RFP 27-1004 Common-Use Passenger Lounge.pdf
PDF 842 KB Posted
- Attached to
- RFP 27-1004, RIC Common-Use Passenger Lounge
- Solicitation number
- RFP-132009
- Issued by
- Roanoke City, Virginia
About this file
RFP 27-1004 Common-Use Passenger Lounge Summary
This Request for Proposal (RFP) document, issued by a state or local transportation authority, solicits proposals for the design, construction, and operation of a common-use passenger lounge facility. The project seeks to establish a modern passenger amenity space that will serve multiple transportation operators and their customers. Prospective bidders are required to submit comprehensive proposals addressing facility design standards, operational procedures, staffing requirements, and maintenance protocols. The RFP establishes specific submission deadlines and evaluation criteria for proposal review. Site visits and pre-bid conferences are made available to interested parties to familiarize bidders with project requirements and site conditions. The contract will be awarded to the qualified bidder whose proposal best meets the stated evaluation criteria, with the initial contract term and any renewal or extension options specified within the solicitation documents.
The RFP establishes pricing structures and payment terms for the design, construction, and ongoing operational phases of the passenger lounge facility. Bidders must provide detailed cost breakdowns, including capital expenditures for construction and equipment, as well as annual operating and maintenance costs. The procurement may include specific small business set-asides or participation requirements as outlined in the solicitation. Funding for the project is derived from the issuing agency's budget or dedicated transportation revenue sources. Additional considerations include facility management expectations, service level agreements, accessibility compliance with applicable regulations, and performance metrics that will govern the contractor's operational responsibilities throughout the contract period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | 1
Common-Use
Passenger Lounge
Program Capital Region Airport Commission
Richmond International Airport
Request for Proposals
#27-1004
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 2
This public body does not discriminate against faith-based organizations, bidders, or offerors because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state or federal laws relating to discrimination.
Common-Use
Passenger Lounge
Capital Region Airport Commission
Request for Proposals (RFP)
November 19, 2026 | #27-1004
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 3
Table of Contents
Procurement Schedule
Common-Use Passenger Lounge ....................................................................... Error! Bookmark not defined.
I. Solicitation Overview
A. Background
B. Purpose
C. Program Goals
D. Richmond and Virginia Sense of Place
E. Strategic Collaborative Relationship Expectations
II. Contact with the Capital Region Airport Commission
III. Questions, Pre-Proposal Conference and Site Tour, and Proposal Submission
A. Questions
B. Pre-Proposal Conference and Site Tour
C. Proposal Submission
1. Electronic Submission
2. Paper Submission
3. Proposal Validity
IV. Scope of Services
A. General Scope
B. Initial Operating Environment
C. Future Operating Environment
D. General Operator Responsibilities
E. Queue Management and Passenger Circulation
F. Passenger Experience Expectations
G. Richmond and Virginia Sense of Place
H. Innovation and Technology
I. Continuous Improvement
J. Design, Development, and Construction Requirements
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 4
K. Architectural Vision and Guest Environment
L. Food and Beverage Program
M. Hours of Operation
N. Staffing and Training
O. Customer Experience Standards
P. Technology Requirements
Q. Sustainability
R. Maintenance and Housekeeping
S. Security and Airport Operations
T. Performance Standards and Operational Excellence
U. Marketing, Community Engagement, and Sense of Place
V. Required Capital Refresh and Reinvestment
W. Central Receiving and Distribution Center (CRDC)
X. Lounge Exclusivity and Reservation of Rights
V. Proposal Requirements
A. General Proposal Requirements
B. Proposal Organization
Tab A – Executive Summary and Responsible Party
Tab B – Qualifications and Relevant Experience
Tab C – Financial Qualifications and Commercial Proposal
Tab D – Lounge Concept and Guest Experience
Tab E – Design Concept and Architectural Renderings
Tab F – Operations, Staffing, and Technology Plan
Tab G – Marketing, Community Engagement, and Strategic Collaborations
Tab H – Transition and Implementation Plan
Tab I – Exceptions to the Solicitation
Tab J – Required Forms and Certifications
C. Proposal Format
VI. Evaluation Criteria
VII. Proposal Award and Contract Formation
A. Award of Contract
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 5
B. Notice of Intent to Award
C. Contract Negotiation and Execution
D. Failure to Execute Agreement
E. Reservation of Rights
VIII. DBE/SBE and ACDBE Participation
A. Commission Policy
B. Current Regulatory Context
C. Participation Goals
D. Small-Business Participation Requirements
E. Certification, Monitoring, and Agreement Requirements
IX. General Terms and Conditions
A. Applicable Laws and Courts
B. Announcement of Award
C. Antitrust
D. Assignment of Contract
E. Anti-Discrimination
F. Cancellation of Contract
G. Clarification of Terms
H. Default
I. Debarment Status
J. Ethics in Public Contracting
K. Indemnification of the Commission
L. Immigration Reform and Control Act of 1986
M. Insurance Requirements
N. Qualifications of Offerors
O. Drug-Free Workplace
P. Contractor's Authorization to Transact Business
Q. FAA Required Contract Provisions
R. Title VI Solicitation Notice
S. Trade Restriction Certification
T. Precedence of Terms
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 6
X. Special Terms and Conditions
A. Familiarity with Project Requirements
B. Tax Exemption Status
C. Changes in the Contract
D. Term of Agreement
E. Subcontractors
F. Proposal Acceptance
G. Offeror Contact Information
H. Agreement Review and Contracting Expectations
I. Proprietary Information
J. Airport-Wide Beverage Program and Pouring Rights Reservation
K. Airport-Wide Concessions Marketing and Promotion Program
L. Future Airport Development and Operational Changes
M. Confidentiality
N. Federal or State Funding Requirements
XI. Attachments, Exhibits, and Incorporated Documents
Attachments
Exhibits
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 7
Procurement Schedule
Title
Common-Use Passenger Lounge
Issue Date
Thursday, November 19, 2026
RFP Number
27-1004
Issuing Agency
1 Richard E. Byrd Terminal Drive, Suite C
Richmond, VA 23250
Site Tour Pre-Registration Deadline
Thursday, December 3, 2026, at 4:00 p.m. EST
Pre-Proposal Conference and Site Tour
Thursday, December 10, 2026, 10:00 a.m.–12:00 p.m. EST
Deadline for Questions
Thursday, December 17, 2026, at 2:00 p.m. EST
Proposals Due
Tuesday, April 13, 2027, at 2:00 p.m. EST
All inquiries should be directed to:
Arquesia S. Haskins, ACE, VCO, VCA
Senior Procurement Specialist
Richmond International Airport ahaskins@flyrichmond.com
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 8
I. Solicitation Overview
The Capital Region Airport Commission (the "Commission") requests proposals from qualified, experienced, financially capable, and hospitality-driven firms (referred to herein as "Offerors") to design, finance, construct, furnish, equip, operate, maintain, and continuously enhance a premium common-use passenger lounge within Concourse A at Richmond International Airport ("RIC" or the "Airport"), pursuant to the terms and conditions set forth in or referred to in this Request for Proposals ("RFP").
The Commission intends to select the proposal that offers the greatest overall value to the Airport, considering passenger experience, hospitality expertise, operational capability, financial strength, innovation, long-term collaborative relationship, financial return, and overall responsiveness to this solicitation.
This RFP is open to all qualified Offerors capable of providing the lounge development, hospitality, concession, and operational services described herein. The Commission reserves the right to reject any or all proposals and reserves the right to decline awarding an agreement to any Offeror. Submission of a proposal does not commit the Commission to enter into an agreement with any Offeror.
RI CHM ON D I N T ERN AT I ONAL A I RP ORT | 8 RI CHM ON D I N T ERN AT I ONAL A I RP ORT | 8
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | 9
A. Background
Richmond International Airport serves as the primary commercial airport for Central Virginia and the greater Richmond metropolitan region. The Airport supports a diverse passenger base that includes business travelers, government personnel, military travelers, university-related travel, leisure passengers, and visitors supporting the region's growing tourism and economic development initiatives.
The Airport currently serves multiple domestic air carriers and continues to pursue strategic air service development opportunities designed to expand passenger traffic, route diversity, and passenger convenience. Richmond International Airport is entering a transformational period of growth, reinvestment, and passenger experience enhancement as it continues to evolve beyond a traditional airport terminal into a hospitality-focused passenger environment.
The Airport is undertaking significant capital improvement initiatives intended to modernize terminal operations, improve passenger circulation, increase post-security dwell time, and elevate the overall customer experience. Among these initiatives is the future Consolidated Security Screening Checkpoint
Project, which is anticipated to significantly enhance passenger movement throughout the terminal and expand long-term commercial opportunities.
Richmond International Airport is owned and operated by the Capital Region Airport Commission, an independent political subdivision of the Commonwealth of Virginia established pursuant to state law. The
Commission serves as the contracting authority for this solicitation.
B. Purpose
The purpose of this solicitation is to select an experienced hospitality operator to design, finance, construct, furnish, equip, operate, and maintain a premium common-use passenger lounge located within Concourse
A at Richmond International Airport.
This solicitation is not intended to procure merely a concession operation. Rather, the Commission seeks a long-term collaborative relationship with a hospitality operator capable of delivering a premium passenger experience while supporting the Airport's evolving commercial strategy, operational objectives, and customer experience initiatives.
The selected Offeror will be expected to develop and operate a sophisticated lounge environment that reflects the culture, hospitality, and character of Richmond and the Commonwealth of Virginia while maintaining the operational standards expected within modern premium airport lounge environments.
C. Program Goals
The Commission views the Common-Use Passenger Lounge as a strategic passenger amenity and an important component of the Airport's long-term commercial development strategy.
The Commission's objectives include, but are not limited to:
• Enhancing the overall passenger experience through premium hospitality services.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 10
• Creating a signature passenger amenity that reflects the character and hospitality of Richmond and the Commonwealth of Virginia.
• Supporting long-term airport growth through a scalable and adaptable lounge concept.
• Increasing passenger satisfaction, comfort, productivity, and wellness while traveling through
Richmond International Airport.
• Encouraging innovation, operational excellence, and continuous reinvestment throughout the term of the Agreement.
• Establishing a collaborative long-term relationship between the Commission and the selected
Operator.
• Supporting future passenger growth associated with terminal improvements and the future
Consolidated Security Screening Checkpoint Project.
D. Richmond and Virginia Sense of Place
The Commission believes the most memorable airport hospitality experiences authentically reflect the communities they serve. Accordingly, the Common-Use Passenger Lounge should celebrate the culture, history, culinary offerings, arts, businesses, and hospitality traditions of Richmond and the Commonwealth of Virginia while delivering a contemporary premium passenger experience.
Offerors are encouraged to demonstrate how regional identity will be incorporated throughout the Lounge experience through architecture, interior design, artwork, food and beverage offerings, technology, programming, collaborations, and customer engagement strategies.
The Commission does not seek a themed environment, but rather an authentic and sophisticated hospitality experience that provides passengers with a memorable first and last impression of the Richmond region.
E. Strategic Collaborative Relationship Expectations
The Commission intends to establish a long-term relationship with an operator that functions as more than a tenant and instead serves as a strategic hospitality collaborator supporting the Airport's broader passenger experience, commercial development, tourism, and community engagement initiatives.
The selected Operator shall collaborate with the Commission to continuously improve operations, enhance customer experience, support regional collaborations, and participate in initiatives that strengthen
Richmond International Airport's position as the region's gateway to the world.
The Commission anticipates conducting periodic business reviews with the selected Operator to evaluate operational performance, customer experience, financial performance, community engagement opportunities, and future development initiatives throughout the term of the Agreement.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 11
II. Contact with the Capital Region Airport
Commission
Except as otherwise expressly authorized herein, from the date this Request for Proposal is issued until a contract is awarded or the solicitation is cancelled, Offerors and their representatives shall not communicate with any Commissioner, officer, employee, consultant, or representative of the Capital Region
Airport Commission regarding this solicitation except through the Senior Procurement Specialist identified herein.
All communications concerning this solicitation, including requests for clarification, interpretation, or additional information, shall be submitted in writing via email to:
Arquesia S. Haskins, ACE, VCO, VCA
Senior Procurement Specialist
Richmond International Airport
Email: ahaskins@flyrichmond.com
Any attempt by an Offeror to contact Commission Commissioners, employees, consultants, evaluation committee members, or other representatives regarding this solicitation outside of the procedures established herein may result in disqualification of the Offeror's Proposal if determined by the Commission to have compromised or attempted to compromise the integrity of the procurement process.
Nothing contained herein shall prohibit Commission staff from communicating with Offerors for administrative purposes, including, but not limited to, confirming receipt of Proposals, requesting clarification of minor administrative matters, scheduling interviews or presentations, coordinating site visits, requesting additional information authorized under the Virginia Public Procurement Act, or conducting negotiations with the highest-ranked Offeror(s) as permitted by law.
All official interpretations, clarifications, modifications, revisions, or changes to this Request for Proposal shall be made only through written Addenda issued by the Commission. Oral statements, discussions, interpretations, explanations, or representations made by any Commission representative shall not be binding upon the Commission and shall not be relied upon by any Offeror in preparing its Proposal.
Offerors are solely responsible for monitoring Virginia's Marketplace (eVA) for the issuance of Addenda and for acknowledging receipt of all Addenda as required by this Request for Proposal.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 12
III. Questions, Pre-Proposal Conference and Site
Tour, and Proposal Submission
A. Questions
Questions regarding this Request for Proposal shall be submitted in writing no later than the date and time identified in the Procurement Schedule, via email to:
Arquesia S. Haskins, ACE, VCO, VCA
Senior Procurement Specialist
Richmond International Airport
Capital Region Airport Commission
Email: ahaskins@flyrichmond.com
Questions received after the established deadline may not be considered.
Responses to questions received by the deadline will be issued by the Commission in the form of a written
Addendum and posted on Virginia's Marketplace (eVA). Any interpretation, clarification, modification, or change to this Request for Proposal shall be made only through written Addenda issued by the Commission.
Oral statements, explanations, interpretations, or information provided by Commission personnel shall not be binding upon the Commission.
Offerors are solely responsible for monitoring Virginia's Marketplace (eVA) and ensuring receipt of all
Addenda issued prior to the Proposal submission deadline.
B. Pre-Proposal Conference and Site Tour
The Commission will conduct one optional Pre-Proposal Conference and Site Tour on Thursday, December
10, 2026, from 10:00 a.m. to 12:00 p.m. EST. The Pre-Proposal Conference will be available for both in-person and virtual participation. The Site Tour will be conducted in person immediately following the conference portion of the event.
Attendance at the Pre-Proposal Conference is optional and open to all interested parties. Advance registration is not required to attend the Pre-Proposal Conference.
In-Person Location: South Conference Room, Richmond International Airport, Second Floor, adjacent to the
South Ticketing Counters.
Virtual Participation – Microsoft Teams
Join Meeting: https://teams.microsoft.com/meet/2479156554499084?p=Y3o4bUr4HsOyCymqEh
Meeting ID: 247 915 655 449 908 4 | Passcode: fb6mf2Yh
Dial-In: +1 321-754-9474 | Phone Conference ID: 884 023 037# https://teams.microsoft.com/meet/2479156554499084?p=Y3o4bUr4HsOyCymqEh
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 13
An optional escorted Site Tour of the proposed Common-Use Passenger Lounge space will be conducted immediately following the Pre-Proposal Conference. Advance registration is required for all Site Tour participants. Offerors wishing to participate shall complete the online pre-registration form no later than
Thursday, December 3, 2026, at 4:00 p.m. EST: https://wkf.ms/4ALhRj6
Due to Airport operational and security considerations, participation in the Site Tour shall be limited to a maximum of four (4) representatives per Offeror. Registration for the Site Tour is not required to attend the
Pre-Proposal Conference.
The Pre-Proposal Conference and Site Tour are intended to provide prospective Offerors with an opportunity to better understand the Commission’s objectives, observe the proposed Common-Use
Passenger Lounge location, evaluate the active Airport operating environment, review passenger circulation and access conditions, assess existing site characteristics, and identify factors that may affect concept development, design, construction, logistics, and operations.
Information discussed during the Pre-Proposal Conference or Site Tour is intended to supplement, but not modify, the requirements of this Request for Proposal. Any interpretation, clarification, modification, or change to the solicitation shall be made only through a written Addendum issued by the Commission. Oral statements, explanations, or interpretations shall not be binding upon the Commission.
No additional individual, private, or appointment-based site visits will be conducted. Offerors remain solely responsible for conducting their own due diligence and for reviewing this Request for Proposal, all attachments, exhibits, Addenda, and other available information necessary to prepare a complete Proposal.
C. Proposal Submission
Offerors may submit their Proposal using one (1) of the following submission methods. Offerors shall not submit both an electronic Proposal through Virginia's Marketplace (eVA) and a paper Proposal. Submission by one method only shall constitute the Offeror's official Proposal.
1. Electronic Submission
Offerors electing to submit electronically shall submit one (1) complete Proposal, including all required forms, certifications, attachments, exhibits, and supporting documentation, through Virginia's Marketplace
(eVA) no later than the Proposal Due Date and Time identified in this Request for Proposal.
Offerors must be registered in eVA to submit an electronic Proposal and are solely responsible for ensuring that their Proposal is successfully uploaded and received through Virginia's Marketplace (eVA) prior to the established submission deadline.
The electronic Proposal shall be submitted through Virginia's Marketplace at https://eva.virginia.gov.
For instructions on submitting an electronic Proposal, Offerors should:
a. Go to www.eva.virginia.gov;
b. Click "I Sell To Virginia";
c. Click "eVA Supplier Training"; and https://wkf.ms/4ALhRj6 https://eva.virginia.gov/ https://eva.virginia.gov/
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 14
d. Select "Viewing and Responding to Solicitations".
Offerors requiring technical assistance with the electronic submission process should contact eVA Customer
Care at 866-289-7367 or by email at eVACustomerCare@dgs.virginia.gov.
Prior to the Proposal Due Date, Offerors should:
• Monitor Virginia's Marketplace (eVA) under Virginia Business Opportunities (VBO) for any updates, amendments, addenda, cancellations, or other solicitation changes;
• Verify that all required forms, attachments, exhibits, amendments, certifications, and supporting documentation have been completed; and
• Upload all required Proposal documents electronically as part of the Offeror’s submission.
Failure to successfully upload and submit a complete Proposal through Virginia's Marketplace (eVA) by the
Proposal Due Date and Time shall be the sole responsibility of the Offeror. The Commission shall not be responsible for incomplete, delayed, or unsuccessful electronic submissions.
2. Paper Submission
Offerors electing to submit a paper Proposal shall submit:
• One (1) original signed hard copy of the complete Proposal; and
• One (1) complete electronic copy of the Proposal on a USB flash drive in searchable PDF format.
The electronic copy shall be identical to the signed hard copy submitted. In the event of any discrepancy between the electronic copy and the signed hard copy, the signed hard copy shall govern.
Paper Proposals shall be sealed and clearly marked with the Request for Proposal number, title, and the
Offeror's name and shall be delivered to:
Arquesia S. Haskins, ACE, VCO, VCA
Senior Procurement Specialist
Richmond International Airport
Capital Region Airport Commission
1 Richard E. Byrd Terminal Drive, Suite C
Richmond, Virginia 23250-2400
The Commission will record the date and time each Proposal is received. Proposals received after the date and time established in this Request for Proposal will not be accepted or evaluated.
Proposals submitted by facsimile, email, or any other electronic means not expressly authorized by this
Request for Proposal will not be accepted.
Offerors are solely responsible for ensuring timely delivery of their Proposal and for submitting a complete
Proposal in accordance with the requirements of this Request for Proposal.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 15
3. Proposal Validity
Proposals shall remain valid for one hundred twenty (120) calendar days following the Proposal Due Date unless otherwise agreed in writing by the Commission and the Offeror.
IV. Scope of Services
A. General Scope
The Capital Region Airport Commission ("Commission") is seeking a qualified, experienced, and financially capable hospitality operator to develop and operate a premium Common-Use Passenger Lounge within
Richmond International Airport ("RIC" or the "Airport").
The selected Offeror shall be responsible for the complete planning, design, financing, permitting, construction, furnishing, equipping, staffing, operation, maintenance, and continuous improvement of the
Common-Use Passenger Lounge throughout the term of the Agreement.
The Commission intends to establish a collaborative, long-term relationship with an Operator capable of delivering a premium passenger experience while supporting the Airport's strategic objectives, commercial growth initiatives, and evolving operational environment.
The selected Operator shall provide all labor, supervision, management, equipment, materials, furnishings, technology, licenses, permits, supplies, and services necessary to successfully develop, operate, and maintain the Common-Use Passenger Lounge in accordance with this Request for Proposal and the resulting Agreement.
B. Initial Operating Environment
At the commencement of operations, the Common-Use Passenger Lounge will be located within Concourse
A of Richmond International Airport and will operate within the Airport's existing post-security terminal configuration.
Offerors shall recognize that the Airport is currently undergoing significant capital improvements that will alter passenger circulation, passenger dwell patterns, and operational characteristics over the life of the
Agreement.
Offerors shall demonstrate an operational approach that successfully serves passengers during both the initial operating environment and the Airport's future operational configuration.
C. Future Operating Environment
The Commission anticipates implementing a future Consolidated Security Screening Checkpoint and other terminal improvements intended to enhance passenger circulation, support increased post-security dwell time, and expand commercial opportunities. Exhibit C illustrates the anticipated future security screening configuration. The final configuration, scope, phasing, and completion schedule remain subject to design development, applicable approvals, funding, and construction.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 16
Offerors shall identify the assumptions concerning these improvements used in their operational plans and financial projections and explain how the proposed Lounge will remain viable if implementation is delayed or the anticipated configuration changes. Information concerning future improvements does not constitute a guarantee of completion by a particular date or of passenger volumes, Lounge utilization, or revenues.
The selected Operator shall demonstrate flexibility and operational readiness to adapt to these evolving conditions.
The Commission expects the Common-Use Passenger Lounge concept to remain operationally relevant throughout these changes and to capitalize on increased passenger volumes and evolving customer expectations.
Offerors should describe how their proposed concept can successfully adapt to future operational environments without compromising guest experience or service quality.
D. General Operator Responsibilities
The selected Operator shall, at a minimum:
• Design and develop a premium Common-Use Passenger Lounge concept.
• Finance all required tenant improvements except as otherwise provided by the Commission.
• Obtain all required licenses, permits, and regulatory approvals.
• Coordinate all required design reviews and approvals.
• Construct, furnish, equip, and commission the Lounge.
• Recruit, hire, train, supervise, and retain qualified personnel.
• Operate the Lounge in accordance with all Airport Rules and Regulations.
• Maintain all furniture, fixtures, equipment, technology, and finishes.
• Maintain required insurance throughout the Agreement.
• Provide exceptional customer service at all times.
• Maintain compliance with all applicable federal, state, and local laws.
• Maintain financial records and submit required reports.
• Coordinate regularly with the Commission regarding operational issues, maintenance activities, customer experience initiatives, and future improvements.
E. Queue Management and Passenger Circulation
The Operator shall develop and maintain an effective approach to guest queuing, Lounge access, and passenger circulation that supports efficient Lounge operations without adversely affecting public areas of the Airport.
All guest check-in, queuing, waiting, and other Lounge-related passenger activity shall be managed within the leased premises to the greatest extent practicable and shall not obstruct or interfere with public concourse circulation, passenger movement, gate hold room activity, adjacent concessions, Airport operations, or access to surrounding passenger amenities.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 17
The Operator shall actively manage Lounge capacity and peak-period demand through appropriate operational measures, which may include reservation or waitlist functionality, digital guest notifications, access-control procedures, staffing adjustments, and other customer service strategies designed to minimize congestion and maintain an orderly and positive passenger experience.
The Operator shall coordinate with the Commission regarding any recurring passenger circulation or queuing concerns and shall promptly implement reasonable corrective measures when required by the
Commission.
F. Passenger Experience Expectations
The Common-Use Passenger Lounge shall provide a premium hospitality experience designed to exceed the expectations of today's business and leisure travelers.
Offerors shall propose an operating concept that emphasizes:
• Exceptional customer service.
• Comfortable and flexible seating environments.
• Quiet work areas.
• Technology-enabled guest services.
• Premium food and beverage offerings.
• Efficient guest processing.
• High-quality interior finishes.
• Cleanliness and maintenance.
• Safety and security.
• Accessibility for all passengers.
The Commission encourages Offerors to develop concepts that distinguish Richmond International Airport through thoughtful hospitality rather than excessive luxury.
G. Richmond and Virginia Sense of Place
The Lounge should authentically reflect Richmond and the Commonwealth of Virginia.
Offerors are encouraged to incorporate regional identity through:
• Interior architecture
• Materials
• Digital design integration
• Artwork
• Local artists
• Local culinary collaborations
• Virginia-produced food and beverages
• Regional branding
• Community storytelling
• Cultural programming
• Seasonal offerings
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 18
The Commission encourages authentic integration of regional character rather than themed or novelty-based concepts.
H. Innovation and Technology
The Commission encourages Offerors to incorporate innovative technologies that improve both guest experience and operational efficiency.
Examples include, but are not limited to:
• Digital guest check-in
• Mobile applications
• Self-service technology
• Contactless payment systems
• Guest analytics
• Queue management
• Digital communication platforms
• Smart building technology
• Energy-efficient systems
• Operational reporting tools
Technology should complement, rather than replace, exceptional hospitality.
I. Continuous Improvement
The Commission expects the Common-Use Passenger Lounge to evolve throughout the Agreement.
Accordingly, the selected Operator shall evaluate on an on-going basis:
• Customer satisfaction
• Operational performance
• Food and beverage offerings
• Technology
• Furniture and finishes
• Branding
• Sustainability initiatives
• Service standards
The Commission expects the Operator to periodically refresh and reinvest in the Lounge to maintain a first-class passenger experience throughout the term of the Agreement.
J. Design, Development, and Construction Requirements
The selected Operator shall be responsible for the complete design, financing, permitting, construction, furnishing, equipping, commissioning, and opening of the Common-Use Passenger Lounge.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 19
The Lounge shall be designed as a premium hospitality environment that complements the Airport’s architecture, enhances the passenger experience, and supports the Commission’s long-term commercial vision.
The Lounge opportunity is located post-security within Concourse A at Richmond International Airport. The premises consist of approximately 3,300 square feet and are located directly across from Concourse A
Gate 08, near the newer restrooms and Mother’s Room. The Lounge location is identified in Exhibit A, Common-Use Passenger Lounge Location Map. The final premises boundaries and square footage shall be established in the Commission-approved Lease Outline Drawing (LOD) incorporated into the resulting
Agreement.
The Lounge location benefits from several physical characteristics that distinguish the opportunity within the Airport environment, including elevated ceiling conditions, significant opportunities for natural light, extensive glazing, potential airfield views, adjacency to existing passenger amenities, and strong visibility within the Concourse A passenger circulation path.
The premises are currently delivered in shell condition. The Operator shall be responsible for all tenant improvements, furnishings, fixtures, equipment, technology systems, and operational infrastructure necessary to develop, construct, furnish, equip, and operate the Common-Use Passenger Lounge.
Dimensions, square footage, utility locations, and existing-condition information shown on the Lease
Outline Drawing (LOD), location maps, plans, and other reference materials are provided for general guidance and shall not substitute for independent field verification. The Commission does not warrant the accuracy or completeness of such information. Offerors shall independently verify conditions reasonably observable during the authorized site tour and identify material discrepancies through the solicitation’s written question process.
Before completing design or commencing affected construction, the selected Operator shall, at its expense, field-measure the premises and verify dimensions, utility locations and availability, existing conditions, and other information necessary for its work. The Operator shall promptly notify the Commission in writing of any discrepancy and obtain written resolution before proceeding with affected work. To the extent permitted by law, the Commission shall not be responsible for additional costs, delays, redesign, or corrective work resulting from the Operator’s failure to perform the required verification or from its reliance on drawing errors or omissions that such verification would reasonably have disclosed. Field verification shall not authorize any change to the approved premises boundaries without the Commission’s written approval.
The Operator shall be responsible, at its expense, for the utility infrastructure, connections, distribution systems, and modifications required to serve the Lounge, subject to Commission review and approval. The
Operator shall coordinate proposed utility demands, available capacity, connection locations, metering requirements, and tie-ins with the Commission during design and before commencing the affected work.
Electrical service to the Lounge shall be separately metered, and the Operator shall be responsible for the cost of electricity based on actual consumption. The Operator shall include the required metering
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 20
equipment and installation in its proposed capital investment, subject to Commission-approved specifications.
Water, sewer, solid waste, recycling, and certain shared operational services may be provided through
Airport-wide systems and allocated to the Operator through a cost-recovery methodology established by the Commission and reflected in the resulting Agreement. Offerors shall account for these anticipated expenses in their operating projections and identify any assumptions concerning utility capacity, infrastructure, metering, and shared-service charges.
At a minimum, the Operator shall:
• Develop complete architectural, structural, mechanical, electrical, plumbing, fire protection, technology, and interior design documents.
• Provide two (2) separate, fully operational, code-compliant, accessible, all-gender restrooms located within the Common-Use Passenger Lounge and reserved exclusively for Lounge patrons. Each restroom shall contain approximately seventy-five (75) square feet, subject to final design, code, permitting, and Commission approval.
• Obtain all required permits, approvals, and regulatory authorizations.
• Coordinate all design reviews through the Commission’s designated project representative for review by the applicable Commission departments and consultants.
• Furnish all labor, supervision, equipment, materials, and services necessary for construction.
• Coordinate all work within an active operating commercial airport.
• Maintain safe pedestrian circulation throughout construction.
• Comply with all Airport operational, security, and safety requirements.
• Coordinate all utility connections and tie-ins.
• Provide all furniture, fixtures, equipment (“FF&E”), operating supplies, and technology necessary for commencement of operations.
All construction activities shall be planned and performed in a manner that minimizes disruption to Airport operations, passenger circulation, adjacent tenants and concessionaires, and the traveling public. The
Operator shall coordinate design and construction activities with the Commission throughout the development and construction process.
The Operator shall furnish, install, maintain, and remove temporary construction walls and associated graphics at its expense in accordance with Attachment D, Construction Wall & Customer Engagement
Standard (Effective July 1, 2026). Proposed wall systems, layouts, access points, finishes, and graphics installation shall be subject to Commission review and approval before installation. The Operator may select its supplier, provided the proposed system meets the required standard. The Commission will provide approved graphics artwork, and the Operator shall coordinate production and installation in accordance with Attachment D. Construction walls shall remain clean, secure, and in good condition throughout construction and shall maintain required access, emergency egress, and passenger circulation.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 21
K. Architectural Vision and Guest Environment
The Common-Use Passenger Lounge shall present a modern, sophisticated, welcoming environment consistent with nationally recognized premium airport lounges while reflecting the unique character of
Richmond and the Commonwealth of Virginia.
The Commission encourages Offerors to create a space that balances comfort, productivity, wellness, hospitality, and regional identity through thoughtful architectural design, lighting, finishes, furnishings, acoustics, artwork, and material selections.
Design concepts should promote flexibility and accommodate a variety of passenger needs, including relaxation, business travel, dining, social interaction, and quiet work environments.
L. Food and Beverage Program
The Common-Use Passenger Lounge shall provide a premium food and beverage program consistent with the expectations of today’s premium airline and independent lounge users.
The Lounge shall include an alcoholic beverage program. Offerors shall propose a detailed food and beverage concept describing the anticipated service model, menu approach, food preparation and presentation standards, alcoholic and non-alcoholic beverage offerings, staffing approach, service standards, responsible alcohol service practices, and integration of local and Virginia-produced products.
The Commission intends to provide Offerors flexibility to propose the concept they believe will best support the Lounge experience, subject to all applicable licensing, legal, security, health, safety, and operational requirements.
The proposed food and beverage program should emphasize:
• Freshly prepared menu offerings;
• Seasonal menu rotation;
• Virginia-produced products;
• Local culinary collaborations;
• Beer, wine, spirits, and premium cocktail offerings;
• Local breweries, wineries, and distilleries;
• Specialty coffee and premium non-alcoholic beverages;
• Healthy dining alternatives;
• Dietary accommodations;
• Efficient service delivery; and
• High-quality food and beverage presentation.
Offerors are encouraged to establish collaborative relationships with local chefs, restaurants, food producers, breweries, wineries, distilleries, and other Virginia-based businesses where practical.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 22
All alcoholic beverage service shall be conducted in accordance with applicable laws, regulations, licensing requirements, responsible-service standards, and Commission policies.
M. Hours of Operation
The Common-Use Passenger Lounge shall operate in accordance with Airport operating requirements and passenger demand.
At a minimum, the Lounge shall remain open during all scheduled operating hours established by the
Commission and shall maintain sufficient staffing levels to accommodate passenger demand during peak operating periods, irregular operations, flight delays, holidays, and special events.
The Lounge shall operate seven (7) days per week, 365 days per year, opening to receive passengers no later than one and one-half (1½) hours before the earliest scheduled departure from either Concourse A or
Concourse B and remaining open until thirty (30) minutes after the last actual departure from either concourse.
The Commission reserves the right to require modifications to operating hours based upon passenger activity, airline schedules, terminal operations, or customer service requirements.
N. Staffing and Training
The Operator shall employ sufficient qualified personnel to ensure efficient, professional, and courteous operation of the Common-Use Passenger Lounge.
Employees shall receive ongoing training in:
• Customer service;
• Hospitality standards;
• Food safety;
• Responsible alcohol service;
• Emergency procedures;
• Airport security requirements;
• ADA customer service;
• Cultural awareness and inclusivity; and
• Commission operational policies applicable to concession operations.
The Operator shall maintain staffing levels appropriate to passenger demand at all times. Staffing and training shall meet the requirements of Section 6.02 of the Sample Agreement and the applicable requirements of Attachment C, the RIC Concessions Compliance Standards Manual, including minimum on-duty staffing, qualified management coverage, preassignment customer-service training, and ongoing training. In the event of any inconsistency between the Manual and the Sample Agreement, the Sample
Agreement shall govern.
O. Customer Experience Standards
The Common-Use Passenger Lounge shall consistently deliver an exceptional guest experience emphasizing professionalism, comfort, responsiveness, and hospitality.
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 23
Performance expectations include, but are not limited to:
• Prompt guest service;
• Professional employee appearance;
• Cleanliness throughout the facility;
• Efficient guest check-in;
• Comfortable seating availability;
• High-quality food and beverage presentation;
• Prompt issue resolution;
• Routine facility inspections; and
• On-going monitoring of customer satisfaction.
The Commission may periodically evaluate the Lounge's performance through inspections, customer feedback, operational reviews, and other performance measurement tools.
P. Technology Requirements
The Operator shall provide and maintain technology systems necessary to support efficient Lounge operations. The Operator shall provide and maintain complimentary enterprise-grade high-speed guest wireless internet service through a network independent of RIC’s Wi-Fi network, in accordance with the
Sample Agreement.
Technology may include:
• Guest access control;
• Reservation systems;
• Point-of-sale systems;
• Wireless internet;
• Digital signage;
• Flight information displays;
• Queue management;
• Mobile applications;
• Contactless payment;
• Operational analytics;
• Cybersecurity protections; and
• Future technology enhancements.
Technology systems shall remain compatible with Airport operational requirements.
Q. Sustainability
The Commission encourages environmentally responsible operations throughout the term of the
Agreement.
Offerors should describe initiatives supporting:
• Waste reduction;
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 24
• Recycling;
• Composting;
• Sustainable packaging;
• Water conservation;
• Energy efficiency;
• Local sourcing;
• Environmentally preferred products; and
• Other sustainability initiatives consistent with Airport objectives.
R. Maintenance and Housekeeping
The Operator shall maintain the Common-Use Passenger Lounge in a clean, safe, attractive, and fully operational condition at all times.
The Operator shall be responsible for routine maintenance, housekeeping, repairs, preventative maintenance, replacement of damaged furnishings, and prompt correction of deficiencies.
The Commission may periodically inspect the facility and require corrective action when deficiencies are identified.
S. Security and Airport Operations
The Operator shall comply with all applicable federal, state, local, TSA, FAA, Airport, and Commission security requirements.
Employees requiring access to secure areas shall obtain and maintain all required credentials and successfully complete Airport security training.
Operational activities shall be coordinated with Airport personnel to minimize impacts on Airport operations.
T. Performance Standards and Operational Excellence
The Commission expects the Common-Use Passenger Lounge to remain a premier passenger amenity throughout the term of the Agreement.
The Operator shall evaluate on an on-going basis operational performance and implement improvements where appropriate.
Areas of ongoing evaluation include:
• Customer satisfaction;
• Food and beverage offerings;
• Technology;
• Cleanliness;
• Service delivery;
• Employee performance;
• Facility appearance;
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 25
• Sustainability initiatives;
• Revenue performance; and
• Operational efficiency.
The Commission anticipates periodic business reviews with the Operator to evaluate performance and identify opportunities for continuous improvement as more fully set forth in the Sample Agreement.
U. Marketing, Community Engagement, and Sense of Place
The Operator shall actively support the Airport's brand while creating an authentic Richmond and Virginia hospitality experience.
Offerors are encouraged to collaborate with local organizations, tourism organizations, educational institutions, arts organizations, community groups, and regional businesses to create a Lounge experience that celebrates the region and enhances the Airport's role as the gateway to Central Virginia.
V. Required Capital Refresh and Reinvestment
The Operator shall complete two required capital refresh and reinvestment projects during the fifteen-year
Agreement term. The first shall be completed during Agreement Years Five (5) through Six (6), no later than the end of Agreement Year Six (6). The second shall be completed during Agreement Years Ten (10) through
Eleven (11), no later than the end of Agreement Year Eleven (11).
For each required project, the Operator shall reinvest no less than ten percent (10%) of the Minimum
Required Capital Investment of Two Million Dollars ($2,000,000), for a minimum of Two Hundred Thousand
Dollars ($200,000) per project and a combined minimum of Four Hundred Thousand Dollars ($400,000). A higher proposed, committed, approved, or actual initial capital investment shall not increase either required reinvestment amount. Expenditures credited toward the first required reinvestment shall not also be credited toward the second. Each required reinvestment shall be separate from and in addition to the
Operator’s annual Repair and Maintenance Program requiring expenditures of not less than two and one-half percent (2.5%) of Gross Revenue. Both reinvestment projects shall be completed regardless of the
Operator’s compliance with that program or the continued First-Class Condition of the Premises. Routine maintenance, repairs, and ordinary operating expenses shall not count toward either required reinvestment. No expenditure shall be credited toward more than one of these obligations. Eligible improvements may include furniture, fixtures, finishes, technology, equipment, branding, customer amenities, and other capital improvements approved by the Commission. For each required reinvestment, the Operator shall submit a comprehensive reinvestment plan identifying the proposed scope, itemized budget, funding arrangements, schedule, operational phasing, and measures to maintain passenger service and protect Airport operations. The plan shall be submitted no later than one hundred eighty (180) days prior to the proposed commencement of work to allow Commission review, any required revisions, permitting, procurement, construction, and completion within the required period. The Operator shall not begin work without first obtaining the Commission’s written approval. Submission or approval of a plan shall not, by itself, extend the required completion deadline.
Within ninety (90) days following completion of each project, the Operator shall submit a certified expenditure report documenting the completed improvements and qualifying expenditures, supported by
R I CHM ON D I N T ERN AT I ONAL A I RP ORT | RF P 27 - 10 04 | 26
itemized final costs, invoices, evidence of payment, photographs, warranties, and other records reasonably requested by the Commission. The Commission may audit qualifying expenditures and shall conduct a post-construction inspection. The Operator shall promptly correct identified deficiencies. The reporting period shall not extend the project completion deadline.
W. Central Receiving and Distribution Center (CRDC)
The Capital Region Airport Commission is advancing the development of a Central Receiving and
Distribution Center (“CRDC”) to support Airport concessions and operations, improve delivery coordination, enhance security, and reduce delivery vehicle activity within the terminal environment.
The Commission intends to rehabilitate an existing Airport cargo facility with landside and airside access for this purpose. Implementation is currently anticipated during Spring/Summer 2027, subject to facility readiness and the implementation schedule established by the Commission.
Under the initial operating model, concessionaires shall receive their goods and supplies at the landside portion of the CRDC and retain responsibility for custody and handling throughout the receiving and security-screening process. Security screening shall be performed by the Commission’s designated screening contractor in accordance with applicable requirements. Following screening, concessionaires shall move their goods to dedicated leased storage within the CRDC and shall be responsible for transporting their goods from the CRDC to their respective terminal premises.
Dedicated dry, refrigerated, and frozen storage shall be addressed through the CRDC space-allocation and leasing process, based on operational needs and available capacity. The Operator shall identify its anticipated storage requirements and coordinate the required space and arrangements with the
Commission.
Th…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .