" 22' - 0" 47' - 0"
COMPLY WITH ALL REQUIREMENTS INCLUDED IN THE “GENERAL
NOTES FOR NEW CONSTRUCTION FLOOR PLANS" ON SHEET
A001.
GATE IDENTIFICATION NUMBERS
KEY PAD
SEE "KEYNOTES" LEGEND ON THIS SHEET.
DOOR DESIGNATION (SEE SHEET A901, AND PROJECT
MANUAL FOR DOOR, FRAME AND HARDWARE SCHEDULE)
EXTERIOR WINDOW DESIGNATION (SEE SHEET A901
FOR EXTERIOR WINDOW SCHEDULE)
WALL DESIGNATION (SEE SHEET G011 FOR TYPES OF WALLS/
PARTITIONS/ BARRIERS)
KP
00 000.00
AXXEXISTING TYPE A - 1 HOUR FIRE BARRIERS TO REMAIN
EXISTING TYPE N - NON-RATED PARTITION TO REMAIN
TYPE A - 1 HOUR FIRE BARRIERS
TYPE N - NON-RATED PARTITION
SEE PROJECT INFORMATION SHEET G011 FOR
COMPONENTS OF WALLS/ PARTITIONS/ BARRIERS
ACCESSIBLE ACC
1i
A00
ACCESS PANEL
CARD READER
ELECTRIC WATER COOLER
ELECTRICAL PANEL
EXPANSION JOINT
FIRE EXTINGUISHER
FIRE HOSE CABINET
FIRE HOSE CABINET WITH FIRE EXTINGUISHER
AP
CR
EWC
EP
EXJ
FE
FHC
FHC W/ FE
D ra w n B y
C h e c k e d B y
A p p ro v e d B y
DATE:
PROJECT:
G S & P R
G R E S H A M S M I T H A N D P A R T N E R S
Design Services For The Built
Environment
LINE IS 3 INCHES WHEN PRINTED FULL SIZE
FULL SHEET SIZE = 30"X42"
www.greshamsmith.com
10 South 6th Street Suite 100
Richmond, VA 23219
These Record Documents have been prepared based on information provided by others.
Gresham Smith has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by the contractor, owner or others. Those relying on this Record Document are advised to obtain independent verification of its accuracy.
RECORD DRAWINGS
/1
/2
:5 :5
P
M B
IM
/4 .0
R
IC
C o n co u rs e E x p a n si o n R
/4
A R C H
.r v t
LEVEL 2 - NEW
CONSTRUCTION PLAN &
DIMENSION PLAN
A202 41477.06
AUGUST 27, 2021
A u th o r
C h e ck e r
A p p ro v e r
C o n co u rs e A
E x te n si o n
R ic h m o n d I n te rn a ti o n a l A ir p o rt
R ic h a rd
E B y rd
T e rm in a l D r
R ic h m o n d V A
IF
B
-2
0' 48'32'16'8' 1/16" = 1'-0"
LEVEL 2 - DIMENSION PLAN
0' 48'32'16'8' 1/16" = 1'-0"
LEVEL 2 - NEW CONSTRUCTION PLAN
KEY PLAN
CONCOURSE A
FLOOR PLAN LEGEND
PLAN
NORTH
Revision
No. Date Description
09/10/18 ISSUE FOR
CONSTRUCTION
1 04/12/19 ASI #05
2 5/27/20 PR #11
3 8/27/21 RECORD
DRAWING
EXHIBIT R
ID Task Name Duration Start Finish 0 Consolidated Checkpoint Project - Execution Plan 796 days 7/30/2026 8/16/2029 1 Procurement - Design Consultant 95 days 7/30/2026 11/1/2026 2 Consultant RFP 33 days 7/30/2026 8/31/2026 3 Consultant Selection 11 days 9/1/2026 9/11/2026 4 Board Approval 1 day 10/27/2026 10/27/2026 5 Design Contract Execution 5 days 10/28/2026 11/1/2026 6 Procurement - CMAR (Contractor) 173 days 8/28/2026 2/16/2027 7 CMAR RFQ 31 days 8/28/2026 9/27/2026 8 CMAR Shortlisting 14 days 9/28/2026 10/11/2026 9 CMAR RFP 30 days 10/12/2026 11/10/2026 10 CMAR Selection 21 days 11/11/2026 12/1/2026 11 Board Approval 1 day 1/26/2027 1/26/2027 12 CMAR Contract Execution 21 days 1/27/2027 2/16/2027 13 Design Schedule 390 days 11/2/2026 11/26/2027 14 Enabling Projects Design 90 days 11/2/2026 1/30/2027 15 Checkpoint Design 300 days 1/31/2027 11/26/2027 16 Construction Schedule 900 days 3/1/2027 8/16/2029 17 Enabling Projects Construction 120 days 3/1/2027 6/28/2027 18 Phase 1 Checkpoint 480 days 6/29/2027 10/20/2028 19 Checkpoint Construction (Shell + 7 Lanes) 390 days 6/29/2027 7/22/2028 20 Old Checkpoint A Demo 90 days 7/23/2028 10/20/2028 21 Atrium Concessions 120 days 7/1/2027 10/28/2027 22 2nd Floor Shell Space 120 days 7/1/2027 10/28/2027 23 1st Floor Shell Space 120 days 7/1/2027 10/28/2027 24 Phase 2 Checkpoint 390 days 7/23/2028 8/16/2029 25 Checkpoint Construction (7 Lanes) 270 days 7/23/2028 4/18/2029 26 Old Checkpoint B Demo 90 days 4/19/2029 7/17/2029 27 Mezzanine Finishes 180 days 7/23/2028 1/18/2029 28 1st Floor Finishes 120 days 4/19/2029 8/16/2029
Consultant RFP Consultant Selection
10/27 Design Contract Execution
CMAR RFQ
CMAR Shortlisting
CMAR RFP
CMAR Selection
1/26 CMAR Contract Execution
Enabling Projects Design Checkpoint Design
Enabling Projects Construction
Checkpoint Construction (Shell + 7 Lanes) Old Checkpoint A Demo
2nd Floor Shell Space 1st Floor Shell Space
Checkpoint Construction (7 Lanes) Old Checkpoint B Demo
Mezzanine Finishes 1st Floor Finishes
Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Project: Consolidated Checkpo Date: 10/8/2026
This Timeline is the current proposed execution plan and is subject to change.
Exhibit SU
File details come from the government source that posted it. Updated .