This document is a Request for Proposals (RFP) for the design and construction or renovation of school facilities in Floresti and Rezina, Moldova.
The solicitation includes the following key details:
- The project consists of renovations and improvements to the elementary school block in Floresti and energy efficiency upgrades and renovations to the main school buildings in Rezina. The work includes new bathroom construction, building enclosure repairs, interior repairs, and thermal insulation improvements.
- The Government will evaluate proposals based on price and non-price factors such as corporate experience, safety, and past performance. Award will be made to the offeror submitting the lowest priced, technically acceptable proposal.
- Proposals are due by 16 May 2024 at 14:00 CEST. The performance period is 700 calendar days after contract award.
- The contract will be Firm-Fixed Price. The estimated magnitude of the project is between $500,000 and $1,000,000, exclusive of Value Added Tax.
- The work will be performed in Moldova and the solicitation includes specific requirements for Joint Venture offerors, site investigations, and contractor personnel.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3319124R4009 D-B Floresti and Rezina Schools, Moldova
Proposals shall be submitted electronically per the instructions in Block 13 and section 00 10 00.
Please note: the dealine to submit proposals is 16 May 2024 at 14:00 Central European Summer Time (CEST).
In accordance w ith FAR 36.204 the magnitude of this project is expected to be betw een $500,000 and $1,000,000.
GLORIA LUCERO 39 0815685519
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
11-Apr-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________700 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________16 May 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC EUROPE AFRICA CENTRAL
PSC 817 BOX 51
FPO AE 09622-0051
N33191
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
39 081 568 7750FAX:TEL: 39 081 568 7750 TEL: FAX:
N3319124R0009 63
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
INSTRUCTIONS TO OFFERORS
** PLEASE READ ALL INSTRUCTIONS CAREFULLY**
I. INSTRUCTIONS FOR PREPARATION OF PROPOSALS
1. GENERAL
Offerors are instructed to submit their proposal electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module (https://piee.eb.mil). Proposals submitted by e-mail, mail, or hand-carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. A vendor registration guide for obtaining access to the PIEE Solicitation Module is posted to the Defense Pricing and Contracting website at:
https://www.acq.osd.mil/dpap/pdi/eb/docs/PIEE/PIEE_Solicitation_Module_Vendor_Access_Instructions .pdf
For instructions on how to post an offer, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files for the full proposal. Offerors’ proposals submitted via the PIEE Solicitation Module shall not contain CLASSIFIED INFORMATION. In the event that the Solicitation Module is down, or if the Offeror experiences technical difficulties, the Offeror shall immediately notify the Contracting Officer for an alternate proposal submission method. This notification must occur prior to the proposal submission deadline.
Offeror notification shall be in writing and may be in conjunction with verbal notification, but verbal notification alone shall not be sufficient. All proposals received after the exact time specified for receipt will be handled in accordance with FAR 52.215-1.
All documents submitted as part of the proposals shall be in English and submitted in PDF format.
2. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed. The Point of Contract to make arrangements to visit the site is as follows:
The contractor may visit the project site prior to submission of their offer to the US Government. The project site is open to the general public and the contractor may visit it without prior approval.
It is strongly recommended that the contractor visits the site with the necessary details to account and plan for all necessary works in order to fulfil the contract requirements.
3. AMENDMENTS
If necessary, any Amendment issued will be posted to the Solicitation Module (https://piee.eb.mil ). It is the offeror’s responsibility to check the designated websites for any amendments to the solicitation.
4. INSTRUCTION FOR SUBMITTING PRE-PROPOSAL INQUIRIES
Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing.
Inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form provided as Attachment 2, via e-mail to Ms. Gloria Lucero at gloria.x.lucero.civ@us.navy.mil. Receipt will be acknowledged. The PPI shall reference the drawing/detail and/or the specification section, including the paragraph number and include only one question per form. Verbal queries will not be entertained. Responses to the PPI will be provided by Amendment and will be posted to the PIEE solicitation Module (https://piee.eb.mil). Pre-proposal questions will be accepted ten (10) calendar days before the proposal due date, any inquiries made after that date may not be answered.
5. REQUIRED PROPOSAL DOCUMENTS
All items listed below are required for the offeror to be found responsive and the offer to be considered for award. Any unrequested information will not be considered as part of the offer and will not be reviewed.
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance
(A) Price Factor:
(1) Solicitation Submittal Requirements:
(a) STANDARD FORM 1442, SOLICITATION, OFFER, AND AWARD
The offeror MUST complete Blocks 14 through 20c.
In Block 14 provide a Point of Contact with a valid phone number and email address.
In Block 14, provide a Commercial and Government Entity (CAGE) Code (United States firm) or NATO Commercial and Government Entity (NCAGE) Code (non United States firm).
In Block 14 provide the Unique Entity Identifier Code created through System for Award Management (SAM) at www.sam.gov.
The offeror MUST acknowledge all amendments.
(b) SECTION 00 10 00 – SOLICITATION CONTRACT FORM/PRICE SCHEDULE
The offeror MUST fill in the dollar amount for Contract Line Item Numbers (CLINs) 0001 through CLIN 0004 on Attachment 3 Price Schedule to include the total amount to complete the construction for each CLIN Exclusive of the Value Added Tax (VAT) as stated in DFARS 252.229-7001.
Offerors shall provide their Price Proposal in U.S. Dollars. Award will be made in U.S. Dollars, therefore, the offeror’s bank must be able to accept U.S. Dollars as payment.
(c) SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The offeror MUST have an active registration with System for Award Management (SAM) at the time of proposal submission. If you do not have an active registration with SAM at the time of proposal submission, your proposal shall not be considered for award.
If proposing as a Joint Venture (JV) the offeror MUST provide the documents requested below under “Joint Venture Requirements”.
(d) SECTION 00 70 00 – CONTRACT CLAUSES
The offeror MUST fill in the tax relief exemption rate in DFARS252.229-7001 TAX RELIEF (APR 2020) provided in Section 00 70 00 of this solicitation and submit with their proposal (Attachment 4)
(2) Basis of Evaluation: The Government will evaluate price based on the total price, exclusive of the Value
Added Tax (VAT) in DFARS 252.229-7001.
Total price consists of CLINs 0001 through 0004; analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the solicitation.
(ii) Comparison of proposed prices with the Independent Government Estimate.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of proposed prices with market survey results.
An evaluation and written determination concerning whether unbalanced pricing exists will be conducted in accordance with FAR 15.404-1(g). If unbalanced pricing exits, the Government will consider the risks of that unbalanced pricing in making the source selection decision.
The Government reserves the right to conduct a price realism analysis of proposed prices it considers to be unrealistically low. If the Government elects to conduct a price realism analysis, it may consider offeror(s)’ understanding of the work, ability to perform the work, or proposed prices received in response to the solicitation, in this analysis and risk assessment. An unrealistically low price may result in the offeror(s)’ proposed price being rejected and the offeror(s)’ proposal being ineligible for award.
Proposals will be evaluated in the following manner: The number of proposals that will be technically evaluated will initially be limited to the lowest priced proposal. If the lowest priced proposal is not found technically acceptable, the next lowest priced proposal will be evaluated. This process will be repeated until the Government identifies a technically acceptable proposal.
(B) NON-PRICE FACTORS:
The Technical Proposal includes the following factors:
(1) Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements: The offeror MUST provide a minimum of one (1) but no more than two (2) relevant projects for which the Offeror was the prime contractor, sub-contractor or Joint Venture partner.
For a project to be considered relevant, it MUST meet the following requirements:
1. Design and construction or renovation of a building or facility owned by the Government of Moldova and located in the country of Moldova; and
2. New construction or renovation must include heating and electrical work by Design-Build (MUST show experience in design or design management as well as construction); and
3. Performed in the country of Moldova and at least 70% complete within the last 10 years of the date this RFP was issued; and
4. Similar in scope and magnitude to the effort under this solicitation, and with a value of at least $500,000.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a unique and single task order as a project.
If more than two (2) projects are submitted, only the two (2) most recently completed projects will be evaluated.
The Corporate Experience Contract Data Sheet (Attachment C) must be used to submit Corporate Experience project information. Project descriptions for each project shall explain the detailed scope of work performed and the relevancy to the project requirements of this solicitation. Blocks 8, 9 and 10 from Attachment C can be continued on a separate page if additional information is required. For each submitted project, the offeror shall include the contract number, project location, project description, building size, an explanation of -similarity to the current solicitation, dollar value, ending date of the contract, the date the work was completed, and a client point of contact. Offerors must include sufficient information in their proposal to establish the relevancy of their submitted projects.
For each submitted project, the offeror shall include the following:
1. If the experience is for a United States Government contract include the contract number and the Government Point of Contact of the Contracting Office or the Contracting Officer Representative.
2. If the corporate experience is not with the US Government, or is a subcontract, the offeror shall provide:
- An electronic copy (PDF or photocopy) of the original contract or subcontract signed by all parties to include: Project title, location by physical project address or coordinates, award value converted into USD, beneficiary Point of Contact information, contract completion date, construction completion date, and a detailed copy of the scope or work translated into English,
- Pictures of the job site showing the construction sign or construction permit with the name, or logo, of the offeror clearly visible
Offerors must include sufficient information in their proposal to establish the relevancy of their submitted projects.
1. All submissions shall be in the English language, documents provided in another language will not be evaluated.
2. The total length for each project shall not exceed ten (10) pages, single sided, with a minimum font size of twelve (12). If more than ten (10) pages are submitted, only the first ten (10) pages will be evaluated.
3. All projects submitted that are outside of the specified time period indicated in paragraph (i) 3 above will not be considered relevant.
4. Proposals that fail to provide all requested data, an accessible point of contact, correct phone number and e-mail address, may result in the project not being evaluated or the project being found not relevant.
If the Offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects should be submitted for one of the Joint Venture partners. Offerors are still limited to a total of two (2) projects combined
The offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment and an explanation of the subcontractor’s role in the performance of this contract.
If an offeror is utilizing experience of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF 1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the project of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state the specific commitments of technical resources (e.g. personnel, equipment that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/are of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the offeror in performance of the contract.
(ii) Basis of Evaluation: To receive an acceptable rating in this factor, the offeror
MUST provide a minimum of one (1) relevant project meeting the following requirements:
1. Design and construction or renovation of a facility owned by a Governmental entity of Moldova or one of its agents; and
2. New construction or renovation to include electrical work, and cast-in place concrete structure by
Design-Build (MUST show experience in design or design management as well as construction);
and
3. Performed in the country of Moldova and at least 70% complete within the last 10 years of the date this RFP was issued; and
4. Similar in magnitude with a value of at least $500,000.
The offeror must demonstrate experience performing at least one (1) relevant project as defined in the solicitation submittal requirements or one (1) relevant project for one of the Joint Venture partners without shared experience together. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the solicitation. The Government will review a maximum of two (2) projects. An offeror will be rated UNACCEPTABLE if the offeror does not submit the minimum number of relevant projects (one (1)). Any projects submitted in excess of the two (2) for Corporate Experience will not be considered.
(2) Factor 2, Safety:
Solicitation Submittal Requirements: The offeror MUST submit:
1. The company’s Safety Narrative.
2. The company’s SIGNED copy of the provided Safety Checklist Form, which is provided as
Attachment 6 to this solicitation.
Safety Narrative: The Safety Narrative shall describe the offeror’s safety management approach for its employees and subcontractors identifying the company’s commitment to safety and indicating how the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Safety Narrative should pertain to this project solicitation and address specific safety hazards involved in the scope of work such as multiple project sites and/or high risk activities. It shall identify the authorities and responsibilities of the Site Safety and Health Officer (SSHO), as well as provide a plan describing how the offeror will implement a safe working environment for all levels of subcontractors.
The Safety Narrative shall be limited to four (4) pages, single sided. Any pages submitted in excess of the four
(4) page limitation will not be reviewed.
Safety Checklist Form: By signing the provided form the contractor is verifying that if awarded the contract, they will comply with the safety regulations, provide an acceptable safety plan within 30 days of contract award, appoint a competent employee as SSHO in accordance with this contract and the EM 385-1-1, and provide all required Personal Protective Equipment (PPE) to their employees.
Basis of Evaluation: The Government is seeking to determine that the offeror has a commitment to safety and that the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. To receive an acceptable rating for this factor the offeror MUST provide:
1. The Company’s Safety Narrative and
2. The company’s SIGNED copy of the provided Safety Checklist Form.
The Safety Checklist Form is provided as Attachment 5 to this RFP. Failure to submit a Safety Narrative and a completed Safety Checklist with the proposal will result in a rating of Unacceptable and you will not be eligible to be awarded the contract without discussions.
(3) Factor 3, Past Performance:
(i) Solicitation Submittal Requirements: The offeror shall provide a past performance evaluation for each project submitted under Factor 1 – Corporate Experience. If a completed Contractor Performance Assessment Reporting system (CPARS) or DD2626 Performance Evaluation (Construction) is available, it shall be submitted with the proposal. If there is not a completed CPARS or DD-2626 evaluation available, then the offeror shall submit the Past Performance Questionnaire (PPQ) for each project included in Factor 1- Corporate Experience.
If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Ms. Gloria Lucero, via email at gloria.x.lucero.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.
If the evaluation is in other than English, provide a translation of the evaluation into English. Documents provided in a language other than English, without an English translation will not be evaluated.
The Government may review any other sources of information for evaluating past performance. Sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company /subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Offerors may also address any adverse past performance issues.
Explanations shall not exceed four (4) pages in total.
Performance awards or additional information submitted will not be considered.
(ii) Basis of Evaluation: The Government is seeking to determine if there is a reasonable expectation that the offeror will successfully perform the required effort. The Government will evaluate the degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (e-SRS), performance recognition documents, and information obtained from any other source) reflect a minimum of satisfactory performance considering:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- How recently the tasks that are identical to, similar to or related to the task at hand were performed.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable”.
II. BASIS OF AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest fair and reasonable evaluated price.
4. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.
III. REQUIREMENTS FOR OFFERORS
It is the responsibility of the offeror to register and obtain the following:
Commercial and Governmental Entity (CAGE) Code for U.S. firms NATO Commercial and Governmental Entity (NCAGE) Code for non U.S. firms.
(https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx) System for Award Management (SAM) registration to include a Unique Entity Identifier Code.
(https://www.sam.gov/SAM/) **Please contact the Federal Service Help Desk at https://www.fsd.gov/app/sam/ if you have any questions during the registration process**
ENGLISH SPEAKING REPRESENTATIVE
At all times when any performance of the work at the site is being conducted by any employee of the Contractor, the Contractor shall have a representative present on the site that is capable of explaining the work operations and receiving instruction in the English language. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities and the Contactor shall immediately replace any individual not acceptable to the Contracting Officer.
2. JOINT VENTURE REQUIREMENTS
Joint Venture (JV) offerors shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one (1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified English translation of the notarized JV document. The Joint Venture MUST be formed and valid at the time of submission of the proposal. The offeror MUST include the CAGE code or NCAGE code and Unique Entity Identifier Code of the JV on their proposal. The validated notarized legal document MUST include language that each member of the JV will be jointly and severally liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.
(a) Name of firms that form the Joint Venture and the name of the Joint Venture
(b) Name and title of the corporate officials signing in behalf of each party
(c) Solicitation number
(d) Description of the responsibilities in terms of work category for each partner
N3319124R0009
(e) The statement "The composition and structure of the Joint Venture will remain unchanged from award to one (1) year after the work has been finally inspected and accepted by the Government.”
(f) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.
(g) Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement MUST be signed under oath by all members comprising the Joint Venture.
The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (bonds, insurance, etc.) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
3. CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC.
Offerors shall be responsible for determining and paying all fees associated with, and obtaining any required permits for proposed projects including, but not necessarily limited to permits for onsite and off-site hauling, demolition/disposal, storm water discharge, construction activity, temporary utilities, road improvements, communications, etc.
Offerors are responsible for acquiring any required professional certifications (licensing) as required by the country where the work is to be performed.
Offerors are responsible for complying with environmental laws, regulations and requirements. All coordination with the local, regional, national authorities is the responsibility of the Offeror.
IV. ATTACHMENTS
Attachment 1: Performance Technical Specifications (PTS) and Drawings Attachment 2: Pre-Proposal Inquiry Form Attachment 3: Price Schedule Attachment 4: DFARS 252.229-7001 Tax Relief Attachment 5: Contract Data Form Attachment 6: Safety Checklist Form Attachment 7: Past Performance Questionnaire
**PLEASE RE-READ AND FOLLOW ALL INSTRUCTIONS TO ENSURE
YOUR PROPOSAL INCLUDES ALL REQUIRED SUBMITTALS**
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Base Bid - School located in Floresti
FFP
The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to design and construct new bathrooms as well as a new enclosure for the existing building and full repairs of a portion of the ground floor of approximately 75 m2 in accordance to the Performance Technical Statement labeled Renovations & Improvements to the Elementary Block of Mihai Eminescu Lyceum at Floresti, Moldova.
FOB: Destination
NET AMT
0002 1 Each OPTION Option Item 1-Interor Repairs Floresti
FFP
The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to complete repairs of the interior of the existing building, including, but not limited to new floors, wall finishes, suspended ceiling, closed loop radiator system, electrical installation or wall finishes in accordance to the Performance Technical Statement labeled Renovations & Improvements to the Elementary Block of Mihai Eminescu Lyceum at Floresti, Moldova.
0003 1 Each Base Bid - School in Rezina
FFP
The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to improve the energy efficiency of the main school buildings by reducing the heal loss through building enclosures, as well as a main entrance in accordance to the Performance Technical Statement labeled Design and Renovation of School “Olimp” at Rezina, Moldova.
0004 1 Each OPTION Option Item 2 - Thermal Insulations
FFP
The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to provide new thermal insulation on the walls for Auxiliary Library and Music School Building in accordance to the Performance Technical Statement labeled Design and Renovation of School “Olimp” at Rezina, Moldova.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.204-2 Security Requirements MAR 2021 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
NOV 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-29 Notification Of Visa Denial APR 2015 52.222-50 Alt I Combating Trafficking in Persons (NOV 2021) Alternate I MAR 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-25 Requirements for Registration of Designers JUN 2003 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.246-1 Contractor Inspection Requirements APR 1984 52.246-12 Inspection of Construction AUG 1996 52.247-63 Preference For U.S. Flag Air Carriers JUN 2003 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7011 Payments in Support of Emergencies and Contingency Operations
MAY 2013
252.242-7006 Accounting System Administration FEB 2012 252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(a) Definitions. As used in this clause--
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People's Republic of China.
Covered telecommunications equipment or services means--
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing--
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement.
(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
(i) Within one business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)--
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use-
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, "No TikTok on Government Devices" Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor's employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall…