RFP 25_044 General Contractor_ParkingLotExpan.pdf
PDF 330 KB Posted
- Attached to
- RFP 25-044 Parking Lot Expansion
- Solicitation number
- PE-61110-NONST-2025-000000067
- Issued by
- Bibb County, Georgia
About this file
This is a Request for Qualifications and Proposals (RFP) issued by the Board of Public Education for Bibb County, Georgia, seeking a qualified General Contractor to manage the construction of an expansion of the school bus parking area located at 4580 Cavalier Drive, Macon, Georgia. The project scope includes demolition, clearing and grubbing, erosion control, earthwork, storm drainage, curbs and gutters, paving, pavement markings, and grassing. The RFP was released on May 21, 2025, with a pre-bid meeting scheduled for June 18, 2025 at 9:00 AM EST on site. Written questions must be submitted by June 23, 2025 at 9:00 AM EST. Proposals are due on July 1, 2025 at 9:00 AM EST via the Bonfire platform only. Construction must begin by September 8, 2025 and be completed no later than January 5, 2026. The project is structured as a turn-key operation with the General Contractor responsible for comprehensive administration across bidding and award, construction, and warranty phases.
The selection process will utilize a one-stage evaluation conducted by a Selection Committee that will identify a short-list of three firms and may invite them for detailed presentations or interviews. Evaluation will be based on demonstrated qualifications and capabilities using a scoring matrix that weighs base proposal pricing at 25 percent, company overview at 15 percent, related experience at 20 percent, qualified and experienced personnel at 20 percent, and project approach at 20 percent. The General Contractor will be compensated on a cost-plus-fee basis with reimbursement for actual labor and material costs plus a fixed fee for pre-construction services and general conditions and a percentage fee applied to actual construction costs. The selected contractor must provide a 100 percent performance and payment bond. The preliminary construction budget will be determined through the RFP process, and all respondents must submit detailed financial information, safety records, insurance documentation, and references demonstrating prior experience on similar projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cancelled Notice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications and Proposals to provide
General Contractor to the
BOARD OF PUBLIC EDUCATION FOR BIBB COUNTY
484 Mulberry Street
MACON, GA 31201
For the RFP _25-044______
Construction of the Expansion of School Bus Parking Area
Release of RFP: 05/21/2025
Pre-Bid Date: 06/18/2025 @ 9 am, EST (On Site)
Questions Due: 06/23/2025 @ 9 am, EST
Close Date 07/01/2025 @ 9 am, Est.
Proposals will be due
07/01/2025 @ 09:00 AM EST
VIA BONFIRE ONLY
Table of Contents
I. Request for Qualifications and Proposals
II. Project Overview
A. Building Program
B. Project Delivery Method
C. Project Schedule
D. Construction Budget
E. Form of Agreement
III. Scope of Services
A. General Contractor Services to be Provided
1. Bidding and Award Phase Services
2. Construction Phase Services
3. Warranty Phase Services
IV. Qualifications/Proposal - Submittal Format and Requirements
A. Instructions
B. Format and Requirements
1. Letter of Interest
2. Description of Firm
3. Experience
4. Project Team
5. Safety Information
6. Financial Information
7. References
8. Local Participation Plan
9. Pre-Construction Management Plan
10. Construction Management Plan
11. Fee Proposal
V. Evaluation, Selection and Award
A. General Contractor Selection Process
VI. Additional Conditions
Attachment A – Construction Management Fee Proposal Form
Attachment B – Approved General Conditions Line Items and Cost Breakdown
I. Request for Qualifications and Proposals
The BOARD OF PUBLIC EDUCATION FOR BIBB COUNTY is requesting submittals from qualified General
Contractors for the construction of the EXPANSION OF THE SCHOOL BUS PARKING AREA. If your firm is experienced in similar type and size projects, you are requested to submit your qualifications for consideration and an opportunity to submit a fee proposal for General Contractor service for the project.
II. Project Overview
The facility is the School Bus Parking Area, located at 4580 Cavalier Drive, Macon, GA 31220. The project scope includes demolition, clearing and grubbing; erosion control/slop matting; earthwork; storm drainage; curbs and gutters;
paving/base; pavement markings, and grassing as detailed in plans attached as Exhibit A. This is a turn-key project. It is also the intent of the Bibb County School District to have high-performance buildings with sustainable design. The program development services for this project shall begin immediately upon acceptance of this proposal and must be completed soon enough for construction to begin by September 8, 2025. Construction must be completed no later than
January 5, 2026.
A. Building Program
The project will be constructed to a level of quality and timeliness that reflects the long-term use of a school district owned facility.
B. Project Delivery Method
The General Contractor will be required to expedite the completion of the project while maintaining high levels of quality and cost control. Final contract documents will be available for construction package prior to commencement of the work.
C. Project Schedule
Schedule targets January 5, 2026 for completion of the work. The General Contractor will be responsible for reviewing and incorporating milestones into the Total Project Schedule.
D. Construction Budget
The preliminary construction budget of the project will be determined through the RFP process.
E. Form of Agreement
The agreement between Bibb County School District and the General Contractor will be a form of agreement where the basis of payment is the cost of labor and material.
III. Scope of Services
Bibb County School District seeks General Contractor services to provide a turn-key project based on the plans and specifications provided. The General Contractor will provide comprehensive administration and management of all aspects of project construction and provide successful completion of the project on schedule, at or less than budgeted costs, meeting or exceeding standards stipulated by the construction documents, and in adherence with all standards and ordinances required by local authorities and other agencies having jurisdiction.
The General Contractor, either through in-house staff or outside consultant/contractors, will serve as a General Contractor and provide all construction services and activities necessary for the construction of the project.
The services described in this Request are representative of the services required but do not constitute a comprehensive specification. A comprehensive specification of the Scope of Services required is contained in the proposed Contractor
Agreement that will be issued to all short-listed respondents.
A. General Contractor Services to be Provided
1. Bidding and Award Phase Services
Any costs associated with Bidding and Award Phase Services should be included in the Respondent’s proposals for Pre-Construction Services or General Conditions. Bidding and Award Phase Services shall include, but may not be limited to the following:
▪ Provide input on division of construction activities into separate bid packages.
▪ Pre-qualification of potential contractors and vendors.
▪ Provide a provisional construction schedule (CPM) for issuance with bid packages.
▪ Develop bidding requirements necessary to assure time, cost and quality control during construction.
▪ Advertise and distribute bidding documents.
▪ Schedule and conduct pre-bid conferences in conjunction with the Architect.
▪ Monitor bidder activity to ensure adequate contractor and vendor participation.
▪ Receive and analyze bids for presentation to the project team.
▪ Verify adherence of bids with construction budget.
▪ Contract with successful bidders for construction.
2. Construction Phase Services
Construction Phase Services shall include, but may not be limited to the following:
▪ Develop requirements for safety, quality assurance, and schedule adherence.
▪ Maintain on-site staff for construction management.
▪ Maintain a system for tracking the timely submittal, review and approval of shop drawings.
▪ Coordinate, conduct and document regular construction meetings.
▪ Prepare and submit change order documentation for approval of the Architect and the Owner.
▪ Maintain on-site records and submit progress reports to Architect and the Owner.
▪ Maintain quality control and ensure conformity to contract documents.
▪ Administration of the construction contract and reconciliation with construction budget.
▪ Develop and maintain a detailed design and construction schedule (CPM) indicating methods and sequencing of construction activities and milestones necessary for completion of the project by the targeted date.
▪ Documentation of activities associated with the administration, management and construction of the project.
▪ Monthly certification of all work in place and approval of all contractor and vendor payment requests.
▪ Develop record documents for presentation to the Owner upon project completion.
▪ Provide enhanced project documentation of the construction (photographic history).
▪ Develop and maintain contingency log.
3. Warranty Phase Services
Warranty Phase Services shall include, but may not be limited to the following:
▪ Resolution of remaining “punch-list” items.
▪ Coordinate post-completion activities, including the assembly of guarantees, manuals, closeout documents, training, and the Owner’s final acceptance.
▪ Monitor, coordinate and resolve all warranty complaints to the satisfaction of the Owner during the one-year general warranty period.
IV. Qualifications/Proposal - Submittal Format and Requirements
A. Instructions
Any questions in regard to this Request shall be submitted in writing to the School District at the address listed below or email: Elaine.Wilson@bcsdk12.net . Submittals will be received until 07/01/2025 @ 9 AM EST.
All bids should be submitted to the BOARD OF PUBLIC EDUCATION FOR BIBB COUNTY via Bonfire at https://bcsdk12.bonfirehub.com/portal/?tab=login
It is the sole responsibility of the respondents to assure delivery to the appropriate party. The owner cannot accept responsibility for incorrect delivery, regardless of reason. No submittals will be accepted after the time stipulated above. Submittal will not be accepted via facsimile.
mailto:Elaine.Wilson@bcsdk12.net https://bcsdk12.bonfirehub.com/portal/?tab=login
B. Format and Requirements
Submittals must meet the requirements of this section to be considered. The response to this Request must be complete;
partial or incomplete responses will not be considered. Respondents are required to follow the outline below in their response. Responses should be concise, clear and relevant. Submittals must be on standard 8.5” x 11” paper with pages numbered. A table of contents, with corresponding tabs should be included to identify each section. Please include only the information requested in your submittal.
1. Letter of Interest – A letter executed by a principal of the General Contractor firm committing to the requirements specified in this Request. Provide a summary of the firm’s experience and capabilities in related endeavors with public agencies and why you are interested in this project. Provide an explanation of what differentiates your team as the best candidate for this project.
2. Description of Firm – Provide basic company information including name of firm; street, mailing and e-mail addresses; phone and fax numbers; along with the name of a primary contact in regard to this submittal. Provide the number of years the firm has been in business, form of ownership and state of residency or incorporation. If the firm has multiple offices, the submittal should primarily include information about the office that will perform the work. Describe the firm’s current position in the construction market and briefly describe the firm’s vision or philosophy towards construction (Why are you in business?).
3. Experience – Provide examples of specific project experience utilizing a General Contractor form of project delivery, including experience relevant to the type of project to be constructed. Describe three to four roughly equivalent projects (similar type of construction and a contract dollar amount) that demonstrate the firm’s capabilities to perform the project at hand. For each project, the following information should be provided: project name, location, dates during which the project was constructed, physical description (square footage, number of stories, site area, etc.), brief description of project services provided by the General Contractor, statement of performance versus owner expectations in the areas of cost, quality and schedule, owner reference and design professional reference.
4. Project Team - Provide qualifications and experience of the following key personnel that you are proposing for this project: principal of the General Contractor firm in charge, senior project manager, project manager, major consultants, cost estimating staff, project manager, construction superintendent, project engineer, etc. Include resumes of key personnel for both pre-construction and construction services. Highlight professional qualifications and relevant individual experience. Provide at least two references for the top three (3) key personnel at each service phase. List the firm’s percentage mark-up on labor for payroll taxes and insurance.
Substitutions of key team members will not be allowed without written permission of the Owner. Replacements will also have to be approved by the Owner. Where the projected construction start is more than six months from date of the solicitation, multiple names may be given.
5. Safety Information – Submit a copy of your firm’s safety program. Provide a letter on the firm’s insurance company’s letterhead stating the Workers Compensation Experience Modification Factor (EMF) for the past three years. Provide your accident rate for the past three years utilizing the following formula: incident rate = # injuries
(200,000) / # Total Man Hours. List the contact persons, addresses, and phone numbers for the firm’s insurance carrier and agent.
6. Financial Information - Supply financial and main banking references. List the firm’s total annual billings for each of the past three calendar years. What percentage of your firm’s work has been negotiated during the past three years? Has the firm ever failed to complete, or been removed from any project that has been awarded? The
General Contractor selected will be required to provide a 100% performance and payment bond for the entire cost of construction; confirm your ability to meet this requirement and provide your firm’s bonding rate for a project of this value.
7. References - Provide the name, address, telephone number and contact of three references for which you have provided services similar to those described in this Request. Provide the project name and services provided for each reference.
8. Local Participation Plan – Provide a plan of action to ensure local contractors and suppliers are included in the project when and where beneficial to the project and owner.
9. Pre-Construction Management Plan - Describe your firm’s proposed organization for the pre-construction management team including principals, project managers, superintendents, cost estimators, etc. who will manage the process. Identify the individual who will be the leader of your pre-construction team and the principal point of contact between your firm and the Owner and other consultants. Describe your firm’s approach to pre-construction services. How does your firm implement cost control and scheduling activities during pre-construction? Describe the level of documentation necessary to obtain a GMP for this project. Describe any of your firm’s policies or recommendations for bonding sub-contractors. Describe how your firm intends to arrange the construction into bid packages in order to reach the proposed schedule and budget objectives. Describe how your firm would encourage participation by local contractors and vendors.
10. Construction Management Plan - Describe your firm’s proposed organization for the construction management team including principals, project managers, superintendents, cost estimators, etc. who will manage the project.
Identify the individual who, from project start to finish, will be the leader of your construction team and the principal point of contact between your firm and the Owner and other consultants. This individual’s competence, leadership and ability to achieve customer satisfaction will be heavily considered in the selection of a General
Contractor. Describe your firm’s approach to quality assurance and any quality assurance programs currently in place. Describe your firm’s cost control systems during construction. What type of procedures could your firm implement to insure the prompt and expeditious completion of the punch list and other project closeout activities?
11. Fee Proposal - Use the attached Construction Management Fee Proposal Form (Attachment A) to submit fee proposals for the following:
▪ Pre-Construction Services – Submit a Fixed Fee (lump sum dollar value) for Pre-Construction Services as defined in section III of this Request. Fixed Fee shall include overhead and profit for Pre-Construction
Services.
▪ General Conditions Proposal – Submit a Fixed Fee (lump sum dollar value) for General Conditions as defined by Attachment B to this Request.
▪ Fee Proposal – Submit a Fee Percentage (% of construction costs not including Pre-Construction costs) for
Construction Manager’s overhead and profit.
V. Evaluation, Selection and Award
A. General Contractor Selection Process
Selection of the General Contractor will be a one stage process. The Board of Public Education for Bibb County will generally follow the requirements of Official Code of Georgia Annotated §36-91-1, et seq. with respect to the selection of a General Contractor for the proposed project.
The selection of a General Contractor will be by a Selection Committee consisting of representatives of the BOARD
OF PUBLIC EDUCATION FOR BIBB COUNTY. The Selection Committee will receive and review Proposals in response to this Request. A short-list of three firms will be determined and said companies MAY OR MAY NOT be invited to submit more detailed information, make a brief presentation or participate in an interview.
At the conclusion of the interviews, IF CONDUCTED, the Owner may negotiate a contract with a firm for Pre-
Construction Services, General Conditions and a Fee percentage. If negotiations are not successful, the owner may then negotiate with another firm.
The services being sought under this Request are considered to be professional in nature. Consequently, the evaluation of the proposals will be based upon consideration of the demonstrated qualifications and capabilities of the respondents that will result in an award that is in the best interest of the Owner.
The following scoring matrix will be used by the evaluation team:
SCORING MATRIX
PROPOSAL EVALUATION FORM
PROJECT: SCHOOL BUS PARKING AREA EXPANSION
DATE:
VI. Additional Conditions
The Owner reserves the right to reject any or all Proposals received. The Owner is not obligated to request clarifications or additional information but may do so at its discretion. The Owner reserves the right to extend the deadline for submittals.
Upon receipt of said proposals by the Owner, the proposal shall become the property of the Owner without compensation to the Respondent. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
The Owner assumes no responsibility or obligation to the respondents and will make no payment for any costs associated with the preparation or submission of the proposals. Costs incurred in responding to the request for qualifications and proposals are the Respondents’ alone and the Owner does not accept liability for any such costs.
The Owner does not desire to enter into “joint-venture” agreements with multiple Construction Management firms. In the event two or more firms desire to “joint-venture”, it is strongly recommended that one incorporated firm become
Construction Management firm with the remaining firms being consultants.
RFP INITIAL
EVALUATION
FORM
PROJECT: Date:
Offeror #1
Offeror #2
Offeror #3
Offeror #4
Offeror #5
Offeror #6
Offeror #7
Comments
Evaluation Factors Maximum
Percentage
Base Proposal of Lump Sum Price (25%)
25%
Offeror / Company Overview
15%
Related Experience 20%
Qual/Exp. Personnel 20%
Offeror's Project Approach
20%
TOTAL 100%
BID BOND Yes or No
ADDENDA
ACKNOWLEDGED
Yes or No
Signature of Committee Members, Please Print, Sign, and Date
Signature Print Date
Attachment A
General Contractor Fee Proposal Form
I. General Conditions
Should the Owner authorize the General Contractor to proceed with construction of the project, the fixed fee construction overhead costs is inclusive of all direct and incidental expenses including, but not limited to, travel, sustenance, reproduction, salaries, wages home office expenses, and those costs listed in the proposed General
Contractor Agreement as depicted in the attached General Contractor Agreement. The fixed amount for construction overhead costs is the maximum amount the Owner shall be liable to the General Contractor for overhead costs.
General Conditions: $______________, (_________________________________________________________ dollars)
(Include a list of all items included in the general conditions not specified in the attached scope.)
II. Construction Manager’s Fee
If authorized by the Owner to proceed with construction, the General Contractor will execute the work and be reimbursed for the actual costs as defined in the proposed General Contractor Agreement, documented overhead costs not to exceed the amount proposed above, and a General Contactor’s fee. The fee shall be submitted as a percentage of the actual construction costs including General Conditions. If the Owner and General Contractor agree upon a
Guaranteed Maximum Price, the General Contractor’s fee shall be converted to a fixed dollar amount and will include any unpaid Pre-Construction service fees.
General Contractor’s Fee: _______ % (_______________________________________________________ percent)
Respondent: ____________________________________________________
Signature: ____________________________________________________
Name: ____________________________________________________
Title: ____________________________________________________
Attachment B
APPROVED GENERAL CONDITIONS LINE ITEMS AND COST BREAKDOWN
Project Management:
Superintendent(S)
Safety Manager
CPM Scheduler
Quality Assurance/Quality Control
Project Manager(s)
Project Executive
Field Office Engineer
Field Office Support Staff
Project Expeditor
Assistant Superintendent(s)
Project Management Subtotal $
Bonds and Insurance (excluding any for Subcontractors):
Builder’s Risk Insurance
General Liability Insurance
Other General Project Insurance
Security, Payment & Performance Bonds
Bonds and Insurance Subtotal $
Site Conditions:
Temporary Power Consumption (Offices)
Temporary Power Consumption (General Site Use)
Temporary Water and Sewer Consumption
Temporary Water Hookup, Distribution & Meters
Temporary Electrical Hookup, Distribution & Meters
Temporary Telephone & Network System Installation
Temporary Telephone & Internet Consumption Fees
Temporary Fire Protection
Temporary Heating & Cooling
Temporary Fencing
Temporary Covered Walkways
SWPPP Measures
Temporary Entries and Truck Washes
Street Cleaning (by G.C.)
Traffic Control Measures
Traffic Control Maintenance
Temporary Barricades & Signage
Temporary Roads & Walkways (install & maintenance)
Temporary Lighting
Temporary Partitions & Covered Floor Openings
Temporary Toilets/Sanitary Measures
Temporary Laydown (prep and restoration)
Security System/Watchman
Pre-construction Photo Documentation
Progress Photos
Temporary Protection (in-place work/adjacent structures)
Temporary Weather Protection/Enclosures
Trash Chutes
Dumpsters (site and field offices)
Site Conditions Subtotal $
Field Offices & Construction Supplies:
Field Offices & Furnishings
Job/Office Drayage
Field Office Maintenance and Cleaning
Storage Trailers
Small Tools & Consumables
Mobilization & Demobilization
Monthly Cell Phone Expenses
Job Site Communications (radios, chargers, etc.)
Final Clean (general site, windows/glass, etc.)
Job Office Supplies
Job Site Computers, Copiers, Fax, Servers, etc.
Postage & Shipping Expenses
Project Sign
Drinking Water & Supplies (site and offices)
Incidental Construction Equipment, Fuel & Drayage
Materials Handling
Document Imaging
Parking Logistics
Parking Permits
Printing Costs
Reproduction Costs
As-built & Record Document Preparation
Partnering Costs
Project Milestone Event Costs
Employee I.D./Badging/Background Checks
Safety Expenses
PPE for Staff & Visitors
First Aid
Fall Protection (staff)
Safety Program Administration & Training
Safety Incentives
Drug Testing
Safety Signage
Field Offices & Construction Supplies Subtotal $
GENERAL CONDITIONS TOTAL $
It is understood by the owner that the above amounts in attachment B are estimates based on project cost and information provided in this RFP.
It is further understood that the actual cost shall be determined when actual construction cost are established.